The document describes an experiment to test methods for accelerating the drainage of water from sand piles, including allowing free drainage over 14 days as well as using a perforated pipe connected to a suction pump. Results showed that with the suction pump, moisture levels were reduced to 4-8% within 3 days, much faster than the 2 weeks required without the pump. The suction drainage system effectively sped up the drainage process to one fifth of the normal drying time for sand piles.