NYU BY THE NUMBERS
• NYU is the largest private
university in the United
States
• Second oldest engineering
school in the US
• 18 schools, colleges, and
divisions in NYC
25countries
108incubator
companies
1831Founding
NYU BY THE NUMBERS
Abu Dhabi
Nanjing
Guangzhou
Tel Aviv
NYC Metro Area
Berlin
Buenos Aires
Florence
Ghana
London
Madrid
Paris
Prague
Shanghai
NYU BY THE NUMBERS
4
salary potential
in the Nation,
according to Forbes#
10
innovative IT
Schools
according to Computerworld#
• We have students from
93 countries
• Undergraduate
Students – 2,344
• Graduate Students –
2,868
RESEARCH CENTERS OF
EXCELLENCE
•Applied Dynamics and Optimization Lab
•Information Systems and Internet Security (ISIS) Lab
•Center for Interdisciplinary Studies in Security and Privacy (CRISSP)
•High-speed Networking Lab
•Wireless Internet Center for Advanced Technology (WICAT)
•Center for Advanced Technology in Telecom (CATT)
•Control & Telecommunications Research Lab
•CITE Game Innovation Lab
•Experimental Media Center
•NYC Media Lab
Click to edit Master text
styles
ACCREDITATION
• Graduate and Undergraduate
– New York State Education Department
– Middle States Association
• Undergraduate Engineering
– Accreditation Board for Engineering
and Technology (ABET)
• Undergraduate Computer
Science
– Computer Science Accreditation
Board (CSAB)
ONLINE GRADUATE PROGRAM
What is NYU Tandon
Online?
NYU Tandon Online is the official
Online Learning Unit of NYU Tandon
School of Engineering. Allowing
students to study Technology,
Science, Management, and
Engineering anytime and anywhere.
Eliminates Barriers
ONLINE GRADUATE PROGRAM
Highly Ranked
Student
Services and
Technology
#3
Student
Engagement &
Accreditation
#4
Top Online
Graduate Engineering School
ONLINE GRADUATE PROGRAM
Highly Ranked
2012
Outstanding
Cyber Security Online
Program Award
2015
Ralph E. Gomory
Award for High-Quality
Online Education
2014 2014
Best Online
Master’s
In Engineering
Program
Most
Technologically
Savvy Online
School
HOW IT WORKS
Students attend online courses on
NYUClasses
• Assignments
• Videos and audio
• Quizzes and exams
• Discussion boards
• Active Learning Modules
Webinar
• Virtual classroom
Class specific software
HW IT WORKS
HOW IT WORKS
HOW IT WORKS
HOW IT WORKS
Course-Management System and Webcasting
• Secured access to NYU Classes, the school’s virtual course
management system and webcasting
Online Resources
• Online Resources
• Digital library
• Tutor Database
• Career Management Portal
• Grades, transcript, other data
• Announcements
• Class, enrollment, exam
schedule
• Calendar and E-Mail
• Faculty directory
DEPARTMENT
http://engineering.nyu.edu/academics/departments/technology
INDUSTRIAL ENGINEERING MS
Industrial engineers find the most effective way to turn the basic factors of
production — people, materials, machines, time, energy, and money — into
almost every product and service we consume. The best engineers are adept
not only at managing employees and technology but also at optimizing the
organization of a business.
INDUSTRIAL ENGINEERING MS
At the School of Engineering, we ask our students to take the
unique approach of examining relationships rather than
components. The MS in Industrial Engineering program
teaches you to search for similarities in concepts, laws, and
models across disciplines. From there, it’s up to you to adapt,
integrate, and exploit these similarities in innovative ways.
Because industrial engineers often work on multidisciplinary
teams, we offer an elective-heavy curriculum. That approach
lets you build expertise in whichever subjects best fit your
career interests.
PROGRAM REQUIREMENTS
Core Courses
(12 credits)
Industrial (IE) Electives
(9 credits)
Free Electives
(9 credits)
Full-Time: 30 credits in 1.2 to 2 years max.
Part-Time: 30 credits in 2.5 to 3.5 years max.
Maximum of 5 years to complete your degree.
CORE COURSES
MN 7893
Production
Science
IE 6823
Factory
Simulation
IE 6113
Quality Control &
Improvement
IE 6213
Facility Planning &
Design
IE/MN ELECTIVES
• IE-GY 6003 Engineering Economics
• IE-GY 6063 Work Design and Measurement
• IE-GY 6193 Production Planning and Control
• IE-GY 6203 Project Planning and Control (Project Management)
• IE-GY 7653 Human Factors in Engineering Design
• IE-GY 7763 Manufacturing Resources Planning
• IE-GY 7873 Lean Manufacturing
• IE-GY 7883 Manufacturing Systems Engineering
• IE-GY 7923 Design for Manufacturability
• IE-GY 7933 Environmental Health and Safety
• IE-GY 7993 Supply Chain Engineering
• IE-GY 9113 Selected Topics in IE
• MN-GY 6513 Design Strategies
• MN-GY 7503 Introduction to Target Costing
IE/MN ELECTIVES
(MANAGEMENT CLASSES)
• MG-GY 6303 Operations Management
• MG-GY 6343 Human Capital Engineering & Analytics
• MG-GY 6361 Managing Business Process Reengineering
• MG- GY 6293 Managing Technical Professionals
• MG-GY 6353 Quality Management
• MG-GY 6463 Supply Chain Management
• MG-GY 8573 Managing Cleantech and Renewable Energy Innovation
• MG-GY 8643 New Product Development
• MG-GY 8653 Managing Technological Change and Innovation
• MG-GY 6103 Management Science
FREE ELECTIVES
http://bulletin.engineering.nyu.edu/content.php?catoid=9&navoid=864
CONCENTRATIONS/TRACKS
• Manufacturing Engineering
• Supply Chain & Logistics
• Operations & Production
• Quality and Reliability
• Human Factors and Ergonomics
• Product Design & Development
• System Engineering
• Data Analytics & Management
• Other disciplines
SAMPLE SYLLABUS -
QUALITY CONTROL AND
IMPROVEMENT
Part I: [Statistical Foundations and Methods of Quality Improvements]
[Session 1] “Introduction and Overview to Quality Control and Improvement”
Part II: [Statistical Process Control]
[02/03/2015] Session 2 “Control Charts for Variables”
[02/10/2015] Session 3 “Special Control Charts”
[02/17/2015] Session 4 “Control Charts for Attributes”
[02/24/2015] Session 5 “Process Capability, Specification Limits, Tolerances Analysis”
Part III: [Acceptance Sampling]
[03/03/2015] Session 6 “Acceptance Sampling for Attributes”
[03/10/2015] Session 7 “Acceptance Sampling for Variable”
[03/24/2015] Session 8 “Mid Term Exam”
Part IV: [Product and Process Design with Designed Experiments]
[03/31/2015] Session 9 “Reliability”
[04/07/2015] Session 10 “Design Of Experiments Part I”
[04/14/2015] Session 11 “Design Of Experiments Part II”
[04/21/2015] Session 12 “Taguchi Methods”
[04/28/2015] Session 13 “Six Sigma”
[05/05/2015] Session 14 “Project Presentations and Course Review”
05/12/2015] Session 15 “Final Exam”
SAMPLE SYLLABUS -
FACTORY SIMULATION
Part I: [Introduction to Discrete – Event System Simulation]
[01/27/2015] Session 1“Introduction to System Analysis and simulation”
[02/03/2015] Session 2 “Manual Simulation”
[02/10/2015] Session 3 “General Principles of Discrete Event Simulation”
Part II: [Mathematical and Statistical Models Review]
[02/17/2015] Session 4 “Statistical Models in Simulation”
[02/24/2015] Session 5 “Queueing Models”
Part III: [Random Numbers]
[03/03/2015] Session 6 “Random-Number Generation”
[03/10/2015] Session 7 “Random-Variate Generator”
[03/24/2015] Session 8 “Mid Term Exam”
[03/31/2015] Session 9 “Simulation Software and Witness 13 Software Usage”
Part IV: [Analysis of Simulation Data; Input and Output Data]
[04/07/2015] Session 10 “Input Modeling”
[04/14/2015] Session 11 “Verification, Calibration, and Validation of Simulation Models”
[04/21/2015] Session 12 “Estimation of Absolute Performance”
[04/28/2015] Session 13 “Estimation of Relative Performance”
[05/05/2015] Session 14 “Project Presentations and Course Review”
[05/12/2015] Session 15 “Final Exam”
WHY NYU?
Flexibility
Job Diversity
Program Length
Growing Industry
Sector
Job Growth
TUITION
Graduate tuition, per credit $ 1,646
Registration and service fee, per credit $ 85
Estimated cost of one course, 3 credits $ 5,193
Estimated cost of a Master’s Degree $ 52,000
Estimated cost of a Certificate Degree $ 19,000
SOCIETY CO-SPONSORS
Tuition Scholarships
Society Member Benefits
engineering.nyu.edu/enterprise-learning/society-co-sponsors
APPLICATION ELIGIBILITY
• Bachelor’s degree from accredited school
• Greater than 3.0 GPA in undergraduate school
• Preference for accredited ABET, ACS and CSAB
schools
• Some may be required to take prerequisite
courses without graduate credit
APPLICATION REQUIREMENTS
• Application Form
• $75 Fee
• Resume
• Personal Statement
• Transcripts
• Two Letters of Recommendation
• GRE or GMAT Scores (NYU School
Code 2668)
• English Language Proficiency
(TOEFL/IELTS/CAE/Pearson PTE)
Required to Submit
Your Application
Required to Complete
Your Application
APPLICATION REQUIREMENTS
• Application Form
• $75 Fee
• Resume
• Personal Statement
Required to Submit Your Application
APPLICATION REQUIREMENTS
• Transcripts
• GRE or GMAT Scores
(NYU School Code 2668)
• Two Letters of
Recommendation
• English Language Proficiency
(TOEFL/IELTS/CAE/Pearson PTE)
Required to Complete Your Application
APPLICATION DEADLINES
Spring 2017
Summer
2017
Fall 2017
Full-Time Applicants
(9+ Credits per semester)
Passed December 21,
2016
February 15,
2017
Part-Time Applicants - Early
Admission
(Fewer than 9 credits per semester)
October 1,
2016
February 1,
2017
March 15,
2017
Part-Time Applicants
(Fewer than 9 credits per semester)
November 1,
2016
March 14,
2017
May 1,
2017
All documents due December 15,
2016
April 18,
2017
June 15, 2017
NYU TANDON ONLINE
FUTURE WEBINARS
Industrial Engineering
Wed, Nov 16 at 2:00 PM
General Webinar
Thu, Sep 29 at 2:00 PM
NYU TANDON ONLINE
CONTACT INFORMATION
Luke Modzier
Student Services Counselor
luke.modzier@nyu.edu
(646) 997-3071
Front Desk
online.engineering.nyu.edu
tandon.online@nyu.edu
(646) 997-3623
nyu.tandon.online
@NYUTandonOnline
#NYUOnline
/NYUTandonOnline
Professor Mark De Lessio
Program Director
mpdelessio@nyu.edu

Online MS in Industrial Engineering at NYU

  • 1.
    NYU TANDON ONLINE MSIN INDUSTRIAL ENGINEERING Thursday, September 22, 2:00pm – 3:00pm Presenters Professor Mark De Lessio, Program Director Daniel Parra, Marketing and Database Systems Specialist
  • 2.
    Click to editMaster text styles PRESENTERS Professor Mark De Lessio Program Director Luke Modzier Student Services Counselor
  • 5.
    NYU BY THENUMBERS • NYU is the largest private university in the United States • Second oldest engineering school in the US • 18 schools, colleges, and divisions in NYC 25countries 108incubator companies 1831Founding
  • 6.
    NYU BY THENUMBERS Abu Dhabi Nanjing Guangzhou Tel Aviv NYC Metro Area Berlin Buenos Aires Florence Ghana London Madrid Paris Prague Shanghai
  • 7.
    NYU BY THENUMBERS 4 salary potential in the Nation, according to Forbes# 10 innovative IT Schools according to Computerworld# • We have students from 93 countries • Undergraduate Students – 2,344 • Graduate Students – 2,868
  • 8.
    RESEARCH CENTERS OF EXCELLENCE •AppliedDynamics and Optimization Lab •Information Systems and Internet Security (ISIS) Lab •Center for Interdisciplinary Studies in Security and Privacy (CRISSP) •High-speed Networking Lab •Wireless Internet Center for Advanced Technology (WICAT) •Center for Advanced Technology in Telecom (CATT) •Control & Telecommunications Research Lab •CITE Game Innovation Lab •Experimental Media Center •NYC Media Lab
  • 9.
    Click to editMaster text styles ACCREDITATION • Graduate and Undergraduate – New York State Education Department – Middle States Association • Undergraduate Engineering – Accreditation Board for Engineering and Technology (ABET) • Undergraduate Computer Science – Computer Science Accreditation Board (CSAB)
  • 10.
    ONLINE GRADUATE PROGRAM Whatis NYU Tandon Online? NYU Tandon Online is the official Online Learning Unit of NYU Tandon School of Engineering. Allowing students to study Technology, Science, Management, and Engineering anytime and anywhere. Eliminates Barriers
  • 11.
    ONLINE GRADUATE PROGRAM HighlyRanked Student Services and Technology #3 Student Engagement & Accreditation #4 Top Online Graduate Engineering School
  • 12.
    ONLINE GRADUATE PROGRAM HighlyRanked 2012 Outstanding Cyber Security Online Program Award 2015 Ralph E. Gomory Award for High-Quality Online Education 2014 2014 Best Online Master’s In Engineering Program Most Technologically Savvy Online School
  • 13.
    HOW IT WORKS Studentsattend online courses on NYUClasses • Assignments • Videos and audio • Quizzes and exams • Discussion boards • Active Learning Modules Webinar • Virtual classroom Class specific software
  • 14.
  • 15.
  • 16.
  • 17.
    HOW IT WORKS Course-ManagementSystem and Webcasting • Secured access to NYU Classes, the school’s virtual course management system and webcasting Online Resources • Online Resources • Digital library • Tutor Database • Career Management Portal • Grades, transcript, other data • Announcements • Class, enrollment, exam schedule • Calendar and E-Mail • Faculty directory
  • 18.
  • 19.
    INDUSTRIAL ENGINEERING MS Industrialengineers find the most effective way to turn the basic factors of production — people, materials, machines, time, energy, and money — into almost every product and service we consume. The best engineers are adept not only at managing employees and technology but also at optimizing the organization of a business.
  • 20.
    INDUSTRIAL ENGINEERING MS Atthe School of Engineering, we ask our students to take the unique approach of examining relationships rather than components. The MS in Industrial Engineering program teaches you to search for similarities in concepts, laws, and models across disciplines. From there, it’s up to you to adapt, integrate, and exploit these similarities in innovative ways. Because industrial engineers often work on multidisciplinary teams, we offer an elective-heavy curriculum. That approach lets you build expertise in whichever subjects best fit your career interests.
  • 21.
    PROGRAM REQUIREMENTS Core Courses (12credits) Industrial (IE) Electives (9 credits) Free Electives (9 credits) Full-Time: 30 credits in 1.2 to 2 years max. Part-Time: 30 credits in 2.5 to 3.5 years max. Maximum of 5 years to complete your degree.
  • 22.
    CORE COURSES MN 7893 Production Science IE6823 Factory Simulation IE 6113 Quality Control & Improvement IE 6213 Facility Planning & Design
  • 23.
    IE/MN ELECTIVES • IE-GY6003 Engineering Economics • IE-GY 6063 Work Design and Measurement • IE-GY 6193 Production Planning and Control • IE-GY 6203 Project Planning and Control (Project Management) • IE-GY 7653 Human Factors in Engineering Design • IE-GY 7763 Manufacturing Resources Planning • IE-GY 7873 Lean Manufacturing • IE-GY 7883 Manufacturing Systems Engineering • IE-GY 7923 Design for Manufacturability • IE-GY 7933 Environmental Health and Safety • IE-GY 7993 Supply Chain Engineering • IE-GY 9113 Selected Topics in IE • MN-GY 6513 Design Strategies • MN-GY 7503 Introduction to Target Costing
  • 24.
    IE/MN ELECTIVES (MANAGEMENT CLASSES) •MG-GY 6303 Operations Management • MG-GY 6343 Human Capital Engineering & Analytics • MG-GY 6361 Managing Business Process Reengineering • MG- GY 6293 Managing Technical Professionals • MG-GY 6353 Quality Management • MG-GY 6463 Supply Chain Management • MG-GY 8573 Managing Cleantech and Renewable Energy Innovation • MG-GY 8643 New Product Development • MG-GY 8653 Managing Technological Change and Innovation • MG-GY 6103 Management Science
  • 25.
  • 26.
    CONCENTRATIONS/TRACKS • Manufacturing Engineering •Supply Chain & Logistics • Operations & Production • Quality and Reliability • Human Factors and Ergonomics • Product Design & Development • System Engineering • Data Analytics & Management • Other disciplines
  • 27.
    SAMPLE SYLLABUS - QUALITYCONTROL AND IMPROVEMENT Part I: [Statistical Foundations and Methods of Quality Improvements] [Session 1] “Introduction and Overview to Quality Control and Improvement” Part II: [Statistical Process Control] [02/03/2015] Session 2 “Control Charts for Variables” [02/10/2015] Session 3 “Special Control Charts” [02/17/2015] Session 4 “Control Charts for Attributes” [02/24/2015] Session 5 “Process Capability, Specification Limits, Tolerances Analysis” Part III: [Acceptance Sampling] [03/03/2015] Session 6 “Acceptance Sampling for Attributes” [03/10/2015] Session 7 “Acceptance Sampling for Variable” [03/24/2015] Session 8 “Mid Term Exam” Part IV: [Product and Process Design with Designed Experiments] [03/31/2015] Session 9 “Reliability” [04/07/2015] Session 10 “Design Of Experiments Part I” [04/14/2015] Session 11 “Design Of Experiments Part II” [04/21/2015] Session 12 “Taguchi Methods” [04/28/2015] Session 13 “Six Sigma” [05/05/2015] Session 14 “Project Presentations and Course Review” 05/12/2015] Session 15 “Final Exam”
  • 28.
    SAMPLE SYLLABUS - FACTORYSIMULATION Part I: [Introduction to Discrete – Event System Simulation] [01/27/2015] Session 1“Introduction to System Analysis and simulation” [02/03/2015] Session 2 “Manual Simulation” [02/10/2015] Session 3 “General Principles of Discrete Event Simulation” Part II: [Mathematical and Statistical Models Review] [02/17/2015] Session 4 “Statistical Models in Simulation” [02/24/2015] Session 5 “Queueing Models” Part III: [Random Numbers] [03/03/2015] Session 6 “Random-Number Generation” [03/10/2015] Session 7 “Random-Variate Generator” [03/24/2015] Session 8 “Mid Term Exam” [03/31/2015] Session 9 “Simulation Software and Witness 13 Software Usage” Part IV: [Analysis of Simulation Data; Input and Output Data] [04/07/2015] Session 10 “Input Modeling” [04/14/2015] Session 11 “Verification, Calibration, and Validation of Simulation Models” [04/21/2015] Session 12 “Estimation of Absolute Performance” [04/28/2015] Session 13 “Estimation of Relative Performance” [05/05/2015] Session 14 “Project Presentations and Course Review” [05/12/2015] Session 15 “Final Exam”
  • 29.
    WHY NYU? Flexibility Job Diversity ProgramLength Growing Industry Sector Job Growth
  • 30.
    TUITION Graduate tuition, percredit $ 1,646 Registration and service fee, per credit $ 85 Estimated cost of one course, 3 credits $ 5,193 Estimated cost of a Master’s Degree $ 52,000 Estimated cost of a Certificate Degree $ 19,000
  • 31.
    SOCIETY CO-SPONSORS Tuition Scholarships SocietyMember Benefits engineering.nyu.edu/enterprise-learning/society-co-sponsors
  • 32.
    APPLICATION ELIGIBILITY • Bachelor’sdegree from accredited school • Greater than 3.0 GPA in undergraduate school • Preference for accredited ABET, ACS and CSAB schools • Some may be required to take prerequisite courses without graduate credit
  • 33.
    APPLICATION REQUIREMENTS • ApplicationForm • $75 Fee • Resume • Personal Statement • Transcripts • Two Letters of Recommendation • GRE or GMAT Scores (NYU School Code 2668) • English Language Proficiency (TOEFL/IELTS/CAE/Pearson PTE) Required to Submit Your Application Required to Complete Your Application
  • 34.
    APPLICATION REQUIREMENTS • ApplicationForm • $75 Fee • Resume • Personal Statement Required to Submit Your Application
  • 35.
    APPLICATION REQUIREMENTS • Transcripts •GRE or GMAT Scores (NYU School Code 2668) • Two Letters of Recommendation • English Language Proficiency (TOEFL/IELTS/CAE/Pearson PTE) Required to Complete Your Application
  • 36.
    APPLICATION DEADLINES Spring 2017 Summer 2017 Fall2017 Full-Time Applicants (9+ Credits per semester) Passed December 21, 2016 February 15, 2017 Part-Time Applicants - Early Admission (Fewer than 9 credits per semester) October 1, 2016 February 1, 2017 March 15, 2017 Part-Time Applicants (Fewer than 9 credits per semester) November 1, 2016 March 14, 2017 May 1, 2017 All documents due December 15, 2016 April 18, 2017 June 15, 2017
  • 37.
    NYU TANDON ONLINE FUTUREWEBINARS Industrial Engineering Wed, Nov 16 at 2:00 PM General Webinar Thu, Sep 29 at 2:00 PM
  • 38.
    NYU TANDON ONLINE CONTACTINFORMATION Luke Modzier Student Services Counselor luke.modzier@nyu.edu (646) 997-3071 Front Desk online.engineering.nyu.edu tandon.online@nyu.edu (646) 997-3623 nyu.tandon.online @NYUTandonOnline #NYUOnline /NYUTandonOnline Professor Mark De Lessio Program Director mpdelessio@nyu.edu