Simplify and Accelerate Cloud and Big Data
with Expert Integrated Systems
Andrew Sotiropoulos
General Manager
PureFlex Systems
© 2013 IBM Corporation
#IBMINTERCONNECT
Market Shifts Are Driving IT Imperatives
IT economics is
driving integrated
systems
Mobile, social, big data &
analytics are redefining
client engagement
Cloud is the
new delivery
model
IMPROVE IT EFFICIENCY
by simplifying
the IT lifecycle
ACCELERATE
new applications,
big data and analytics
SIMPLIFY CLOUD
application platforms
and infrastructure
#IBMINTERCONNECT
The Problem: The Time and Effort Spent on
Deploying an IT Project
Top Causes of Project Delays
Hardware
 Troubleshooting and tuning
production environment
 Integration, configuration and
testing of the infrastructure
 Installation, cabling and network
access for the environment
Software
 Integration, configuration and
testing of applications
 Integration, configuration and
testing of middleware
 Configuration, build and
deployment of applications
45%
45%
29%
41%
35%
34%
PHASE TIME (DAYS) BUDGET
Specify/design 73 - 96 14% - 16%
Procure 57 - 112 19% - 21%
Implement 74 – 93 12%
Configure/test 74 – 80 10% - 11%
Cluster & HA 66 – 104 11% - 12%
Backup 44 – 108 10%
Tune 89 – 98 9% - 10%
Management 67 – 110 9 – 10%
Typical IT Project Time and Budget
From a commissioned study conducted by Forrester Consulting on behalf of IBM
Design/Deploy Manage/Maintain
#IBMINTERCONNECT
You Can Fundamentally Change the
Economics and Experience of IT
Systems with integrated expertise and built for cloud
Deeply integrating and tuning
hardware and software
Capturing and automating
what experts do
Making every part of the IT lifecycle easier
Integration by DesignBuilt-in Expertise
Simplified Experience
#IBMINTERCONNECT
Cloud
Applications
 BPM
 SAP
 DevOps
 Etc…
 Mobile
 Social
 Analytics
 Commerce
 SaaS/BPaaS
 PaaS
 IaaS
Big Data
 Transactions
 Data Warehouse
 Operational
 Exploration
IT Efficiency
 Consolidation
 VDI
 High availability
 Performance
Optimized to Accelerate and Simplify Business
Priorities
Technology
Building Blocks Advanced Blade Technology
#IBMINTERCONNECT
Compute
 Multi architecture: POWER & x86
 Flexible choice of nodes to meet
workload requirements
Chassis / Networking
 Highest performance I/O - 40Gb
Ethernet, 16Gb SAN, 56Gb
Infiniband FDR
 Designed for multiple generations of
technology for investment protection
Storage
 Optimize data between Flash
and HDDs with tiering
 Connect to or virtualize existing
storage
Management
 Single point of management control
for all resources
 Reduce complexity by automating
everyday management tasks
The building blocks for PureSystems
7
Architectures Hypervisors Operating Systems
Advanced Blade Technology
#IBMINTERCONNECT
PureFlex System: Infrastructure for Cloud and
IT Efficiency
Scalable Storage with Seamless Integration
Enhanced Virtualization and Efficient
Resource Pooling
Single Point Management System
IT Scalability and Leading VM Density
High Performance Networking
 PureFlex Express
 PureFlex Enterprise
 Additional solutions
for cloud, Microsoft
and IBM i
#IBMINTERCONNECT
0144: Simplify cloud deployments with the IBM PureSystems family
Simplify Cloud Deployments
WHEN: Today at 2:00 PM WHERE: Roselle (4611)
Rapidly and efficiently
entered cloud
services market
with single point of support
Cut time to provision
new environments
by 30%
SEE THIS
SESSION
Simplify and Accelerate Cloud and Big Data
with Expert Integrated Systems
© 2013 IBM Corporation
Marie Wieck
General Manager
Application and Integration Middleware
#IBMINTERCONNECT
Achieving a new level of application efficiency
14 non-IBM apps
efficiently migrated onto
WAS v8.5
75 minutes
to create a production-ready
BPM 8.0 environment
Simultaneously tested
deployment of 9 patterns
Large Global Financial
Provider
#IBMINTERCONNECT
PureApplication System: Revolutionary Deployment and
Management of Applications
Accelerate new project delivery
& simplify application lifecycle
using Patterns of Expertise
 New applications up and running an order
of magnitude faster
 System management, maintenance and upgrades
automated and without downtime
 Scaling policies, security and disaster recovery
setup and applied with just a few clicks
 Up to 6.5x better performance for web and
database workloads
System “mini”
Power model
Based on IBM internal tests of the IBM PureApplication System W1700-96 compared to results of testing of a competitor’s configuration (previous version; no longer available; executing an online JEE trading application workload in a controlled laboratory environment and a 3 year total cost of acquisition (based on US list prices). The cost calculation compares the average cost per
request. 3 year total cost of acquisition includes expected hardware, software, service & support. IBM's internal workload studies are not benchmark applications, nor are they based on any benchmark standard. As such, customer applications, differences in the stack deployed, and other systems variations or testing conditions may produce different results and may vary based on
actual configuration, applications, specific queries and other variables in a production environment. Users of this document should verify the applicable data for their specific environment.
#IBMINTERCONNECT
Partners
*
*
We’re Partnering across Key Industries to
Bring Critical Applications onto PureSystems
Big Data
Data Management
Business Analytics & Data Warehousing
Information Integration & Governance
Mobile
Mobile Development
and Connectivity
Social
Collaboration
Web Experience
 SAP Business Suite
 Smarter Process
 DB2 with
BLU Acceleration
Banking
Energy &
Utilities
Insurance
Government
Retail
Telecom
Financial
Markets
Healthcare
Consumer
Products
#IBMINTERCONNECT
Coming Soon! IBM Business Intelligence
Pattern with BLU Acceleration
Self-service, self-optimizing
Business Intelligence
• FAST in-memory acceleration
• RICH performance optimization and visibility
• SIMPLE to deploy and manage
Accelerated OLAP
Pre-configured deployment for predictable,
high performance analytics solution delivery
#IBMINTERCONNECT
Example: IBM PureApplication System savings
across the IT lifecycle
Deployment
• Fully assembled and configured
• Pre-installed management software
• Fast pattern-based deployment
Incident/capacity management
• Centrally monitor and resolve issues
• Automatic scaling
Asset management
• Track license usage of products
Security management
• Centralized access control
Change management
• Visibility into relationships of virtual
images in a workload
• Automatically apply changes to desired
virtual servers
9612 hrs
2302 hrs
0
10000
5000
Do It Yourself PureApplication System
Labor Hours Spent*
76%Savings
*Note: Do It yourself used 9 blades (144 cores). IBM PureApplication System used 3 nodes (96 cores). Each system has the
capacity to run 72 workloads where each workload can sustain a peak throughput of 1720 page elements per second.
#IBMINTERCONNECT
9612 hrs
2302 hrs
0
10000
5000
Do It Yourself PureApplication System
Labor Hours Spent*
76%Savings
IBM PureApplication System beats the competition
*Note: Do It yourself used 9 blades (144 cores). IBM PureApplication System used 3 nodes (96 cores). Each system has the
capacity to run 72 workloads where each workload can sustain a peak throughput of 1720 page elements per second.
5815 hrs
153%More
4843 hrs
110%More
Pre-integrated
Competitor
Coalition
Competitor
Deployment
Change Management
Security Management
Asset Management
Incident/capacity Mgmt
#IBMINTERCONNECT
SEE THIS
SESSION
500% increase
in email open rates
1000% increase
in conversion rate
Accelerate Big Data & Analytics
0149: Accelerate big data and analytics with the IBM PureSystems family
WHEN: Today at 3:00 PM WHERE: Simpor (4811)
Drastically reduces
the data extraction workload
#IBMINTERCONNECT
 PureData System
for Hadoop
 PureData System
for Analytics
New smaller capacity
PureData System: Optimized for Big Data and
Analytics
 Completely integrated
 Appliance simplicity
 Fast time-to-value
for Transactions High availability transactions (OLTP)
for Analytics High-speed, peta-scale analytics
for Operational Analytics Real-time, high-throughput analytics
for Hadoop Exploratory analysis & queryable archive
MODELS OPTIMIZED FOR PURPOSE
#IBMINTERCONNECT
PureSystems simplify each phase of the
systems lifecycle reducing time, cost and risk
Phase Time (days)
Specify/design 73 - 96
Procure 57 - 112
Implement 74 – 93
Configure/test 74 – 80
Cluster & HA 66 – 104
Backup 44 – 108
Tune 89 – 98
Management 67 – 110
Typical IT Project Time and Budget
From a commissioned study conducted by Forrester Consulting on behalf of IBM
 Pre-integrated, pre-tested, ready to run
 Up and running in hours
 Rapid application and data deployment
 Rapid dev/test environment replication
 Dynamic scaling
 Automatic failover and high availability
 Fully integrated management
 Single support number
 System level updates and upgrades
 Simplified problem determination
From…. To.…
#IBMINTERCONNECT
The PureSystems Family Can Make a
Difference in Transforming Your Business
IMPROVE IT EFFICIENCY
by simplifying the
IT lifecycle
ACCELERATE
new applications,
big data and analytics
SIMPLIFY CLOUD
application platforms
and infrastructure
 Deploy a web
application in under
15 minutes1
 Application time to
market has decreased
by as much as 67%4
 Setup times 33% less
than traditional
approaches2
 Deploy services in
minutes or hours rather
than days or weeks4
 Reduce management
time across the IT
lifecycle by up to 75%3
 57% lower operating
expenses4
1Based upon testing of the IBM PureApplication System W1500-192 and W1700-608 deploying a single Virtual Application Pattern consisting of 2 WAS VMs, a DB2 VM, and updating the Elastic Load Balancer (ELB). The WAS VMs were allocated 4 vCPUs, 4 GB of memory and 12 GB of disk while the DB2 VM was allocated 8 vCPUs, 6 GB of memory and two virtual disks of 12 GB and 4 GB.
2Based upon testing of the IBM PureApplication System W1500-96 and W1700-608 with time measured from powering on the system to when it is ready to support application deployments
3IBM Competitive Project Office analysis of PureApplication System versus do-it-yourself (DIY) approach. DIY used nine blades (144 cores). IBM PureApplication System used three nodes (96 cores). Each system has the capacity to run 72 workloads, where each workload can sustain a peak throughput of 1,720 page elements per second
4Real customer results documented and published by IDC
#IBMINTERCONNECT
Take Advantage of Opportunities to Learn More
ibm.com/puresystems
youtube.com/user/expertintegratedsys/featured
Solution Center
PureSystems Sessions
Expert Integrated
Systems Zone
Business Best Practice Solution Sessions
144: Simplify Cloud Deployments
149: Accelerate Big Data & Analytics
Technology Roadmaps Solution Sessions
173: IBM PureFlex System and IBM Flex System
174: IBM PureApplication System
175: IBM PureData System for Transactions
176: IBM PureData Systems
#IBMINTERCONNECT
© 2013 IBM Corporation
Thank You
IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck

IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck

  • 1.
    Simplify and AccelerateCloud and Big Data with Expert Integrated Systems Andrew Sotiropoulos General Manager PureFlex Systems © 2013 IBM Corporation
  • 2.
    #IBMINTERCONNECT Market Shifts AreDriving IT Imperatives IT economics is driving integrated systems Mobile, social, big data & analytics are redefining client engagement Cloud is the new delivery model IMPROVE IT EFFICIENCY by simplifying the IT lifecycle ACCELERATE new applications, big data and analytics SIMPLIFY CLOUD application platforms and infrastructure
  • 3.
    #IBMINTERCONNECT The Problem: TheTime and Effort Spent on Deploying an IT Project Top Causes of Project Delays Hardware  Troubleshooting and tuning production environment  Integration, configuration and testing of the infrastructure  Installation, cabling and network access for the environment Software  Integration, configuration and testing of applications  Integration, configuration and testing of middleware  Configuration, build and deployment of applications 45% 45% 29% 41% 35% 34% PHASE TIME (DAYS) BUDGET Specify/design 73 - 96 14% - 16% Procure 57 - 112 19% - 21% Implement 74 – 93 12% Configure/test 74 – 80 10% - 11% Cluster & HA 66 – 104 11% - 12% Backup 44 – 108 10% Tune 89 – 98 9% - 10% Management 67 – 110 9 – 10% Typical IT Project Time and Budget From a commissioned study conducted by Forrester Consulting on behalf of IBM Design/Deploy Manage/Maintain
  • 4.
    #IBMINTERCONNECT You Can FundamentallyChange the Economics and Experience of IT Systems with integrated expertise and built for cloud Deeply integrating and tuning hardware and software Capturing and automating what experts do Making every part of the IT lifecycle easier Integration by DesignBuilt-in Expertise Simplified Experience
  • 5.
    #IBMINTERCONNECT Cloud Applications  BPM  SAP DevOps  Etc…  Mobile  Social  Analytics  Commerce  SaaS/BPaaS  PaaS  IaaS Big Data  Transactions  Data Warehouse  Operational  Exploration IT Efficiency  Consolidation  VDI  High availability  Performance Optimized to Accelerate and Simplify Business Priorities Technology Building Blocks Advanced Blade Technology
  • 6.
    #IBMINTERCONNECT Compute  Multi architecture:POWER & x86  Flexible choice of nodes to meet workload requirements Chassis / Networking  Highest performance I/O - 40Gb Ethernet, 16Gb SAN, 56Gb Infiniband FDR  Designed for multiple generations of technology for investment protection Storage  Optimize data between Flash and HDDs with tiering  Connect to or virtualize existing storage Management  Single point of management control for all resources  Reduce complexity by automating everyday management tasks The building blocks for PureSystems 7 Architectures Hypervisors Operating Systems Advanced Blade Technology
  • 7.
    #IBMINTERCONNECT PureFlex System: Infrastructurefor Cloud and IT Efficiency Scalable Storage with Seamless Integration Enhanced Virtualization and Efficient Resource Pooling Single Point Management System IT Scalability and Leading VM Density High Performance Networking  PureFlex Express  PureFlex Enterprise  Additional solutions for cloud, Microsoft and IBM i
  • 8.
    #IBMINTERCONNECT 0144: Simplify clouddeployments with the IBM PureSystems family Simplify Cloud Deployments WHEN: Today at 2:00 PM WHERE: Roselle (4611) Rapidly and efficiently entered cloud services market with single point of support Cut time to provision new environments by 30% SEE THIS SESSION
  • 10.
    Simplify and AccelerateCloud and Big Data with Expert Integrated Systems © 2013 IBM Corporation Marie Wieck General Manager Application and Integration Middleware
  • 11.
    #IBMINTERCONNECT Achieving a newlevel of application efficiency 14 non-IBM apps efficiently migrated onto WAS v8.5 75 minutes to create a production-ready BPM 8.0 environment Simultaneously tested deployment of 9 patterns Large Global Financial Provider
  • 12.
    #IBMINTERCONNECT PureApplication System: RevolutionaryDeployment and Management of Applications Accelerate new project delivery & simplify application lifecycle using Patterns of Expertise  New applications up and running an order of magnitude faster  System management, maintenance and upgrades automated and without downtime  Scaling policies, security and disaster recovery setup and applied with just a few clicks  Up to 6.5x better performance for web and database workloads System “mini” Power model Based on IBM internal tests of the IBM PureApplication System W1700-96 compared to results of testing of a competitor’s configuration (previous version; no longer available; executing an online JEE trading application workload in a controlled laboratory environment and a 3 year total cost of acquisition (based on US list prices). The cost calculation compares the average cost per request. 3 year total cost of acquisition includes expected hardware, software, service & support. IBM's internal workload studies are not benchmark applications, nor are they based on any benchmark standard. As such, customer applications, differences in the stack deployed, and other systems variations or testing conditions may produce different results and may vary based on actual configuration, applications, specific queries and other variables in a production environment. Users of this document should verify the applicable data for their specific environment.
  • 13.
    #IBMINTERCONNECT Partners * * We’re Partnering acrossKey Industries to Bring Critical Applications onto PureSystems Big Data Data Management Business Analytics & Data Warehousing Information Integration & Governance Mobile Mobile Development and Connectivity Social Collaboration Web Experience  SAP Business Suite  Smarter Process  DB2 with BLU Acceleration Banking Energy & Utilities Insurance Government Retail Telecom Financial Markets Healthcare Consumer Products
  • 14.
    #IBMINTERCONNECT Coming Soon! IBMBusiness Intelligence Pattern with BLU Acceleration Self-service, self-optimizing Business Intelligence • FAST in-memory acceleration • RICH performance optimization and visibility • SIMPLE to deploy and manage Accelerated OLAP Pre-configured deployment for predictable, high performance analytics solution delivery
  • 15.
    #IBMINTERCONNECT Example: IBM PureApplicationSystem savings across the IT lifecycle Deployment • Fully assembled and configured • Pre-installed management software • Fast pattern-based deployment Incident/capacity management • Centrally monitor and resolve issues • Automatic scaling Asset management • Track license usage of products Security management • Centralized access control Change management • Visibility into relationships of virtual images in a workload • Automatically apply changes to desired virtual servers 9612 hrs 2302 hrs 0 10000 5000 Do It Yourself PureApplication System Labor Hours Spent* 76%Savings *Note: Do It yourself used 9 blades (144 cores). IBM PureApplication System used 3 nodes (96 cores). Each system has the capacity to run 72 workloads where each workload can sustain a peak throughput of 1720 page elements per second.
  • 16.
    #IBMINTERCONNECT 9612 hrs 2302 hrs 0 10000 5000 DoIt Yourself PureApplication System Labor Hours Spent* 76%Savings IBM PureApplication System beats the competition *Note: Do It yourself used 9 blades (144 cores). IBM PureApplication System used 3 nodes (96 cores). Each system has the capacity to run 72 workloads where each workload can sustain a peak throughput of 1720 page elements per second. 5815 hrs 153%More 4843 hrs 110%More Pre-integrated Competitor Coalition Competitor Deployment Change Management Security Management Asset Management Incident/capacity Mgmt
  • 18.
    #IBMINTERCONNECT SEE THIS SESSION 500% increase inemail open rates 1000% increase in conversion rate Accelerate Big Data & Analytics 0149: Accelerate big data and analytics with the IBM PureSystems family WHEN: Today at 3:00 PM WHERE: Simpor (4811) Drastically reduces the data extraction workload
  • 19.
    #IBMINTERCONNECT  PureData System forHadoop  PureData System for Analytics New smaller capacity PureData System: Optimized for Big Data and Analytics  Completely integrated  Appliance simplicity  Fast time-to-value for Transactions High availability transactions (OLTP) for Analytics High-speed, peta-scale analytics for Operational Analytics Real-time, high-throughput analytics for Hadoop Exploratory analysis & queryable archive MODELS OPTIMIZED FOR PURPOSE
  • 20.
    #IBMINTERCONNECT PureSystems simplify eachphase of the systems lifecycle reducing time, cost and risk Phase Time (days) Specify/design 73 - 96 Procure 57 - 112 Implement 74 – 93 Configure/test 74 – 80 Cluster & HA 66 – 104 Backup 44 – 108 Tune 89 – 98 Management 67 – 110 Typical IT Project Time and Budget From a commissioned study conducted by Forrester Consulting on behalf of IBM  Pre-integrated, pre-tested, ready to run  Up and running in hours  Rapid application and data deployment  Rapid dev/test environment replication  Dynamic scaling  Automatic failover and high availability  Fully integrated management  Single support number  System level updates and upgrades  Simplified problem determination From…. To.…
  • 21.
    #IBMINTERCONNECT The PureSystems FamilyCan Make a Difference in Transforming Your Business IMPROVE IT EFFICIENCY by simplifying the IT lifecycle ACCELERATE new applications, big data and analytics SIMPLIFY CLOUD application platforms and infrastructure  Deploy a web application in under 15 minutes1  Application time to market has decreased by as much as 67%4  Setup times 33% less than traditional approaches2  Deploy services in minutes or hours rather than days or weeks4  Reduce management time across the IT lifecycle by up to 75%3  57% lower operating expenses4 1Based upon testing of the IBM PureApplication System W1500-192 and W1700-608 deploying a single Virtual Application Pattern consisting of 2 WAS VMs, a DB2 VM, and updating the Elastic Load Balancer (ELB). The WAS VMs were allocated 4 vCPUs, 4 GB of memory and 12 GB of disk while the DB2 VM was allocated 8 vCPUs, 6 GB of memory and two virtual disks of 12 GB and 4 GB. 2Based upon testing of the IBM PureApplication System W1500-96 and W1700-608 with time measured from powering on the system to when it is ready to support application deployments 3IBM Competitive Project Office analysis of PureApplication System versus do-it-yourself (DIY) approach. DIY used nine blades (144 cores). IBM PureApplication System used three nodes (96 cores). Each system has the capacity to run 72 workloads, where each workload can sustain a peak throughput of 1,720 page elements per second 4Real customer results documented and published by IDC
  • 22.
    #IBMINTERCONNECT Take Advantage ofOpportunities to Learn More ibm.com/puresystems youtube.com/user/expertintegratedsys/featured Solution Center PureSystems Sessions Expert Integrated Systems Zone Business Best Practice Solution Sessions 144: Simplify Cloud Deployments 149: Accelerate Big Data & Analytics Technology Roadmaps Solution Sessions 173: IBM PureFlex System and IBM Flex System 174: IBM PureApplication System 175: IBM PureData System for Transactions 176: IBM PureData Systems
  • 23.
    #IBMINTERCONNECT © 2013 IBMCorporation Thank You