What Makes Prolifics Different
Public | Copyright © 2014 Prolifics 2
Global Delivery Advantage
From offices throughout North America, Europe, and Asia, we deliver
solutions across the world.
Core Values
Thought Leadership & Innovation: We invest in industry-specific expertise
Customer Centric: The value received by the client is the core focus of every project
Accountability: We follow through on our commitments
Trust & Teamwork: We establish long term partnerships with our clients
Ethical Behavior & Integrity: Our reputation and employees = our most important
assets
Industry Focus
Prolifics utilizes its wealth of expertise to provide
comprehensive business solutions to all major industries.
Technical Excellence
Combining business flexibility and cost
competitiveness with excellence in technical
skill, Prolifics drives success.
CONNECT WITH US:
How Prolifics Can Help You
Public | Copyright © 2014 Prolifics 3
 Adapt faster than the
competition with
continuous process
improvement
 Transform your
applications to increase
business agility
 Create best-in-class
customer and employee
experiences. Become more
social and collaborative
 Gain actionable insight
with an intelligent
approach to security
BUSINESS PROCESS
MANAGEMENT
SOA INTEGRATION USER EXPERIENCE SECURITY
 Drive business growth with
proactive IT management
 Maximize IT investments
with end-to-end testing
 Optimize business
performance with smarter,
faster decisions
 Increase efficiency within
your organization and
achieve “straight through
processing”
APPLICATION
INFRASTRUCTURE
TEST ADVISORY, APPLICATION
TESTING & TEST AUTOMATION BUSINESS ANALYTICS
OPERATIONAL DECISION
MANAGEMENT (ODM)
 Simplify employee and
customer access to the
documents they need when
they need them
 Get the most out of your IT
to create competitive
advantage.
 Leverage global expertise
to support your IT
environment
 Optimize your software
spend to achieve business
value
ENTERPRISE CONTENT
MANAGEMENT
ADVISORY SERVICES MANAGED SERVICES SOFTWARE
CONNECT WITH US:
Questions for you….
September 26, 2014
Public | Copyright © 2014 Prolifics 4
• How can your IT deliver more solutions?
• Better, Faster, Cheaper?
• Who is doing this???
CONNECT WITH US:
Technology Evolution in IT Operations
Public | Copyright © 2014 Prolifics 5
Source: 2012 IBM Data Center Study: www.ibm.com/data-center/study ( http://www.ibm.com/data-center/study )
• According to Gartner’s analysis worldwide IT spending in 2013 was about $3.7T
• IBM’s 2012 Data Center Study showed that only 1 in 5 organizations allocate more than half their IT
budget to new projects and innovation
Least efficient data centers
Use of new technology:
43% first and fast technology adoption
1% move virtual machines to meet
desired outcomes
21% use storage virtualization
3% use a storage service catalog (tiered
storage)
Results:
65%
New
projects
35%
Most efficient data centers
Use of new technology:
86% first and fast technology adoption
58% move virtual machines to meet
desired outcomes
93% use storage virtualization
87% use a storage service catalog
(tiered storage)
Results
47%
53%
New
projects
Maintaining
existing
infrastructure
Maintaining
existing
infrastructure
CONNECT WITH US:
The Problem Statement
September 26, 2014
Public | Copyright © 2014 Prolifics 7
App
App
App
App
App
App
App
App
App
AppApp
App
App
App
App
Tribal knowledge, do
we cut the red or the
green wire first ?
A large support team
with a diverse skill set
Forcing high value
key personnel onto
low value tasks
Frustration at how
long IT takes to get
things done
Frustration at how
unstable applications
are
Frustration that skilled
personnel can’t help
with innovation and
revenue generating
initiatives
Frustration how much
IT costs
Systems, versions,
configurations =
complexity
CONNECT WITH US:
Why so much
…and what can we do about it ?
September 26, 2014
Public | Copyright © 2014 Prolifics 8
General Purpose
Components
Custom Built
System
Design / Deploy Manage / Maintain
What to do… ?
 Simplify - reduce variety and complexity
 Automate - hands free repeatable installation and
configuration
 Adapt - change the culture
Time, resource capacity, and costs at every stage of the process
designing, building, testing, deploying, verifying, managing and
maintaining
CONNECT WITH US:
Customer Case Study
September 26, 2014
Public | Copyright © 2014 Prolifics 9
• By establishing standard patterns for their deployments, and
removing the diversity and complexity of systems they were
able to shorten production delivery times from 6 months down
to 2 months, and most recently down to 2 weeks and in some
cases 2 days.
• They have been able to drive out hard and soft costs, and have
experienced improved application performance and stability.
• They have also been able to realize a 12 month ROI that has
allowed them to get additional funding and take this IT change
initiative to the next level.
CONNECT WITH US:
Pure Application + Patterns = Automation,
Automation = Simplification
September 26, 2014
Public | Copyright © 2014 Prolifics 10
- Cloud
- Infrastructure
Patterns
- Monitoring
- Log agents
- Security agents
System Infrastructure
Application Platform Services
 Integrated Server, Storage,
Network
 Power Management
 Storage & VM Optimization
 Virtualization
 Integrated System Mgmt
 Provisioning
 Security
 Monitoring
 IT Lifecycle
Management
 System design
 Application Optimization
 System wide Management
 Automation & Scaling
 Caching & Elasticity
 Application Centric
Provisioning
 Usage Metering
 Security
 Monitoring
 App. Lifecycle Mgmt
 License Management
 Self-service
 Data management
 IBM Software Patterns (>40), BI, BPM, Portal , More…
 A large number of ISV business applications
Patterns of Expertise
CONNECT WITH US:
Patterns Target Middleware cost reduction
Public | Copyright © 2014 Prolifics 11
Patterns of Expertise: Proven best practices and expertise for complex tasks learned
from decades of client and partner engagements that are captured, lab tested and
optimized into a deployable form
Monitoring
Lifecycle
Management
• Pre-defined application architecture for each part of the
application (database, web server, etc)
• Pre-installation on an operating system
• Pre-integration across components
• Pre-configured & tuned
• Pre-configured Monitoring
• Pre-configured Security
• Lifecycle Management
• In a deployable form, resulting in repeatable deployment
with full lifecycle management
• Delivers superior results:
•Speed: Faster time to setup, configure
•Agility: Less time required to adapt to changes
•Efficiency: Reduced costs and resources
•Simplicity: Simpler skills requirements
•Elasticity: Scale up or down as needed
•Repeatability/Control: Lower risk and errors General Purpose
Components
Custom Built
System
Design / Deploy Manage / Maintain
CONNECT WITH US:Public | Copyright © 2014 Prolifics
12
Pre-Entitled and Pre-Optimized Middleware Patterns
(Entitlement Included to run on Full System)
Pre-Optimized IBM Middleware and ISV Patterns
(Available for Additional Purchase)
Custom-built Patterns, Customized IBM Patterns
(Pattern-creation tools included)
OptimizedforPureApplicationSystem
Pre-
Entitled
Anything else that will run on a supported OS
What Can I Run on Pure Applications?
BreadthofCoverage
IntegratedValue
CONNECT WITH US:
Prolifics gets you more Value,
Just below the surface…
Public | Copyright © 2014 Prolifics 13
10%
90%
What if…
… you need to customize Middleware Patterns
to your organization’s needs?
… you have/need a Cloud strategy for
Middleware?
… you leverage Cloud economics to for
development?
… you Deploy your Applications atop the
Patterns you implement with cloud-like
elasticity?
… you expand the scope of Pattern
Implementation to include DevOps?
… you integrate automated application testing?
... you incorporate an IBM software licensing
strategy along side your Pattern deployments?
CONNECT WITH US:
Prolifics: Our Patterns
Public | Copyright © 2014 Prolifics 15
Prolifics has shared its ICAP in
Patterns released
 IBM ExtremeScale Java
Object Cache
 IBM Liberty Server for
Developers
 IBM UrbanCode Deploy
 3rd Party: Splunk Centralized
Log Management
 Apache JMeter Load/Testing
 IBM Filenet P8
 IBM Algorithmics* (Algo) –
Risk Management and
Compliance
 JDA Red Prairie* – Logistics
Optimization
* = under construction…
Prolifics’ custom Patterns in IBM Marketplace:
CONNECT WITH US:
Prolifics – Pattern Offerings and Types
September 26, 2014
Public | Copyright © 2014 Prolifics 16
Base
Patterns
We have patterns available at no cost to customers
when because we can leverage IBM incentives when we
help fulfill or support the your buying decision.
We believe by enhancing the patterns with your
organizational best practices and simplifying the
operational procedures you will increase the value you
can get from this solution.
Prolifics can build patterns for you as well as show you
the best ways to utilize them to realize increased
stability through automation, more resilience through
better validation, and at lower risk.
Not only do we want to help you get started and
successful but our patterns can be managed and
maintained by Prolifics under Managed Services
contract.
Advanced
Patterns
Custom
Patterns
CONNECT WITH US:
Testing and auto scaling – Elasticity
September 26, 2014
Public | Copyright © 2014 Prolifics 17
CONNECT WITH US:
Why should I care about AutoScaling ?
September 26,Public | Copyright © 2014 Prolifics 18
Traditional Sizing
Elastic Sizing
CONNECT WITH US:
Patterns: DevOps
Public | Copyright © 2014 Prolifics 19
IBM UrbanCode Deploy
By adding UrbanCode Deploy we can
automate the steps after infrastructure set
up that might be needed to configure
infrastructure beyond the pattern or any of
the installed components. We also get a
centralized dashboard of the version and
status of all items on the on the promote to
production path.
CONNECT WITH US:
Patterns: Cloud Strategy Realized
Public | Copyright © 2014 Prolifics 20
Service on
PureApplication Service on SoftLayer is an environment allowing users to
deploy and manage patterns with rental economics of public cloud and isolation
of private cloud. Potential use for Development, and other Use Cases
Cloud
CONNECT WITH US:
Patterns/Application Cloud Strategy Realized
Public | Copyright © 2014 Prolifics 21
Combine PureApplication Service on SoftLayer with Pure Applications systems
to realize new deployment capabilities
On-Premise
Service on
SMBs Growing to large enterprise
Dev/Test moving to Production
LoB moving to Corporate IT
Disaster Recovery as a service
Offloading tier 2 workload
Cloud Bursting
Cloud
CONNECT WITH US:
Optimal
Investment
Spend
Pure Application: Software Licensing
PureApplication System:
Produces license usage reports which meet
subcapacity licensing requirements
Prevents license overages by optionally taking action
when a requested deployment would exceed
entitlement:
 Warn: send email to user and admin, but allow
deployment
 Enforce: reject deployment
Now supports the following license metrics:
 Processor Value Unit (PVU), Virtual Instance / VM,
Compute Node / Physical Server, Processor Core
 Requires license expertise for optimal licensing
 Prolifics’ IBM Software License Assessment and
Review (iSOLAR) Program optimizes license costs
License
Inventory
License
Allocation
License
Overage
Protection
CONNECT WITH US:
iSOLAR – What is it?
 The iSOLAR Program is a consultative asset management
service which Prolifics provides its customers to optimize
infrastructure, provide a technology roadmap, identify risks and
save money.
 Executed in confidence. All materials under optional NDA.
 Provides Customer:
1. Cost Savings – optimize software and hardware spend
2. Visibility - Provides IT inventory data for actionable insight into a client’s IT infrastructure
3. Planning - Improves infrastructure reporting, analysis and planning
4. Compliance / Risk Reduction - Ensures accurate tracking and reporting of IBM licenses and lowers
audit exposure.
Copyright © 2014 Prolifics. Do not distribute without
permission. 23
 Consists of two primary workstreams:
 Data Collection Assessment/Analysis:
 Analyze Customer Asset Management Data
 IBM License Management Tool (ILMT) Assessment and
installation: Optional – iSOLAR+
 Asset Management Analysis:
 iSOLAR Data Analysis and IBM Technology Review
CONNECT WITH US:
Patterns: Business Value
Public | Copyright © 2014 Prolifics 24
Sample 3Yr TCO Comparison
TCO = 68% (Lower)
ROI = 351% (Higher)
Avoid investment (capital expenses) on HW, SW,
Networking, Storage $3,542,000
Avoid ongoing costs (operational expenses) on HW
and SW maintenance $1,584,000
Achieve faster set-up of infrastructure $19,440
Improve environment design and deploy time $378,000
Leverage patterns for repeatable quick provisioning $1,105,650
Reduce defects and improve dev/test efficiencies $907,200
Automate maintenance and change management $296,698
Consolidate monitoring and improve incident
management $264,384
Automate capacity management and allocation of
resources $198,288
Improve security, asset management and
compliance $622,080
Reduce Energy and Facilities cost $163,987
Avoid Revenue loss due to outages $51,370
Increase Revenue with improved time to market $205,479
Total Benefit for 3 years: $9,338,576
Estimated Investment in 3 years: $2,072,000
Net Benefit in 3 years: $7,266,576
Customers with holistic approach are projecting better returns
than these…
CONNECT WITH US:
How to get Started
Public | Copyright © 2014 Prolifics 25
 Build the vision and Share it
 Build a Business Case:
 Think full lifecycle, Dev through Operations for ROI
 Analyze/Optimize your IBM Software spend for Patterns
 Set realistic budget
 Leverage your IBM Software spend – use Prolifics iSOLAR to maximize
 Utilize Softlayer – lower initial cost threshold and validate use as Dev platform
 Identify a workload – but Don’t boil the ocean:
 make it feasible
 Get Creative – 3rd party apps may also be Pattern candidates
 Start with a pilot/POC but set aggressive timelines and challenges
 Plan for Integration Needs (DBs, Sys Mgmt, Networking, Security,
Facilities, etc). But don’t let them derail you.
 EDUCATE, EDUCATE, EDUCATE:
 In order to build Patterns, you must know how to integrate/Operate base Middleware
 Make sure everyone knows their parts as well as tech training
 Prolifics will partner with you to insure success.
CONNECT WITH US:
Contact US
September 26,Public | Copyright © 2014 Prolifics 26
www.prolifics.com
(407) 641-0763
Bradley.Hertenstein@prolifics.com
CONNECT WITH US:
Back Up Slides
Public | Copyright © 2014 Prolifics 27
CONNECT WITH US:Public | Copyright © 2014 Prolifics 28
 Clients have entitlement to run the following software on the full capacity
of the System
 Virtual System Patterns:
 IBM OS Image for Red Hat Linux Systems v1 (RHEL 64-bit v6.2)
 IBM WebSphere Application Server Hypervisor Edition v7 (WAS 7.0.0.21)
 IBM WebSphere Application Server Hypervisor Edition v8 (WAS 8.0.0.2)
 IBM WebSphere Application Server Hypervisor Edition v8.5 (WAS 8.5.0.0)
 IBM WebSphere Application Server Hypervisor Edition v8.5 (WAS 8.5.5.0)
 IBM Data Mart Pattern 1.1.0.8 (with DB2 BLU Acceleration)
 IBM DB2 (9.7 FP5, 10.1, 10.5 with BLU Acceleration)
 Automation Framework HV (for migrating applications)
 Virtual Application Patterns:
 IBM Application Pattern for Java 1.0
 IBM Workload Deployer Pattern for Web Applications v1 (with WAS v7)
 IBM Web Application Pattern 1.0, 2.0 (with WAS v8)
 IBM Transactional Database for Cloud v1.1 (with DB2 9.7 FP5)
 IBM Data Mart for Cloud v1.1 (with DB2 9.7 FP5)
 Any other software that clients run on PureApplication System is
traditionally licensed (i.e. PVUs) on a sub-capacity basis
Pre-Optimized and Pre-Entitled Middleware
CONNECT WITH US:
IBM Software Pattern Inventory for PureApplication System W1500 (Intel)
29
• IBM SOA Policy Gateway 2.0, 2.5
• IBM Software Delivery and LifeCycle Patterns
•Collaborative Lifecycle Mgmt 4.0.2
•Rational Application Developer 8.5
•Test Virtualization Server and Workbench
• IBM Transactional Database Pattern 1.1
• IBM Web Application Pattern (1.0, 2.0)
• IBM Web Content Manager 8.0
• IBM WebSphere App Server HV (7.0, 8.0, 8.5, 8.5.5)
• IBM WebSphere Message Broker 8.0
• IBM WebSphere Cast Iron 6.4
• IBM WebSphere Commerce Pattern 1.0 (for WC
Enterprise 7.0)
• IBM WebSpere Datapower XG45 V5.0, V6.0
• IBM WebSphere Datapower XI52 V5.0, V6.0
• IBM WebSphere MQ 7.5
• IBM WebSphere Portal Server 8.0
• IBM WebSphere Transformation Extender Launcher 8.4,
8.4.1
• Microsoft Dynamics v2008
• Microsoft Exchange for Intel
• Microsoft Sharepoint V2010
• Microsoft SQL Server V2012
• Oracle DB Enterprise Edition v11g, R2
• IBM API Management 2.0
• IBM Application Pattern for Java 1.0
• IBM Business Intelligence 1.0, 2.0
• IBM Business Process Manager 8.0.1, 8.5
• IBM Connections 4.0
• IBM Content Foundation Pattern 5.2
• IBM Data Mart Pattern 1.1.0.8 (with DB2 BLU
Acceleration)
• IBM DB2 (9.7 FP5, 10.1, 10.5 with BLU Acceleration)
• IBM Domino 9.0
• IBM Encryption Pattern for Guardium Encryption Expert
• IBM Encryption Pattern for SecurityFirst SPxBitFiler
• IBM Informix 11.7, 12.10
• IBM InfoSphere Information Server 9.1
• IBM InfoSphere Master Data Management Standard
Edition and Advanced Edition, 11.0
• IBM Integration Bus 9.0 (evolution of Message Broker)
• IBM Maximo Asset Management 7.5
• IBM Messaging Extension for Web App Pattern 2.0
• IBM Mobile Application Platform 5.0.6, 6.0
• IBM Operational Decision Manager 8.0.1, 8.5
• IBM SOA Policy 2.0
Pre-entitled with
PureApplication System
CONNECT WITH US: 30
IBM Software Pattern Inventory for PureApplication System W1700 (Power)
• IBM SOA Policy Gateway 2.0, 2.5
• IBM Software Delivery and LifeCycle Patterns
•Collaborative Lifecycle Mgmt 4.0.2
•Rational Application Developer 8.5
• IBM Transactional Database Pattern 1.1
• IBM Web Application Pattern (1.0, 2.0)
• IBM Web Content Manager 8.0
• IBM WebSphere App Server HV (7.0, 8.0, 8.5, 8.5.5)
• IBM WebSphere Message Broker 8.0
• IBM WebSphere Commerce Pattern 1.0 (for WC
Enterprise 7.0)
• IBM WebSphere MQ 7.5
• IBM WebSphere Portal Server 8.0
• IBM WebSphere Transformation Extender Launcher 8.4,
8.4.1
• Oracle DB Enterprise Edition v11g, R2
• IBM Application Pattern for Java 1.0
• IBM Business Intelligence 1.0, 2.0
• IBM Business Intelligence Pattern w/BLU Acceleration
1.0
• IBM Business Process Manager 8.0.1, 8.5
• IBM Data Mart Pattern 1.1.0.8 (with DB2 BLU
Acceleration)
• IBM DB2 (9.7 FP5, 10.1, 10.5 with BLU Acceleration)
• IBM Encryption Pattern for Guardium Encryption Expert
• IBM Encryption Pattern for SecurityFirst SPxBitFiler
• IBM Informix 11.7, 12.10
• IBM InfoSphere Information Server 9.1
• IBM Integration Bus 9.0 (evolution of Message Broker)
• IBM Maximo Asset Management 7.5
• IBM Messaging Extension for Web App Pattern 2.0
• IBM Mixed Language Application Modernization Pattern
1.0 (Runtime pre-entitled, Extensions separate
purchase)
• IBM Mobile Application Platform 5.0.6, 6.0
• IBM Operational Decision Manager 8.0.1, 8.5
Pre-entitled with
PureApplication System
CONNECT WITH US:
{Intro to Prolifics}
Public | Copyright © 2014 Prolifics 31
CONNECT WITH US:
Intro to Prolifics
Public | Copyright © 2014 Prolifics 32
•Los Angeles
•San
Francisco
•London
•Hamburg
•Hyderabad
•Pune
•Calabasas
•New York
•Boston
•Philadelphia
•Washington
DC
•Orlando
In business for over 35 years, Prolifics is a Global Technology Consulting company with 1300 employees
worldwide specializing in the expert delivery of end-to-end solutions utilizing IBM technologies.
Who Are We?
CONNECT WITH US:
Company Snapshot
Public | Copyright © 2014 Prolifics 33
FY 2012: $105M
35 years of continued growth
Over 150 global
customers
are currently Fortune
1000 companies
Over 550
technical certifications
SkillsYoY Revenue Growth
Customers
Services across the full project lifecycle
including advisory services, architecture,
business analysis, design, development,
testing, training, support, and system
administration
End-to-End Services from Innovations to
on-going Support and Maintenance
IBM Software
Leadership
Repeat winner of multiple IBM Software
awards, including the Beacon Award for
Outstanding Technical Vitality.
More IBM Authorizations/Accreditations
than any other IBM partner.
CONNECT WITH US:
BPM Pattern and Typical Development Topology
Public | Copyright © 2014 Prolifics 34
Process Server
Production
Process Server
QA Test
Process Center
Centralized repository
Centralized deployment
Centralized governance
Process Server
Staging Test
Integration Designer
Workstation
Process Designer
Workstation
Process Center
Console
Unit Test
Environment
IT Developers
Administrators
Business & IT
Authors
Administrators
Process Admin
Console
Runtime
Environments
Administrators
BPM
Application
Pattern
Prolifics Pure Acceleration: BPM Pattern and Typical Development Topology
CONNECT WITH US:
CONNECT WITH US:
CONNECT WITH US:
Pure Application: Hardware
Public | Copyright © 2014 Prolifics 37
CONNECT WITH US:
PureApplication System W1500 W1500-32 W1500-64 W1500-96 W1500-192 W1500-384 W1500-608
Compute
Processor 8 core, 2.6GHz Intel Sandy Bridge EP processor, 115 W
Compute Node Dual Processor, 16-core, 256GB memory
Memory/Compute Node 256GB (8 2x16GB, 1333 MHz, DDR3, LP RDIMMS(1.35V))
Network cards/Compute Node 1 x EN4054 – 4 port 10Gb Ethernet Mezz Adapter
Fibre cards/Compute Node 1 x FC 3172 - 2 port 8Gb Fibre Channel Mezz Adapter
# Compute nodes 2 4 6 12 24 38
# Cores 32 64 96 192 384 608
Memory 512 GB 1 TB 1.5 TB 3.1 TB 6.1 TB 9.7 TB
Storage
Solid State Drive (SSD) 6 x 400GB 2.5 in. SSD (E-MLC) 16 x 400GB 2.5 in. SSD (E-MLC)
Hard Disk Drive (HDD) 40 x 600 GB 2.5 in. 10k HDD 80 x 600 GB 2.5 in. 10k HDD
Storage Controller 1 x IBM Storwize V7000 Disk System 2 x IBM Storwize V7000 Disk System
Storage Expansion 1 x IBM Storwise V700 Storage Drawer 2 x IBM Storwise V700 Storage Drawer
Total Storage SSD 2.4 TB unformatted / 1.6 TB usable 6.4 TB unformatted / 4.8 TB usable
Total Storage HDD 24.0 TB unformatted / 21.6 TB usable 48.0 TB unformatted / 43.2 TB usable
Network
Top of Rack Switches (TOR) BLADE Network Technologies TOR G8264 switches for Customer Data Center & Rack to Rack communications
Transceivers Choice of: 10GbE Fibre, 1GbE Fibre, 1GbE Copper, Direct Attach Cabling (DAC / Twinax)
Chassis
Network / Chassis 2 x EN4093 – BNT 10GbE
Fibre / Chassis 2 x FC5022– Brocade 48 16GbFC
Chassis 1 x Accipiter Chassis 3 x Accipiter Chassis
Power Power Distribution Unit (PDU)
4 x 60A 1ph - North America
4 x 32A 1ph - International
4 x 60A 3ph - North America
4 x 32A 3ph - International
Mmgt
Node
2 x PureSystems Manager (PSM)
2 x Virtualization System Manager (VSM)
Rack Rack 1.3 M 19” Enterprise Rack 2.0 M 19” Enterprise Rack
Specs
Weight 365.6 Kg
(815 lb)
385.6 Kg
(850 lb)
936 Kg
(2027 lb)
953 Kg
(2095 lb)
1016 Kg
(2232 lb)
1088 Kg
(2391 lb)
Power Max: 5.5 kW
Typical: 4.68 kW
Max: 6.5 kW
Typical: 5.52 kW
Max: 7.9 kW
Typical: 5.9kW
Label: 14kW
Max: 10.4 kW
Typical: 7.8 kW
Label: 17.4 kW
Max: 15.4 kW
Typical: 11.6 kW
Label: 24.3 kW
Max: 21.2 kW
Typ.: 15.9 kW
Label: 31.1 kW
Dimensions Height: 1240 mm (49 in) / Depth: 1000
mm (39.4 in) / Width: 610 mm (24 in)
Height: 2.015 m (79.3 in) / Depth: 1.098 m (43.3 in) /
Width: 0.644 m (25.4 in)

PureApp Presentation

  • 1.
    CONNECT WITH US: IT:Customized to Your Advantage Pure Applications + Patterns + Prolifics = IT Better, Faster, Cheaper Impact Comes to You - Boston Brad Hertenstein, MBA Enterprise Architect, WebSphere Brand Leader Public | Copyright © 2014 Prolifics
  • 2.
    CONNECT WITH US: WhatMakes Prolifics Different Public | Copyright © 2014 Prolifics 2 Global Delivery Advantage From offices throughout North America, Europe, and Asia, we deliver solutions across the world. Core Values Thought Leadership & Innovation: We invest in industry-specific expertise Customer Centric: The value received by the client is the core focus of every project Accountability: We follow through on our commitments Trust & Teamwork: We establish long term partnerships with our clients Ethical Behavior & Integrity: Our reputation and employees = our most important assets Industry Focus Prolifics utilizes its wealth of expertise to provide comprehensive business solutions to all major industries. Technical Excellence Combining business flexibility and cost competitiveness with excellence in technical skill, Prolifics drives success.
  • 3.
    CONNECT WITH US: HowProlifics Can Help You Public | Copyright © 2014 Prolifics 3  Adapt faster than the competition with continuous process improvement  Transform your applications to increase business agility  Create best-in-class customer and employee experiences. Become more social and collaborative  Gain actionable insight with an intelligent approach to security BUSINESS PROCESS MANAGEMENT SOA INTEGRATION USER EXPERIENCE SECURITY  Drive business growth with proactive IT management  Maximize IT investments with end-to-end testing  Optimize business performance with smarter, faster decisions  Increase efficiency within your organization and achieve “straight through processing” APPLICATION INFRASTRUCTURE TEST ADVISORY, APPLICATION TESTING & TEST AUTOMATION BUSINESS ANALYTICS OPERATIONAL DECISION MANAGEMENT (ODM)  Simplify employee and customer access to the documents they need when they need them  Get the most out of your IT to create competitive advantage.  Leverage global expertise to support your IT environment  Optimize your software spend to achieve business value ENTERPRISE CONTENT MANAGEMENT ADVISORY SERVICES MANAGED SERVICES SOFTWARE
  • 4.
    CONNECT WITH US: Questionsfor you…. September 26, 2014 Public | Copyright © 2014 Prolifics 4 • How can your IT deliver more solutions? • Better, Faster, Cheaper? • Who is doing this???
  • 5.
    CONNECT WITH US: TechnologyEvolution in IT Operations Public | Copyright © 2014 Prolifics 5 Source: 2012 IBM Data Center Study: www.ibm.com/data-center/study ( http://www.ibm.com/data-center/study ) • According to Gartner’s analysis worldwide IT spending in 2013 was about $3.7T • IBM’s 2012 Data Center Study showed that only 1 in 5 organizations allocate more than half their IT budget to new projects and innovation Least efficient data centers Use of new technology: 43% first and fast technology adoption 1% move virtual machines to meet desired outcomes 21% use storage virtualization 3% use a storage service catalog (tiered storage) Results: 65% New projects 35% Most efficient data centers Use of new technology: 86% first and fast technology adoption 58% move virtual machines to meet desired outcomes 93% use storage virtualization 87% use a storage service catalog (tiered storage) Results 47% 53% New projects Maintaining existing infrastructure Maintaining existing infrastructure
  • 6.
    CONNECT WITH US: TheProblem Statement September 26, 2014 Public | Copyright © 2014 Prolifics 7 App App App App App App App App App AppApp App App App App Tribal knowledge, do we cut the red or the green wire first ? A large support team with a diverse skill set Forcing high value key personnel onto low value tasks Frustration at how long IT takes to get things done Frustration at how unstable applications are Frustration that skilled personnel can’t help with innovation and revenue generating initiatives Frustration how much IT costs Systems, versions, configurations = complexity
  • 7.
    CONNECT WITH US: Whyso much …and what can we do about it ? September 26, 2014 Public | Copyright © 2014 Prolifics 8 General Purpose Components Custom Built System Design / Deploy Manage / Maintain What to do… ?  Simplify - reduce variety and complexity  Automate - hands free repeatable installation and configuration  Adapt - change the culture Time, resource capacity, and costs at every stage of the process designing, building, testing, deploying, verifying, managing and maintaining
  • 8.
    CONNECT WITH US: CustomerCase Study September 26, 2014 Public | Copyright © 2014 Prolifics 9 • By establishing standard patterns for their deployments, and removing the diversity and complexity of systems they were able to shorten production delivery times from 6 months down to 2 months, and most recently down to 2 weeks and in some cases 2 days. • They have been able to drive out hard and soft costs, and have experienced improved application performance and stability. • They have also been able to realize a 12 month ROI that has allowed them to get additional funding and take this IT change initiative to the next level.
  • 9.
    CONNECT WITH US: PureApplication + Patterns = Automation, Automation = Simplification September 26, 2014 Public | Copyright © 2014 Prolifics 10 - Cloud - Infrastructure Patterns - Monitoring - Log agents - Security agents System Infrastructure Application Platform Services  Integrated Server, Storage, Network  Power Management  Storage & VM Optimization  Virtualization  Integrated System Mgmt  Provisioning  Security  Monitoring  IT Lifecycle Management  System design  Application Optimization  System wide Management  Automation & Scaling  Caching & Elasticity  Application Centric Provisioning  Usage Metering  Security  Monitoring  App. Lifecycle Mgmt  License Management  Self-service  Data management  IBM Software Patterns (>40), BI, BPM, Portal , More…  A large number of ISV business applications Patterns of Expertise
  • 10.
    CONNECT WITH US: PatternsTarget Middleware cost reduction Public | Copyright © 2014 Prolifics 11 Patterns of Expertise: Proven best practices and expertise for complex tasks learned from decades of client and partner engagements that are captured, lab tested and optimized into a deployable form Monitoring Lifecycle Management • Pre-defined application architecture for each part of the application (database, web server, etc) • Pre-installation on an operating system • Pre-integration across components • Pre-configured & tuned • Pre-configured Monitoring • Pre-configured Security • Lifecycle Management • In a deployable form, resulting in repeatable deployment with full lifecycle management • Delivers superior results: •Speed: Faster time to setup, configure •Agility: Less time required to adapt to changes •Efficiency: Reduced costs and resources •Simplicity: Simpler skills requirements •Elasticity: Scale up or down as needed •Repeatability/Control: Lower risk and errors General Purpose Components Custom Built System Design / Deploy Manage / Maintain
  • 11.
    CONNECT WITH US:Public| Copyright © 2014 Prolifics 12 Pre-Entitled and Pre-Optimized Middleware Patterns (Entitlement Included to run on Full System) Pre-Optimized IBM Middleware and ISV Patterns (Available for Additional Purchase) Custom-built Patterns, Customized IBM Patterns (Pattern-creation tools included) OptimizedforPureApplicationSystem Pre- Entitled Anything else that will run on a supported OS What Can I Run on Pure Applications? BreadthofCoverage IntegratedValue
  • 12.
    CONNECT WITH US: Prolificsgets you more Value, Just below the surface… Public | Copyright © 2014 Prolifics 13 10% 90% What if… … you need to customize Middleware Patterns to your organization’s needs? … you have/need a Cloud strategy for Middleware? … you leverage Cloud economics to for development? … you Deploy your Applications atop the Patterns you implement with cloud-like elasticity? … you expand the scope of Pattern Implementation to include DevOps? … you integrate automated application testing? ... you incorporate an IBM software licensing strategy along side your Pattern deployments?
  • 13.
    CONNECT WITH US: Prolifics:Our Patterns Public | Copyright © 2014 Prolifics 15 Prolifics has shared its ICAP in Patterns released  IBM ExtremeScale Java Object Cache  IBM Liberty Server for Developers  IBM UrbanCode Deploy  3rd Party: Splunk Centralized Log Management  Apache JMeter Load/Testing  IBM Filenet P8  IBM Algorithmics* (Algo) – Risk Management and Compliance  JDA Red Prairie* – Logistics Optimization * = under construction… Prolifics’ custom Patterns in IBM Marketplace:
  • 14.
    CONNECT WITH US: Prolifics– Pattern Offerings and Types September 26, 2014 Public | Copyright © 2014 Prolifics 16 Base Patterns We have patterns available at no cost to customers when because we can leverage IBM incentives when we help fulfill or support the your buying decision. We believe by enhancing the patterns with your organizational best practices and simplifying the operational procedures you will increase the value you can get from this solution. Prolifics can build patterns for you as well as show you the best ways to utilize them to realize increased stability through automation, more resilience through better validation, and at lower risk. Not only do we want to help you get started and successful but our patterns can be managed and maintained by Prolifics under Managed Services contract. Advanced Patterns Custom Patterns
  • 15.
    CONNECT WITH US: Testingand auto scaling – Elasticity September 26, 2014 Public | Copyright © 2014 Prolifics 17
  • 16.
    CONNECT WITH US: Whyshould I care about AutoScaling ? September 26,Public | Copyright © 2014 Prolifics 18 Traditional Sizing Elastic Sizing
  • 17.
    CONNECT WITH US: Patterns:DevOps Public | Copyright © 2014 Prolifics 19 IBM UrbanCode Deploy By adding UrbanCode Deploy we can automate the steps after infrastructure set up that might be needed to configure infrastructure beyond the pattern or any of the installed components. We also get a centralized dashboard of the version and status of all items on the on the promote to production path.
  • 18.
    CONNECT WITH US: Patterns:Cloud Strategy Realized Public | Copyright © 2014 Prolifics 20 Service on PureApplication Service on SoftLayer is an environment allowing users to deploy and manage patterns with rental economics of public cloud and isolation of private cloud. Potential use for Development, and other Use Cases Cloud
  • 19.
    CONNECT WITH US: Patterns/ApplicationCloud Strategy Realized Public | Copyright © 2014 Prolifics 21 Combine PureApplication Service on SoftLayer with Pure Applications systems to realize new deployment capabilities On-Premise Service on SMBs Growing to large enterprise Dev/Test moving to Production LoB moving to Corporate IT Disaster Recovery as a service Offloading tier 2 workload Cloud Bursting Cloud
  • 20.
    CONNECT WITH US: Optimal Investment Spend PureApplication: Software Licensing PureApplication System: Produces license usage reports which meet subcapacity licensing requirements Prevents license overages by optionally taking action when a requested deployment would exceed entitlement:  Warn: send email to user and admin, but allow deployment  Enforce: reject deployment Now supports the following license metrics:  Processor Value Unit (PVU), Virtual Instance / VM, Compute Node / Physical Server, Processor Core  Requires license expertise for optimal licensing  Prolifics’ IBM Software License Assessment and Review (iSOLAR) Program optimizes license costs License Inventory License Allocation License Overage Protection
  • 21.
    CONNECT WITH US: iSOLAR– What is it?  The iSOLAR Program is a consultative asset management service which Prolifics provides its customers to optimize infrastructure, provide a technology roadmap, identify risks and save money.  Executed in confidence. All materials under optional NDA.  Provides Customer: 1. Cost Savings – optimize software and hardware spend 2. Visibility - Provides IT inventory data for actionable insight into a client’s IT infrastructure 3. Planning - Improves infrastructure reporting, analysis and planning 4. Compliance / Risk Reduction - Ensures accurate tracking and reporting of IBM licenses and lowers audit exposure. Copyright © 2014 Prolifics. Do not distribute without permission. 23  Consists of two primary workstreams:  Data Collection Assessment/Analysis:  Analyze Customer Asset Management Data  IBM License Management Tool (ILMT) Assessment and installation: Optional – iSOLAR+  Asset Management Analysis:  iSOLAR Data Analysis and IBM Technology Review
  • 22.
    CONNECT WITH US: Patterns:Business Value Public | Copyright © 2014 Prolifics 24 Sample 3Yr TCO Comparison TCO = 68% (Lower) ROI = 351% (Higher) Avoid investment (capital expenses) on HW, SW, Networking, Storage $3,542,000 Avoid ongoing costs (operational expenses) on HW and SW maintenance $1,584,000 Achieve faster set-up of infrastructure $19,440 Improve environment design and deploy time $378,000 Leverage patterns for repeatable quick provisioning $1,105,650 Reduce defects and improve dev/test efficiencies $907,200 Automate maintenance and change management $296,698 Consolidate monitoring and improve incident management $264,384 Automate capacity management and allocation of resources $198,288 Improve security, asset management and compliance $622,080 Reduce Energy and Facilities cost $163,987 Avoid Revenue loss due to outages $51,370 Increase Revenue with improved time to market $205,479 Total Benefit for 3 years: $9,338,576 Estimated Investment in 3 years: $2,072,000 Net Benefit in 3 years: $7,266,576 Customers with holistic approach are projecting better returns than these…
  • 23.
    CONNECT WITH US: Howto get Started Public | Copyright © 2014 Prolifics 25  Build the vision and Share it  Build a Business Case:  Think full lifecycle, Dev through Operations for ROI  Analyze/Optimize your IBM Software spend for Patterns  Set realistic budget  Leverage your IBM Software spend – use Prolifics iSOLAR to maximize  Utilize Softlayer – lower initial cost threshold and validate use as Dev platform  Identify a workload – but Don’t boil the ocean:  make it feasible  Get Creative – 3rd party apps may also be Pattern candidates  Start with a pilot/POC but set aggressive timelines and challenges  Plan for Integration Needs (DBs, Sys Mgmt, Networking, Security, Facilities, etc). But don’t let them derail you.  EDUCATE, EDUCATE, EDUCATE:  In order to build Patterns, you must know how to integrate/Operate base Middleware  Make sure everyone knows their parts as well as tech training  Prolifics will partner with you to insure success.
  • 24.
    CONNECT WITH US: ContactUS September 26,Public | Copyright © 2014 Prolifics 26 www.prolifics.com (407) 641-0763 Bradley.Hertenstein@prolifics.com
  • 25.
    CONNECT WITH US: BackUp Slides Public | Copyright © 2014 Prolifics 27
  • 26.
    CONNECT WITH US:Public| Copyright © 2014 Prolifics 28  Clients have entitlement to run the following software on the full capacity of the System  Virtual System Patterns:  IBM OS Image for Red Hat Linux Systems v1 (RHEL 64-bit v6.2)  IBM WebSphere Application Server Hypervisor Edition v7 (WAS 7.0.0.21)  IBM WebSphere Application Server Hypervisor Edition v8 (WAS 8.0.0.2)  IBM WebSphere Application Server Hypervisor Edition v8.5 (WAS 8.5.0.0)  IBM WebSphere Application Server Hypervisor Edition v8.5 (WAS 8.5.5.0)  IBM Data Mart Pattern 1.1.0.8 (with DB2 BLU Acceleration)  IBM DB2 (9.7 FP5, 10.1, 10.5 with BLU Acceleration)  Automation Framework HV (for migrating applications)  Virtual Application Patterns:  IBM Application Pattern for Java 1.0  IBM Workload Deployer Pattern for Web Applications v1 (with WAS v7)  IBM Web Application Pattern 1.0, 2.0 (with WAS v8)  IBM Transactional Database for Cloud v1.1 (with DB2 9.7 FP5)  IBM Data Mart for Cloud v1.1 (with DB2 9.7 FP5)  Any other software that clients run on PureApplication System is traditionally licensed (i.e. PVUs) on a sub-capacity basis Pre-Optimized and Pre-Entitled Middleware
  • 27.
    CONNECT WITH US: IBMSoftware Pattern Inventory for PureApplication System W1500 (Intel) 29 • IBM SOA Policy Gateway 2.0, 2.5 • IBM Software Delivery and LifeCycle Patterns •Collaborative Lifecycle Mgmt 4.0.2 •Rational Application Developer 8.5 •Test Virtualization Server and Workbench • IBM Transactional Database Pattern 1.1 • IBM Web Application Pattern (1.0, 2.0) • IBM Web Content Manager 8.0 • IBM WebSphere App Server HV (7.0, 8.0, 8.5, 8.5.5) • IBM WebSphere Message Broker 8.0 • IBM WebSphere Cast Iron 6.4 • IBM WebSphere Commerce Pattern 1.0 (for WC Enterprise 7.0) • IBM WebSpere Datapower XG45 V5.0, V6.0 • IBM WebSphere Datapower XI52 V5.0, V6.0 • IBM WebSphere MQ 7.5 • IBM WebSphere Portal Server 8.0 • IBM WebSphere Transformation Extender Launcher 8.4, 8.4.1 • Microsoft Dynamics v2008 • Microsoft Exchange for Intel • Microsoft Sharepoint V2010 • Microsoft SQL Server V2012 • Oracle DB Enterprise Edition v11g, R2 • IBM API Management 2.0 • IBM Application Pattern for Java 1.0 • IBM Business Intelligence 1.0, 2.0 • IBM Business Process Manager 8.0.1, 8.5 • IBM Connections 4.0 • IBM Content Foundation Pattern 5.2 • IBM Data Mart Pattern 1.1.0.8 (with DB2 BLU Acceleration) • IBM DB2 (9.7 FP5, 10.1, 10.5 with BLU Acceleration) • IBM Domino 9.0 • IBM Encryption Pattern for Guardium Encryption Expert • IBM Encryption Pattern for SecurityFirst SPxBitFiler • IBM Informix 11.7, 12.10 • IBM InfoSphere Information Server 9.1 • IBM InfoSphere Master Data Management Standard Edition and Advanced Edition, 11.0 • IBM Integration Bus 9.0 (evolution of Message Broker) • IBM Maximo Asset Management 7.5 • IBM Messaging Extension for Web App Pattern 2.0 • IBM Mobile Application Platform 5.0.6, 6.0 • IBM Operational Decision Manager 8.0.1, 8.5 • IBM SOA Policy 2.0 Pre-entitled with PureApplication System
  • 28.
    CONNECT WITH US:30 IBM Software Pattern Inventory for PureApplication System W1700 (Power) • IBM SOA Policy Gateway 2.0, 2.5 • IBM Software Delivery and LifeCycle Patterns •Collaborative Lifecycle Mgmt 4.0.2 •Rational Application Developer 8.5 • IBM Transactional Database Pattern 1.1 • IBM Web Application Pattern (1.0, 2.0) • IBM Web Content Manager 8.0 • IBM WebSphere App Server HV (7.0, 8.0, 8.5, 8.5.5) • IBM WebSphere Message Broker 8.0 • IBM WebSphere Commerce Pattern 1.0 (for WC Enterprise 7.0) • IBM WebSphere MQ 7.5 • IBM WebSphere Portal Server 8.0 • IBM WebSphere Transformation Extender Launcher 8.4, 8.4.1 • Oracle DB Enterprise Edition v11g, R2 • IBM Application Pattern for Java 1.0 • IBM Business Intelligence 1.0, 2.0 • IBM Business Intelligence Pattern w/BLU Acceleration 1.0 • IBM Business Process Manager 8.0.1, 8.5 • IBM Data Mart Pattern 1.1.0.8 (with DB2 BLU Acceleration) • IBM DB2 (9.7 FP5, 10.1, 10.5 with BLU Acceleration) • IBM Encryption Pattern for Guardium Encryption Expert • IBM Encryption Pattern for SecurityFirst SPxBitFiler • IBM Informix 11.7, 12.10 • IBM InfoSphere Information Server 9.1 • IBM Integration Bus 9.0 (evolution of Message Broker) • IBM Maximo Asset Management 7.5 • IBM Messaging Extension for Web App Pattern 2.0 • IBM Mixed Language Application Modernization Pattern 1.0 (Runtime pre-entitled, Extensions separate purchase) • IBM Mobile Application Platform 5.0.6, 6.0 • IBM Operational Decision Manager 8.0.1, 8.5 Pre-entitled with PureApplication System
  • 29.
    CONNECT WITH US: {Introto Prolifics} Public | Copyright © 2014 Prolifics 31
  • 30.
    CONNECT WITH US: Introto Prolifics Public | Copyright © 2014 Prolifics 32 •Los Angeles •San Francisco •London •Hamburg •Hyderabad •Pune •Calabasas •New York •Boston •Philadelphia •Washington DC •Orlando In business for over 35 years, Prolifics is a Global Technology Consulting company with 1300 employees worldwide specializing in the expert delivery of end-to-end solutions utilizing IBM technologies. Who Are We?
  • 31.
    CONNECT WITH US: CompanySnapshot Public | Copyright © 2014 Prolifics 33 FY 2012: $105M 35 years of continued growth Over 150 global customers are currently Fortune 1000 companies Over 550 technical certifications SkillsYoY Revenue Growth Customers Services across the full project lifecycle including advisory services, architecture, business analysis, design, development, testing, training, support, and system administration End-to-End Services from Innovations to on-going Support and Maintenance IBM Software Leadership Repeat winner of multiple IBM Software awards, including the Beacon Award for Outstanding Technical Vitality. More IBM Authorizations/Accreditations than any other IBM partner.
  • 32.
    CONNECT WITH US: BPMPattern and Typical Development Topology Public | Copyright © 2014 Prolifics 34 Process Server Production Process Server QA Test Process Center Centralized repository Centralized deployment Centralized governance Process Server Staging Test Integration Designer Workstation Process Designer Workstation Process Center Console Unit Test Environment IT Developers Administrators Business & IT Authors Administrators Process Admin Console Runtime Environments Administrators BPM Application Pattern Prolifics Pure Acceleration: BPM Pattern and Typical Development Topology
  • 33.
  • 34.
  • 35.
    CONNECT WITH US: PureApplication: Hardware Public | Copyright © 2014 Prolifics 37
  • 36.
    CONNECT WITH US: PureApplicationSystem W1500 W1500-32 W1500-64 W1500-96 W1500-192 W1500-384 W1500-608 Compute Processor 8 core, 2.6GHz Intel Sandy Bridge EP processor, 115 W Compute Node Dual Processor, 16-core, 256GB memory Memory/Compute Node 256GB (8 2x16GB, 1333 MHz, DDR3, LP RDIMMS(1.35V)) Network cards/Compute Node 1 x EN4054 – 4 port 10Gb Ethernet Mezz Adapter Fibre cards/Compute Node 1 x FC 3172 - 2 port 8Gb Fibre Channel Mezz Adapter # Compute nodes 2 4 6 12 24 38 # Cores 32 64 96 192 384 608 Memory 512 GB 1 TB 1.5 TB 3.1 TB 6.1 TB 9.7 TB Storage Solid State Drive (SSD) 6 x 400GB 2.5 in. SSD (E-MLC) 16 x 400GB 2.5 in. SSD (E-MLC) Hard Disk Drive (HDD) 40 x 600 GB 2.5 in. 10k HDD 80 x 600 GB 2.5 in. 10k HDD Storage Controller 1 x IBM Storwize V7000 Disk System 2 x IBM Storwize V7000 Disk System Storage Expansion 1 x IBM Storwise V700 Storage Drawer 2 x IBM Storwise V700 Storage Drawer Total Storage SSD 2.4 TB unformatted / 1.6 TB usable 6.4 TB unformatted / 4.8 TB usable Total Storage HDD 24.0 TB unformatted / 21.6 TB usable 48.0 TB unformatted / 43.2 TB usable Network Top of Rack Switches (TOR) BLADE Network Technologies TOR G8264 switches for Customer Data Center & Rack to Rack communications Transceivers Choice of: 10GbE Fibre, 1GbE Fibre, 1GbE Copper, Direct Attach Cabling (DAC / Twinax) Chassis Network / Chassis 2 x EN4093 – BNT 10GbE Fibre / Chassis 2 x FC5022– Brocade 48 16GbFC Chassis 1 x Accipiter Chassis 3 x Accipiter Chassis Power Power Distribution Unit (PDU) 4 x 60A 1ph - North America 4 x 32A 1ph - International 4 x 60A 3ph - North America 4 x 32A 3ph - International Mmgt Node 2 x PureSystems Manager (PSM) 2 x Virtualization System Manager (VSM) Rack Rack 1.3 M 19” Enterprise Rack 2.0 M 19” Enterprise Rack Specs Weight 365.6 Kg (815 lb) 385.6 Kg (850 lb) 936 Kg (2027 lb) 953 Kg (2095 lb) 1016 Kg (2232 lb) 1088 Kg (2391 lb) Power Max: 5.5 kW Typical: 4.68 kW Max: 6.5 kW Typical: 5.52 kW Max: 7.9 kW Typical: 5.9kW Label: 14kW Max: 10.4 kW Typical: 7.8 kW Label: 17.4 kW Max: 15.4 kW Typical: 11.6 kW Label: 24.3 kW Max: 21.2 kW Typ.: 15.9 kW Label: 31.1 kW Dimensions Height: 1240 mm (49 in) / Depth: 1000 mm (39.4 in) / Width: 610 mm (24 in) Height: 2.015 m (79.3 in) / Depth: 1.098 m (43.3 in) / Width: 0.644 m (25.4 in)

Editor's Notes

  • #6  According to Gartner’s analysis worldwide IT spending in 2013 was about $3.7T IBM’s 2012 Data Center Study showed that only 1 in 5 organizations allocate more than half their IT budget to new projects and innovation
  • #18 Phoenix Test Servers are test systems that we rebuild for each round of testing to ensure we don’t accidentally produce code or configuration that works because of a left over from a prior set up. Red/Green Servers (a.k.a odd/even) are none active instances set up along side an active environment so that pre-production deployments and tests can be done prior to a go live. This gives an easy path to switch back and avoids the all weekend sucky go live conference calls because everyone is concerned that the deployment might not work.
  • #30 Intel Based Solutions available
  • #31 Power Based Solutions available
  • #36 35
  • #37 36
  • #39 This is Gen 1 Data.