The document summarizes port development projects at Laem Chabang Port in Thailand. It outlines plans to expand the port's capacity through three phases, with Phase III construction planned from 2017-2022 to accommodate growing throughput. It also details two specific projects - a single rail transfer operator project to increase rail transport volume, and a coastal terminal project to serve coastal and inland shipping. Both projects are slated to begin operations in 2017 after construction from 2016-2017.