1 EXISTING CONDITION
Greater Jakarta Transport Authority 2
GREATER JAKARTA (JABODETABEK)
CHALLENGE : SPRAWL!
Greater Jakarta Transport Authority
Greater Jakarta includes
3 provinces and 8
municipalities
Population: 31 million
Badan Pengelola Transportasi Jabodetabek
Proportion of Commuting Trip
Greater Jakarta Transport Authority
30,6%
425.000
38,3%
571.000
31,1%
423.000
Number of Vehicle :
24.9 million
Motorcycle:
18.5 million units ( 74 % )
Private car:
5.9 million units ( 24 % )
Buses :
512 thousand units ( 2 % )
Trip = 47.5 million / day
4
Greater Jakarta Transport Authority
ZONA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Total 2015
1 4,514,137 36,678 151,060 259,766 409,221 189,447 352,430 269,431 124,242 152,088 225,107 116,415 30,450 36,254 29,099 34,076 23,176 6,953,078
2 33,525 780,004 10,158 52,377 4,540 3,842 143,153 4,408 3,078 5,821 18,862 2,087 2,040 8,320 2,089 2,269 2,118 1,078,692
3 148,636 10,917 367,522 29,263 4,713 3,481 15,666 54,366 4,871 5,091 7,397 2,437 3,496 1,990 1,284 1,158 722.8868 663,010
4 232,566 54,131 28,166 719,203 14,029 12,045 136,540 9,536 5,763 12,553 35,088 4,952 2,350 9,988 1,634 3,011 3,344 1,284,899
5 397,448 5,012 4,587 14,544 1,888,969 47,238 35,208 57,123 113,082 145,605 35,660 101,936 5,811 8,880 9,639 15,830 10,490 2,897,062
6 187,253 4,263 4,251 13,192 40,561 1,459,584 42,972 10,361 9,992 68,088 64,726 6,450 3,099 11,244 3,983 9,939 10,847 1,950,804
7 346,843 148,368 14,536 122,564 35,477 39,512 2,785,760 17,175 15,250 28,323 240,476 12,576 5,659 43,695 4,372 5,120 8,861 3,874,568
8 261,313 4,690 56,872 9,955 55,349 10,826 19,290 2,251,927 115,466 16,230 16,781 16,480 27,411 5,382 2,234 2,999 2,406 2,875,609
9 122,807 3,133 4,922 6,316 111,318 10,057 15,946 124,888 3,183,221 16,201 21,149 68,483 178,878 5,611 2,576 3,214 1,849 3,880,570
10 152,300 5,871 4,626 13,922 140,442 67,918 29,047 16,235 18,546 2,505,458 26,420 25,413 2,920 6,071 16,730 46,736 56,393 3,135,049
11 226,972 18,342 7,289 36,006 31,279 64,656 227,466 17,517 21,277 25,225 3,967,599 7,456 3,262 179,845 3,254 4,807 17,756 4,860,008
12 113,042 2,523 2,731 4,874 103,883 9,360 12,196 17,429 65,698 25,749 9,379 1,299,005 20,557 1,731 2,912 10,954 1,759 1,703,782
13 31,125 2,420 3,383 2,240 6,124 3,034 5,755 29,096 182,445 2,939 3,410 20,382 2,471,282 2,346 1,574 27,886 1,846 2,797,286
14 36,490 7,810 2,205 10,184 9,352 10,862 44,863 5,455 6,060 6,391 179,786 1,789 579.1357 2,804,351 914.2318 790.0932 14,101 3,141,982
15 26,902 1,941 1,345 1,745 9,608 3,825 4,426 2,476 2,406 16,643 2,605 3,213 646.1143 1,332 980,764 162,117 115,981 1,337,976
16 34,901 2,488 1,408 2,818 15,453 10,512 4,784 3,368 3,776 47,482 4,985 11,058 28,083 1,640 169,946 1,885,981 73,508 2,302,193
17 21,827 2,501 623.5696 2,852 10,160 10,709 8,054 2,183 2,062 54,642 17,844 1,666 757.6981 16,959 114,991 72,808 2,476,402 2,817,042
Total 2015 6,888,088 1,091,092 665,687 1,301,821 2,890,477 1,956,906 3,883,556 2,892,973 3,877,237 3,134,529 4,877,276 1,701,799 2,787,281 3,145,639 1,347,993 2,289,695 2,821,559 47,553,609
Total Trip in Jabodetabek 2015 : 47.5 million / day
O/D MATRIX 2015
5
6
Worsening Traffic Jam
• Significantly decreased vehicle speed since 10 years ago
• In Jakarta, average speed at peak hour 10km/hour
• Volume Capacity Ratio (VCR) in metropolitan area exceeded 1
• Economic losses due to traffic congestion up to USD 1.3 billion (2010), and
predicted to be USD 6.5 billion in 2020;
Current Major Problems of Transport in Greater Jakarta
(Jabodetabek)
2 KEY PERFORMANCE INDICATORS
Greater Jakarta Transport Authority 7
KEY PERFORMANCE INDICATORS
Greater Jakarta Transport Authority
8
1. Public transport share is 60 %
2. Maximum travel time from origin to destination
is 1.5 hours at peak hours.
3. Minimum average speed is 30 km / h at peak
hours.
4. Coverage of public transport services in urban
areas is 80 % of the length of the road.
5. Maximum walking distance to public transport is
500 m .
6. Each region must have feeder line connected to
the trunk line in transit point.
7. The transit must have facilities for pedestrians
and car park and ride, with the maximum tranfer
distance between mode is 500 m.
24%
Existing 2016
40%
2019
50%
2024
60%
2029
+ 16%
+ 10%
+ 10%
3 years 5 years 5 years
Greater Jakarta Transport Authority
9
MAIN TARGET :
INCREASE PUBLIC TRANSPORT SHARE
3 THE WAY FORWARD
Greater Jakarta Transport Authority 10
MASTER PLAN OF GREATER JAKARTA TRANSPORTATION
(RENCANA INDUK TRANSPORTASI JABODETABEK)
Greater Jakarta Transport Authority
11
R I T J
SAFETY&SECURITY
TRANSPORTATION
GREEN
NETWORK
INFRASTRUCTURE
TRANSPORTATION
ROADTRANSPORTATION
SYSTEM
RAILTRANSPORTATION
SYSTEM
ENHANCINGTRAFFIC
PERFORMANCE
INTEGRATED
TRANSPORTATIONSYSTEM
FINANCING
GREENTRANSPORTATION
PILAR
1
PILAR
2
PILAR
6
PILAR
7
PILAR
9
PILAR
8
PILAR
3
PILAR
4
PILAR
5
9 PILARS
THEINTEGRATIONOF
TRANSPORTATION&LANDUSE
10/26/2017
Existing Public Transport in GJTA
Transport Mode Service Area Route Network Price Headway
KRL (Commuter Line) Jabodetabek Six loop lines Subsidized-distance based fare 5- 15 min
Transjakarta (Bus Rapid
Transit)
Inner Jakarta 14 trunk corridors Subsidized-íntegrated price and
network
5- 20 min
APTB (Feeder
Transjakarta)
Jabodetabek 24 main route Highly regulated market price 15 min- 1 hour
Intermediate bus Inner Jakarta More than 20 Low regulated market price Random
Angkot (mini bus) Jabodetabek More than 20 Low regulated market price Random
Taxi Jabodetabek - Distance based fare -
Jabodebatek
Ressidence Connexion
Jabodetabek More than 10 Market Price 15 min
Jabodetabek Airport
Connexion
Jabodetabek More than 10 Markat Price 15 min
10/26/2017
DEVELOPMENT OF PUBLIC TRANSPORT
IN JABODETABEK
1. Commuter Line (CL), PT. KCJ (operated)
2. Bus Rapid Transit (BRT), PT. Transjakarta (operated)
3. Automatic People Mover system (APMS), Soekarno-Hatta
Airport (operated)
4. LRT JABODEBEK, Ministry of Transportation /Adhi Karya
5. LRT JAKPRO, Jakarta Government / JAKPRO
6. Mass Rapid Transit (MRT), PT. MRT
7. Airport Railway (CL dan Ekspress), PT. KAI
8. Jakarta – Bandung High-Speed Train (KCIC)
9. Light Rail Transit (LRT), Jababeka
Greater Jakarta Transport Authority
4 LIGHT RAPID TRANSIT (LRT)
MOT/ PT. ADHI KARYA
Greater Jakarta Transport Authority 16
PROJECT PROFILE
• BASED ON PRESIDENTIAL DECREE NO. 98/2015
PT. ADHI KARYA & PT. KERETA API INDONESIA
ASSIGNED TO BUILD
• TOTAL COST 27 TRILYUN
• IDR 24 TRILIUN FOR INFRASTRUKTUR
• IDR 3 TRILIUN FOR TRAIN
• PT ADHI KARYA & PT. KAI BEAR BUDGET
REQUIREMENT OF 9 TRILYUN AND THE
REMAINING 18 TRILYUN BY THE BANKING
SYNDICATION
10/26/2017
10/26/2017
10/26/2017
10/26/2017
10/26/2017
LENGTH OF TRACK 14,3 KM 37%PROGRES ON AUSGUST 2017
10/26/2017
LENGTH OF TRACK 18,3 KM
17%PROGRES ON AUSGUST 2017
10/26/2017
LENGTH OF TRACK 10,5 KM
3 %PROGRES ON AUSGUST 2017
PROSES
PENGERJAAN
AREA PEKERJAAN
DEWI SARTIKA -
KASN
Stasiun Cawang
Pulau
Intan
Video Progres LRT MOT/ADHI KARYA
10/26/2017
5 LIGHT RAPID TRANSIT (LRT)
JAKPRO
Greater Jakarta Transport Authority 25
PROJECT PROFILE
• BASED ON PRESIDENTIAL DECREE NO.
99/2015, JAKARTA GOVERNMENT TO
ASSIGNED REGIONAL OWNED
ENTERPRISES TO BUILD AND OPEARATE
RAILWAY
• GOVERNOR DECREE NO. 213/2015 AND
211/2016 ASSIGN PT. JAKPRO TO
DEVELOP LRT
• TOTAL COST 6,8 TRILYUN FROM LOCAL
BUDGET (GOVERNMENT JAKARTA)
10/26/2017
27
LEGAL BASIS LRT JAKARTA
PerGub DKI Jakarta No. 213 Tahun 2015 sudah direvisi menjadi PerGub DKI
Jakarta No. 211 Tahun 2016
7 CORRIDOR LRT NETWORK IN JAKARTA
▪ Total length of track for Asian
Games 2018: ± 5,8 km
(including Depo)
▪ Number of station LRT: 6
Elevated Station
Koridor 1 (Fase 1)
CORIDOR 1 (FASE 1)
Depot LRT
Gading Nias
Kelapa Gading Mall Station
Kelapa Gading Boulevard Station
Pulomas Station
Equestrian Station
Velodrome Station
2015 2018
Today
2015 2016 2017 2018
Penugasan PT
JakPro
11 Sep '15
Launching
Konstruksi
22 Jun '16
Konstruksi Skala Besar
15 Jan '17
Purchase Order (PO) Sarana
1 Feb '17
Asian Games 2018
18 Aug '18
Pendirian PT LRT
Jakarta dan
Rekrutmen SDM
Operasional
1 Nov '17
Delivery Sarana
Pertama dan
Testing &
Commissioning
1 May '18
Soft Operation
13 Aug '18
14 Sep - 2 Dec
2.6 months
Pengadaan Konsultan
Pengawas
3 Dec - 29 Feb
2.9 months
Feasibility
Study
1 Mar - 31 Jul
5 months
Preliminary
Design
5 Apr - 20 Jun
2.5 months
Pengadaan
Kontraktor P101
5.8 months
Pelaksanaan P101 (Persiapan
Konstruksi)
16 Aug - 20 Dec
4.2 months
Pengadaan
Kontraktor P102
20 Dec - 21 Aug
20.1 months
23%
Pelaksanaan P102 (Konstruksi
Prasarana)
15 Dec - 1 Feb
1.5 months
Pengadaan
Kontraktor P103
1 Feb - 30 Oct
21 months
16%
Pelaksanaan P103
(Pabrikasi Sarana)
1 Jun - 31 Oct
5 months
Pre-Operational Plan dan Pembentukan Badan
Usaha Sarana Prasarana
1 Nov - 13 Aug
9.5 months
Operational
Plan
Plan : 23,25%
Actual : 23,67%
Deviasi : +0,42%
20 Jun - 11 Dec
PROGRESS IMPLENTATION LRT JAKARTA
Update per tanggal 26 Mei 2017
Progress Summary :
Plan Progress : 23.25%
Actual Progress : 23.67%
Deviation : +0.42%
FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA
32
Pekerjaan Konstruksi Pondasi
Viaduct di Section 5A
Pekerjaan Konstruksi Pondasi Viaduct di
Section 5BProgress Pembangunan Depo LRT
Pekerjaan Konstruksi Pondasi Rencana
Stasiun Mall Kelapa Gading
FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA
Stasiun Pulomas
Viaduct Section 4
Stasiun Kelapa Gading Boulevard
Viaduct Section 3
FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA
Viaduct Section 2
Stasiun Pacuan Kuda
Viaduct Section 1 Stasiun Velodrome
FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA
Pembesian Pier Head di pier 140 di
section 5A
Proses pembesian
pilecap di P153L
Pembesian Box Pilecap di RPSS Di Depo
Pembuatan Lantai kerja di Ramp P12 area Depo
FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA
Loading Test Segment Box Girder at P68
Section 3
Girder Launcher di P68
Section 3
Seremoni Erection Box Girder at P68
Box Girder Erection di
P68 Section 3
5 MASS RAPID TRANSIT (MRT)
Greater Jakarta Transport Authority 37
10/26/2017
MRT NETWORK
39
Jakarta Outer Ring Road
(JORR)
Elevated Lane L : ± 10 KM
Underground Lane L : ± 6
KM
Travel Time ± 30 menit
Lenght of track ± 16 km
Distance
between station
0,8 – 2,2 km
Headway 5 minutes (2019)
Target Passenger 173,400 pass/day
Train 16 train set (96 cars)
1 set = 6 cars
Width track 1.067 mm
Electricity 60 MVA
Operation
System
Automatic Train
Operation (ATO)
Signailing
System
Communication-
Based Train Control
(CBTC)
Total Cost
Project (Fase I)
¥ 123,368 juta
= ± Rp 14,187
triliun
Operational 2019
INFORMASI
FITUR MRT JAKARTA FASE I
SOUTH-NORTH CORRIODR (LEBAK BULUS – BUNDARAN HI)
7 Eleveted Station 6 Underground Station
13
Stasiun
40
FITUR MRT JAKARTA PHASE II
SOUTH-NORTH (FASE II) & EAST - WEST
South-North (Fase II)
Corridor: Bundaran HI – Ancol Timur
Length of track: ± 13.5 Km
Construction Method: Underground
Number of Stations: 12 (including 1
Depo)
(Start in 2018)
East – West
CoRridor: Cikarang – Balaraja
Length of track : ± 87 Km
Number of Stations : 41
Fase I: Ujung Menteng – Kembangan
Length of track : ± 27 Km
Construction Method : Underground and
Eleveted
Number of Stations : 22 (including 2
Depo)
(Target konstruksi pada 2020)
West
Java
Banten
Kembangan
Ujung
Menteng
Lebak
Bulus
Bundaran HI
Ancol Timur
PROGRES CONSTRUCTION
VIDEO PROGRES MRT
10/26/2017
Thank You
Terima kasih
43Greater JakartaTransport Authority

More Related Content

What's hot

The white elephant -KSRTC
The white elephant -KSRTCThe white elephant -KSRTC
The white elephant -KSRTC
Centre for Public Policy Research
 
Drt2 mu 18112019
Drt2 mu 18112019Drt2 mu 18112019
Drt2 mu 18112019
PhDLogisticsandEngin
 
Ksrtc expenditure
Ksrtc expenditureKsrtc expenditure
Webinar: How to design express services on a bus transit network
Webinar: How to design express services on a bus transit networkWebinar: How to design express services on a bus transit network
Webinar: How to design express services on a bus transit network
BRTCoE
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"
BRTCoE
 
Towards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaTowards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in Ghana
Institute for Transport Studies (ITS)
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
IRJET Journal
 
Transport Matters
Transport MattersTransport Matters
Transport Matters
Geraint Day
 
Transit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bodTransit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bod
Ayala Solzi Tertman
 
Presentation economic benefits - Lars Stromgren, Minsk - 2017
Presentation economic benefits - Lars Stromgren, Minsk - 2017Presentation economic benefits - Lars Stromgren, Minsk - 2017
Presentation economic benefits - Lars Stromgren, Minsk - 2017
Pashka Gorbunov
 
Theme 3 The costumer experience
Theme 3 The costumer experienceTheme 3 The costumer experience
Theme 3 The costumer experience
BRTCoE
 
Robert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP projectRobert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP project
Keith Nolan
 
Integration of Land Use & Transportation Planning in the SMART Plan
Integration of Land Use & Transportation Planning in the SMART PlanIntegration of Land Use & Transportation Planning in the SMART Plan
Integration of Land Use & Transportation Planning in the SMART Plan
Miami-Dade Transportation Planning Organization
 
DiBonaModelCityHKG160624OpolePRT
DiBonaModelCityHKG160624OpolePRTDiBonaModelCityHKG160624OpolePRT
DiBonaModelCityHKG160624OpolePRT
Richard Di Bona
 
Trb presentation final
Trb presentation finalTrb presentation final
Urban Mobility Forecasts: Emissions Scenarios for Three Indian Cities
Urban Mobility Forecasts: Emissions Scenarios for Three Indian CitiesUrban Mobility Forecasts: Emissions Scenarios for Three Indian Cities
Urban Mobility Forecasts: Emissions Scenarios for Three Indian Cities
WRI Ross Center for Sustainable Cities
 
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Keith Nolan
 
IRJET- Public Transportation System
IRJET- Public Transportation SystemIRJET- Public Transportation System
IRJET- Public Transportation System
IRJET Journal
 
Best Practice
Best PracticeBest Practice
Best Practice
Sayantani Mitra
 

What's hot (19)

The white elephant -KSRTC
The white elephant -KSRTCThe white elephant -KSRTC
The white elephant -KSRTC
 
Drt2 mu 18112019
Drt2 mu 18112019Drt2 mu 18112019
Drt2 mu 18112019
 
Ksrtc expenditure
Ksrtc expenditureKsrtc expenditure
Ksrtc expenditure
 
Webinar: How to design express services on a bus transit network
Webinar: How to design express services on a bus transit networkWebinar: How to design express services on a bus transit network
Webinar: How to design express services on a bus transit network
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"
 
Towards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in GhanaTowards an effective transitioning of public transport system in Ghana
Towards an effective transitioning of public transport system in Ghana
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
 
Transport Matters
Transport MattersTransport Matters
Transport Matters
 
Transit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bodTransit analyst project_proposal_v10_for_miu_bod
Transit analyst project_proposal_v10_for_miu_bod
 
Presentation economic benefits - Lars Stromgren, Minsk - 2017
Presentation economic benefits - Lars Stromgren, Minsk - 2017Presentation economic benefits - Lars Stromgren, Minsk - 2017
Presentation economic benefits - Lars Stromgren, Minsk - 2017
 
Theme 3 The costumer experience
Theme 3 The costumer experienceTheme 3 The costumer experience
Theme 3 The costumer experience
 
Robert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP projectRobert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP project
 
Integration of Land Use & Transportation Planning in the SMART Plan
Integration of Land Use & Transportation Planning in the SMART PlanIntegration of Land Use & Transportation Planning in the SMART Plan
Integration of Land Use & Transportation Planning in the SMART Plan
 
DiBonaModelCityHKG160624OpolePRT
DiBonaModelCityHKG160624OpolePRTDiBonaModelCityHKG160624OpolePRT
DiBonaModelCityHKG160624OpolePRT
 
Trb presentation final
Trb presentation finalTrb presentation final
Trb presentation final
 
Urban Mobility Forecasts: Emissions Scenarios for Three Indian Cities
Urban Mobility Forecasts: Emissions Scenarios for Three Indian CitiesUrban Mobility Forecasts: Emissions Scenarios for Three Indian Cities
Urban Mobility Forecasts: Emissions Scenarios for Three Indian Cities
 
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
Yvonne Hübner - Electric vehicle and infrastructure trials in the north east ...
 
IRJET- Public Transportation System
IRJET- Public Transportation SystemIRJET- Public Transportation System
IRJET- Public Transportation System
 
Best Practice
Best PracticeBest Practice
Best Practice
 

Similar to Improvement of urban transport system

[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
shrdcinfo
 
Urban presentation
Urban presentationUrban presentation
Urban presentation
Haider Al Kaisy
 
Development plane of urban transportation in Malaysia
Development plane of urban transportation in MalaysiaDevelopment plane of urban transportation in Malaysia
Development plane of urban transportation in Malaysia
engrasha
 
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Desi Waluyanti
 
Transformation and Disruption of Urban Mobility in Asia
Transformation and Disruption of Urban Mobility in Asia Transformation and Disruption of Urban Mobility in Asia
Transformation and Disruption of Urban Mobility in Asia
Chartered Institute of Logistics and Transport (International)
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
Suryadev Maity
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
Norma Nun
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
The Business Council of Mongolia
 
Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)
Irvan Wahyu
 
Laem Chabang Port Development Project
Laem Chabang Port Development ProjectLaem Chabang Port Development Project
Laem Chabang Port Development Project
Thailand Board of Investment North America
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEM
Amar Patel
 
SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
Norma Nun
 
BUS PROCUREMENT
BUS PROCUREMENTBUS PROCUREMENT
BUS PROCUREMENT
AMIT BHARTI
 
SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...
SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...
SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...
Kyna Tsai
 
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfJPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
SaidrashedHosayni
 
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdfBRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
ranvirsahi1
 
Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
ijsrd.com
 
International Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission BusesInternational Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission Buses
Ray Minjares
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
shrdcinfo
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
shrdcinfo
 

Similar to Improvement of urban transport system (20)

[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
 
Urban presentation
Urban presentationUrban presentation
Urban presentation
 
Development plane of urban transportation in Malaysia
Development plane of urban transportation in MalaysiaDevelopment plane of urban transportation in Malaysia
Development plane of urban transportation in Malaysia
 
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
 
Transformation and Disruption of Urban Mobility in Asia
Transformation and Disruption of Urban Mobility in Asia Transformation and Disruption of Urban Mobility in Asia
Transformation and Disruption of Urban Mobility in Asia
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
 
Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)Surabaya mass rapid transportation (smart)
Surabaya mass rapid transportation (smart)
 
Laem Chabang Port Development Project
Laem Chabang Port Development ProjectLaem Chabang Port Development Project
Laem Chabang Port Development Project
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEM
 
SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
 
BUS PROCUREMENT
BUS PROCUREMENTBUS PROCUREMENT
BUS PROCUREMENT
 
SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...
SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...
SPEEDA INSIGHTS_Jakarta MRT and LRT Development A Ground Breaking Start to Ea...
 
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfJPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
 
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdfBRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
BRT-System-in-Delhi-Presen-and-Future-Scenario_2010.pdf
 
Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
 
International Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission BusesInternational Experience with Electric and Zero Emission Buses
International Experience with Electric and Zero Emission Buses
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Surabaya(Indonesia)
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
 

More from Dr. Zar Rdj

Detasering_secondment_BLU_SPI_APIP.pdf
Detasering_secondment_BLU_SPI_APIP.pdfDetasering_secondment_BLU_SPI_APIP.pdf
Detasering_secondment_BLU_SPI_APIP.pdf
Dr. Zar Rdj
 
Aturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdf
Aturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdfAturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdf
Aturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdf
Dr. Zar Rdj
 
Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...
Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...
Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...
Dr. Zar Rdj
 
Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan Leader...
Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan  Leader...Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan  Leader...
Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan Leader...
Dr. Zar Rdj
 
Buku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal Audit
Buku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal AuditBuku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal Audit
Buku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal Audit
Dr. Zar Rdj
 
Sistem manajemen kinerja pns permenpan 8 tahun 2021
Sistem manajemen kinerja pns permenpan 8 tahun 2021Sistem manajemen kinerja pns permenpan 8 tahun 2021
Sistem manajemen kinerja pns permenpan 8 tahun 2021
Dr. Zar Rdj
 
Change it today birokrasi is modern model
Change it today birokrasi is modern modelChange it today birokrasi is modern model
Change it today birokrasi is modern model
Dr. Zar Rdj
 
Penyederhanaan struktur organisasi kementerian lembaga penyederhanaan birokrasi
Penyederhanaan struktur organisasi kementerian  lembaga penyederhanaan birokrasiPenyederhanaan struktur organisasi kementerian  lembaga penyederhanaan birokrasi
Penyederhanaan struktur organisasi kementerian lembaga penyederhanaan birokrasi
Dr. Zar Rdj
 
Manajemen talenta ASN arah model birokrasi 2020 2024
Manajemen talenta ASN arah model birokrasi 2020 2024Manajemen talenta ASN arah model birokrasi 2020 2024
Manajemen talenta ASN arah model birokrasi 2020 2024
Dr. Zar Rdj
 
Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...
Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...
Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...
Dr. Zar Rdj
 
Mewujudkan birokrasi di era disrupsi dan tatanan normal baru
Mewujudkan birokrasi di era disrupsi dan tatanan normal baruMewujudkan birokrasi di era disrupsi dan tatanan normal baru
Mewujudkan birokrasi di era disrupsi dan tatanan normal baru
Dr. Zar Rdj
 
Three lines model updated, IIA update model tiga lapis pertahanan risiko
Three lines model updated, IIA update model tiga lapis pertahanan risikoThree lines model updated, IIA update model tiga lapis pertahanan risiko
Three lines model updated, IIA update model tiga lapis pertahanan risiko
Dr. Zar Rdj
 
Dua model pengukuran dampak ekonomi proyek infrastruktur publik
Dua model pengukuran dampak ekonomi proyek infrastruktur publikDua model pengukuran dampak ekonomi proyek infrastruktur publik
Dua model pengukuran dampak ekonomi proyek infrastruktur publik
Dr. Zar Rdj
 
Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...
Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...
Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...
Dr. Zar Rdj
 
Redesain sistem perencanaan dan penganggaran kementerian dan lembaga
Redesain sistem perencanaan dan penganggaran kementerian dan lembagaRedesain sistem perencanaan dan penganggaran kementerian dan lembaga
Redesain sistem perencanaan dan penganggaran kementerian dan lembaga
Dr. Zar Rdj
 
Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...
Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...
Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...
Dr. Zar Rdj
 
Kebijakan implementasi reformasi birokrasi RB 2020 2024
Kebijakan implementasi reformasi birokrasi RB 2020 2024Kebijakan implementasi reformasi birokrasi RB 2020 2024
Kebijakan implementasi reformasi birokrasi RB 2020 2024
Dr. Zar Rdj
 
Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19
Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19
Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19
Dr. Zar Rdj
 
Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...
Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...
Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...
Dr. Zar Rdj
 
Value based internal auditing - Nilai Dasar Internal Audit
Value based internal auditing - Nilai Dasar Internal AuditValue based internal auditing - Nilai Dasar Internal Audit
Value based internal auditing - Nilai Dasar Internal Audit
Dr. Zar Rdj
 

More from Dr. Zar Rdj (20)

Detasering_secondment_BLU_SPI_APIP.pdf
Detasering_secondment_BLU_SPI_APIP.pdfDetasering_secondment_BLU_SPI_APIP.pdf
Detasering_secondment_BLU_SPI_APIP.pdf
 
Aturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdf
Aturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdfAturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdf
Aturan pALING LENGKAP Manajemen ASN_pns _sESUAI_NSPK_SLIDE SHARE.pdf
 
Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...
Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...
Transformasi Internal Audit_APIP_Auditor Agile_Itjen_Kemenhub_Agile Auditing_...
 
Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan Leader...
Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan  Leader...Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan  Leader...
Perilaku Kerja Inovatif Memediasi Pengaruh Integritas, Kompetensi Dan Leader...
 
Buku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal Audit
Buku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal AuditBuku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal Audit
Buku Saku Perilaku Kerja Inovatif dan Efektivitas Kerja Internal Audit
 
Sistem manajemen kinerja pns permenpan 8 tahun 2021
Sistem manajemen kinerja pns permenpan 8 tahun 2021Sistem manajemen kinerja pns permenpan 8 tahun 2021
Sistem manajemen kinerja pns permenpan 8 tahun 2021
 
Change it today birokrasi is modern model
Change it today birokrasi is modern modelChange it today birokrasi is modern model
Change it today birokrasi is modern model
 
Penyederhanaan struktur organisasi kementerian lembaga penyederhanaan birokrasi
Penyederhanaan struktur organisasi kementerian  lembaga penyederhanaan birokrasiPenyederhanaan struktur organisasi kementerian  lembaga penyederhanaan birokrasi
Penyederhanaan struktur organisasi kementerian lembaga penyederhanaan birokrasi
 
Manajemen talenta ASN arah model birokrasi 2020 2024
Manajemen talenta ASN arah model birokrasi 2020 2024Manajemen talenta ASN arah model birokrasi 2020 2024
Manajemen talenta ASN arah model birokrasi 2020 2024
 
Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...
Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...
Pentingnya pengendalian risiko bagi organsiasi menghadapi revolusi global dar...
 
Mewujudkan birokrasi di era disrupsi dan tatanan normal baru
Mewujudkan birokrasi di era disrupsi dan tatanan normal baruMewujudkan birokrasi di era disrupsi dan tatanan normal baru
Mewujudkan birokrasi di era disrupsi dan tatanan normal baru
 
Three lines model updated, IIA update model tiga lapis pertahanan risiko
Three lines model updated, IIA update model tiga lapis pertahanan risikoThree lines model updated, IIA update model tiga lapis pertahanan risiko
Three lines model updated, IIA update model tiga lapis pertahanan risiko
 
Dua model pengukuran dampak ekonomi proyek infrastruktur publik
Dua model pengukuran dampak ekonomi proyek infrastruktur publikDua model pengukuran dampak ekonomi proyek infrastruktur publik
Dua model pengukuran dampak ekonomi proyek infrastruktur publik
 
Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...
Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...
Perencanaan dan penganggaran yang lebih efisien, efektif dan bermanfaat bagi ...
 
Redesain sistem perencanaan dan penganggaran kementerian dan lembaga
Redesain sistem perencanaan dan penganggaran kementerian dan lembagaRedesain sistem perencanaan dan penganggaran kementerian dan lembaga
Redesain sistem perencanaan dan penganggaran kementerian dan lembaga
 
Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...
Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...
Maizar_Pembangunan zona integritas zi wbk wbbm tahun 2020 kementerian perhubu...
 
Kebijakan implementasi reformasi birokrasi RB 2020 2024
Kebijakan implementasi reformasi birokrasi RB 2020 2024Kebijakan implementasi reformasi birokrasi RB 2020 2024
Kebijakan implementasi reformasi birokrasi RB 2020 2024
 
Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19
Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19
Proses audit jarak jauh selama dan setelah corona virus disease 2019 covid 19
 
Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...
Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...
Pembangunan Zona Integritas (ZI) menuju predikat Wilayah Bebas dari Korupsi (...
 
Value based internal auditing - Nilai Dasar Internal Audit
Value based internal auditing - Nilai Dasar Internal AuditValue based internal auditing - Nilai Dasar Internal Audit
Value based internal auditing - Nilai Dasar Internal Audit
 

Recently uploaded

Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
odmqk
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
ajatjamwal123
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 

Recently uploaded (20)

Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 
karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
一比一原版(theauckland毕业证书)新西兰奥克兰大学毕业证成绩单如何办理
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 

Improvement of urban transport system

  • 1. IMPROVEMENT OF URBAN TRANSPORT SYSTEM IN GREATER JAKARTA INDONESIA (Planning and Development LRT and MRT) By Muiz Thohir Deputy Director for Program Evaluation, Greater Jakarta Transport Authority Presented at: Capacity Building Workshop on Sustainable Urban Transport Index Colombo, Srilanka 30-31 October 2017 Ministry of Transportation Republic of Indonesia
  • 2. 1 EXISTING CONDITION Greater Jakarta Transport Authority 2
  • 3. GREATER JAKARTA (JABODETABEK) CHALLENGE : SPRAWL! Greater Jakarta Transport Authority Greater Jakarta includes 3 provinces and 8 municipalities Population: 31 million
  • 4. Badan Pengelola Transportasi Jabodetabek Proportion of Commuting Trip Greater Jakarta Transport Authority 30,6% 425.000 38,3% 571.000 31,1% 423.000 Number of Vehicle : 24.9 million Motorcycle: 18.5 million units ( 74 % ) Private car: 5.9 million units ( 24 % ) Buses : 512 thousand units ( 2 % ) Trip = 47.5 million / day 4
  • 5. Greater Jakarta Transport Authority ZONA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Total 2015 1 4,514,137 36,678 151,060 259,766 409,221 189,447 352,430 269,431 124,242 152,088 225,107 116,415 30,450 36,254 29,099 34,076 23,176 6,953,078 2 33,525 780,004 10,158 52,377 4,540 3,842 143,153 4,408 3,078 5,821 18,862 2,087 2,040 8,320 2,089 2,269 2,118 1,078,692 3 148,636 10,917 367,522 29,263 4,713 3,481 15,666 54,366 4,871 5,091 7,397 2,437 3,496 1,990 1,284 1,158 722.8868 663,010 4 232,566 54,131 28,166 719,203 14,029 12,045 136,540 9,536 5,763 12,553 35,088 4,952 2,350 9,988 1,634 3,011 3,344 1,284,899 5 397,448 5,012 4,587 14,544 1,888,969 47,238 35,208 57,123 113,082 145,605 35,660 101,936 5,811 8,880 9,639 15,830 10,490 2,897,062 6 187,253 4,263 4,251 13,192 40,561 1,459,584 42,972 10,361 9,992 68,088 64,726 6,450 3,099 11,244 3,983 9,939 10,847 1,950,804 7 346,843 148,368 14,536 122,564 35,477 39,512 2,785,760 17,175 15,250 28,323 240,476 12,576 5,659 43,695 4,372 5,120 8,861 3,874,568 8 261,313 4,690 56,872 9,955 55,349 10,826 19,290 2,251,927 115,466 16,230 16,781 16,480 27,411 5,382 2,234 2,999 2,406 2,875,609 9 122,807 3,133 4,922 6,316 111,318 10,057 15,946 124,888 3,183,221 16,201 21,149 68,483 178,878 5,611 2,576 3,214 1,849 3,880,570 10 152,300 5,871 4,626 13,922 140,442 67,918 29,047 16,235 18,546 2,505,458 26,420 25,413 2,920 6,071 16,730 46,736 56,393 3,135,049 11 226,972 18,342 7,289 36,006 31,279 64,656 227,466 17,517 21,277 25,225 3,967,599 7,456 3,262 179,845 3,254 4,807 17,756 4,860,008 12 113,042 2,523 2,731 4,874 103,883 9,360 12,196 17,429 65,698 25,749 9,379 1,299,005 20,557 1,731 2,912 10,954 1,759 1,703,782 13 31,125 2,420 3,383 2,240 6,124 3,034 5,755 29,096 182,445 2,939 3,410 20,382 2,471,282 2,346 1,574 27,886 1,846 2,797,286 14 36,490 7,810 2,205 10,184 9,352 10,862 44,863 5,455 6,060 6,391 179,786 1,789 579.1357 2,804,351 914.2318 790.0932 14,101 3,141,982 15 26,902 1,941 1,345 1,745 9,608 3,825 4,426 2,476 2,406 16,643 2,605 3,213 646.1143 1,332 980,764 162,117 115,981 1,337,976 16 34,901 2,488 1,408 2,818 15,453 10,512 4,784 3,368 3,776 47,482 4,985 11,058 28,083 1,640 169,946 1,885,981 73,508 2,302,193 17 21,827 2,501 623.5696 2,852 10,160 10,709 8,054 2,183 2,062 54,642 17,844 1,666 757.6981 16,959 114,991 72,808 2,476,402 2,817,042 Total 2015 6,888,088 1,091,092 665,687 1,301,821 2,890,477 1,956,906 3,883,556 2,892,973 3,877,237 3,134,529 4,877,276 1,701,799 2,787,281 3,145,639 1,347,993 2,289,695 2,821,559 47,553,609 Total Trip in Jabodetabek 2015 : 47.5 million / day O/D MATRIX 2015 5
  • 6. 6 Worsening Traffic Jam • Significantly decreased vehicle speed since 10 years ago • In Jakarta, average speed at peak hour 10km/hour • Volume Capacity Ratio (VCR) in metropolitan area exceeded 1 • Economic losses due to traffic congestion up to USD 1.3 billion (2010), and predicted to be USD 6.5 billion in 2020; Current Major Problems of Transport in Greater Jakarta (Jabodetabek)
  • 7. 2 KEY PERFORMANCE INDICATORS Greater Jakarta Transport Authority 7
  • 8. KEY PERFORMANCE INDICATORS Greater Jakarta Transport Authority 8 1. Public transport share is 60 % 2. Maximum travel time from origin to destination is 1.5 hours at peak hours. 3. Minimum average speed is 30 km / h at peak hours. 4. Coverage of public transport services in urban areas is 80 % of the length of the road. 5. Maximum walking distance to public transport is 500 m . 6. Each region must have feeder line connected to the trunk line in transit point. 7. The transit must have facilities for pedestrians and car park and ride, with the maximum tranfer distance between mode is 500 m.
  • 9. 24% Existing 2016 40% 2019 50% 2024 60% 2029 + 16% + 10% + 10% 3 years 5 years 5 years Greater Jakarta Transport Authority 9 MAIN TARGET : INCREASE PUBLIC TRANSPORT SHARE
  • 10. 3 THE WAY FORWARD Greater Jakarta Transport Authority 10
  • 11. MASTER PLAN OF GREATER JAKARTA TRANSPORTATION (RENCANA INDUK TRANSPORTASI JABODETABEK) Greater Jakarta Transport Authority 11 R I T J SAFETY&SECURITY TRANSPORTATION GREEN NETWORK INFRASTRUCTURE TRANSPORTATION ROADTRANSPORTATION SYSTEM RAILTRANSPORTATION SYSTEM ENHANCINGTRAFFIC PERFORMANCE INTEGRATED TRANSPORTATIONSYSTEM FINANCING GREENTRANSPORTATION PILAR 1 PILAR 2 PILAR 6 PILAR 7 PILAR 9 PILAR 8 PILAR 3 PILAR 4 PILAR 5 9 PILARS THEINTEGRATIONOF TRANSPORTATION&LANDUSE
  • 12.
  • 14. Existing Public Transport in GJTA Transport Mode Service Area Route Network Price Headway KRL (Commuter Line) Jabodetabek Six loop lines Subsidized-distance based fare 5- 15 min Transjakarta (Bus Rapid Transit) Inner Jakarta 14 trunk corridors Subsidized-íntegrated price and network 5- 20 min APTB (Feeder Transjakarta) Jabodetabek 24 main route Highly regulated market price 15 min- 1 hour Intermediate bus Inner Jakarta More than 20 Low regulated market price Random Angkot (mini bus) Jabodetabek More than 20 Low regulated market price Random Taxi Jabodetabek - Distance based fare - Jabodebatek Ressidence Connexion Jabodetabek More than 10 Market Price 15 min Jabodetabek Airport Connexion Jabodetabek More than 10 Markat Price 15 min 10/26/2017
  • 15. DEVELOPMENT OF PUBLIC TRANSPORT IN JABODETABEK 1. Commuter Line (CL), PT. KCJ (operated) 2. Bus Rapid Transit (BRT), PT. Transjakarta (operated) 3. Automatic People Mover system (APMS), Soekarno-Hatta Airport (operated) 4. LRT JABODEBEK, Ministry of Transportation /Adhi Karya 5. LRT JAKPRO, Jakarta Government / JAKPRO 6. Mass Rapid Transit (MRT), PT. MRT 7. Airport Railway (CL dan Ekspress), PT. KAI 8. Jakarta – Bandung High-Speed Train (KCIC) 9. Light Rail Transit (LRT), Jababeka Greater Jakarta Transport Authority
  • 16. 4 LIGHT RAPID TRANSIT (LRT) MOT/ PT. ADHI KARYA Greater Jakarta Transport Authority 16
  • 17. PROJECT PROFILE • BASED ON PRESIDENTIAL DECREE NO. 98/2015 PT. ADHI KARYA & PT. KERETA API INDONESIA ASSIGNED TO BUILD • TOTAL COST 27 TRILYUN • IDR 24 TRILIUN FOR INFRASTRUKTUR • IDR 3 TRILIUN FOR TRAIN • PT ADHI KARYA & PT. KAI BEAR BUDGET REQUIREMENT OF 9 TRILYUN AND THE REMAINING 18 TRILYUN BY THE BANKING SYNDICATION 10/26/2017
  • 21. 10/26/2017 LENGTH OF TRACK 14,3 KM 37%PROGRES ON AUSGUST 2017
  • 22. 10/26/2017 LENGTH OF TRACK 18,3 KM 17%PROGRES ON AUSGUST 2017
  • 23. 10/26/2017 LENGTH OF TRACK 10,5 KM 3 %PROGRES ON AUSGUST 2017 PROSES PENGERJAAN AREA PEKERJAAN DEWI SARTIKA - KASN Stasiun Cawang Pulau Intan
  • 24. Video Progres LRT MOT/ADHI KARYA 10/26/2017
  • 25. 5 LIGHT RAPID TRANSIT (LRT) JAKPRO Greater Jakarta Transport Authority 25
  • 26. PROJECT PROFILE • BASED ON PRESIDENTIAL DECREE NO. 99/2015, JAKARTA GOVERNMENT TO ASSIGNED REGIONAL OWNED ENTERPRISES TO BUILD AND OPEARATE RAILWAY • GOVERNOR DECREE NO. 213/2015 AND 211/2016 ASSIGN PT. JAKPRO TO DEVELOP LRT • TOTAL COST 6,8 TRILYUN FROM LOCAL BUDGET (GOVERNMENT JAKARTA) 10/26/2017
  • 27. 27 LEGAL BASIS LRT JAKARTA PerGub DKI Jakarta No. 213 Tahun 2015 sudah direvisi menjadi PerGub DKI Jakarta No. 211 Tahun 2016
  • 28. 7 CORRIDOR LRT NETWORK IN JAKARTA ▪ Total length of track for Asian Games 2018: ± 5,8 km (including Depo) ▪ Number of station LRT: 6 Elevated Station Koridor 1 (Fase 1)
  • 29. CORIDOR 1 (FASE 1) Depot LRT Gading Nias Kelapa Gading Mall Station Kelapa Gading Boulevard Station Pulomas Station Equestrian Station Velodrome Station
  • 30. 2015 2018 Today 2015 2016 2017 2018 Penugasan PT JakPro 11 Sep '15 Launching Konstruksi 22 Jun '16 Konstruksi Skala Besar 15 Jan '17 Purchase Order (PO) Sarana 1 Feb '17 Asian Games 2018 18 Aug '18 Pendirian PT LRT Jakarta dan Rekrutmen SDM Operasional 1 Nov '17 Delivery Sarana Pertama dan Testing & Commissioning 1 May '18 Soft Operation 13 Aug '18 14 Sep - 2 Dec 2.6 months Pengadaan Konsultan Pengawas 3 Dec - 29 Feb 2.9 months Feasibility Study 1 Mar - 31 Jul 5 months Preliminary Design 5 Apr - 20 Jun 2.5 months Pengadaan Kontraktor P101 5.8 months Pelaksanaan P101 (Persiapan Konstruksi) 16 Aug - 20 Dec 4.2 months Pengadaan Kontraktor P102 20 Dec - 21 Aug 20.1 months 23% Pelaksanaan P102 (Konstruksi Prasarana) 15 Dec - 1 Feb 1.5 months Pengadaan Kontraktor P103 1 Feb - 30 Oct 21 months 16% Pelaksanaan P103 (Pabrikasi Sarana) 1 Jun - 31 Oct 5 months Pre-Operational Plan dan Pembentukan Badan Usaha Sarana Prasarana 1 Nov - 13 Aug 9.5 months Operational Plan Plan : 23,25% Actual : 23,67% Deviasi : +0,42% 20 Jun - 11 Dec
  • 31. PROGRESS IMPLENTATION LRT JAKARTA Update per tanggal 26 Mei 2017 Progress Summary : Plan Progress : 23.25% Actual Progress : 23.67% Deviation : +0.42%
  • 32. FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA 32 Pekerjaan Konstruksi Pondasi Viaduct di Section 5A Pekerjaan Konstruksi Pondasi Viaduct di Section 5BProgress Pembangunan Depo LRT Pekerjaan Konstruksi Pondasi Rencana Stasiun Mall Kelapa Gading
  • 33. FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Stasiun Pulomas Viaduct Section 4 Stasiun Kelapa Gading Boulevard Viaduct Section 3
  • 34. FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Viaduct Section 2 Stasiun Pacuan Kuda Viaduct Section 1 Stasiun Velodrome
  • 35. FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Pembesian Pier Head di pier 140 di section 5A Proses pembesian pilecap di P153L Pembesian Box Pilecap di RPSS Di Depo Pembuatan Lantai kerja di Ramp P12 area Depo
  • 36. FOTO PERKEMBANGAN LAPANGAN LRT JAKARTA Loading Test Segment Box Girder at P68 Section 3 Girder Launcher di P68 Section 3 Seremoni Erection Box Girder at P68 Box Girder Erection di P68 Section 3
  • 37. 5 MASS RAPID TRANSIT (MRT) Greater Jakarta Transport Authority 37
  • 39. 39 Jakarta Outer Ring Road (JORR) Elevated Lane L : ± 10 KM Underground Lane L : ± 6 KM Travel Time ± 30 menit Lenght of track ± 16 km Distance between station 0,8 – 2,2 km Headway 5 minutes (2019) Target Passenger 173,400 pass/day Train 16 train set (96 cars) 1 set = 6 cars Width track 1.067 mm Electricity 60 MVA Operation System Automatic Train Operation (ATO) Signailing System Communication- Based Train Control (CBTC) Total Cost Project (Fase I) ¥ 123,368 juta = ± Rp 14,187 triliun Operational 2019 INFORMASI FITUR MRT JAKARTA FASE I SOUTH-NORTH CORRIODR (LEBAK BULUS – BUNDARAN HI) 7 Eleveted Station 6 Underground Station 13 Stasiun
  • 40. 40 FITUR MRT JAKARTA PHASE II SOUTH-NORTH (FASE II) & EAST - WEST South-North (Fase II) Corridor: Bundaran HI – Ancol Timur Length of track: ± 13.5 Km Construction Method: Underground Number of Stations: 12 (including 1 Depo) (Start in 2018) East – West CoRridor: Cikarang – Balaraja Length of track : ± 87 Km Number of Stations : 41 Fase I: Ujung Menteng – Kembangan Length of track : ± 27 Km Construction Method : Underground and Eleveted Number of Stations : 22 (including 2 Depo) (Target konstruksi pada 2020) West Java Banten Kembangan Ujung Menteng Lebak Bulus Bundaran HI Ancol Timur