www. prgco.ir
PADIDEH ROYAYEH GHARN
P.GC in a Glance:
Companies look to something with the idea of regional
markets to export technical and engineering services
and formed the founding group of senior engineers with
decades of experience in the implementation of various
projects in Iran
During a brief period with the dozens of projects
implemented in the region with a view to complying with
international standards as a GC to execute EPC projects
as established.
www. prgco.ir2
Co-centurydreamphenomenainengineering,industrialandcivilprojectscarriedsuppliesandgoodsisactive.
Managingtheincreasedemphasisonattitudesandsatisfaction,continuousoptimizationservicestoclientsintheprocess,
protect the environment and human agenda in its duties.
In addition to the foregoing commitment and adherence to legal requirements and other relevant requirements, it is
believed that the use of management system standards ISO9001: 2008 - ISO14001 :2004-OHSAS18001: 2007 as
Executive models excellence in order to take action.
Policy outline is as follows:
1.Achieve predetermined objectives and plans of the Board
2. Commitment to professional ethics and the ethics of being preferred over material interests
3. Improve the processes and activities associated with projects focusing on quality, timely execution and cost manage-
ment of projects in order to increase stakeholder satisfaction
4. Regular planning and action for the prevention of injuries, illnesses and accidents of controlling harmful work environ-
ment (especially chemical and physical agents, ergonomic factors in headquarters and administrative units)
5. Regular planning and action to prevent environmental pollution (especially to prevent contamination of soil, air and
water units and reduced resource consumption in equity executive and administrative)
6. Implementing organizational structures and management company for export of engineering services conforming to
international standards
7. Promote the scientific level, managerial and technical skills of employees through training
8. Development and quality infrastructure in order to achieve the general contractor (GC)
9. Registration, recording and exploitation and transfer of technical knowledge gained from projects to local partners
I am also committed to pursuing continuous improvement of the system in order to achieve goals and review the terms
of this
Policy on an annual basis and according to the requirements of financial, operational, organizational and personnel,
including managers, experts and officials have demanded that the important principles glory, wisdom and how to com-
municate with the public, employers, consultant, contractor component and other interested parties and the priority set
of professional value, all of their efforts to achieve the goals and plans communicated to operate.
CEO
												 Majid Kiani
www. prgco.ir 3
IntegratedManagementSystemPolicy
EngineeringandConsultingServices
Project engineering services in the specialized field of marine
structures , underground structures , geo technics (land and
water)andgeologicalengineeringandsurveyingbusinessalready
has a special position , so that in addition to full coverage of the
advisory needs ( research , design and monitoring ) and research ,
dozens of independent projects done or is in progress .
Abilities:
•	 Designandengineeringservicesinallcivilandindustrialtrends
•	 Geotechnical Engineering Services (land and water)
•	 Geological Engineering and Surveying
•	 Project Management Services
•	 Consultation and supervision (higher and resident)
•	 Engineering services for coping with earthquake retrofitting
buildings
www. prgco.ir4
Name of project Status
lanoitanretni yb dengised sgnidliub loohcS lacideM dna latneD ,lacideM Unfinished
)Shrine to Shrine Highway Engineering Management Services (Qom to Mashhad Under implementation
Rail Project Phase 1 study area Yazd, Isfahan and Shiraz Unfinished
Design and Engineering Services martyr Zinedine Tehran Highway Unfinished
Engineering and design of highway tunnels martyr Faith Shiraz Unfinished
Engineering and design studies martyr Motahari Crossing and Tehran Highway Unfinished
Advisory services and preparation of tender documents for the Tehran Metro Line 6 Unfinished
Consulting services and documentation Karaj Metro Under implementation
Engineering and consulting services Project 16 Phase 15 of South Pars gas field Under implementation
Design and engineering and consulting services for water treatment plants of Mazandaran, Shiraz Unfinished
Mining equipment design, engineering and consulting services Khamroud Unfinished
Engineering services and studies a new international airport in Iran Under implementation
Engineering services and design studies Bushehr InternationalAirport Under implementation
www. prgco.ir 5
Havingestablishedintheadministrativebuildings
Having established in the administrative buildings and structures -
Business - University of the Health Check and the rapid implementation
of international standards of design and construction operations in EPC
or PC to fulfill the following.
OneoftheflagshipprojectsandthecompanyplanstoexpandPGCporch
and courtyard housing with the Commander of the Faithful pilgrimage
shrine of Fatima al-Zahra (sa) in Iraq.
Other projects implemented or under implementation are as follows.
www. prgco.ir6
StatusName of project
Unfinished
Design and construction of the International School
of Dental Medicine and Biomedical Sciences
Unfinished
Completed construction and operation of
mechanical and electrical slow Hospital
Under implementationPark Construction Landscape Tabriz Museum
Under implementation
Manufacturing of Songun copper smelter and
sulfuric acid plant
Under implementation
Design, construction, supervision and project
development supreme shrine of ImamAli (AS)
www. prgco.ir 7
Road,Rail&Tunnel
PGC in the structure of Underwater beginning of its activities in the field
of tunnel construction, effective presence has increased dramatically
in the field of manufacturing of highways, main roads and ancillary
infrastructure for rail and even upgrade and repair the band airports in
the record run has and with regard to the implementation of dozens of
tunnelswithdifferentuserprofilesandshapesincomplexandtechnical,
arenowregardedasoneofthemajorcontractorsinthefieldofroadand
railway tunnels are considered.
Abilities:
•	 Road and highway design and implementation
•	 Design and implementation of main and secondary roads
•	 Design and implementation of rail lines and related facilities.
•	 Design and implementation of railway infrastructure
•	 Design and implementation of hydropower tunnels
•	 Design and implementation of road tunnels and runways
•	 Transformer cavern excavation and consolidation of operations
and the elevator shaft Dam and Power Plant
•	 Exploratory drilling and galleries Dam and Power Plant
www. prgco.ir8
StatusName of project
Unfinishedmad ,lennut noisrevid retaw fo noitcurtsnoC zaraH fo slennut yawllips dna
UnfinishedRoad construction Shahindej - TAKAB
UnfinishedCompleting the Borazjan - Ganaveh
UnfinishedRoad construction Kangan - Dvrahk
Under implementationHighway construction in Bushehr - late as the primary way of pars
UnfinishedZahedan road Nosratabad
UnfinishedGorgan railway - border Incheh
UnfinishedThe construction of the dam access road and qiz Khoda afarin wildlife crossings
Unfinished3-piece rail infrastructure Gol-Gohar - Shiraz length of 100 km.
Under implementationQazvin -Alamut
UnfinishedPart V rail Maragheh - Urmia
Under implementationFreeway shrine to shrine (Qom – Branch)
UnfinishedHamedan railway infrastructure - Sanandaj
Under implementationKermanshah-Khosravi rail
Under implementationThe first piece of high-speed rail infrastructure Qom - Esfahan
www. prgco.ir 9
Damsandirrigationschemesdrainage
Water crisis as one of the major challenges facing humanity in this
century, has attracted worldwide attention. Resource management
and development of dams and irrigation canals and drainage networks
including places of work priorities.
Dozens of companies and network of irrigation and drainage canals huge
project area has implemented several thousand acres of irrigation and
drainage and irrigation canal network of the project already has.
Abilities:
•	 Design and implementation of irrigation and drainage networks.
•	 Design and implementation of irrigation canals
•	 Dependent on irrigation and drainage facilities, network design and
implementation
•	 Design and implementation of large earthen dams, rockfill, concrete
and RCC
•	 Design and construction of hydropower plants and tall concrete
structures
•	 Design and implementation of levee walls, curtains, sealing, drilling
and injection Consolidation
•	 Designed, installed and operated instrumentation projects, dams,
tunnels and power plants
www. prgco.ir10
StatusName of project
UnfinishednamreK ot nuf si mad eht morf retaw refsnart ot nalP
UnfinishedDam building Polrood
UnfinishedWater Supply Dam to Hamedan Talwar
Under implementationCochrane Dam
Under implementationLane of Haraz Dam
UnfinishedDam Klqan tea
UnfinishedDam construction Lylan tea
UnfinishedDam water release delivery system, Qorveh Plains - Dehgalan
UnfinishedThe second half of the transmission line carrying water from the well to Zahedan
Under implementationImplementation of housing and utility Chraghvys Dam
UnfinishedPlan to transfer water from the dam to Kerman
Under implementationShrfshah Dam
Under implementationWater from the dam to Kermanshah
Under implementationShrfshah Dam
UnfinishedAmendment Iyushan Dam
UnfinishedWater Supply Dam to Hamedan Talwar
www. prgco.ir 11
MiningandMetallurgicalIndustry
PGChavinguniquefacilitiessuchasadvanceddrillingmachines,drilling
wagons all Hydraulic, mining fleet is equipped and able to implement
the project in three exploration, extraction and processing as a general
contractor (GC) surfaces different (EPC, ...) .
With regard to the objective of developing the mineral industry, mineral
industry, sponge iron plants, such as construction, manufacturing
concentrate,copper,ironandAluminumsmeltingandrefiningofmetals
has begun.
Abilities
•	 Network discovery and exploration plans
•	 Exploratory boreholes and sampling depths and under different
conditions
•	 Exploratory digging tunnels and trenches
•	 Geochemical and geophysical exploration
•	 Geo electrics well logging operations and data processing
•	 Design and surface mining, including metallic and non-metallic
•	 Network design and implementation of drilling and blasting
•	 Design and underground mining
www. prgco.ir12
StatusName of project
Under implementationPMS eussit namreK leets gnitsac dna gnitlem yb derutcafunaM
Under implementation
Sponge Iron and Steel Plant handlingAzerbaijan
)Miyaneh Steel Design(
Under implementationManufacturing of Songun copper smelter and sulfuric acid plant
Under implementationSongun Copper Refinery Plant Complex
Unfinished
Construction and commissioning of steel casting machine
Mobarakeh
UnfinishedManufacturing of Songun copper smelter and sulfuric acid plant
Under implementation
Songun copper complex method development project
)concentrated EPC (construction phase
Under implementationSongun Copper Refinery Plant Complex
www. prgco.ir 13
Machinery
SetsMachinerySetsMachinery
42Mechanical shovel50Loader
45Bulldozer35Grader
5Scraper50Roller
5Tunnel boring machine38Side boom
450Truck21Drill wagon
10Asphalt Factory19Excavator
2000Others12Jumbo
32Tractors
14
www. prgco.ir info@prgco.ir P.O.Box: 15875-8499 Tehran-IRAN

More Related Content

What's hot (20)

Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Burgasneftoproekt
BurgasneftoproektBurgasneftoproekt
Burgasneftoproekt
 
PTL Presentation
PTL PresentationPTL Presentation
PTL Presentation
 
CV
CVCV
CV
 
CV updated February 2017
CV updated  February 2017CV updated  February 2017
CV updated February 2017
 
RESUME_ARCHITH_SANKER_ATKINS
RESUME_ARCHITH_SANKER_ATKINSRESUME_ARCHITH_SANKER_ATKINS
RESUME_ARCHITH_SANKER_ATKINS
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Cv phaniraz
Cv   phanirazCv   phaniraz
Cv phaniraz
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CV
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
DCG_CV
DCG_CVDCG_CV
DCG_CV
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 

Viewers also liked

Surya epaper 10 november 2013
Surya epaper 10 november 2013Surya epaper 10 november 2013
Surya epaper 10 november 2013Portal Surya
 
Zimplement Business plan
Zimplement Business planZimplement Business plan
Zimplement Business planrachit malik
 
The Hero's Journey in Amsterdam. Demo guide 9 november 2013
The Hero's Journey in Amsterdam. Demo guide 9 november 2013The Hero's Journey in Amsterdam. Demo guide 9 november 2013
The Hero's Journey in Amsterdam. Demo guide 9 november 2013Peter de Kuster
 
HealthyGuide - Opportunity Analysis Project (OAP)
HealthyGuide  - Opportunity Analysis Project (OAP)HealthyGuide  - Opportunity Analysis Project (OAP)
HealthyGuide - Opportunity Analysis Project (OAP)Vijaya Eluri
 
Electronic Portfolio
Electronic Portfolio Electronic Portfolio
Electronic Portfolio c0nniemarie
 
Work History Stuart Bennett
Work History Stuart BennettWork History Stuart Bennett
Work History Stuart BennettStuart Bennett
 
Prisoners poster analysis
Prisoners poster analysisPrisoners poster analysis
Prisoners poster analysisBlozeit
 
Analysis of posters corrected
Analysis of posters correctedAnalysis of posters corrected
Analysis of posters correctedBurtoncalvin
 
O quadrado magico de Durero
O quadrado magico de DureroO quadrado magico de Durero
O quadrado magico de DureroJoão Couto
 

Viewers also liked (16)

Surya epaper 10 november 2013
Surya epaper 10 november 2013Surya epaper 10 november 2013
Surya epaper 10 november 2013
 
Zimplement Business plan
Zimplement Business planZimplement Business plan
Zimplement Business plan
 
The Hero's Journey in Amsterdam. Demo guide 9 november 2013
The Hero's Journey in Amsterdam. Demo guide 9 november 2013The Hero's Journey in Amsterdam. Demo guide 9 november 2013
The Hero's Journey in Amsterdam. Demo guide 9 november 2013
 
HealthyGuide - Opportunity Analysis Project (OAP)
HealthyGuide  - Opportunity Analysis Project (OAP)HealthyGuide  - Opportunity Analysis Project (OAP)
HealthyGuide - Opportunity Analysis Project (OAP)
 
Electronic Portfolio
Electronic Portfolio Electronic Portfolio
Electronic Portfolio
 
Work History Stuart Bennett
Work History Stuart BennettWork History Stuart Bennett
Work History Stuart Bennett
 
Abordaje
AbordajeAbordaje
Abordaje
 
Tarea 2. corrección
Tarea 2. correcciónTarea 2. corrección
Tarea 2. corrección
 
future resume
future resumefuture resume
future resume
 
Lesson plan
Lesson planLesson plan
Lesson plan
 
Holiday Checklist
Holiday ChecklistHoliday Checklist
Holiday Checklist
 
Prisoners poster analysis
Prisoners poster analysisPrisoners poster analysis
Prisoners poster analysis
 
Noticias en línea
Noticias en líneaNoticias en línea
Noticias en línea
 
Analysis of posters corrected
Analysis of posters correctedAnalysis of posters corrected
Analysis of posters corrected
 
Exposición informatica.
Exposición informatica.Exposición informatica.
Exposición informatica.
 
O quadrado magico de Durero
O quadrado magico de DureroO quadrado magico de Durero
O quadrado magico de Durero
 

Similar to master_En (20)

MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
KHURRAM ASHFAQ KHAN CV updated
KHURRAM ASHFAQ KHAN  CV updatedKHURRAM ASHFAQ KHAN  CV updated
KHURRAM ASHFAQ KHAN CV updated
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
JESA_Presentation_2013
JESA_Presentation_2013JESA_Presentation_2013
JESA_Presentation_2013
 
MPH Global Services
MPH Global ServicesMPH Global Services
MPH Global Services
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior Infrastructure
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 
Gajendra_Resume
Gajendra_ResumeGajendra_Resume
Gajendra_Resume
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
Resume_mahim
Resume_mahimResume_mahim
Resume_mahim
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
A-insinoorit
A-insinooritA-insinoorit
A-insinoorit
 

master_En

  • 2. P.GC in a Glance: Companies look to something with the idea of regional markets to export technical and engineering services and formed the founding group of senior engineers with decades of experience in the implementation of various projects in Iran During a brief period with the dozens of projects implemented in the region with a view to complying with international standards as a GC to execute EPC projects as established. www. prgco.ir2
  • 3. Co-centurydreamphenomenainengineering,industrialandcivilprojectscarriedsuppliesandgoodsisactive. Managingtheincreasedemphasisonattitudesandsatisfaction,continuousoptimizationservicestoclientsintheprocess, protect the environment and human agenda in its duties. In addition to the foregoing commitment and adherence to legal requirements and other relevant requirements, it is believed that the use of management system standards ISO9001: 2008 - ISO14001 :2004-OHSAS18001: 2007 as Executive models excellence in order to take action. Policy outline is as follows: 1.Achieve predetermined objectives and plans of the Board 2. Commitment to professional ethics and the ethics of being preferred over material interests 3. Improve the processes and activities associated with projects focusing on quality, timely execution and cost manage- ment of projects in order to increase stakeholder satisfaction 4. Regular planning and action for the prevention of injuries, illnesses and accidents of controlling harmful work environ- ment (especially chemical and physical agents, ergonomic factors in headquarters and administrative units) 5. Regular planning and action to prevent environmental pollution (especially to prevent contamination of soil, air and water units and reduced resource consumption in equity executive and administrative) 6. Implementing organizational structures and management company for export of engineering services conforming to international standards 7. Promote the scientific level, managerial and technical skills of employees through training 8. Development and quality infrastructure in order to achieve the general contractor (GC) 9. Registration, recording and exploitation and transfer of technical knowledge gained from projects to local partners I am also committed to pursuing continuous improvement of the system in order to achieve goals and review the terms of this Policy on an annual basis and according to the requirements of financial, operational, organizational and personnel, including managers, experts and officials have demanded that the important principles glory, wisdom and how to com- municate with the public, employers, consultant, contractor component and other interested parties and the priority set of professional value, all of their efforts to achieve the goals and plans communicated to operate. CEO Majid Kiani www. prgco.ir 3 IntegratedManagementSystemPolicy
  • 4. EngineeringandConsultingServices Project engineering services in the specialized field of marine structures , underground structures , geo technics (land and water)andgeologicalengineeringandsurveyingbusinessalready has a special position , so that in addition to full coverage of the advisory needs ( research , design and monitoring ) and research , dozens of independent projects done or is in progress . Abilities: • Designandengineeringservicesinallcivilandindustrialtrends • Geotechnical Engineering Services (land and water) • Geological Engineering and Surveying • Project Management Services • Consultation and supervision (higher and resident) • Engineering services for coping with earthquake retrofitting buildings www. prgco.ir4
  • 5. Name of project Status lanoitanretni yb dengised sgnidliub loohcS lacideM dna latneD ,lacideM Unfinished )Shrine to Shrine Highway Engineering Management Services (Qom to Mashhad Under implementation Rail Project Phase 1 study area Yazd, Isfahan and Shiraz Unfinished Design and Engineering Services martyr Zinedine Tehran Highway Unfinished Engineering and design of highway tunnels martyr Faith Shiraz Unfinished Engineering and design studies martyr Motahari Crossing and Tehran Highway Unfinished Advisory services and preparation of tender documents for the Tehran Metro Line 6 Unfinished Consulting services and documentation Karaj Metro Under implementation Engineering and consulting services Project 16 Phase 15 of South Pars gas field Under implementation Design and engineering and consulting services for water treatment plants of Mazandaran, Shiraz Unfinished Mining equipment design, engineering and consulting services Khamroud Unfinished Engineering services and studies a new international airport in Iran Under implementation Engineering services and design studies Bushehr InternationalAirport Under implementation www. prgco.ir 5
  • 6. Havingestablishedintheadministrativebuildings Having established in the administrative buildings and structures - Business - University of the Health Check and the rapid implementation of international standards of design and construction operations in EPC or PC to fulfill the following. OneoftheflagshipprojectsandthecompanyplanstoexpandPGCporch and courtyard housing with the Commander of the Faithful pilgrimage shrine of Fatima al-Zahra (sa) in Iraq. Other projects implemented or under implementation are as follows. www. prgco.ir6
  • 7. StatusName of project Unfinished Design and construction of the International School of Dental Medicine and Biomedical Sciences Unfinished Completed construction and operation of mechanical and electrical slow Hospital Under implementationPark Construction Landscape Tabriz Museum Under implementation Manufacturing of Songun copper smelter and sulfuric acid plant Under implementation Design, construction, supervision and project development supreme shrine of ImamAli (AS) www. prgco.ir 7
  • 8. Road,Rail&Tunnel PGC in the structure of Underwater beginning of its activities in the field of tunnel construction, effective presence has increased dramatically in the field of manufacturing of highways, main roads and ancillary infrastructure for rail and even upgrade and repair the band airports in the record run has and with regard to the implementation of dozens of tunnelswithdifferentuserprofilesandshapesincomplexandtechnical, arenowregardedasoneofthemajorcontractorsinthefieldofroadand railway tunnels are considered. Abilities: • Road and highway design and implementation • Design and implementation of main and secondary roads • Design and implementation of rail lines and related facilities. • Design and implementation of railway infrastructure • Design and implementation of hydropower tunnels • Design and implementation of road tunnels and runways • Transformer cavern excavation and consolidation of operations and the elevator shaft Dam and Power Plant • Exploratory drilling and galleries Dam and Power Plant www. prgco.ir8
  • 9. StatusName of project Unfinishedmad ,lennut noisrevid retaw fo noitcurtsnoC zaraH fo slennut yawllips dna UnfinishedRoad construction Shahindej - TAKAB UnfinishedCompleting the Borazjan - Ganaveh UnfinishedRoad construction Kangan - Dvrahk Under implementationHighway construction in Bushehr - late as the primary way of pars UnfinishedZahedan road Nosratabad UnfinishedGorgan railway - border Incheh UnfinishedThe construction of the dam access road and qiz Khoda afarin wildlife crossings Unfinished3-piece rail infrastructure Gol-Gohar - Shiraz length of 100 km. Under implementationQazvin -Alamut UnfinishedPart V rail Maragheh - Urmia Under implementationFreeway shrine to shrine (Qom – Branch) UnfinishedHamedan railway infrastructure - Sanandaj Under implementationKermanshah-Khosravi rail Under implementationThe first piece of high-speed rail infrastructure Qom - Esfahan www. prgco.ir 9
  • 10. Damsandirrigationschemesdrainage Water crisis as one of the major challenges facing humanity in this century, has attracted worldwide attention. Resource management and development of dams and irrigation canals and drainage networks including places of work priorities. Dozens of companies and network of irrigation and drainage canals huge project area has implemented several thousand acres of irrigation and drainage and irrigation canal network of the project already has. Abilities: • Design and implementation of irrigation and drainage networks. • Design and implementation of irrigation canals • Dependent on irrigation and drainage facilities, network design and implementation • Design and implementation of large earthen dams, rockfill, concrete and RCC • Design and construction of hydropower plants and tall concrete structures • Design and implementation of levee walls, curtains, sealing, drilling and injection Consolidation • Designed, installed and operated instrumentation projects, dams, tunnels and power plants www. prgco.ir10
  • 11. StatusName of project UnfinishednamreK ot nuf si mad eht morf retaw refsnart ot nalP UnfinishedDam building Polrood UnfinishedWater Supply Dam to Hamedan Talwar Under implementationCochrane Dam Under implementationLane of Haraz Dam UnfinishedDam Klqan tea UnfinishedDam construction Lylan tea UnfinishedDam water release delivery system, Qorveh Plains - Dehgalan UnfinishedThe second half of the transmission line carrying water from the well to Zahedan Under implementationImplementation of housing and utility Chraghvys Dam UnfinishedPlan to transfer water from the dam to Kerman Under implementationShrfshah Dam Under implementationWater from the dam to Kermanshah Under implementationShrfshah Dam UnfinishedAmendment Iyushan Dam UnfinishedWater Supply Dam to Hamedan Talwar www. prgco.ir 11
  • 12. MiningandMetallurgicalIndustry PGChavinguniquefacilitiessuchasadvanceddrillingmachines,drilling wagons all Hydraulic, mining fleet is equipped and able to implement the project in three exploration, extraction and processing as a general contractor (GC) surfaces different (EPC, ...) . With regard to the objective of developing the mineral industry, mineral industry, sponge iron plants, such as construction, manufacturing concentrate,copper,ironandAluminumsmeltingandrefiningofmetals has begun. Abilities • Network discovery and exploration plans • Exploratory boreholes and sampling depths and under different conditions • Exploratory digging tunnels and trenches • Geochemical and geophysical exploration • Geo electrics well logging operations and data processing • Design and surface mining, including metallic and non-metallic • Network design and implementation of drilling and blasting • Design and underground mining www. prgco.ir12
  • 13. StatusName of project Under implementationPMS eussit namreK leets gnitsac dna gnitlem yb derutcafunaM Under implementation Sponge Iron and Steel Plant handlingAzerbaijan )Miyaneh Steel Design( Under implementationManufacturing of Songun copper smelter and sulfuric acid plant Under implementationSongun Copper Refinery Plant Complex Unfinished Construction and commissioning of steel casting machine Mobarakeh UnfinishedManufacturing of Songun copper smelter and sulfuric acid plant Under implementation Songun copper complex method development project )concentrated EPC (construction phase Under implementationSongun Copper Refinery Plant Complex www. prgco.ir 13
  • 14. Machinery SetsMachinerySetsMachinery 42Mechanical shovel50Loader 45Bulldozer35Grader 5Scraper50Roller 5Tunnel boring machine38Side boom 450Truck21Drill wagon 10Asphalt Factory19Excavator 2000Others12Jumbo 32Tractors 14 www. prgco.ir info@prgco.ir P.O.Box: 15875-8499 Tehran-IRAN