SlideShare a Scribd company logo
1 of 11
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 1 of 11
EDUCATION
B.S. Civil Engineering,Universityof
Arizona, 1982
REGISTRATIONS:
Qatar Eng. Reg. No # 9869
ProfessionalEngineerLic.In
States of, GA, AL, FL,TN,LA, AZ
andTX.
Level II Erosion& Sedimentation
CertificationGSWCC
#0000064687
Worksite Erosion Control
Supervisor Certification
TRAININGS:
GDOT’sROWPlanReview
PrequalificationCertification(Exp.
11/1/2015)
GDOT’sPlanDevelopment
Process(PDP) 2011Certification,
GDOT’sLocalAdministered
Project(LAP), 2011Certification
NEPA and TransportationDecision
makingProcessbyFHWA,
INROADS monthlyTraining
Sessionsby InRoadsUser Group
LANGUAGES:
Arabic and English
COMPUTER SKILLS:
InRoads design software
Microstation CADD
Microsoft Applications XLS,
Word Document,
PowerPoint
EXPERIENCE PROFILE
Mr. Abousaudhas 31 years of hands-onexperienceinengineeringand
constructionmanagementofhighwayandbridgeprojects.Hehas been
responsibleforpreparingconstructionplansforurbanand ruralfreeway
arterialroadways. Hehas provided engineeringservicesfordesign,project
management,constructionmanagement,projectengineer,andprogram
managementservicesforstate, county, and localtransportationagencies.
Forthe last 18years he hadmanagedalltransportationprojectsforclients
suchas GDOT,CobbDOT,GwinnettDOT,Cityof Atlanta, andCity of
SandySprings. UsingGDOT’sPlanPresentationGuide(PPG),andPlan
DevelopmentProcess(PDP) he has performeddesign/review&approval of
roadwayconstructionplansincludingplansandprofiles,drainagedesign,
maintenanceoftraffic plans, erosioncontrolplans,signingandmarking,
R/W plans,and quantityand costestimatesspecifications.He alsoserved
as the proposalmanagerforalltransportationprojectsinGeorgiaexample
of this is the TransportationInvestmentAct (TIA) proposalwherehewas
assignedto be the ProjectDeliveryManager.
PROJECT EXPERIENCE
PARSONS INTERNATIONAL LIMITED Doha, Qatar
August 29, 2015 - Present
Project: Duhail Interchange(P007 C7 P1), and Landmark Al Bustan
Interchange North (P007 C7 P2)
Client: Ashghal
Project Cost: (QAR 6 billion)
Project Role: Team Leader
Served as a team leaderto completeTechnicalTenderEvaluationReport
for very complexsixurbaninterchangesusingKBR’sTenderEvaluation
Plan, the scopeof workincludes developingaassignmentplanand
schedule for26 professionalsofdepartmentandprojectmanagerslevelto
evaluate five submittalsin8 weeks, leadpost tender meetingwith
contractorsandmakepresentationtoAshghal on the findingof the
evaluation. Theprojectsscopeofwork includescompleteDesignand
Constructionofa new expressway, including sixgrade-separated
interchangeswithcrossroads,frontageroads, overpass and underpass
structures, retainingwalls,pedestrianandbicyclepaths,traffic signs,
signalsandITS, landscapeandhardscapeandartscape,street lighting,
surfacewater micro-tunnelandallrelatedinfrastructure.
Project: Construction of Khalifa Street& TV RoundaboutUpgrade
(P007 C6)
Client: Ashghal
Project Cost: (QAR 6 million)
Project Role: Team Leader
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 2 of 11
Mr. Abousaud served as a team leader to complete Technical Tender
Evaluation Report using KBR’s Tender Evaluation Plan, the scope of work
includes evaluating seven submittals, lead post tender meeting with
contractors and make presentation to Ashghal on the finding of the
evaluation. The project scope includes widening of Khalifa Street from 3 to
4-Lanes,constructionof a two level interchange,andconstructionof500 m
surface water micro tunnel 2.4m diameter.
CB&I/SHAW GROUP INC./STONE&WEBSTER USA
June 1997 - August 2014
Project: SR-20 Forsyth/Cherokee County, GA, Georgia DOT
Client: Georgia DOT
Project Cost: ($120 million)
Project Role: Projectmanager
Served as projectmanagerforturnkey projectto prepareconstructionplans
for 7.5 milesof 4-lanedivided urbanandrural highway. Theproject
involved public hearing,preliminaryplans,andfinal constructionplans
includingplan/profiles,roadwayhydraulicscalculation/design,signingand
marking,maintenanceoftraffic plans,erosioncontrol plans,quantities,right
of way plans, detailcostestimates,and specialprevisions.Thisprojectwas
canceledduringtheconceptdevelopmentduelackof funding
Project: US-19 Sumter County, GA, Georgia DOT.
Client: Georgia DOT
Project Cost: ($25 million)
Project Role: Projectmanager
Served as projectmanagertoprepareconstructionplansfor5.5 milesof 4-
lanedivided with44-ft median,andthreebridges. Theprojectinvolved
public hearing,preliminaryplans,and finalconstructionplansincluding
plan/profiles,roadwayand bridgehydraulicscalculation/design,signing&
marking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W
plansusingGDOT’schecklistfor r/w plans,detailcost estimates,and
specialprevisions.Thisprojectwascompletedincludingconstruction.
Project: Sandy SpringsCapitalProjects.
Client: Sandy SpringsRevitalization, Inc
Project Cost: ($12 million)
Project Role: Program Manager
Mr. Abousaudserved as the program managerforSandy Springs
Revitalization, Inc. Responsibilitiesincludingmanagingsevenstreetscape
designprojects,completedconstructionmanagementoffour
streetscape/traffic calmingprojects,reviewconsultantsplans,prepare
Invitation for Bid, selectionofcontractor,constructionmanagement.
Preparemonthlyreportsto monitorschedule,budget,andprogressfor
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 3 of 11
SSRI Board of Directors,and FultonCountyPublic Works. RepresentSSRI
duringmeetingwithGDOT andFultonCounty.
Project: SR-20, Floyd/Bartow Counties,GA, GeorgiaDOT.
Client: Georgia DOT
Project Cost: ($ 8 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor40
intersectionsimprovementsalongSR-20. Thefinalconstructionplans
included,highwayhydraulicscalculation/design,signing&marking,erosion
controlplans,signalplans,quantities,detailcost estimates,and special
previsions. Thisprojectwascompletedincludingconstruction.
Project: SR-365, Hall/Habersham Counties, GA, Georgia DOT..
Client: Georgia DOT
Project Cost: ($ 8 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor40
intersectionsimprovementsalongSR-365. Thefinal constructionplans
included,highwayhydraulicscalculation/design,signing&marking,erosion
controlplans,signalplans,quantities,detailcost estimates,and special
previsions. Thisprojectwascompletedincludingconstruction.
Project: SR-96 Reynolds, Taylor County, GA, Georgia DOT.
Client: Georgia DOT
Project Cost: ($25 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor14km of 4-
lanedivided with44-ft, and 20-ft medianthroughthecityof Reynolds,
Georgia. Theprojectinvolvedpublic hearing,revisingpreliminaryplans,
andcompletingfinalconstructionplans including,plan/profiles,roadway
hydraulicscalculation/design,signingandmarking,maintenanceoftraffic
plans,erosioncontrolplans,quantities,R/W plansusingGDOT’schecklist
for r/w plans,detailcost estimates,andspecialprevisions.Thisprojectwas
completedincludingconstruction.
Project: US-341/SR-27 Wayne County, GA, Georgia DOT.
Client: Georgia DOT
Project Cost: ($24 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor9 milesof 4-
lanedivided with44-ft median,and20-ft medianthroughthecityof Jessup
Georgia,this alsoincludesfourbridges. Thescopeofprojectincludes
public hearing,preliminaryplans,and finalconstructionplansincluding
plan/profiles,roadwayand bridgehydraulicscalculation/design,signing&
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 4 of 11
marking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W
plansusingGDOT’schecklistfor r/w plans,detailcost estimates,and
specialprevisions.Thisprojectwascompletedincludingconstruction.
Project: Peachtree Dunwoody Road, Fulton County, GA
Client: Fulton County, GA
Project Cost: ($3 million)
Project Role: ProjectManager
Served as projectmanagertoprepare constructionplansfor1.5 miles
urbanroadway. Thisprojectincludedplan/profiles,roadwayhydraulics
calculation/design,signing&marking,maintenanceoftraffic plans, erosion
controlplans,quantities,right of way plans,detail costestimates,and
specialprevisions.Thisprojectwascompletedincludingconstruct
Project: Spalding County DOT, Chuli Rd., Mimosa Rd., and Hickory
Rd., Spalding County, GA.
Client: Spalding County DOT
Project Cost: ($6 million)
Project Role: ProjectManager
Preparedconstructionplansforthree unpavedroad projects. Preparation
of preliminaryplansincludinghydraulics,right-of-wayplans,andfinal
constructionplans.Thisprojectwascompletedincludingconstruction.
Project: Georgia DOT, U.S. 341 (GIP 36 & 37), Jesup, GA.
Client: Georgia DOT
Project Cost: ($22 million)
Project Role: ProjectManager
Overseeingthe designandprojectmanagementfor15km of U.S. 341
south of Jesup, Georgia. Projectinvolved public hearing,revising
preliminaryplansincludinghydraulics,andcompletingfinalconstruction
plans.Thisprojectwascompletedincludingconstruction.
Project: Gwinnett DOT, SR-20/SR-84, Gwinnett County, GA.
Client: Gwinnett DOT
Project Cost: ($2 million)
Project Role: ProjectManager
Preparingpreliminaryandfinal constructionplansforSR-20/SR-84
intersectionimprovements.Thisprojectwascompletedincluding
construction.
Project: Cobb County DOT, Old Villa Rica Bridge Replacement.
Client: Cobb County DOT
Project Cost: ($ 1.8 million)
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 5 of 11
Project Role: ProjectManager
PreparedfinalconstructionplansforOldVilla RicaRoad. Thisproject
includedbridgereplacementoverWildhorseCreek inCobbCounty. This
projectwascompletedincludingconstruction.
Project: Cobb County DOT, New Salem Bridge Replacement.
Client: Cobb County DOT
Project Cost: ($1.2 million)
Project Role: ProjectManager
Preparedfinalconstructionplansandbridgeover NoondayCreek inCobb
County. Thisprojectwascompletedincludingconstruction.
Project: Montgomery Outer Loop Value Engineering Study,
Montgomery, Alabama DOT.
Client: Alabama DOT
Project Cost: ($50 million)
Project Role: ProjectManager
Served as team member to complete a value engineering studyfor 8 miles
(from US-231 to SR-110) of freeway, this study including review of design
plans, interview the designers, prepare a report , and make oral
presentation to the DOT staff and other interested parties of findings and
recommendation. The duration of this studywas four days.
Project: Tuscaloosa EastBypass Value Engineering Study,
Montgomery, Alabama DOT.
Client: Alabama DOT
Project Cost: ($38 million)
Project Role: ProjectManager
Served as team member to complete a value engineering study for 7.4
miles (from Crescent Ridge Road to Jack Warner Parkway) of freeway, this
study including review of design plans, interview the designers, prepare a
report , and make oral presentation to the DOT staff and other interested
partiesof findingsandrecommendation. Thedurationof this study was four
days.
ARCADIS/ PIEDMONT OLSEN HENSELY USA
June 1996 – June 1997
Project: Georgia DOT, US 27 Widening and Construction, Troup
County, GA
Client: Georgia DOT
Project Cost: ($21 million)
Project Role: RoadwayDepartmentManager/MemberofProjectDesign
Team
Prepared preliminary, final construction plans and right-of-wayplans for 8
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 6 of 11
kilometersof wideningandnewconstruction. Thisprojectincludedgrading,
drainage, paving, bridges, erosion control, and cost estimate.
Project: Cobb County DOT, Atlanta Road Widening and
Improvements, Marietta, GA
Client: Cobb County DOT
Project Cost: ($13 million)
Project Role: RoadwayDepartmentManager/MemberofProjectDesign
Team
Roadway Department Manager and Member of Project Design Team -
Preparedconcept,preliminarydesign, final construction plans, and right-of-
way plans for 2.6 miles of widening and road improvements. This project
includedsurvey, traffic analysis, grading, drainage, paving, bridges, erosion
control, cost estimate, and public hearing.
Project: Georgia DOT, I-520/Old Savannah Road Interchange,
Richmond County, GA
Client: Georgia DOT
Project Cost: ($18 million)
Project Role: RoadwayDepartmentManager/MemberofProjectDesign
Team
Roadway Department Manager and Member of Project Design Team -
Evaluated Georgia DOT’s concept, prepared preliminary and final
construction plans for interchange improvements. This project included
survey, traffic analysis, grading, paving, bridge, cost estimate, and public
hearing.
DAVID VOLKERT & ASSOCIATES USA
June 1993 – June 1996
Project: Alabama DOT, I-565/US 72 Interchange, Huntsville, AL.
Client: Alabama, DOT
Project Cost: ($8 million)
Project Role: ProjectManager
As Project Manager, prepared construction plans using metric units. This
projectincludedapproximately6 miles of roadway, two bridges, hydraulics,
includingtwodetentionponds,threetraffic signals,signingandstriping,cost
estimates, and traffic control plans.
Project: Alabama, DOT, US 78/Corridor “X”, Graysville, AL.
Client: Alabama, DOT
Project Cost: ($120 million)
Project Role: ProjectManager
As Project Manager, prepared construction plans for 2.5 miles of 8-lane
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 7 of 11
section of freeway and interchange. This project included grade drain on
the mainline and grade drain base and pave on bridges and crossroads.
Project: Alabama DOT, Corridor “X”, Birmingham, AL.
Client:
Project Cost: ($ 6 million)
Project Role: ProjectManager
Prepareda preliminarydesignplanfor10.5 milesof an 8-lanecross section
of freeway, including six interchanges. A detailed traffic analysis was
performed to evaluate interchanges spacing, the required number of lanes
and the level of service of mainline and crossroads intersection. This
project also included the development/ evaluation of a number of
alternatives from which a preferred design was used for the public hearing.
Project: Birmingham Regional – Commission, Birmingham Traffic
Evaluation, Birmingham, AL.
Client:
Project Cost: ($2 million)
Project Role: ProjectManager
Evaluated traffic circulation,parking,andothermodesof transportation
(pedestrian,bicycle,etc.). Thisprojectinvolvedevaluatingexisting
conditions,providingshortand longterm alternates, andcoordinatingwith
state, county, city, andlocalorganizations,includingdeveloping
TRANPLAN for BirminghamRegionalCommission. Theprojectboundaries
covereddowntownBirmingham.
Project: Birmingham Regional – City of Birmingham, Carver Avenue
Street Improvement, Birmingham, AL
Client:
Project Cost: ($ 1.8 million)
Project Role: ProjectManager
ProjectManagertoPrepareconstructionplansfor½ mileof existing
residentialstreets. Thisprojectincludedplan/profile,drainage,cost
estimate,and representationto neighborhoodassociation.
Project: Birmingham Regional – City of Birmingham, Oxmoor Road,
Birmingham, AL.
Client: City of Birmingham
Project Cost: ($1.2 million)
Project Role: ProjectManager.
Preparedpreliminaryplansfor ½ mileof roadway. Thisprojectincluded
the developmentandevaluationof a numberof alternatives and
presentationto the OxmoorSteeringCommittee.
Project: Jefferson County Commission/Board ofEducation, Clay
Chalkville School Access Route, Birmingham, AL.
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 8 of 11
Client: Jefferson County Commission/Board ofEducation
Project Cost: ($1.5 million)
Project Role: ProjectManager.
Preparedconstructionplansfor½ milesofaccessroadfor a middleand
highschool. Thisprojectincludedplan/profile,drainage,signingand
striping,and costestimate.
Project: City of Birmingham, North Frankfort Road, Birmingham, AL
Client: City of Birmingham
Project Cost: ($2.3 million)
Project Role: ProjectManager.
Preparedpreliminaryandconstructionplansfor1 mileof roadway. This
projectincludedplan/profile,typicalsection,hydraulics,signingandstriping,
utility coordination,and presentationtoa steering committee.
Project: Vulcan Material, Highway 261 Bridge, Helena, AL.
Client: Vulcan Material
Project Cost: ($1.7 million)
Project Role: ProjectManager.
Preparedpreliminary/constructionplansfora 175-foot bridgeover Highway
261and a detourroad as requiredbyAlabamaDOT standardsandspecs,
includingplan/profile,typicalsection,hydraulics,traffic controlplans,cost
estimates,biddingdocuments,selectingcontractor,andconstruction
managementservicesasper AlabamaDOT constructionmanual.
Project: City of Birmingham, Evergreen 21stAvenue, Birmingham,
AL.
Client: City of Birmingham
Project Cost: ($2 million)
Project Role: ProjectManager.
Preparedconstructionplansandright-of-wayplansfor 2 milesof residential
roadwayfor street improvements. Thisprojectincludedplan/profile,
drainageutilitycoordination,andpresentationtoneighborhoodassociation.
JHK & ASSOCIATES USA
January 1988 – January 1993
Project: City of Yuma, 4th Street Intersection Sight Distance, Yuma,
AZ.
Client: City of Yuma
Project Cost: ($ 500K)
Project Role: ProjectManager.
IndependentContractor, ProjectManager/Engineer -investigated
intersection'ssightdistanceproblemsalong14thStreet. Thisproject
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 9 of 11
includeddata collection,intersectionanalysis,intersectionsightdistance
triangles,intersectionimprovements,andsigningandmarkingplans. The
finalresults includedareportdescribinganumberofalternatives to solve
the existingproblem.
Project: City of Commerce, Atlantic Boulevard Undrpass,
Commerce, CA
Client:
Project Cost: ($8.2 million)
Project Role: LeadEngineer
LeadEngineer/AssistingManager -Preliminaryandfinal designof an
arterialroadwayimprovement. Thisprojectincludedpreparing horizontal
andvertical alignmentoverSanta Anna FreewayandunderUnionPacific
Railroad,pavementdesignsection,intersectionsanalysis,travel timeand
delaystudy, traffic signaldesignandretiming,andsigningandstriping.
Project: Arizona DOT, I-10 Corridor Improvements, Tuscon, AZ
Client:
Project Cost: ($20 million)
Project Role: LeadDesignEngineer
Served as a LeadDesignEngineerforthe preliminarydesignof a 28-mile
sectionof freewayimprovements. Thisprojectincluded preparingageneral
plandocumentforthe 8-miledowntownsectionandadesignconcept
documentforthe 20-milesectionnorthofthe city of Tucson. Work included
traffic modeling,traffic analysis,environmentalimpactassessment,and
preliminarydesign planspreparation.
Project: Arizona DOT, I-10 Corridor Improvements, Tuscon, AZ
Client:
Project Cost: ($12 million)
Project Role: ProjectManager
Prepareda traffic report, intersectionanalysis,androadwayconstruction
plans. Theprojectinvolved designandlayout of two interchangesandone
directionalrampforthreemilesof a new8-laneroadway.
Project: City of San Diego, Fletcher Parkway Improvements, San
Diego, CA
Client: City of San Diego
Project Cost: ($4 million)
Project Role: leaddesignengineers
Served as oneof the lead designengineerstopreparea costestimate,
pavementsectiondesign,andtraffic signalplansfor an arterialroadway.
Project: Arizona DOT, Outer Loop Freeway, Phoenix, AZ -
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 10 of 11
Client: Arizona DOT
Project Cost:
Project Role: ProjectEngineer
Preparedthe signingandstripingplansandsign structureplanfor 20miles
of I-10 freeway.
JERRY JONES & ASSOCIATES USA
April 1984 – April 1988
Project: Arizona DOT, US 89 Traffic and Capacity Analysis Report,
Tucson, AZ -
Client: Arizona DOT
Project Cost:
Project Role: ProjectEngineer
Preparedreport that includedthecollectionandanalysisofexisting traffic
andphysicaldata relatingto 16 milesof roadwayandfive signalized
intersections. Theanalysisincludedtraffic counts,signalinventories,
intersection/collisiondiagrams,roadway/intersectioncapacity,travel time
anddelay, signalwarrant,and signal/marking. Thisprojectincludedthe
constructionplansforwidening the16milesof roadwayfrom two lanes to a
divided4-lanehighway.
Project: Arizona DOT, Westmore Road Improvements, Tuscon, AZ -
Client: Arizona DOT
Project Cost:
Project Role: ProjectEngineer-
Prepareda traffic andlevel of serviceanalysis report. Thisreportincluded
assemblingtheexistingtraffic and physicaldatarelatingto the roadwayand
signalizedintersectioncapacity,estimatingdesignyeartraffic, and
performingcapacityandlevel of service analysis. Report recommendation
includedlocationsformedianopenings,left-turnbay storagelengths, and
numberof lanesrequiredat eachintersection.
Project: Price Club Center, Community Shopping Center, Glendale,
AZ
Client: Glendale, AZ
Project Cost:
Project Role: ProjectEngineer
In chargeof preparingatraffic study report to assess the impactofa
proposedcommunityshoppingcenteronthe adjacentarterialstreetsand
the majorintersectionswithinamileofthe proposedproject. Thisproject
includeddatacollectionandtraffic counts,intersection/collisiondiagrams,
intersectionanalysis,design/retimingtraffic signal,intersectionsigning,and
marking.
IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 11 of 11
Project: City of Tucson, MDB Square Development, Tucson, AZ
Client: Glendale, AZ
Project Cost:
Project Role: ProjectEngineer
-Thedevelopmentencompassedapproximately61 acreswithresidential,
commercial,andoffice. Projectengineertopreparea traffic report that
includedtraffic countsforthe existingconditionanddevelopedfuturetrip
generationdistributionandassignmentusingT-Model. Prepared
intersectioncapacityanalysisusingMcTransHighwayCapacitySoftware
and1985 CapacityManualanddesignedtraffic signalplans.
Project: City of Tucson,Tucson Auto Mall, Tucson, AZ
Client: City of Tucson
Project Cost:
Project Role: ProjectEngineer
In chargeof preparingasite impactreportto evaluate the traffic impacton
adjacentstreetsystems. Thisprojectincludedthetraffic counts,
intersection/collisiondiagrams,intersectionanalysis,travel timeand delay
study, traffic signalretiming,andsigningandmarking.
Project: Pima County, La Canada Drive/Orange Grove, Tucson, AZ -
Client: Pima County,
Project Cost:
Project Role: ProjectEngineer
Prepareda traffic engineeringreportthatincludedinvestigatingand
analyzing the existingcapacityandlevel of serviceof the existing
intersection. Therecommendationsincludedadjustinglanegeometryand
signalphasing.
Project: City of Tucson, Kino/Irvington Traffic Study, Tucson, AZ -
Client: City of Tucson
Project Cost:
Project Role: ProjectEngineer-
Prepareda site impactstudyof 18.5 acresof proposedcommercial project
with retailand service. Thepurposeofthe traffic study was to determine
the traffic volumegeneratedby this projectandto analyze the impactonthe
majorstreets.

More Related Content

What's hot

What's hot (20)

Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
CV - Fakruddin R01
CV - Fakruddin  R01CV - Fakruddin  R01
CV - Fakruddin R01
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
 
GregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeaderGregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeader
 
Cv phaniraz
Cv   phanirazCv   phaniraz
Cv phaniraz
 
2015 CV
2015 CV 2015 CV
2015 CV
 
master_En
master_Enmaster_En
master_En
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
Project Summary in Hyder Consulting
Project Summary in Hyder ConsultingProject Summary in Hyder Consulting
Project Summary in Hyder Consulting
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
CV
CVCV
CV
 
Igbc green new buildings nbt precertification preliminary review infin...
Igbc green new buildings nbt precertification preliminary review   infin...Igbc green new buildings nbt precertification preliminary review   infin...
Igbc green new buildings nbt precertification preliminary review infin...
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 

Viewers also liked

Unit 15 lo2 photo shoot plan template
Unit 15 lo2   photo shoot plan templateUnit 15 lo2   photo shoot plan template
Unit 15 lo2 photo shoot plan templateHarrison Cole
 
KimberleyOBrienDolle RO2015cvs2
KimberleyOBrienDolle RO2015cvs2KimberleyOBrienDolle RO2015cvs2
KimberleyOBrienDolle RO2015cvs2Kimberley O'Brien
 
Prezenty dla pracowników i klientów - Kolekcja Lifestyle Premium
Prezenty dla pracowników i klientów - Kolekcja Lifestyle PremiumPrezenty dla pracowników i klientów - Kolekcja Lifestyle Premium
Prezenty dla pracowników i klientów - Kolekcja Lifestyle PremiumExperiago
 
Get started with dropbox
Get started with dropboxGet started with dropbox
Get started with dropboxabhibhardwaj77
 
Book 2015 - Miguel Abarzúa
Book 2015 - Miguel AbarzúaBook 2015 - Miguel Abarzúa
Book 2015 - Miguel AbarzúaMiguel Abarzúa
 
Experiago - prezenty biznesowe i eventy dla firm
Experiago - prezenty biznesowe i eventy dla firmExperiago - prezenty biznesowe i eventy dla firm
Experiago - prezenty biznesowe i eventy dla firmExperiago
 
Unit 15 lo2 – proposal template
Unit 15 lo2 – proposal templateUnit 15 lo2 – proposal template
Unit 15 lo2 – proposal templateHarrison Cole
 
「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」
「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」
「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」Taiki Tatsu
 
Deb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeborah Keefe
 
resume managment
resume managmentresume managment
resume managmentjis4144
 
Nfr Cm Resume 2012
Nfr Cm  Resume 2012Nfr Cm  Resume 2012
Nfr Cm Resume 2012nancyfr
 
Photo shoot plan template
   Photo shoot plan template   Photo shoot plan template
Photo shoot plan templateHarrison Cole
 
Project Manager - PMP [Resume]
Project Manager - PMP [Resume]Project Manager - PMP [Resume]
Project Manager - PMP [Resume]jkern1993
 
Resume Rathna Kumar
Resume   Rathna KumarResume   Rathna Kumar
Resume Rathna Kumarrathnakumar
 
Resume For Project Manager Position
Resume For Project Manager PositionResume For Project Manager Position
Resume For Project Manager PositionMallikaindran
 
Top 8 release manager resume samples
Top 8 release manager resume samplesTop 8 release manager resume samples
Top 8 release manager resume samplesDenisLaw345
 

Viewers also liked (18)

Unit 15 lo2 photo shoot plan template
Unit 15 lo2   photo shoot plan templateUnit 15 lo2   photo shoot plan template
Unit 15 lo2 photo shoot plan template
 
KimberleyOBrienDolle RO2015cvs2
KimberleyOBrienDolle RO2015cvs2KimberleyOBrienDolle RO2015cvs2
KimberleyOBrienDolle RO2015cvs2
 
Prezenty dla pracowników i klientów - Kolekcja Lifestyle Premium
Prezenty dla pracowników i klientów - Kolekcja Lifestyle PremiumPrezenty dla pracowników i klientów - Kolekcja Lifestyle Premium
Prezenty dla pracowników i klientów - Kolekcja Lifestyle Premium
 
Get started with dropbox
Get started with dropboxGet started with dropbox
Get started with dropbox
 
Book 2015 - Miguel Abarzúa
Book 2015 - Miguel AbarzúaBook 2015 - Miguel Abarzúa
Book 2015 - Miguel Abarzúa
 
LO2
LO2 LO2
LO2
 
Experiago - prezenty biznesowe i eventy dla firm
Experiago - prezenty biznesowe i eventy dla firmExperiago - prezenty biznesowe i eventy dla firm
Experiago - prezenty biznesowe i eventy dla firm
 
Unit 15 lo2 – proposal template
Unit 15 lo2 – proposal templateUnit 15 lo2 – proposal template
Unit 15 lo2 – proposal template
 
「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」
「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」
「トップアスリートのセカンドキャリア問題におけるSnsの有用性~facebookを例に~」
 
Deb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management Specialist
 
resume managment
resume managmentresume managment
resume managment
 
Nfr Cm Resume 2012
Nfr Cm  Resume 2012Nfr Cm  Resume 2012
Nfr Cm Resume 2012
 
Lo 3 proposal 2
Lo 3 proposal 2 Lo 3 proposal 2
Lo 3 proposal 2
 
Photo shoot plan template
   Photo shoot plan template   Photo shoot plan template
Photo shoot plan template
 
Project Manager - PMP [Resume]
Project Manager - PMP [Resume]Project Manager - PMP [Resume]
Project Manager - PMP [Resume]
 
Resume Rathna Kumar
Resume   Rathna KumarResume   Rathna Kumar
Resume Rathna Kumar
 
Resume For Project Manager Position
Resume For Project Manager PositionResume For Project Manager Position
Resume For Project Manager Position
 
Top 8 release manager resume samples
Top 8 release manager resume samplesTop 8 release manager resume samples
Top 8 release manager resume samples
 

Similar to Ibrahim Abousaud (Parsons) (51115)

diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)Lilly K
 
Nick curran resume 2015
Nick curran resume 2015Nick curran resume 2015
Nick curran resume 2015Nick Curran
 
Nick Curran-Resume
Nick Curran-ResumeNick Curran-Resume
Nick Curran-ResumeNick Curran
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2Michael Nyquist
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, RobsonRobson Lima
 
Hatem Fawzi Aly-1
Hatem Fawzi Aly-1Hatem Fawzi Aly-1
Hatem Fawzi Aly-1hatem aly
 
Proposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - ShortProposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - ShortRick Rice
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee
 
Julio Cabrera's Resume
Julio Cabrera's ResumeJulio Cabrera's Resume
Julio Cabrera's ResumeJulio Cabrera
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land developmentFernando Bravo, P.E., CFM
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land DevelopmentFernando Bravo, P.E., CFM
 
res_brittany_norris.docx(final)
res_brittany_norris.docx(final)res_brittany_norris.docx(final)
res_brittany_norris.docx(final)Brittany Norris
 
Project formulation slstl-iesl - 25th oct 2018 - to be published
Project formulation   slstl-iesl - 25th oct 2018 - to be publishedProject formulation   slstl-iesl - 25th oct 2018 - to be published
Project formulation slstl-iesl - 25th oct 2018 - to be publishedNamalie Siyambalapitiya
 

Similar to Ibrahim Abousaud (Parsons) (51115) (20)

diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)
 
Nick curran resume 2015
Nick curran resume 2015Nick curran resume 2015
Nick curran resume 2015
 
Nick Curran-Resume
Nick Curran-ResumeNick Curran-Resume
Nick Curran-Resume
 
Modern resume
Modern resumeModern resume
Modern resume
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, Robson
 
Hatem Fawzi Aly-1
Hatem Fawzi Aly-1Hatem Fawzi Aly-1
Hatem Fawzi Aly-1
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 
Proposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - ShortProposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - Short
 
Gonzales' Resume
Gonzales' ResumeGonzales' Resume
Gonzales' Resume
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
Julio Cabrera's Resume
Julio Cabrera's ResumeJulio Cabrera's Resume
Julio Cabrera's Resume
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development
 
res_brittany_norris.docx(final)
res_brittany_norris.docx(final)res_brittany_norris.docx(final)
res_brittany_norris.docx(final)
 
Project formulation slstl-iesl - 25th oct 2018 - to be published
Project formulation   slstl-iesl - 25th oct 2018 - to be publishedProject formulation   slstl-iesl - 25th oct 2018 - to be published
Project formulation slstl-iesl - 25th oct 2018 - to be published
 

Ibrahim Abousaud (Parsons) (51115)

  • 1. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 1 of 11 EDUCATION B.S. Civil Engineering,Universityof Arizona, 1982 REGISTRATIONS: Qatar Eng. Reg. No # 9869 ProfessionalEngineerLic.In States of, GA, AL, FL,TN,LA, AZ andTX. Level II Erosion& Sedimentation CertificationGSWCC #0000064687 Worksite Erosion Control Supervisor Certification TRAININGS: GDOT’sROWPlanReview PrequalificationCertification(Exp. 11/1/2015) GDOT’sPlanDevelopment Process(PDP) 2011Certification, GDOT’sLocalAdministered Project(LAP), 2011Certification NEPA and TransportationDecision makingProcessbyFHWA, INROADS monthlyTraining Sessionsby InRoadsUser Group LANGUAGES: Arabic and English COMPUTER SKILLS: InRoads design software Microstation CADD Microsoft Applications XLS, Word Document, PowerPoint EXPERIENCE PROFILE Mr. Abousaudhas 31 years of hands-onexperienceinengineeringand constructionmanagementofhighwayandbridgeprojects.Hehas been responsibleforpreparingconstructionplansforurbanand ruralfreeway arterialroadways. Hehas provided engineeringservicesfordesign,project management,constructionmanagement,projectengineer,andprogram managementservicesforstate, county, and localtransportationagencies. Forthe last 18years he hadmanagedalltransportationprojectsforclients suchas GDOT,CobbDOT,GwinnettDOT,Cityof Atlanta, andCity of SandySprings. UsingGDOT’sPlanPresentationGuide(PPG),andPlan DevelopmentProcess(PDP) he has performeddesign/review&approval of roadwayconstructionplansincludingplansandprofiles,drainagedesign, maintenanceoftraffic plans, erosioncontrolplans,signingandmarking, R/W plans,and quantityand costestimatesspecifications.He alsoserved as the proposalmanagerforalltransportationprojectsinGeorgiaexample of this is the TransportationInvestmentAct (TIA) proposalwherehewas assignedto be the ProjectDeliveryManager. PROJECT EXPERIENCE PARSONS INTERNATIONAL LIMITED Doha, Qatar August 29, 2015 - Present Project: Duhail Interchange(P007 C7 P1), and Landmark Al Bustan Interchange North (P007 C7 P2) Client: Ashghal Project Cost: (QAR 6 billion) Project Role: Team Leader Served as a team leaderto completeTechnicalTenderEvaluationReport for very complexsixurbaninterchangesusingKBR’sTenderEvaluation Plan, the scopeof workincludes developingaassignmentplanand schedule for26 professionalsofdepartmentandprojectmanagerslevelto evaluate five submittalsin8 weeks, leadpost tender meetingwith contractorsandmakepresentationtoAshghal on the findingof the evaluation. Theprojectsscopeofwork includescompleteDesignand Constructionofa new expressway, including sixgrade-separated interchangeswithcrossroads,frontageroads, overpass and underpass structures, retainingwalls,pedestrianandbicyclepaths,traffic signs, signalsandITS, landscapeandhardscapeandartscape,street lighting, surfacewater micro-tunnelandallrelatedinfrastructure. Project: Construction of Khalifa Street& TV RoundaboutUpgrade (P007 C6) Client: Ashghal Project Cost: (QAR 6 million) Project Role: Team Leader
  • 2. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 2 of 11 Mr. Abousaud served as a team leader to complete Technical Tender Evaluation Report using KBR’s Tender Evaluation Plan, the scope of work includes evaluating seven submittals, lead post tender meeting with contractors and make presentation to Ashghal on the finding of the evaluation. The project scope includes widening of Khalifa Street from 3 to 4-Lanes,constructionof a two level interchange,andconstructionof500 m surface water micro tunnel 2.4m diameter. CB&I/SHAW GROUP INC./STONE&WEBSTER USA June 1997 - August 2014 Project: SR-20 Forsyth/Cherokee County, GA, Georgia DOT Client: Georgia DOT Project Cost: ($120 million) Project Role: Projectmanager Served as projectmanagerforturnkey projectto prepareconstructionplans for 7.5 milesof 4-lanedivided urbanandrural highway. Theproject involved public hearing,preliminaryplans,andfinal constructionplans includingplan/profiles,roadwayhydraulicscalculation/design,signingand marking,maintenanceoftraffic plans,erosioncontrol plans,quantities,right of way plans, detailcostestimates,and specialprevisions.Thisprojectwas canceledduringtheconceptdevelopmentduelackof funding Project: US-19 Sumter County, GA, Georgia DOT. Client: Georgia DOT Project Cost: ($25 million) Project Role: Projectmanager Served as projectmanagertoprepareconstructionplansfor5.5 milesof 4- lanedivided with44-ft median,andthreebridges. Theprojectinvolved public hearing,preliminaryplans,and finalconstructionplansincluding plan/profiles,roadwayand bridgehydraulicscalculation/design,signing& marking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W plansusingGDOT’schecklistfor r/w plans,detailcost estimates,and specialprevisions.Thisprojectwascompletedincludingconstruction. Project: Sandy SpringsCapitalProjects. Client: Sandy SpringsRevitalization, Inc Project Cost: ($12 million) Project Role: Program Manager Mr. Abousaudserved as the program managerforSandy Springs Revitalization, Inc. Responsibilitiesincludingmanagingsevenstreetscape designprojects,completedconstructionmanagementoffour streetscape/traffic calmingprojects,reviewconsultantsplans,prepare Invitation for Bid, selectionofcontractor,constructionmanagement. Preparemonthlyreportsto monitorschedule,budget,andprogressfor
  • 3. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 3 of 11 SSRI Board of Directors,and FultonCountyPublic Works. RepresentSSRI duringmeetingwithGDOT andFultonCounty. Project: SR-20, Floyd/Bartow Counties,GA, GeorgiaDOT. Client: Georgia DOT Project Cost: ($ 8 million) Project Role: ProjectManager Served as projectmanagertoprepareconstructionplansfor40 intersectionsimprovementsalongSR-20. Thefinalconstructionplans included,highwayhydraulicscalculation/design,signing&marking,erosion controlplans,signalplans,quantities,detailcost estimates,and special previsions. Thisprojectwascompletedincludingconstruction. Project: SR-365, Hall/Habersham Counties, GA, Georgia DOT.. Client: Georgia DOT Project Cost: ($ 8 million) Project Role: ProjectManager Served as projectmanagertoprepareconstructionplansfor40 intersectionsimprovementsalongSR-365. Thefinal constructionplans included,highwayhydraulicscalculation/design,signing&marking,erosion controlplans,signalplans,quantities,detailcost estimates,and special previsions. Thisprojectwascompletedincludingconstruction. Project: SR-96 Reynolds, Taylor County, GA, Georgia DOT. Client: Georgia DOT Project Cost: ($25 million) Project Role: ProjectManager Served as projectmanagertoprepareconstructionplansfor14km of 4- lanedivided with44-ft, and 20-ft medianthroughthecityof Reynolds, Georgia. Theprojectinvolvedpublic hearing,revisingpreliminaryplans, andcompletingfinalconstructionplans including,plan/profiles,roadway hydraulicscalculation/design,signingandmarking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W plansusingGDOT’schecklist for r/w plans,detailcost estimates,andspecialprevisions.Thisprojectwas completedincludingconstruction. Project: US-341/SR-27 Wayne County, GA, Georgia DOT. Client: Georgia DOT Project Cost: ($24 million) Project Role: ProjectManager Served as projectmanagertoprepareconstructionplansfor9 milesof 4- lanedivided with44-ft median,and20-ft medianthroughthecityof Jessup Georgia,this alsoincludesfourbridges. Thescopeofprojectincludes public hearing,preliminaryplans,and finalconstructionplansincluding plan/profiles,roadwayand bridgehydraulicscalculation/design,signing&
  • 4. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 4 of 11 marking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W plansusingGDOT’schecklistfor r/w plans,detailcost estimates,and specialprevisions.Thisprojectwascompletedincludingconstruction. Project: Peachtree Dunwoody Road, Fulton County, GA Client: Fulton County, GA Project Cost: ($3 million) Project Role: ProjectManager Served as projectmanagertoprepare constructionplansfor1.5 miles urbanroadway. Thisprojectincludedplan/profiles,roadwayhydraulics calculation/design,signing&marking,maintenanceoftraffic plans, erosion controlplans,quantities,right of way plans,detail costestimates,and specialprevisions.Thisprojectwascompletedincludingconstruct Project: Spalding County DOT, Chuli Rd., Mimosa Rd., and Hickory Rd., Spalding County, GA. Client: Spalding County DOT Project Cost: ($6 million) Project Role: ProjectManager Preparedconstructionplansforthree unpavedroad projects. Preparation of preliminaryplansincludinghydraulics,right-of-wayplans,andfinal constructionplans.Thisprojectwascompletedincludingconstruction. Project: Georgia DOT, U.S. 341 (GIP 36 & 37), Jesup, GA. Client: Georgia DOT Project Cost: ($22 million) Project Role: ProjectManager Overseeingthe designandprojectmanagementfor15km of U.S. 341 south of Jesup, Georgia. Projectinvolved public hearing,revising preliminaryplansincludinghydraulics,andcompletingfinalconstruction plans.Thisprojectwascompletedincludingconstruction. Project: Gwinnett DOT, SR-20/SR-84, Gwinnett County, GA. Client: Gwinnett DOT Project Cost: ($2 million) Project Role: ProjectManager Preparingpreliminaryandfinal constructionplansforSR-20/SR-84 intersectionimprovements.Thisprojectwascompletedincluding construction. Project: Cobb County DOT, Old Villa Rica Bridge Replacement. Client: Cobb County DOT Project Cost: ($ 1.8 million)
  • 5. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 5 of 11 Project Role: ProjectManager PreparedfinalconstructionplansforOldVilla RicaRoad. Thisproject includedbridgereplacementoverWildhorseCreek inCobbCounty. This projectwascompletedincludingconstruction. Project: Cobb County DOT, New Salem Bridge Replacement. Client: Cobb County DOT Project Cost: ($1.2 million) Project Role: ProjectManager Preparedfinalconstructionplansandbridgeover NoondayCreek inCobb County. Thisprojectwascompletedincludingconstruction. Project: Montgomery Outer Loop Value Engineering Study, Montgomery, Alabama DOT. Client: Alabama DOT Project Cost: ($50 million) Project Role: ProjectManager Served as team member to complete a value engineering studyfor 8 miles (from US-231 to SR-110) of freeway, this study including review of design plans, interview the designers, prepare a report , and make oral presentation to the DOT staff and other interested parties of findings and recommendation. The duration of this studywas four days. Project: Tuscaloosa EastBypass Value Engineering Study, Montgomery, Alabama DOT. Client: Alabama DOT Project Cost: ($38 million) Project Role: ProjectManager Served as team member to complete a value engineering study for 7.4 miles (from Crescent Ridge Road to Jack Warner Parkway) of freeway, this study including review of design plans, interview the designers, prepare a report , and make oral presentation to the DOT staff and other interested partiesof findingsandrecommendation. Thedurationof this study was four days. ARCADIS/ PIEDMONT OLSEN HENSELY USA June 1996 – June 1997 Project: Georgia DOT, US 27 Widening and Construction, Troup County, GA Client: Georgia DOT Project Cost: ($21 million) Project Role: RoadwayDepartmentManager/MemberofProjectDesign Team Prepared preliminary, final construction plans and right-of-wayplans for 8
  • 6. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 6 of 11 kilometersof wideningandnewconstruction. Thisprojectincludedgrading, drainage, paving, bridges, erosion control, and cost estimate. Project: Cobb County DOT, Atlanta Road Widening and Improvements, Marietta, GA Client: Cobb County DOT Project Cost: ($13 million) Project Role: RoadwayDepartmentManager/MemberofProjectDesign Team Roadway Department Manager and Member of Project Design Team - Preparedconcept,preliminarydesign, final construction plans, and right-of- way plans for 2.6 miles of widening and road improvements. This project includedsurvey, traffic analysis, grading, drainage, paving, bridges, erosion control, cost estimate, and public hearing. Project: Georgia DOT, I-520/Old Savannah Road Interchange, Richmond County, GA Client: Georgia DOT Project Cost: ($18 million) Project Role: RoadwayDepartmentManager/MemberofProjectDesign Team Roadway Department Manager and Member of Project Design Team - Evaluated Georgia DOT’s concept, prepared preliminary and final construction plans for interchange improvements. This project included survey, traffic analysis, grading, paving, bridge, cost estimate, and public hearing. DAVID VOLKERT & ASSOCIATES USA June 1993 – June 1996 Project: Alabama DOT, I-565/US 72 Interchange, Huntsville, AL. Client: Alabama, DOT Project Cost: ($8 million) Project Role: ProjectManager As Project Manager, prepared construction plans using metric units. This projectincludedapproximately6 miles of roadway, two bridges, hydraulics, includingtwodetentionponds,threetraffic signals,signingandstriping,cost estimates, and traffic control plans. Project: Alabama, DOT, US 78/Corridor “X”, Graysville, AL. Client: Alabama, DOT Project Cost: ($120 million) Project Role: ProjectManager As Project Manager, prepared construction plans for 2.5 miles of 8-lane
  • 7. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 7 of 11 section of freeway and interchange. This project included grade drain on the mainline and grade drain base and pave on bridges and crossroads. Project: Alabama DOT, Corridor “X”, Birmingham, AL. Client: Project Cost: ($ 6 million) Project Role: ProjectManager Prepareda preliminarydesignplanfor10.5 milesof an 8-lanecross section of freeway, including six interchanges. A detailed traffic analysis was performed to evaluate interchanges spacing, the required number of lanes and the level of service of mainline and crossroads intersection. This project also included the development/ evaluation of a number of alternatives from which a preferred design was used for the public hearing. Project: Birmingham Regional – Commission, Birmingham Traffic Evaluation, Birmingham, AL. Client: Project Cost: ($2 million) Project Role: ProjectManager Evaluated traffic circulation,parking,andothermodesof transportation (pedestrian,bicycle,etc.). Thisprojectinvolvedevaluatingexisting conditions,providingshortand longterm alternates, andcoordinatingwith state, county, city, andlocalorganizations,includingdeveloping TRANPLAN for BirminghamRegionalCommission. Theprojectboundaries covereddowntownBirmingham. Project: Birmingham Regional – City of Birmingham, Carver Avenue Street Improvement, Birmingham, AL Client: Project Cost: ($ 1.8 million) Project Role: ProjectManager ProjectManagertoPrepareconstructionplansfor½ mileof existing residentialstreets. Thisprojectincludedplan/profile,drainage,cost estimate,and representationto neighborhoodassociation. Project: Birmingham Regional – City of Birmingham, Oxmoor Road, Birmingham, AL. Client: City of Birmingham Project Cost: ($1.2 million) Project Role: ProjectManager. Preparedpreliminaryplansfor ½ mileof roadway. Thisprojectincluded the developmentandevaluationof a numberof alternatives and presentationto the OxmoorSteeringCommittee. Project: Jefferson County Commission/Board ofEducation, Clay Chalkville School Access Route, Birmingham, AL.
  • 8. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 8 of 11 Client: Jefferson County Commission/Board ofEducation Project Cost: ($1.5 million) Project Role: ProjectManager. Preparedconstructionplansfor½ milesofaccessroadfor a middleand highschool. Thisprojectincludedplan/profile,drainage,signingand striping,and costestimate. Project: City of Birmingham, North Frankfort Road, Birmingham, AL Client: City of Birmingham Project Cost: ($2.3 million) Project Role: ProjectManager. Preparedpreliminaryandconstructionplansfor1 mileof roadway. This projectincludedplan/profile,typicalsection,hydraulics,signingandstriping, utility coordination,and presentationtoa steering committee. Project: Vulcan Material, Highway 261 Bridge, Helena, AL. Client: Vulcan Material Project Cost: ($1.7 million) Project Role: ProjectManager. Preparedpreliminary/constructionplansfora 175-foot bridgeover Highway 261and a detourroad as requiredbyAlabamaDOT standardsandspecs, includingplan/profile,typicalsection,hydraulics,traffic controlplans,cost estimates,biddingdocuments,selectingcontractor,andconstruction managementservicesasper AlabamaDOT constructionmanual. Project: City of Birmingham, Evergreen 21stAvenue, Birmingham, AL. Client: City of Birmingham Project Cost: ($2 million) Project Role: ProjectManager. Preparedconstructionplansandright-of-wayplansfor 2 milesof residential roadwayfor street improvements. Thisprojectincludedplan/profile, drainageutilitycoordination,andpresentationtoneighborhoodassociation. JHK & ASSOCIATES USA January 1988 – January 1993 Project: City of Yuma, 4th Street Intersection Sight Distance, Yuma, AZ. Client: City of Yuma Project Cost: ($ 500K) Project Role: ProjectManager. IndependentContractor, ProjectManager/Engineer -investigated intersection'ssightdistanceproblemsalong14thStreet. Thisproject
  • 9. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 9 of 11 includeddata collection,intersectionanalysis,intersectionsightdistance triangles,intersectionimprovements,andsigningandmarkingplans. The finalresults includedareportdescribinganumberofalternatives to solve the existingproblem. Project: City of Commerce, Atlantic Boulevard Undrpass, Commerce, CA Client: Project Cost: ($8.2 million) Project Role: LeadEngineer LeadEngineer/AssistingManager -Preliminaryandfinal designof an arterialroadwayimprovement. Thisprojectincludedpreparing horizontal andvertical alignmentoverSanta Anna FreewayandunderUnionPacific Railroad,pavementdesignsection,intersectionsanalysis,travel timeand delaystudy, traffic signaldesignandretiming,andsigningandstriping. Project: Arizona DOT, I-10 Corridor Improvements, Tuscon, AZ Client: Project Cost: ($20 million) Project Role: LeadDesignEngineer Served as a LeadDesignEngineerforthe preliminarydesignof a 28-mile sectionof freewayimprovements. Thisprojectincluded preparingageneral plandocumentforthe 8-miledowntownsectionandadesignconcept documentforthe 20-milesectionnorthofthe city of Tucson. Work included traffic modeling,traffic analysis,environmentalimpactassessment,and preliminarydesign planspreparation. Project: Arizona DOT, I-10 Corridor Improvements, Tuscon, AZ Client: Project Cost: ($12 million) Project Role: ProjectManager Prepareda traffic report, intersectionanalysis,androadwayconstruction plans. Theprojectinvolved designandlayout of two interchangesandone directionalrampforthreemilesof a new8-laneroadway. Project: City of San Diego, Fletcher Parkway Improvements, San Diego, CA Client: City of San Diego Project Cost: ($4 million) Project Role: leaddesignengineers Served as oneof the lead designengineerstopreparea costestimate, pavementsectiondesign,andtraffic signalplansfor an arterialroadway. Project: Arizona DOT, Outer Loop Freeway, Phoenix, AZ -
  • 10. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 10 of 11 Client: Arizona DOT Project Cost: Project Role: ProjectEngineer Preparedthe signingandstripingplansandsign structureplanfor 20miles of I-10 freeway. JERRY JONES & ASSOCIATES USA April 1984 – April 1988 Project: Arizona DOT, US 89 Traffic and Capacity Analysis Report, Tucson, AZ - Client: Arizona DOT Project Cost: Project Role: ProjectEngineer Preparedreport that includedthecollectionandanalysisofexisting traffic andphysicaldata relatingto 16 milesof roadwayandfive signalized intersections. Theanalysisincludedtraffic counts,signalinventories, intersection/collisiondiagrams,roadway/intersectioncapacity,travel time anddelay, signalwarrant,and signal/marking. Thisprojectincludedthe constructionplansforwidening the16milesof roadwayfrom two lanes to a divided4-lanehighway. Project: Arizona DOT, Westmore Road Improvements, Tuscon, AZ - Client: Arizona DOT Project Cost: Project Role: ProjectEngineer- Prepareda traffic andlevel of serviceanalysis report. Thisreportincluded assemblingtheexistingtraffic and physicaldatarelatingto the roadwayand signalizedintersectioncapacity,estimatingdesignyeartraffic, and performingcapacityandlevel of service analysis. Report recommendation includedlocationsformedianopenings,left-turnbay storagelengths, and numberof lanesrequiredat eachintersection. Project: Price Club Center, Community Shopping Center, Glendale, AZ Client: Glendale, AZ Project Cost: Project Role: ProjectEngineer In chargeof preparingatraffic study report to assess the impactofa proposedcommunityshoppingcenteronthe adjacentarterialstreetsand the majorintersectionswithinamileofthe proposedproject. Thisproject includeddatacollectionandtraffic counts,intersection/collisiondiagrams, intersectionanalysis,design/retimingtraffic signal,intersectionsigning,and marking.
  • 11. IBRAHIM ABOUSAUD, P.E. Program Manager Email; becisa@yahoo.com Mobile;974-50458194(Doha), +1 678-427-7432(USA) PARSONS INTERNATIONAL LIMITED Page 11 of 11 Project: City of Tucson, MDB Square Development, Tucson, AZ Client: Glendale, AZ Project Cost: Project Role: ProjectEngineer -Thedevelopmentencompassedapproximately61 acreswithresidential, commercial,andoffice. Projectengineertopreparea traffic report that includedtraffic countsforthe existingconditionanddevelopedfuturetrip generationdistributionandassignmentusingT-Model. Prepared intersectioncapacityanalysisusingMcTransHighwayCapacitySoftware and1985 CapacityManualanddesignedtraffic signalplans. Project: City of Tucson,Tucson Auto Mall, Tucson, AZ Client: City of Tucson Project Cost: Project Role: ProjectEngineer In chargeof preparingasite impactreportto evaluate the traffic impacton adjacentstreetsystems. Thisprojectincludedthetraffic counts, intersection/collisiondiagrams,intersectionanalysis,travel timeand delay study, traffic signalretiming,andsigningandmarking. Project: Pima County, La Canada Drive/Orange Grove, Tucson, AZ - Client: Pima County, Project Cost: Project Role: ProjectEngineer Prepareda traffic engineeringreportthatincludedinvestigatingand analyzing the existingcapacityandlevel of serviceof the existing intersection. Therecommendationsincludedadjustinglanegeometryand signalphasing. Project: City of Tucson, Kino/Irvington Traffic Study, Tucson, AZ - Client: City of Tucson Project Cost: Project Role: ProjectEngineer- Prepareda site impactstudyof 18.5 acresof proposedcommercial project with retailand service. Thepurposeofthe traffic study was to determine the traffic volumegeneratedby this projectandto analyze the impactonthe majorstreets.