   Voltage dips
   Short interruption
   Voltage variation
   Interruption, voltage dips and voltage
    variation causes
   Test level and preferred test level
   Test procedure
   2 types test configuration
   Summary
   The immunity test method and range of test
    level applies to electrical/electronic
    equipment which:

            Irated ≤ 16A/phase for connection to
            50Hz/60Hz ac network
VOLTAGE                   SHORT
DIPS/SAG               INTERRUPTION




            TEST &
           MEASURE




            VOLTAGE
           VARIATION
   Sudden reduction in voltage below specified dip
    threshold
   short period of time, follow by recovery to the
    original voltage
   Decreased below specified interruption threshold
   Consider as voltage dip to zero.
   Usually not more then 1 minute
   Followed by recovery to original voltage
   Change in voltage continuously
   Continuously varying load connecting to
    network
   Short circuit (eg. SLG)
   Sudden large change of load
   For equipment that has Vrated range; if the
    voltage range do not exceed 20% of the lower
    Vrated, a single voltage may be specified as
    test level UT
   Class 1 – compatibility level < public network level
    ◦ Sensitive disturbance to ps (ups necessary)
   Class 2 - compatibility level = public network level
   Class 3 - compatibility level > public network level
    ◦   Large motor frequently start
    ◦   Welding machines are present
    ◦   Major part of the load is fed trough converter
    ◦   Load vary rapidly
   changes in                    THE        Recommended
    supply voltage
    shall occur at                TEST        to use 0º for 1
    zero crossing                             of the phases
   Addition angel
    selected from                           SHORT
    45º, 90º,                            INTERRUPTION
    180º,225º,270º
    and 315º if
    necessary.
                  DIPS                                  3 phase
                                    Single
                                    phase
    3 phase                                        For 3 phase
                         Single
                         phase                      short
                                                    interruption,
   Test 1 by 1                                     it shall be
    phase                                           tested
                                                    simultaneou
                                                    sly
 Output voltage of generator at no
  load:
     80% of nominal value verified in
      maximum duration of 5s
     70% and 40% of nominal value
      verified in maximum duration of 3s
     Power source within ±2% of frated
 Shortest ps cable as specified by EUT
  manufacturer
PRE-             TEST
   PLANNING
                          ANALYSIS


                      Define which         EUT FULL
•EUT designation      system              FUNCTION
•Possible             configuration         CHECK
connections (eg:      (next slide) to
plug, terminal etc)   be tested to
•Input power port     reproduce field
•EUT operation        situation
representative                             RESULT/
•EUT Technical                               TEST
                      Test report & Any
specification                              REPORT/
                      degradation also
•Setup description
                      record               RECORD
   Are classified into 4 categories:
2 TYPES TEST
CONFIGURATION



  IMMUNITY TEST
    GENERATOR
  USING VARIABLE
   TRANSFORMER




 COMBINATION
     OF
 TRANSFORMER
     TAP
2 TYPES TEST
                          CONFIGURATION


          VOLTAGE           IMMUNITY TEST
          DIPS/SAG            GENERATOR
                            USING VARIABLE
                             TRANSFORMER



 TEST &       SHORT
MEASURE    INTERRUPTION    COMBINATION
                               OF
                           TRANSFORMER
                               TAP
            VOLTAGE
           VARIATION

Iec 61000 4-11

  • 3.
    Voltage dips  Short interruption  Voltage variation  Interruption, voltage dips and voltage variation causes  Test level and preferred test level  Test procedure  2 types test configuration  Summary
  • 4.
    The immunity test method and range of test level applies to electrical/electronic equipment which: Irated ≤ 16A/phase for connection to 50Hz/60Hz ac network
  • 5.
    VOLTAGE SHORT DIPS/SAG INTERRUPTION TEST & MEASURE VOLTAGE VARIATION
  • 6.
    Sudden reduction in voltage below specified dip threshold  short period of time, follow by recovery to the original voltage
  • 8.
    Decreased below specified interruption threshold  Consider as voltage dip to zero.  Usually not more then 1 minute  Followed by recovery to original voltage
  • 10.
    Change in voltage continuously
  • 11.
    Continuously varying load connecting to network
  • 12.
    Short circuit (eg. SLG)  Sudden large change of load
  • 14.
    For equipment that has Vrated range; if the voltage range do not exceed 20% of the lower Vrated, a single voltage may be specified as test level UT
  • 15.
    Class 1 – compatibility level < public network level ◦ Sensitive disturbance to ps (ups necessary)  Class 2 - compatibility level = public network level  Class 3 - compatibility level > public network level ◦ Large motor frequently start ◦ Welding machines are present ◦ Major part of the load is fed trough converter ◦ Load vary rapidly
  • 17.
    changes in THE Recommended supply voltage shall occur at TEST to use 0º for 1 zero crossing of the phases  Addition angel selected from SHORT 45º, 90º, INTERRUPTION 180º,225º,270º and 315º if necessary. DIPS 3 phase Single phase 3 phase  For 3 phase Single phase short interruption,  Test 1 by 1 it shall be phase tested simultaneou sly
  • 20.
     Output voltageof generator at no load:  80% of nominal value verified in maximum duration of 5s  70% and 40% of nominal value verified in maximum duration of 3s  Power source within ±2% of frated  Shortest ps cable as specified by EUT manufacturer
  • 21.
    PRE- TEST PLANNING ANALYSIS Define which EUT FULL •EUT designation system FUNCTION •Possible configuration CHECK connections (eg: (next slide) to plug, terminal etc) be tested to •Input power port reproduce field •EUT operation situation representative RESULT/ •EUT Technical TEST Test report & Any specification REPORT/ degradation also •Setup description record RECORD
  • 22.
    Are classified into 4 categories:
  • 23.
    2 TYPES TEST CONFIGURATION IMMUNITY TEST GENERATOR USING VARIABLE TRANSFORMER COMBINATION OF TRANSFORMER TAP
  • 29.
    2 TYPES TEST CONFIGURATION VOLTAGE IMMUNITY TEST DIPS/SAG GENERATOR USING VARIABLE TRANSFORMER TEST & SHORT MEASURE INTERRUPTION COMBINATION OF TRANSFORMER TAP VOLTAGE VARIATION