Design and Analysis of
Floating Production Systems
Jinzhu Xia
March, 2012
Primary Engineering Scope


•   Concept Screening and Sizing Studies
•   Naval Architecture
•   Hydrodynamic and Global Performance Analysis
•   Model Test Specification and Support
•   Mooring System Design and Analysis
•   Riser System Design and Analysis
•   Structural Design and Analysis
•   Marine System Design
•   Transportation and Installation Analysis
•   Project Execution Support

                                                   2
Australia’s Gas Network




                      3
The Deepwater Frontier




                     4
Offshore Platform Overview




                         5
Worldwide FPSOs




              6
Worldwide Semisubs




                 7
Worldwide TLPs




             8
Worldwide Spars




              9
Platform Screening and Sizing


     Using benchmarked processes developed in-house, Granherne
     can efficiently size and compare platform options for specific
     field developments

        Semisubs                     Spars                        TLPs




                                                                                                FPSOs



•   Hull Configuration      •   Hull Configuration
                                                         •   Hull Configuration
•   Hydrostatics & Static   •   Hydrostatics/Stability                                 •   Hull Configuration
    Stability                                            •   Heave and Pitch Periods
                            •   Hull Weight and VCG
                                                         •   Tendon Configuration      •   Ballast/Storage Configuration
•   Hull Weight and VCG     •   Fixed Ballast Estimate
                                                         •   Tendon Strength           •   Hydrostatics & Stability
•   Natural Periods         •   Natural Periods
                                                         •   Offset and Air Gap        •   Hull Weight and VCG
•   Motions Estimates       •   Mean Pitch Angle
                                                         •   Ballast                   •   Natural Periods and Motions
                                                                                                                    10
Naval Architecture

•   Detailed Hull Configuration and Sizing
•   Arrangements and Layouts
•   Weight Control
•   Wind and Current Load Calculations
•   Compartmentalization
•   Intact and Damaged Stability
•   Certification & Classification
•   Operability Analysis
•   Marine Operating Manuals

                                                                                               Deck #9    Elev (+)16.8m
                                                                          VOID
                                                                                               Deck #8    Elev. (+)6.0m
                                                                          VOID
                                                                                               Deck #7    Elev. (-)6.0m

                                                                          VOID                                                Hard Tank Below WL
                                                                                               Deck #6    Elev. (-)22.8m

                                                                     BALLAST
                                                                                               Deck #5    Elev. (-)39.6m

                                                                     BALLAST
                                                                                               Deck #4    Elev. (-) 56.4m
                                                                       SKIRT
                                                                        TANK                    Mooring Elev. (-) 69.2m
                                                                                               Open Deck Elev. (-) 73.2m




                                                                                               Heave Plate Elev. (-) 121.8m




                                                                                                                                 Heave Plate
                                                                                               Deck #3    Elev. (-)164m
                                                                                               Deck #2    Elev. (-)170.5m
                                                                   Fixed Ballast               Deck #1    Elev. (-)175.0m


                                                                            22.2 m

     Design of a Floating LNG Facility   FPSO Hull Configuration                      55.5 m
                                                                                   Spar Hull Configuration
                                                                                                                                                   11
Hydrodynamic and Global Performance Analysis

–   Wave Diffraction and Hull Motion Analysis
–   Coupled Hull, Mooring and Riser Analysis
–   Multi-Body Interaction Analysis
–   Air Gap Analysis
–   Slamming and Green Water Analysis
–   VIM Analysis




                                                Air gap analysis




       WAMIT analysis of various hull forms
                                                                   12
Model Testing

– Wave Basin Testing
– Wind Tunnel Testing
– VIM Testing




                                    13
Mooring Design and Analysis

• Mooring Design:
   – Catenary/Taut/Semi-Taut Spread Mooring
   – Turret Mooring
   – Single Point Mooring                               Wire Rope Sockets                                                 Spiral Strand
   – Quayside Mooring                                                                TW1
                                                                                           PW1
                                                                                                 WIW   WIE
                                                                                                             FWIE2 PE1 PE2
                                                                                                                          PE3
                                                                                                                                         Line 7
                                                                                                                                            Line 8
                                                                                                                                                           Fairleads
                                                                                                                                                Line 9

• Specialty Analysis                                                                                                                      FE1

                                                                                                                                            FE2


   – Vortex-Induced Motion Effects                       Line 6                                                                                 FE3
                                                                                                                                                FE4
                                                        Line 5
                                                                                                                                            FE5

   – Polyester Application                              Line 4                              Yv




   – Fatigue Analysis                                                                                                Xv



                                                                  GasExp

   – Chain Wear Predictions                                          OilExp
                                                                              FW1
                                                                                                                                         Line 10
                                                                                                                                        Line 11


• Specification of Mooring Components
                                                                                                                                      Line 12
                                                                                                                                                         Studless Chain
                                                                                Line 3
                                                                                      Line 2 Line 1

• Procurement & Installation Support                              BP Atlantis - Detail Design, Procurement and Installation




    Evaluation of VIM effects on an   Barracuda/Carintgua Detail Design                                                         Design of a soft yoke mooring system
     existing Spar Mooring System           ( Polyester Moorings)                                                                      for Bohai Bay - China
                                                                                                                                                                          14
Riser Design and Analysis

–   Design of Single or Multiple Risers:
     • Flexible Risers
     • Steel Catenary Risers
     • Top-Tension Risers
     • SLOR (Tower) Risers
     • CVARs
–   Dynamic Analysis, Interference Studies
–   1st & 2nd Order Fatigue Analysis
–   VIV Analysis
–   Component Design and Specification
                                                                 TTR and SCR   CVAR Development
                                                                 Solutions




      Detailed Analysis of Flexible Productions Risers for the
      Barracuda and Caratinga FPSOs
                                                                                                  15
Structural Design and Analysis

– Design and Design Verification for:
   • FPSO and FLNG Ships
   • Semisubs
   • Spars
   • TLPs
– Global Strength and Fatigue Analysis
– Development of “Fatigue-Friendly” Details
                                                                    Analysis of FPSO Hull Structure
– Advanced Finite Element Analysis
– Dynamic Response Analysis
– Specification Development
– Fabrication Support




   FEA of Forged Mooring Link                                                         Design of a Riser Protection
                                 Detailed Global Strength and Fatigue Analysis
                                                                                    Frame using Nonlinear Analysis
                                    Ocean Victory Class Semisubmersible
                                                                                                                     16
Marine System Design

–   Marine System Design for All Hulls
–   P&ID and Layout Development
–   Specification Development
–   Procurement Support
–   HVAC
–   Instrumentation and Controls




                                                                Atlantis Semisubmersible
                                                            Marine & Utility System Design,
          Design of FPSO Bilge and Ballast Systems        Procurement Support and Site Support


                                                                                                 17
Transportation and Installation Analysis

–         Concept Development
–         Detail Engineering
–         On-site Installation Support
–         Third Party Review



                                                           Post
Step #1       Step #2       Step #3   Step #4    Step #5   Upending

                                                                      Thunderhorse Flowline Jumper Installation Analysis
                        Spar Upending Analysis




               Benguela Belize Topsides Transportation Analysis
                                                                                                                           18
Project Execution Support

– Integrated Project Management
– Owner’s Engineering Representative
– Capabilities Include:
   • Detail Engineering
   • Procurement Support
   • Regulatory Coordination
   • Fabrication Yard Support
   • Installation Support
                                                Petrobras Barracuda/Carintga FPSOs
   • Commissioning Support
   • Final Documentation




                BP ATLANTIS Semisubmersible            Conoco Belanak FPSO
                                                                                     19
Software Tools

Naval Architecture / Hydrodynamics                                                                                                                      Structural Analysis
• Hydrostatics & Stability
   – HydroD                                                                                                                                             • SESAM
                                                                                                                                                        • ABAQUS
   – AutoHydro
                                                                                                                                                        • SACS
• Hydrodynamics
   – WADAM, WAMIT
   – HydroStar
                                                                                                                                                        Riser Analysis
• Mooring
   – MIMOSA                                                                                                                                             •   Orcaflex
                                                                                                                                                        •   Riflex
   – OrcaFlex
                                                                                                                                                        •   Shear 7
   – Ariane
                              50                                                                                −3
                                                                                                                   −2




                                                                                                                                                        •   VIVA
                                                                                                                 −0.5
                              40         column area                                                         column area
                                                                                                               0.5

                                                     3
                                                      4
                              30                                                                                                                    −
                                   6
                                         5.5                                                                                    5.5                 −
                                                                                                                                                    2



• Global Performance          20


                              10                                                      6.5
                                                                                                           5.5
                                                                                                                 5
                                                                                                                                      6
                                                                                                                                                    −
                                                                                                                                                    0
                                                                                                                                                    −
                                                                                                                                                   6.

                                                                                                                                                   −
                                                                                                                                                   2
                                                                                                                                                    1
                                                                                                                                                    −
                                                                                                                                                        •   Flexcom 3D
                               0
                                                                                                                                                   −



                                                                                                                                                        •   DeepRiser
                                                                4.5           6



   – SIMO
                                                     3.5                                                                                           1
                                                                                                                          3
                             −10
                                                                                                                           2
                                               0.5
                             −20                                                                     3.5                   0.5
                                                                                                                 1
                                         0     −1                                                                         −0.5
                                          −0.5−1.5                                                                             0
                                   1



                                                                                                                                                        •   ABAQUS
                                       −5                                                        4                        −1
                             −30       1.5
                                        1.5
                                        1.5                                                                 1.5
                                         1.5
                                            22
                                            22



   – DeepC
                                                                                                                          2.5
                                               2.5
                                               2.52
                                                2.5                     5.5             5.5
                             −40                 2.5
                                          column area
                                                   333
                                                    3                                                        column area                           5
                                                                                                                       5
                                                          3.5
                                                          3.5
                             −50                                                                                                               6

                                               −40                −20             0         20                       40                   60




   – AQWA
                                                                                                                                                                                 20
Some KBR Milestones

Hutton TLP                    Hoover Spar
ConocoPhillips                ExxonMobil




Thunder Horse Semi            Agbami FPSO
BP                            Chevron

                                            21

More Related Content

What's hot

Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production SystemsSahyog Shishodia
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls IQPC
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
 
Metode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMetode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMFaridGeonova
 
C2. Functional Requirements of FPSO
C2. Functional Requirements of FPSOC2. Functional Requirements of FPSO
C2. Functional Requirements of FPSODavid Seow
 
Offshore fixed platforms
Offshore fixed platformsOffshore fixed platforms
Offshore fixed platformsAmit Purohit
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019UnitedLiftTechnologi
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020David Seow
 
Sacs otc 2012
Sacs otc 2012Sacs otc 2012
Sacs otc 2012HSD Luu
 
IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004Abdulla Wanis
 

What's hot (20)

Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
Metode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.pptMetode Konstruksi Offshore Platform_2016_2_18.ppt
Metode Konstruksi Offshore Platform_2016_2_18.ppt
 
C2. Functional Requirements of FPSO
C2. Functional Requirements of FPSOC2. Functional Requirements of FPSO
C2. Functional Requirements of FPSO
 
Offshore fixed platforms
Offshore fixed platformsOffshore fixed platforms
Offshore fixed platforms
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
 
FPSO Requirements
FPSO RequirementsFPSO Requirements
FPSO Requirements
 
Tutorial #5 - SACS Basic
Tutorial #5 - SACS BasicTutorial #5 - SACS Basic
Tutorial #5 - SACS Basic
 
Tutorial #1 - SACS Basic
Tutorial #1 - SACS BasicTutorial #1 - SACS Basic
Tutorial #1 - SACS Basic
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020
 
Sacs otc 2012
Sacs otc 2012Sacs otc 2012
Sacs otc 2012
 
IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004IMO's Ballast Water Management Convention 2004
IMO's Ballast Water Management Convention 2004
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Tutorial #2 - SACS Basic
Tutorial #2 - SACS BasicTutorial #2 - SACS Basic
Tutorial #2 - SACS Basic
 
Tutorial #4 - SACS Basic
Tutorial #4 - SACS BasicTutorial #4 - SACS Basic
Tutorial #4 - SACS Basic
 
Drillships
DrillshipsDrillships
Drillships
 
Marine Steering Gear and SOLAS Requirements
Marine Steering Gear and SOLAS RequirementsMarine Steering Gear and SOLAS Requirements
Marine Steering Gear and SOLAS Requirements
 

Similar to Design and Analysis of Floating Production Systems

Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Hassan Moursy
 
Project - Various Unit - Kaiwan
Project - Various Unit - KaiwanProject - Various Unit - Kaiwan
Project - Various Unit - KaiwanKaiwan Hasani
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileMitchell Mantiri
 
Design and structural analysis of auv pressure hull with sandwich materials
Design and structural analysis of auv pressure hull with sandwich materialsDesign and structural analysis of auv pressure hull with sandwich materials
Design and structural analysis of auv pressure hull with sandwich materialsVenugopalraoSuravara
 
D. David Andrews London College
D. David Andrews London CollegeD. David Andrews London College
D. David Andrews London CollegeAuxnavalia
 
OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...
OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...
OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...Rodolfo Gonçalves
 
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumarkumar85anil
 
Apbu Casing Drilling Review Dec2010
Apbu  Casing Drilling Review Dec2010Apbu  Casing Drilling Review Dec2010
Apbu Casing Drilling Review Dec2010CalHolt
 
ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...
ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...
ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...Rodolfo Gonçalves
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...Nick Bentley
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2Steffones K
 
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendraPresentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendraRaghavendra Rachamadugu
 
Senior Design Project Final Presentation
Senior Design Project Final PresentationSenior Design Project Final Presentation
Senior Design Project Final Presentationbtpguitar723
 

Similar to Design and Analysis of Floating Production Systems (20)

650 b4d01
650 b4d01650 b4d01
650 b4d01
 
Bureau veritas
Bureau veritasBureau veritas
Bureau veritas
 
MSc Individual Project
MSc Individual ProjectMSc Individual Project
MSc Individual Project
 
Advanced Methods for ULS and FLS
Advanced Methods for ULS and FLSAdvanced Methods for ULS and FLS
Advanced Methods for ULS and FLS
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 
Project - Various Unit - Kaiwan
Project - Various Unit - KaiwanProject - Various Unit - Kaiwan
Project - Various Unit - Kaiwan
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company Profile
 
Schmidt
SchmidtSchmidt
Schmidt
 
Download
DownloadDownload
Download
 
Design and structural analysis of auv pressure hull with sandwich materials
Design and structural analysis of auv pressure hull with sandwich materialsDesign and structural analysis of auv pressure hull with sandwich materials
Design and structural analysis of auv pressure hull with sandwich materials
 
D. David Andrews London College
D. David Andrews London CollegeD. David Andrews London College
D. David Andrews London College
 
OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...
OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...
OMAE2011-4910: Experimental Study on Vortex-Induced Motions (VIM) of a Large-...
 
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
 
Oil & gas
Oil & gasOil & gas
Oil & gas
 
Apbu Casing Drilling Review Dec2010
Apbu  Casing Drilling Review Dec2010Apbu  Casing Drilling Review Dec2010
Apbu Casing Drilling Review Dec2010
 
ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...
ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...
ISOPE2012-TPC145: Vortex-Induced Yaw Motion (VIY) of a Large-Volume Semi-Subm...
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendraPresentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
 
Senior Design Project Final Presentation
Senior Design Project Final PresentationSenior Design Project Final Presentation
Senior Design Project Final Presentation
 

More from Engineers Australia

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAEngineers Australia
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDEEngineers Australia
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonEngineers Australia
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleEngineers Australia
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Engineers Australia
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Engineers Australia
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Engineers Australia
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1Engineers Australia
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1Engineers Australia
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksEngineers Australia
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...Engineers Australia
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1Engineers Australia
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEngineers Australia
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Engineers Australia
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...Engineers Australia
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark BushEngineers Australia
 
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...Engineers Australia
 

More from Engineers Australia (20)

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WA
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of Fremantle
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocks
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
 
111125 IChemE Palmer
111125 IChemE Palmer111125 IChemE Palmer
111125 IChemE Palmer
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark Bush
 
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
 

Recently uploaded

PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowSRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGpriyakumari801827
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 

Recently uploaded (20)

PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowSRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowALWAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
ALWAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 

Design and Analysis of Floating Production Systems

  • 1. Design and Analysis of Floating Production Systems Jinzhu Xia March, 2012
  • 2. Primary Engineering Scope • Concept Screening and Sizing Studies • Naval Architecture • Hydrodynamic and Global Performance Analysis • Model Test Specification and Support • Mooring System Design and Analysis • Riser System Design and Analysis • Structural Design and Analysis • Marine System Design • Transportation and Installation Analysis • Project Execution Support 2
  • 10. Platform Screening and Sizing Using benchmarked processes developed in-house, Granherne can efficiently size and compare platform options for specific field developments Semisubs Spars TLPs FPSOs • Hull Configuration • Hull Configuration • Hull Configuration • Hydrostatics & Static • Hydrostatics/Stability • Hull Configuration Stability • Heave and Pitch Periods • Hull Weight and VCG • Tendon Configuration • Ballast/Storage Configuration • Hull Weight and VCG • Fixed Ballast Estimate • Tendon Strength • Hydrostatics & Stability • Natural Periods • Natural Periods • Offset and Air Gap • Hull Weight and VCG • Motions Estimates • Mean Pitch Angle • Ballast • Natural Periods and Motions 10
  • 11. Naval Architecture • Detailed Hull Configuration and Sizing • Arrangements and Layouts • Weight Control • Wind and Current Load Calculations • Compartmentalization • Intact and Damaged Stability • Certification & Classification • Operability Analysis • Marine Operating Manuals Deck #9 Elev (+)16.8m VOID Deck #8 Elev. (+)6.0m VOID Deck #7 Elev. (-)6.0m VOID Hard Tank Below WL Deck #6 Elev. (-)22.8m BALLAST Deck #5 Elev. (-)39.6m BALLAST Deck #4 Elev. (-) 56.4m SKIRT TANK Mooring Elev. (-) 69.2m Open Deck Elev. (-) 73.2m Heave Plate Elev. (-) 121.8m Heave Plate Deck #3 Elev. (-)164m Deck #2 Elev. (-)170.5m Fixed Ballast Deck #1 Elev. (-)175.0m 22.2 m Design of a Floating LNG Facility FPSO Hull Configuration 55.5 m Spar Hull Configuration 11
  • 12. Hydrodynamic and Global Performance Analysis – Wave Diffraction and Hull Motion Analysis – Coupled Hull, Mooring and Riser Analysis – Multi-Body Interaction Analysis – Air Gap Analysis – Slamming and Green Water Analysis – VIM Analysis Air gap analysis WAMIT analysis of various hull forms 12
  • 13. Model Testing – Wave Basin Testing – Wind Tunnel Testing – VIM Testing 13
  • 14. Mooring Design and Analysis • Mooring Design: – Catenary/Taut/Semi-Taut Spread Mooring – Turret Mooring – Single Point Mooring Wire Rope Sockets Spiral Strand – Quayside Mooring TW1 PW1 WIW WIE FWIE2 PE1 PE2 PE3 Line 7 Line 8 Fairleads Line 9 • Specialty Analysis FE1 FE2 – Vortex-Induced Motion Effects Line 6 FE3 FE4 Line 5 FE5 – Polyester Application Line 4 Yv – Fatigue Analysis Xv GasExp – Chain Wear Predictions OilExp FW1 Line 10 Line 11 • Specification of Mooring Components Line 12 Studless Chain Line 3 Line 2 Line 1 • Procurement & Installation Support BP Atlantis - Detail Design, Procurement and Installation Evaluation of VIM effects on an Barracuda/Carintgua Detail Design Design of a soft yoke mooring system existing Spar Mooring System ( Polyester Moorings) for Bohai Bay - China 14
  • 15. Riser Design and Analysis – Design of Single or Multiple Risers: • Flexible Risers • Steel Catenary Risers • Top-Tension Risers • SLOR (Tower) Risers • CVARs – Dynamic Analysis, Interference Studies – 1st & 2nd Order Fatigue Analysis – VIV Analysis – Component Design and Specification TTR and SCR CVAR Development Solutions Detailed Analysis of Flexible Productions Risers for the Barracuda and Caratinga FPSOs 15
  • 16. Structural Design and Analysis – Design and Design Verification for: • FPSO and FLNG Ships • Semisubs • Spars • TLPs – Global Strength and Fatigue Analysis – Development of “Fatigue-Friendly” Details Analysis of FPSO Hull Structure – Advanced Finite Element Analysis – Dynamic Response Analysis – Specification Development – Fabrication Support FEA of Forged Mooring Link Design of a Riser Protection Detailed Global Strength and Fatigue Analysis Frame using Nonlinear Analysis Ocean Victory Class Semisubmersible 16
  • 17. Marine System Design – Marine System Design for All Hulls – P&ID and Layout Development – Specification Development – Procurement Support – HVAC – Instrumentation and Controls Atlantis Semisubmersible Marine & Utility System Design, Design of FPSO Bilge and Ballast Systems Procurement Support and Site Support 17
  • 18. Transportation and Installation Analysis – Concept Development – Detail Engineering – On-site Installation Support – Third Party Review Post Step #1 Step #2 Step #3 Step #4 Step #5 Upending Thunderhorse Flowline Jumper Installation Analysis Spar Upending Analysis Benguela Belize Topsides Transportation Analysis 18
  • 19. Project Execution Support – Integrated Project Management – Owner’s Engineering Representative – Capabilities Include: • Detail Engineering • Procurement Support • Regulatory Coordination • Fabrication Yard Support • Installation Support Petrobras Barracuda/Carintga FPSOs • Commissioning Support • Final Documentation BP ATLANTIS Semisubmersible Conoco Belanak FPSO 19
  • 20. Software Tools Naval Architecture / Hydrodynamics Structural Analysis • Hydrostatics & Stability – HydroD • SESAM • ABAQUS – AutoHydro • SACS • Hydrodynamics – WADAM, WAMIT – HydroStar Riser Analysis • Mooring – MIMOSA • Orcaflex • Riflex – OrcaFlex • Shear 7 – Ariane 50 −3 −2 • VIVA −0.5 40 column area column area 0.5 3 4 30 − 6 5.5 5.5 − 2 • Global Performance 20 10 6.5 5.5 5 6 − 0 − 6. − 2 1 − • Flexcom 3D 0 − • DeepRiser 4.5 6 – SIMO 3.5 1 3 −10 2 0.5 −20 3.5 0.5 1 0 −1 −0.5 −0.5−1.5 0 1 • ABAQUS −5 4 −1 −30 1.5 1.5 1.5 1.5 1.5 22 22 – DeepC 2.5 2.5 2.52 2.5 5.5 5.5 −40 2.5 column area 333 3 column area 5 5 3.5 3.5 −50 6 −40 −20 0 20 40 60 – AQWA 20
  • 21. Some KBR Milestones Hutton TLP Hoover Spar ConocoPhillips ExxonMobil Thunder Horse Semi Agbami FPSO BP Chevron 21