SlideShare a Scribd company logo
rout waeylay nteercloomckminugnPicaanteiol n 
essenger esservation ystem 
nreserved icting ystem
PRS is computerized reservation system for any train 
from anywhere in country, launched on 15th November 
1985. 
The system works both on the optical fiber cable & the 
microwave communication at the data rate of 4.8 kbps or 9.6 
kbps.
Provide 
Reserved 
Accommodation 
On Any Train 
From Any 
Counter 
Accounting Of 
Money Collected 
Objective 
Preparation Of 
Train Charts
Equipment used in PRS:- 
MODEM 
Multiplexing 
Equipment 
END 
TERMINAL 
It is the process of 
converting multi inputs 
signal into one output 
signal 
Modem means modulate and demodulate. 
We can use modems to log on to micro, mini, main 
frame computer for line processing. 
MUX 
I0 
I1 
I2 
I3 
S0 S1 
O/P 
The end terminal of the system is the station where 
tickets are to be printed out. It consists of a company 
system with a dot matrix printer
It is a computerized system used to issue the tickets for the 
unreserved compartments of train . 
The system is programmed according to the type of the train. 
The system works at the data rate of the 64 kbps .
Equipment used in UTS:- 
Terminal 
and 
terminal 
server 
Baseband 
Modem 
Router 
Router It This is the device end is used is point used to of detect to the interconnect network the quality from user where samples devices tickets with from are each different 
to other 
be 
branches printed over 2-wire out and .It circuits. consists start The sending of ports a monitor, data available from a keyboard for that the branch interfacing and a matrix 
which are has 
G- 
printer. 
good 703, V.quality 35, V.24, ratio. 
V.11. 
The router has 25 input terminals, which means that 25 
branches can be connected to the router.
It will display the position of trains, signals aspects &point 
conditions. The panel contains switches for performing 
different operations. 
The panel contain 2 seven segment display . 
One speaker is also placed for making necessary 
appointments.
Rail net is an internet for railways. 
Important information and data can be transformed from 
one division to other division. 
Within less time in railways current position of train can 
be obtained in PRS. 
The connectivity of different reservation take place with 
the help of rail net.
These 3 aspect which i presented in front 
of you are the building block of railway. 
Which deals with detail study of signal, 
control and communication. 
Which in turn help me to develop a 
practical view of the subject which I 
have learnt in my engineering period.
indian railway ppt samastipur

More Related Content

What's hot

Indian railway signal engg. vol iv
Indian railway signal engg. vol ivIndian railway signal engg. vol iv
Indian railway signal engg. vol ivBhanu Teja
 
Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143
sanjeet kumar
 
The necessity of mobile train radio communication in india
The necessity of mobile train radio communication in indiaThe necessity of mobile train radio communication in india
The necessity of mobile train radio communication in india
eSAT Journals
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)
Suraj Soni
 
Railway shashikant training report on
Railway shashikant training report onRailway shashikant training report on
Railway shashikant training report on
shashi11vgi
 
South central railways
South central railwaysSouth central railways
South central railways
ANJALI KUTADA
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Brief
energyvijay
 
Integrated Railway Transport Management System
Integrated Railway Transport Management SystemIntegrated Railway Transport Management System
Integrated Railway Transport Management System
SIS Group International
 
Signalling and telecommunication
Signalling and telecommunicationSignalling and telecommunication
Signalling and telecommunication
VISHWAJEET SINGH
 
Presentation on railways
Presentation on railwaysPresentation on railways
Presentation on railways
Naughattyy Poem
 
Ppt on datalogger+digital modulation english
Ppt on datalogger+digital modulation englishPpt on datalogger+digital modulation english
Ppt on datalogger+digital modulation english
Bhupesh Jha
 
Radio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail OperationRadio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail OperationIbrahim Al-Hudhaif
 
New approaches in railway signaling
New approaches in railway signalingNew approaches in railway signaling
New approaches in railway signaling
Murat BAYKAL
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-RajbanshRom!el Rajbansh
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
Suraj Talreja
 
indian railway real report
indian railway real reportindian railway real report
indian railway real report
mishra22
 
Metro Signalling Revolution in India
Metro Signalling Revolution in IndiaMetro Signalling Revolution in India
Metro Signalling Revolution in India
Shiv Mohan CEng, PMP, PGDBA ,MIRSE,MIEEE,MIET
 
Communications-Based Signalling Strategies
Communications-Based Signalling StrategiesCommunications-Based Signalling Strategies
Communications-Based Signalling Strategies
Railways and Harbours
 

What's hot (20)

Indian railway signal engg. vol iv
Indian railway signal engg. vol ivIndian railway signal engg. vol iv
Indian railway signal engg. vol iv
 
Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143
 
V
VV
V
 
The necessity of mobile train radio communication in india
The necessity of mobile train radio communication in indiaThe necessity of mobile train radio communication in india
The necessity of mobile train radio communication in india
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)
 
Railway shashikant training report on
Railway shashikant training report onRailway shashikant training report on
Railway shashikant training report on
 
South central railways
South central railwaysSouth central railways
South central railways
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Brief
 
Integrated Railway Transport Management System
Integrated Railway Transport Management SystemIntegrated Railway Transport Management System
Integrated Railway Transport Management System
 
Signalling and telecommunication
Signalling and telecommunicationSignalling and telecommunication
Signalling and telecommunication
 
FTN Architecture
FTN ArchitectureFTN Architecture
FTN Architecture
 
Presentation on railways
Presentation on railwaysPresentation on railways
Presentation on railways
 
Ppt on datalogger+digital modulation english
Ppt on datalogger+digital modulation englishPpt on datalogger+digital modulation english
Ppt on datalogger+digital modulation english
 
Radio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail OperationRadio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail Operation
 
New approaches in railway signaling
New approaches in railway signalingNew approaches in railway signaling
New approaches in railway signaling
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-Rajbansh
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 
indian railway real report
indian railway real reportindian railway real report
indian railway real report
 
Metro Signalling Revolution in India
Metro Signalling Revolution in IndiaMetro Signalling Revolution in India
Metro Signalling Revolution in India
 
Communications-Based Signalling Strategies
Communications-Based Signalling StrategiesCommunications-Based Signalling Strategies
Communications-Based Signalling Strategies
 

Viewers also liked

La contaminación ambiental
La contaminación ambientalLa contaminación ambiental
La contaminación ambiental
Juan Carlos Rodriguez M.
 
Tip ca-tauha nadeem
Tip ca-tauha nadeemTip ca-tauha nadeem
Tip ca-tauha nadeem
Tauha Nadeem
 
8 "vitamine" per far ritrovare la giusta energia al tuo team
8 "vitamine" per far ritrovare la giusta energia al tuo team8 "vitamine" per far ritrovare la giusta energia al tuo team
8 "vitamine" per far ritrovare la giusta energia al tuo team
Cezanne HR Italia
 
Il ruolo delle hr in azienda: possono guidare il business?
Il ruolo delle hr in azienda: possono guidare il business?Il ruolo delle hr in azienda: possono guidare il business?
Il ruolo delle hr in azienda: possono guidare il business?
Cezanne HR Italia
 
Youtube
YoutubeYoutube
Youtube
majed_3yedh
 
Corporate Diaries
Corporate DiariesCorporate Diaries
Corporate Diaries
riamathur1
 
5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India
5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India
5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India
riamathur1
 
Opportunity Hub Ecosystem
Opportunity Hub EcosystemOpportunity Hub Ecosystem
Opportunity Hub Ecosystem
ohubatl
 
iam group limited
iam group limitediam group limited
iam group limited
SelenaMiles
 
ALLSHARP CORP_BagApp_ITB2016_final
ALLSHARP CORP_BagApp_ITB2016_finalALLSHARP CORP_BagApp_ITB2016_final
ALLSHARP CORP_BagApp_ITB2016_finalSerena Panighi
 
La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?
La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?
La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?
Cezanne HR Italia
 
Youtube philip kotler marketing
Youtube philip kotler marketingYoutube philip kotler marketing
Youtube philip kotler marketingselinasimpson715
 
Alle HR servono degli occhiali nuovi
Alle HR servono degli occhiali nuoviAlle HR servono degli occhiali nuovi
Alle HR servono degli occhiali nuovi
Cezanne HR Italia
 
Quale tecnologia hr dovresti acquistare?
Quale tecnologia hr dovresti acquistare?Quale tecnologia hr dovresti acquistare?
Quale tecnologia hr dovresti acquistare?
Cezanne HR Italia
 

Viewers also liked (16)

Textual analysis
Textual analysisTextual analysis
Textual analysis
 
La contaminación ambiental
La contaminación ambientalLa contaminación ambiental
La contaminación ambiental
 
Tip ca-tauha nadeem
Tip ca-tauha nadeemTip ca-tauha nadeem
Tip ca-tauha nadeem
 
8 "vitamine" per far ritrovare la giusta energia al tuo team
8 "vitamine" per far ritrovare la giusta energia al tuo team8 "vitamine" per far ritrovare la giusta energia al tuo team
8 "vitamine" per far ritrovare la giusta energia al tuo team
 
Il ruolo delle hr in azienda: possono guidare il business?
Il ruolo delle hr in azienda: possono guidare il business?Il ruolo delle hr in azienda: possono guidare il business?
Il ruolo delle hr in azienda: possono guidare il business?
 
Youtube
YoutubeYoutube
Youtube
 
Corporate Diaries
Corporate DiariesCorporate Diaries
Corporate Diaries
 
5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India
5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India
5by7.in | Unique gifts | Unique corporate gifts | Unique gift ideas India
 
Opportunity Hub Ecosystem
Opportunity Hub EcosystemOpportunity Hub Ecosystem
Opportunity Hub Ecosystem
 
iam group limited
iam group limitediam group limited
iam group limited
 
ALLSHARP CORP_BagApp_ITB2016_final
ALLSHARP CORP_BagApp_ITB2016_finalALLSHARP CORP_BagApp_ITB2016_final
ALLSHARP CORP_BagApp_ITB2016_final
 
La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?
La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?
La policy sulla gestione delle assenze è adeguata agli obbiettivi aziendali?
 
Youtube philip kotler marketing
Youtube philip kotler marketingYoutube philip kotler marketing
Youtube philip kotler marketing
 
CV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHANCV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHAN
 
Alle HR servono degli occhiali nuovi
Alle HR servono degli occhiali nuoviAlle HR servono degli occhiali nuovi
Alle HR servono degli occhiali nuovi
 
Quale tecnologia hr dovresti acquistare?
Quale tecnologia hr dovresti acquistare?Quale tecnologia hr dovresti acquistare?
Quale tecnologia hr dovresti acquistare?
 

Similar to indian railway ppt samastipur

scada
scadascada
scada
edzam
 
Mtnl bsnl training
Mtnl bsnl trainingMtnl bsnl training
Mtnl bsnl training
Jasgt Singh
 
Mobile robotic platform to gathering real time sensory data in wireless perso...
Mobile robotic platform to gathering real time sensory data in wireless perso...Mobile robotic platform to gathering real time sensory data in wireless perso...
Mobile robotic platform to gathering real time sensory data in wireless perso...
Alexander Decker
 
Bus Data Acquisition and Remote Monitoring System Using Gsm & Can
Bus Data Acquisition and Remote Monitoring System Using Gsm & CanBus Data Acquisition and Remote Monitoring System Using Gsm & Can
Bus Data Acquisition and Remote Monitoring System Using Gsm & Can
IOSR Journals
 
Implementation of MIL-STD1553 using Microcontroller Atmega 328P
Implementation of MIL-STD1553 using Microcontroller Atmega 328PImplementation of MIL-STD1553 using Microcontroller Atmega 328P
Implementation of MIL-STD1553 using Microcontroller Atmega 328P
IRJET Journal
 
Scada
ScadaScada
Scada
Amit Kumar
 
EWSD Switching Systems
 EWSD Switching Systems  EWSD Switching Systems
EWSD Switching Systems
Arun Rajput
 
G05134851
G05134851G05134851
G05134851
IOSR-JEN
 
Cdot Max ng architecture working models
Cdot Max ng  architecture working modelsCdot Max ng  architecture working models
Cdot Max ng architecture working models
RahmanScholar
 
Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...
Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...
Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...
IRJET Journal
 
A010240110
A010240110A010240110
A010240110
IOSR Journals
 
GSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdf
GSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdfGSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdf
GSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdf
Lynn588356
 
Response time analysis of mixed messages in CAN
Response time analysis of mixed messages in CANResponse time analysis of mixed messages in CAN
Response time analysis of mixed messages in CAN
IJERA Editor
 
Frame Relay And Leased Lines Essay
Frame Relay And Leased Lines EssayFrame Relay And Leased Lines Essay
Frame Relay And Leased Lines Essay
Renee Jones
 
enoticeboard-150526024918-lva1-app6892 (2).pdf
enoticeboard-150526024918-lva1-app6892 (2).pdfenoticeboard-150526024918-lva1-app6892 (2).pdf
enoticeboard-150526024918-lva1-app6892 (2).pdf
SupriaNandan
 
wireless E notice board
wireless E notice boardwireless E notice board
wireless E notice board
Ganesh Gani
 
A010610109
A010610109A010610109
A010610109
IOSR Journals
 
Development of Distributed Mains Monitoring and Switching System for Indus Co...
Development of Distributed Mains Monitoring and Switching System for Indus Co...Development of Distributed Mains Monitoring and Switching System for Indus Co...
Development of Distributed Mains Monitoring and Switching System for Indus Co...
iosrjce
 

Similar to indian railway ppt samastipur (20)

scada
scadascada
scada
 
Mtnl bsnl training
Mtnl bsnl trainingMtnl bsnl training
Mtnl bsnl training
 
Mobile robotic platform to gathering real time sensory data in wireless perso...
Mobile robotic platform to gathering real time sensory data in wireless perso...Mobile robotic platform to gathering real time sensory data in wireless perso...
Mobile robotic platform to gathering real time sensory data in wireless perso...
 
Bus Data Acquisition and Remote Monitoring System Using Gsm & Can
Bus Data Acquisition and Remote Monitoring System Using Gsm & CanBus Data Acquisition and Remote Monitoring System Using Gsm & Can
Bus Data Acquisition and Remote Monitoring System Using Gsm & Can
 
Implementation of MIL-STD1553 using Microcontroller Atmega 328P
Implementation of MIL-STD1553 using Microcontroller Atmega 328PImplementation of MIL-STD1553 using Microcontroller Atmega 328P
Implementation of MIL-STD1553 using Microcontroller Atmega 328P
 
Scada
ScadaScada
Scada
 
EWSD Switching Systems
 EWSD Switching Systems  EWSD Switching Systems
EWSD Switching Systems
 
G05134851
G05134851G05134851
G05134851
 
Cdot Max ng architecture working models
Cdot Max ng  architecture working modelsCdot Max ng  architecture working models
Cdot Max ng architecture working models
 
Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...
Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...
Application of NarrowBand Power Line Communication in Medium Voltage Smart Di...
 
A010240110
A010240110A010240110
A010240110
 
GSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdf
GSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdfGSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdf
GSM_BASED_LED_SCROLLING_DISPLAY_BOARD.pdf
 
Response time analysis of mixed messages in CAN
Response time analysis of mixed messages in CANResponse time analysis of mixed messages in CAN
Response time analysis of mixed messages in CAN
 
Frame Relay And Leased Lines Essay
Frame Relay And Leased Lines EssayFrame Relay And Leased Lines Essay
Frame Relay And Leased Lines Essay
 
DMRC
DMRCDMRC
DMRC
 
enoticeboard-150526024918-lva1-app6892 (2).pdf
enoticeboard-150526024918-lva1-app6892 (2).pdfenoticeboard-150526024918-lva1-app6892 (2).pdf
enoticeboard-150526024918-lva1-app6892 (2).pdf
 
wireless E notice board
wireless E notice boardwireless E notice board
wireless E notice board
 
A010610109
A010610109A010610109
A010610109
 
Development of Distributed Mains Monitoring and Switching System for Indus Co...
Development of Distributed Mains Monitoring and Switching System for Indus Co...Development of Distributed Mains Monitoring and Switching System for Indus Co...
Development of Distributed Mains Monitoring and Switching System for Indus Co...
 
sem_project_2
sem_project_2sem_project_2
sem_project_2
 

Recently uploaded

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

indian railway ppt samastipur

  • 1.
  • 2. rout waeylay nteercloomckminugnPicaanteiol n essenger esservation ystem nreserved icting ystem
  • 3. PRS is computerized reservation system for any train from anywhere in country, launched on 15th November 1985. The system works both on the optical fiber cable & the microwave communication at the data rate of 4.8 kbps or 9.6 kbps.
  • 4.
  • 5. Provide Reserved Accommodation On Any Train From Any Counter Accounting Of Money Collected Objective Preparation Of Train Charts
  • 6. Equipment used in PRS:- MODEM Multiplexing Equipment END TERMINAL It is the process of converting multi inputs signal into one output signal Modem means modulate and demodulate. We can use modems to log on to micro, mini, main frame computer for line processing. MUX I0 I1 I2 I3 S0 S1 O/P The end terminal of the system is the station where tickets are to be printed out. It consists of a company system with a dot matrix printer
  • 7. It is a computerized system used to issue the tickets for the unreserved compartments of train . The system is programmed according to the type of the train. The system works at the data rate of the 64 kbps .
  • 8.
  • 9. Equipment used in UTS:- Terminal and terminal server Baseband Modem Router Router It This is the device end is used is point used to of detect to the interconnect network the quality from user where samples devices tickets with from are each different to other be branches printed over 2-wire out and .It circuits. consists start The sending of ports a monitor, data available from a keyboard for that the branch interfacing and a matrix which are has G- printer. good 703, V.quality 35, V.24, ratio. V.11. The router has 25 input terminals, which means that 25 branches can be connected to the router.
  • 10. It will display the position of trains, signals aspects &point conditions. The panel contains switches for performing different operations. The panel contain 2 seven segment display . One speaker is also placed for making necessary appointments.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. Rail net is an internet for railways. Important information and data can be transformed from one division to other division. Within less time in railways current position of train can be obtained in PRS. The connectivity of different reservation take place with the help of rail net.
  • 24.
  • 25. These 3 aspect which i presented in front of you are the building block of railway. Which deals with detail study of signal, control and communication. Which in turn help me to develop a practical view of the subject which I have learnt in my engineering period.

Editor's Notes

  1. Good morning all of you……………… I had completed my training at Indian railways in signaling & telecommunication………..
  2. My training presentation is based on 3 main aspects of railway………..\ Booking of tickets which may be reserved or unreserved. How trains occupy a specific track on a railway station so that the arrival & departure of other trains could not be effected. Proper Communication in b/w railway stations to prevent any miss happening.
  3. It facilitates booking & cancelling of tickets from any of the 4000 terminals all over the country.
  4. My training presentation is based on 3 main aspects of railway………..\ Booking of tickets which may be reserved or unreserved.() How trains occupy a specific track on a railway station so that the arrival & departure of other trains could not be effected. Proper Communication in b/w railway stations to prevent any miss happening.
  5. Train movement sequence:-
  6. More trains arrives
  7. The third trains arrives
  8. Next moves begin
  9. My training presentation is based on 3 main aspects of railway………..\ Booking of tickets which may be reserved or unreserved.() How trains occupy a specific track on a railway station so that the arrival & departure of other trains could not be effected. Proper Communication in b/w railway stations to prevent any miss happening.
  10. So, before starting let’s review about some interesting facts about our railways………. Railway were 1st Introduced To India In 1853,governed by central govt. of India, has 64,215km of track & 7,083 stations. It is world 4th largest n/w carrying 20 million passenger every year equivalent of world population.
  11. So, before starting let’s review about some interesting facts about our railways………. Railway were 1st Introduced To India In 1853,governed by central govt. of India, has 64,215km of track & 7,083 stations. It is world 4th largest n/w carrying 20 million passenger every year equivalent of world population.