SlideShare a Scribd company logo
1 of 3
Download to read offline
IJSRD - International Journal for Scientific Research & Development| Vol. 1, Issue 3, 2013 | ISSN (online): 2321-0613
All rights reserved by www.ijsrd.com 436
Fixation of Toll charge for Six Lane Highway
Haresh G. Prajapati1
Bhagyesh C. Contractor2
Prof. Nikhil G. Raval3
1
M. E. Transportation Engineering
1
Government College of Engineering, Modasa, Gujarat, India
2
Prof. Government Engineering College, Modasa, Gujarat, India
3
L. D. College of Engineering, Ahmedabad, Gujarat, India
Abstract— Toll rates and traffic volumes (or demand) are
the two major factors affecting revenue as well as
investment strategies on toll roads. Although it has been
experiencing dramatic growth in its highway systems during
the past 10 years, there has been a lack of understanding in
maintaining and operating its toll roads. Since most of the
freeways in India are toll roads, it is necessary to establish a
methodology for the toll road system based on the
characteristics of India’s transportation systems and social
economy. A methodology to determine the toll rates for
India's toll road systems is introduced. Factors affecting the
toll rate are analysed, including gross domestic product,
total number of vehicles, growth rates of passenger and
freight transport, and roadway conditions
Keywords:- Growth of traffic, Congestion, Vehicle
characteristics, VOC.
I. INTRODUCTION
Toll tax is collected to recover the total capital outlay which
includes the cost of construction, repairs, maintenance,
expenses on toll operation and interest on the outlay.
The new facility thus constructed should provide
reduced travel time and increased level of service. In
India most of the highway projects are given on PPP
basis, i.e. Public Private Partnership. In this the private
organization finances and constructs the facility and
recovers the capital from the users in the form of toll
tax. This tax is collected for a reasonable period of
time after which the facility is surrendered to the public.
Of late, toll tax is being levied on parking of vehicles
in the urban centers in a move to decongest the streets
and reduce the pollution levels. This concept is known
as Congestion Pricing.
II. OBJECTIVES
Following are the objective of study area:
1) To forecast the toll travel demand for the study area
2) To study about the existing methods of fixation of
toll charges.
3) To compare the various methods of fixation of toll
charges.
4) To optimize the toll charges for the proposed study
area.
III. STUDY AREA
The study corridor between Km.388.200 to 509.000, and
being design a part of the National highway No.8, it passes
through many urban settlements, industrial centers viz.
Sabarkantha and Gandhinagar, etc. As the important link in
the National Highway network of India, it probably carries
the densest traffic in the country.
IV. TRAFFIC ASSESSMENT
Different types of survey were carried out on the study
corridor from Km 388.200 To 509.000 of National Highway
No.8, at different location and duration to appreciate the
traffic and travel characteristics.
Vehicle Type Traffic Growth rate (%)
Two-wheeler 5.5
Car/jeep 7.5
Bus 4.0
LCV,HCV,MAV 4.5
Tractor, Trailor 4.0
Table. 1: Growth rates obtained as per IRC: 108-1996
2013 2023 2033 2040
mode Veh/Day Veh/Day Veh/Day Veh/Day
Car 2886 5948 12259 20339
Bus 455 674 997 1312
Truck 1009 1567 2433 3312
MAV 706 1045 1547 2036
Total 5056 9234 17237 26998
Table. 2: Classified Volume Count Survey
Year 2013 to 2040 at Vantda
Fig.1 :Yearly Traffic variation in AADT at Vantda
2013 2023 2033 2040
Mode Veh/Day Veh/Day Veh/Day Veh/Day
Car 2887 5950 12264 20346
Bus 703 1041 1540 2027
Truck 998 1550 2407 3275
MAV 752 1113 1648 2168
Total 5340 9654 17859 27817
Table. 3: Traffic Assessments At Kathpur
0500010000150002000025000300003500040000
Veh/Day
Veh/Day
Veh/Day
Veh/Day
Veh/Day
Veh/Day
Veh/Day
2013201820232028203320382040
Car
Bus
Truck
MAV
Total
Fixation of Toll charge for Six Lane Highway
(IJSRD/Vol. 1/Issue 3/2013/0009)
All rights reserved by www.ijsrd.com
437
Fig .2 : Yearly Traffic variation in AADT at Kathpur
Sr.
no
Project Activities Estimated Cost (Rs.)
1 Site clearance 15570107
2 Earthwork 728235560
3
Sub base and base
courses
926276470
4 Bituminous works 2517184915
5
Bridge, flyovers,
underpasses, RoB,
Pedestrian subway,
footbridge, etc
2495561548
6
Drainage and Protection
Work
714757586
7
Traffic sign, Markings
and Road appurtenances
720576959
8
Maintenance, Repair and
rehabilitation
842967485
9
Environmental
Management
48293119
Project Cost (Rs.) 9009423748
Escalation 25% ; (Total project
Cost) Rs.
1801884750
Total Project Cost 10811308458
Concession period in days 9855
Per day cost to be collected 1097037.899
Table. 4: estimated cost of project
(Source: Feasibility for 6-laning of NH-8 from Udaipur
Ahmedabad in the State of Rajasthan)
vehicle characteristics
Length
in m
Width in
m
Weight (self wt+ load
capacity)
car 3.66 1.5 1.4
Truck 9.2 2.4 9.7
bus 9.2 2.4 16
MAV 18.5 2.5 55
Table. 5: Vehicle Characteristics
Lin
m
W in
m
Weight occupancy
saving in
travel time
Total
car 1.98 6.00 0.25 1.07 0.58 9.88
LCV 4.97 9.60 1.76 0.44 10.04 26.8
bus 4.97 9.60 2.91 10 12.22 39.7
MAV 10 10 10 0.44 12.78 43.2
Table. 6: weight age awarded vehicle characteristics
The weight ages awarded to each vehicle characteristic on
a 10-point scale are as in Table-6.
Percent weight age for each vehicle
type:
Car = 1/12 x 100 = 8.33%
LCV = 2.5/12x 100 = 33.33%
Truck or bus= 4.0/12 x 100 = 20.83%
MAV = 4.5/12 x 100 = 35.7%
The toll fee per trip for each vehicle type may be assumed
as:
Car = x1
LCV= x2
Truck or bus = x3
MAV = x4
The total revenue collected per day must be equal to per day
cost of project so that the total estimated cost of the project
is recovered in the stipulated concession period.
2886X1 + 455X2 +1009X3 +706X4 = 563419.5634
Suppose X1,X2, X3 and X4 is X
2886x(8.33%/100) +455x(33.33%/100) +1009x(23.83%/10
0) +706x(35.7%/100) = 563419.5634
X=636.97….
Put X=636.97 in
Car = X1=1/12 x 100 =
(8.33/100)*636.97=53.05Rs
LCV =X2= 2.5/12x 100 = (33.33/100)*636.97
=212.30 Rs
Truck or bus=X3= 4.0/12 x 100 =
(20.83/100)*636.97=132.68 Rs
MAV = X4=4.5/12 x 100 =
(35.7/100)*636.97=227.39Rs
Car=X1=53.05
LCV=X2=212.30
Truck or bus= X3=132.68
MAV=X4=227.3
V. CONCLUSION
1) Economic evaluation of a proposed BOT facility is
essential for the assessment of technical as well as
economic feasibility of the project.
2) The estimation of vehicle operating cost and saving in
travel time due to provision of a new facility must be
undertaken carefully so that the toll fees for each
vehicle type and toll collection period can be fixed
accordingly.
3) With assumed parameters and computation
methodology the Rounded off toll collection amount for
car comes out to be Rs 53, for bus Rs 212, for truck Rs
132 and for multi-axle vehicle (MAV) as Rs 227.
4) The car and multi axle truck vehicle are more than other
category of the vehicle on the study area.
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Veh/Day
Veh/Day
Veh/Day
Veh/Day
Veh/Day
Veh/Day
Veh/Day
2013 2018 2023 2028 2033 2038 2040
Ca
r
Bu
s
Tr
uc
k
Fixation of Toll charge for Six Lane Highway
(IJSRD/Vol. 1/Issue 3/2013/0009)
All rights reserved by www.ijsrd.com
438
REFERENCES
[1]. “Financing and Managing Infrastructure”, IFC,
Lesson of experience-4, pp.43-52.
[2]. Shekhar S., (1999) “Innovative Approaches of
Financing Public Transport” Indian Journal Of
Transport Management, pp.469-475.
[3]. The secretariat for the committee on infrastructure
(May 2009) “Review of Toll Policy for National
Highway”
[4]. Yuan-Hua jia and Zong Z. tian “Toll Rates and Related
Factors on China’s Highway, Paper no 02-2736
[5]. Dr.Tom. v. Mathew, IIT Bombay (2-april-2012), “Toll
Operation”
[6]. Junwook Chi, “Regional Economic Impact of a toll
Road in West Virginia”
[7]. Baker and public Financial Management CRA
International Fitzgerald & Holliday (28- Oct- 2005),
“toll Feasibility Study”
[8]. Youssel Mezdani (June 2011) “optimal toll based on an
agent based model of travel Demand”
[9]. Prof.(Dr.) R.K. Khitoliya, Former Professor,
‘Development of Techno-economic Evaluation
Methodology for Proposed BoT based Highway
Railway-Over-Bridge Project’

More Related Content

What's hot

A Study on Share Autos in Chennai
A Study on Share Autos in ChennaiA Study on Share Autos in Chennai
A Study on Share Autos in ChennaiDhanuraj D
 
IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road ...
IRJET-  	  Delay Analysis due to Road Side Activities at Urban Arterial Road ...IRJET-  	  Delay Analysis due to Road Side Activities at Urban Arterial Road ...
IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road ...IRJET Journal
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)Gurjit Kaur Kaler
 
Feasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi ExpresswayFeasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi Expresswayvivatechijri
 
Metro stations all over world
Metro stations all over worldMetro stations all over world
Metro stations all over worldSai Swaroop
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Rajesh Prasad
 
High speed rails in india ppt
High speed rails in india pptHigh speed rails in india ppt
High speed rails in india pptPravin Hadiyal
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Future Rail Metro Summit Apr 14 -15, 2015
Future Rail  Metro Summit Apr 14 -15, 2015Future Rail  Metro Summit Apr 14 -15, 2015
Future Rail Metro Summit Apr 14 -15, 2015Binu Thankappan
 
Logistics & supply chain management
Logistics & supply chain managementLogistics & supply chain management
Logistics & supply chain managementKaushal Dubey
 
Nagpur metro
Nagpur metroNagpur metro
Nagpur metroanandkc77
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet TrainIRJET Journal
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system Aditya Gupta
 

What's hot (20)

Study on Paratransit in Chennai
Study on Paratransit in ChennaiStudy on Paratransit in Chennai
Study on Paratransit in Chennai
 
A Study on Share Autos in Chennai
A Study on Share Autos in ChennaiA Study on Share Autos in Chennai
A Study on Share Autos in Chennai
 
IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road ...
IRJET-  	  Delay Analysis due to Road Side Activities at Urban Arterial Road ...IRJET-  	  Delay Analysis due to Road Side Activities at Urban Arterial Road ...
IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road ...
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Feasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi ExpresswayFeasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi Expressway
 
Metro stations all over world
Metro stations all over worldMetro stations all over world
Metro stations all over world
 
12
1212
12
 
DMRC
DMRCDMRC
DMRC
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata
 
India : Railways Sector Report_August 2013
India : Railways Sector Report_August 2013India : Railways Sector Report_August 2013
India : Railways Sector Report_August 2013
 
High speed rails in india ppt
High speed rails in india pptHigh speed rails in india ppt
High speed rails in india ppt
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Future Rail Metro Summit Apr 14 -15, 2015
Future Rail  Metro Summit Apr 14 -15, 2015Future Rail  Metro Summit Apr 14 -15, 2015
Future Rail Metro Summit Apr 14 -15, 2015
 
Logistics & supply chain management
Logistics & supply chain managementLogistics & supply chain management
Logistics & supply chain management
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
Nagpur metro
Nagpur metroNagpur metro
Nagpur metro
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system
 

Viewers also liked

Build, operate & transfer
Build, operate & transferBuild, operate & transfer
Build, operate & transferSaurav Kumar
 
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENTOWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENTConstruction Mechanizer
 
Finishing works detail of residence building
Finishing works detail of residence buildingFinishing works detail of residence building
Finishing works detail of residence buildingshamal das
 
Strawbale construction low cost housing
Strawbale construction low cost housingStrawbale construction low cost housing
Strawbale construction low cost housingShourya Puri
 
Planning Principles
Planning PrinciplesPlanning Principles
Planning Principlesizaherna
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)Waqas Aslam
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)Satish Kambaliya
 
Functional Planning of a Building
 Functional Planning of a Building Functional Planning of a Building
Functional Planning of a BuildingMr. Ramesh Nayaka
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bondingRAHUL SINHA
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
LOW COST HOUSING
LOW COST HOUSING LOW COST HOUSING
LOW COST HOUSING Amol Pawar
 
low cost construction
low cost constructionlow cost construction
low cost constructionricha_15b
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Dhaval Jadhav
 

Viewers also liked (20)

Piyush
PiyushPiyush
Piyush
 
Build, operate & transfer
Build, operate & transferBuild, operate & transfer
Build, operate & transfer
 
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENTOWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT
 
Finishing works detail of residence building
Finishing works detail of residence buildingFinishing works detail of residence building
Finishing works detail of residence building
 
Strawbale construction low cost housing
Strawbale construction low cost housingStrawbale construction low cost housing
Strawbale construction low cost housing
 
Planning Principles
Planning PrinciplesPlanning Principles
Planning Principles
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)
 
Functional Planning of a Building
 Functional Planning of a Building Functional Planning of a Building
Functional Planning of a Building
 
Surface finishes(1)
Surface finishes(1)Surface finishes(1)
Surface finishes(1)
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
LOW COST HOUSING
LOW COST HOUSING LOW COST HOUSING
LOW COST HOUSING
 
Brick masonry
Brick masonryBrick masonry
Brick masonry
 
low cost construction
low cost constructionlow cost construction
low cost construction
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 

Similar to Fixation of Toll charge for Six Lane Highway

Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtseSAT Journals
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAIRJET Journal
 
Automated Highway System Report
Automated Highway System ReportAutomated Highway System Report
Automated Highway System ReportSamir8880
 
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...ijsrd.com
 
Dynamic Real time taxi ride-sharing android Application
Dynamic Real time taxi ride-sharing android Application  Dynamic Real time taxi ride-sharing android Application
Dynamic Real time taxi ride-sharing android Application IRJET Journal
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET Journal
 
Analysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking AreaAnalysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking Areaijsrd.com
 
Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...Minakshi Patel
 
Urban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdfUrban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdfssuserdec673
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
Driving cycle development methods: case study in Malaysia
Driving cycle development methods: case study in MalaysiaDriving cycle development methods: case study in Malaysia
Driving cycle development methods: case study in MalaysiaTELKOMNIKA JOURNAL
 
Survey report on GSRTC customers' satisfaction.
Survey report on GSRTC customers' satisfaction. Survey report on GSRTC customers' satisfaction.
Survey report on GSRTC customers' satisfaction. Harsh Tamakuwala
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...IRJET Journal
 
myBas driving cycle for Kuala Terengganu city
myBas driving cycle for Kuala Terengganu city myBas driving cycle for Kuala Terengganu city
myBas driving cycle for Kuala Terengganu city IJECEIAES
 
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesA Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesIRJET Journal
 
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreAnalysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreIRJET Journal
 
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET-  	  To Check Feasibility of ERP (Electronic Road Pricing) System at C ...IRJET-  	  To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...IRJET Journal
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWIRJET Journal
 

Similar to Fixation of Toll charge for Six Lane Highway (20)

Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 
Final Defence (3).pptx
Final Defence (3).pptxFinal Defence (3).pptx
Final Defence (3).pptx
 
Automated Highway System Report
Automated Highway System ReportAutomated Highway System Report
Automated Highway System Report
 
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
 
Dynamic Real time taxi ride-sharing android Application
Dynamic Real time taxi ride-sharing android Application  Dynamic Real time taxi ride-sharing android Application
Dynamic Real time taxi ride-sharing android Application
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
 
Analysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking AreaAnalysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking Area
 
Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...
 
Urban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdfUrban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdf
 
Car Pooling Web App
Car Pooling Web AppCar Pooling Web App
Car Pooling Web App
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
Driving cycle development methods: case study in Malaysia
Driving cycle development methods: case study in MalaysiaDriving cycle development methods: case study in Malaysia
Driving cycle development methods: case study in Malaysia
 
Survey report on GSRTC customers' satisfaction.
Survey report on GSRTC customers' satisfaction. Survey report on GSRTC customers' satisfaction.
Survey report on GSRTC customers' satisfaction.
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
myBas driving cycle for Kuala Terengganu city
myBas driving cycle for Kuala Terengganu city myBas driving cycle for Kuala Terengganu city
myBas driving cycle for Kuala Terengganu city
 
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesA Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining Techniques
 
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreAnalysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
 
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET-  	  To Check Feasibility of ERP (Electronic Road Pricing) System at C ...IRJET-  	  To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 

More from ijsrd.com

IoT Enabled Smart Grid
IoT Enabled Smart GridIoT Enabled Smart Grid
IoT Enabled Smart Gridijsrd.com
 
A Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of ThingsA Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of Thingsijsrd.com
 
IoT for Everyday Life
IoT for Everyday LifeIoT for Everyday Life
IoT for Everyday Lifeijsrd.com
 
Study on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOTStudy on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOTijsrd.com
 
Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...ijsrd.com
 
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...ijsrd.com
 
A Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's LifeA Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's Lifeijsrd.com
 
Pedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language LearningPedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language Learningijsrd.com
 
Virtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation SystemVirtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation Systemijsrd.com
 
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...ijsrd.com
 
Understanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart RefrigeratorUnderstanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart Refrigeratorijsrd.com
 
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...ijsrd.com
 
A Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processingA Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processingijsrd.com
 
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web LogsWeb Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logsijsrd.com
 
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEMAPPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEMijsrd.com
 
Making model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point TrackingMaking model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point Trackingijsrd.com
 
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...ijsrd.com
 
Study and Review on Various Current Comparators
Study and Review on Various Current ComparatorsStudy and Review on Various Current Comparators
Study and Review on Various Current Comparatorsijsrd.com
 
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...ijsrd.com
 
Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.ijsrd.com
 

More from ijsrd.com (20)

IoT Enabled Smart Grid
IoT Enabled Smart GridIoT Enabled Smart Grid
IoT Enabled Smart Grid
 
A Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of ThingsA Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of Things
 
IoT for Everyday Life
IoT for Everyday LifeIoT for Everyday Life
IoT for Everyday Life
 
Study on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOTStudy on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOT
 
Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...
 
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
 
A Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's LifeA Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's Life
 
Pedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language LearningPedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language Learning
 
Virtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation SystemVirtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation System
 
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
 
Understanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart RefrigeratorUnderstanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart Refrigerator
 
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
 
A Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processingA Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processing
 
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web LogsWeb Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
 
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEMAPPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
 
Making model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point TrackingMaking model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point Tracking
 
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
 
Study and Review on Various Current Comparators
Study and Review on Various Current ComparatorsStudy and Review on Various Current Comparators
Study and Review on Various Current Comparators
 
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
 
Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.
 

Fixation of Toll charge for Six Lane Highway

  • 1. IJSRD - International Journal for Scientific Research & Development| Vol. 1, Issue 3, 2013 | ISSN (online): 2321-0613 All rights reserved by www.ijsrd.com 436 Fixation of Toll charge for Six Lane Highway Haresh G. Prajapati1 Bhagyesh C. Contractor2 Prof. Nikhil G. Raval3 1 M. E. Transportation Engineering 1 Government College of Engineering, Modasa, Gujarat, India 2 Prof. Government Engineering College, Modasa, Gujarat, India 3 L. D. College of Engineering, Ahmedabad, Gujarat, India Abstract— Toll rates and traffic volumes (or demand) are the two major factors affecting revenue as well as investment strategies on toll roads. Although it has been experiencing dramatic growth in its highway systems during the past 10 years, there has been a lack of understanding in maintaining and operating its toll roads. Since most of the freeways in India are toll roads, it is necessary to establish a methodology for the toll road system based on the characteristics of India’s transportation systems and social economy. A methodology to determine the toll rates for India's toll road systems is introduced. Factors affecting the toll rate are analysed, including gross domestic product, total number of vehicles, growth rates of passenger and freight transport, and roadway conditions Keywords:- Growth of traffic, Congestion, Vehicle characteristics, VOC. I. INTRODUCTION Toll tax is collected to recover the total capital outlay which includes the cost of construction, repairs, maintenance, expenses on toll operation and interest on the outlay. The new facility thus constructed should provide reduced travel time and increased level of service. In India most of the highway projects are given on PPP basis, i.e. Public Private Partnership. In this the private organization finances and constructs the facility and recovers the capital from the users in the form of toll tax. This tax is collected for a reasonable period of time after which the facility is surrendered to the public. Of late, toll tax is being levied on parking of vehicles in the urban centers in a move to decongest the streets and reduce the pollution levels. This concept is known as Congestion Pricing. II. OBJECTIVES Following are the objective of study area: 1) To forecast the toll travel demand for the study area 2) To study about the existing methods of fixation of toll charges. 3) To compare the various methods of fixation of toll charges. 4) To optimize the toll charges for the proposed study area. III. STUDY AREA The study corridor between Km.388.200 to 509.000, and being design a part of the National highway No.8, it passes through many urban settlements, industrial centers viz. Sabarkantha and Gandhinagar, etc. As the important link in the National Highway network of India, it probably carries the densest traffic in the country. IV. TRAFFIC ASSESSMENT Different types of survey were carried out on the study corridor from Km 388.200 To 509.000 of National Highway No.8, at different location and duration to appreciate the traffic and travel characteristics. Vehicle Type Traffic Growth rate (%) Two-wheeler 5.5 Car/jeep 7.5 Bus 4.0 LCV,HCV,MAV 4.5 Tractor, Trailor 4.0 Table. 1: Growth rates obtained as per IRC: 108-1996 2013 2023 2033 2040 mode Veh/Day Veh/Day Veh/Day Veh/Day Car 2886 5948 12259 20339 Bus 455 674 997 1312 Truck 1009 1567 2433 3312 MAV 706 1045 1547 2036 Total 5056 9234 17237 26998 Table. 2: Classified Volume Count Survey Year 2013 to 2040 at Vantda Fig.1 :Yearly Traffic variation in AADT at Vantda 2013 2023 2033 2040 Mode Veh/Day Veh/Day Veh/Day Veh/Day Car 2887 5950 12264 20346 Bus 703 1041 1540 2027 Truck 998 1550 2407 3275 MAV 752 1113 1648 2168 Total 5340 9654 17859 27817 Table. 3: Traffic Assessments At Kathpur 0500010000150002000025000300003500040000 Veh/Day Veh/Day Veh/Day Veh/Day Veh/Day Veh/Day Veh/Day 2013201820232028203320382040 Car Bus Truck MAV Total
  • 2. Fixation of Toll charge for Six Lane Highway (IJSRD/Vol. 1/Issue 3/2013/0009) All rights reserved by www.ijsrd.com 437 Fig .2 : Yearly Traffic variation in AADT at Kathpur Sr. no Project Activities Estimated Cost (Rs.) 1 Site clearance 15570107 2 Earthwork 728235560 3 Sub base and base courses 926276470 4 Bituminous works 2517184915 5 Bridge, flyovers, underpasses, RoB, Pedestrian subway, footbridge, etc 2495561548 6 Drainage and Protection Work 714757586 7 Traffic sign, Markings and Road appurtenances 720576959 8 Maintenance, Repair and rehabilitation 842967485 9 Environmental Management 48293119 Project Cost (Rs.) 9009423748 Escalation 25% ; (Total project Cost) Rs. 1801884750 Total Project Cost 10811308458 Concession period in days 9855 Per day cost to be collected 1097037.899 Table. 4: estimated cost of project (Source: Feasibility for 6-laning of NH-8 from Udaipur Ahmedabad in the State of Rajasthan) vehicle characteristics Length in m Width in m Weight (self wt+ load capacity) car 3.66 1.5 1.4 Truck 9.2 2.4 9.7 bus 9.2 2.4 16 MAV 18.5 2.5 55 Table. 5: Vehicle Characteristics Lin m W in m Weight occupancy saving in travel time Total car 1.98 6.00 0.25 1.07 0.58 9.88 LCV 4.97 9.60 1.76 0.44 10.04 26.8 bus 4.97 9.60 2.91 10 12.22 39.7 MAV 10 10 10 0.44 12.78 43.2 Table. 6: weight age awarded vehicle characteristics The weight ages awarded to each vehicle characteristic on a 10-point scale are as in Table-6. Percent weight age for each vehicle type: Car = 1/12 x 100 = 8.33% LCV = 2.5/12x 100 = 33.33% Truck or bus= 4.0/12 x 100 = 20.83% MAV = 4.5/12 x 100 = 35.7% The toll fee per trip for each vehicle type may be assumed as: Car = x1 LCV= x2 Truck or bus = x3 MAV = x4 The total revenue collected per day must be equal to per day cost of project so that the total estimated cost of the project is recovered in the stipulated concession period. 2886X1 + 455X2 +1009X3 +706X4 = 563419.5634 Suppose X1,X2, X3 and X4 is X 2886x(8.33%/100) +455x(33.33%/100) +1009x(23.83%/10 0) +706x(35.7%/100) = 563419.5634 X=636.97…. Put X=636.97 in Car = X1=1/12 x 100 = (8.33/100)*636.97=53.05Rs LCV =X2= 2.5/12x 100 = (33.33/100)*636.97 =212.30 Rs Truck or bus=X3= 4.0/12 x 100 = (20.83/100)*636.97=132.68 Rs MAV = X4=4.5/12 x 100 = (35.7/100)*636.97=227.39Rs Car=X1=53.05 LCV=X2=212.30 Truck or bus= X3=132.68 MAV=X4=227.3 V. CONCLUSION 1) Economic evaluation of a proposed BOT facility is essential for the assessment of technical as well as economic feasibility of the project. 2) The estimation of vehicle operating cost and saving in travel time due to provision of a new facility must be undertaken carefully so that the toll fees for each vehicle type and toll collection period can be fixed accordingly. 3) With assumed parameters and computation methodology the Rounded off toll collection amount for car comes out to be Rs 53, for bus Rs 212, for truck Rs 132 and for multi-axle vehicle (MAV) as Rs 227. 4) The car and multi axle truck vehicle are more than other category of the vehicle on the study area. 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 Veh/Day Veh/Day Veh/Day Veh/Day Veh/Day Veh/Day Veh/Day 2013 2018 2023 2028 2033 2038 2040 Ca r Bu s Tr uc k
  • 3. Fixation of Toll charge for Six Lane Highway (IJSRD/Vol. 1/Issue 3/2013/0009) All rights reserved by www.ijsrd.com 438 REFERENCES [1]. “Financing and Managing Infrastructure”, IFC, Lesson of experience-4, pp.43-52. [2]. Shekhar S., (1999) “Innovative Approaches of Financing Public Transport” Indian Journal Of Transport Management, pp.469-475. [3]. The secretariat for the committee on infrastructure (May 2009) “Review of Toll Policy for National Highway” [4]. Yuan-Hua jia and Zong Z. tian “Toll Rates and Related Factors on China’s Highway, Paper no 02-2736 [5]. Dr.Tom. v. Mathew, IIT Bombay (2-april-2012), “Toll Operation” [6]. Junwook Chi, “Regional Economic Impact of a toll Road in West Virginia” [7]. Baker and public Financial Management CRA International Fitzgerald & Holliday (28- Oct- 2005), “toll Feasibility Study” [8]. Youssel Mezdani (June 2011) “optimal toll based on an agent based model of travel Demand” [9]. Prof.(Dr.) R.K. Khitoliya, Former Professor, ‘Development of Techno-economic Evaluation Methodology for Proposed BoT based Highway Railway-Over-Bridge Project’