Korea builds their first IGCC plant with proven Loesche technology. Loesche signed a contract to supply two LM 43.4 D coal mills for Korea's first 300 MW IGCC demonstration plant in Taean. The Loesche mills will grind, dry, and classify a coal and additive mixture to produce 95 tons/hour of raw material for the plant's gasification process.