SlideShare a Scribd company logo
1 of 10
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EDUCATION:
North Staffordshire University “School of Engineering”
HNC Mechanical Engineering (Technician 1-6)
City & Guilds Mechanical Engineering
Navisworks Freedom 2015 plus Bluebeam Revu 2016 for PDMS Version 12.4
PDMS Silicon Graphics 10.3, 10.4.3, 10.5.1a (UNIX)
PDMS Silicon Graphics Version 11.2 (NT) Version 12.4
PDMS Silicon Graphics DRAFT 11.2 (NT) Version12.4
Microsoft Access 97
AutoCAD Release 10, 11, 12, 13, 14 & Advanced Level 3D
Microstation Version 5
Acorn Systems "Iso Express" Version 7.39
LANGUAGES:
English and French
SKILLS:
Engineering Design, Construction Supervision with Major International Contracting Organizations in
Offshore, Petro-Chemical, Oil & Gas, Pharmaceutical & Associated Industries, covering 42 years.
Experience in Piping Design, Supports, Installation Mechanical Handling,
Pressure Vessel design, Nuclear Plants, Co-gen Power plants, Material specification, Planning Scheduling
Estimating throughout the United Kingdom, France, Indonesia, Puerto Rico, Turkey , Canada & USA
SUMMARY:
My Experience in Engineering Design, Supervision and Construction Coordination covers 40 + years
I Utilize Microsoft Scheduler to progress the Construction Contractors Activities also Utilize Excel to
Track Construction Progress to Approve Finances.
I am well Versed in Microsoft Scheduler, Excel and Word.
EXPERIENCE:
Feb 2015 – Present
Company: AECON | Mining Construction Services
Project: K+S Legacy project Sask
Location: REGINA Saskatchewan
Role: Piping Coordinator
Responsibilities:
Created Fabrication Isometrics from PDMS 3D Model utilizing Navisworks Freedom 2015 plus
Bluebeam Revu 2016 software.
Coordinating Material take-Off for Overall Construction Project.
Designed and Created BOLT-UP Excel spreadsheet for Overall Construction Project
Created Fabrication Small Bore Work Packages from PDMS 3D Model
May 2013 – Dec 2014
Company: VALE Canada Limited
Location: St John’s Newfoundland
Project: Construction of Long Harbour Processing Plant
Role: Engineering Review Coordinator
Responsibilities: Coordinating Engineering Review Team (Verify Construction Utilizing 3D PDS Model)
Updated Oct 18th
2016 1
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
Jan 2007 – To May 2013
Company: VALE Canada Limited
Location: Voisey’s Bay Remote Mine-Site Newfoundland Labrador
Project: Construction of New & Improvement Sustainability Projects All Disciplines
Role: Capital Project Coordinator
Responsibilities:
Oversee and Progress Construction Activities of Numerous Contractors and Trades Coordinate
Contractor Bids, Budget Control, Project Scheduling, Purchasing, Engineering Design, Commissioning
Final Close-Out & Turn-Over Packages for $20 + Million Construction Budgets
2012-2013 Major Project $15Million Pebble Crusher Including Infrastructure and 3 Conveyor Systems
Mar 2006 – To Dec 2006
Company: SNC-Lavalin Mount Pearl Newfoundland Canada
Location: Voisey’s Bay Remote Mine-Site Newfoundland Labrador
Project: Construction of New & Improvement Sustainability Projects All Disciplines
Role: Project Manager
Responsibilities:
Coordinating Construction for New & Improvement Projects All Disciplines.
Final Close-Out & Turn-Over Packages for $8.5 Million Construction Budget
Aug 2004 – To Feb 2006
Company: SNC-Lavalin Mount Pearl Newfoundland Canada
Location: Voisey’s Bay Remote Mine-Site Newfoundland Labrador
Project: Construction of New Mine Site Process Facility
Role: Construction Piping Superintendent.
Responsibilities:
Duties Included Coordinating Piping, Supports, HVAC, Pump Installations Heat Tracing & Insulation.
Overseeing Construction of 5 x 4.5 Meg Gen-Sets Power Plant plus Heat Recovery System
Coordinating Hydrotesting and Commissioning of All Systems.
On Site Re-Design, Project Close-Out “As-Builts Drawings Coordination and Turn-Over Documentation.
Jan 2004 – 31st
July 2004
Company: FENCO Division of SNC-Lavalin lake Shore Blvd Toronto Ontario
Location: Bandirma Turkey.
Project: Sulphuric Acid Plant
Role: Piping & Mechanical Superintendent Site Construction Support
Responsibilities:
On Site Coordinating Piping, Supports, Mechanical & HVAC.
Controlling Piping & Mechanical Installation, Heat Tracing & Insulation.
Commissioning with Vendors for Start-Up.
Updated Oct 18th
2016 2
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
May 2003 – Dec 2003
Company: AMEC
Location: HALIFAX Nova Scotia
Project: SOUTH VENTURE PRODUCTION PLATFORM for Exxon Mobil Sable Island
Role: PDMS COORDINATION
Responsibilities:
Coordinating and CHECKING 3D PDMS Model for HVAC, Mechanical, Piping, Structural & Supports
Duties included:
On Site Coordinating and CHECKING Piping, Structural Including Supports, Mechanical & HVAC.
Controlling Isometric and Pipe Supports Construction Issues.
Construction Support for PDMS Piping/Supports, Mechanical & HVAC.
Coordinating Draft Layouts of Hydrotest Systems for Construction.
Aug 2001 – April 2003
Company: KVAERNA/SNC-LAVALIN (KSLO)
Location: HALIFAX Nova Scotia
Project: ALMA PRODUCTION PLATFORM for Exxon Mobil Sable Island
Role: PDMS PIPING & DRAFT Coordinator
Responsibilities:
Coordinating and CHECKING 3D PDMS Model for HVAC, Mechanical, Piping, Structural & Supports
Duties included:
Coordinating and CHECKING PDMS Piping, Structural Including Supports, Mechanical & HVAC.
Controlling Piping Isometrics and Pipe Supports Construction Issues.
Construction Support for PDMS Piping/Supports, Mechanical & HVAC.
Coordinated PDMS Draft Layouts for Construction & Installation.
Coordinated PDMS Draft Pipe Supports for Construction & Installation
Aug 1999 – Aug 2001
Company: RAYTHEON ENGINEERS & CONSTRUCTORS (PA, USA)
Location: On Site Puerto Rico
Project: Merck Industries Spa Project
Role: Chief Field Engineer and PDMS Engineering Coordinator
Responsibilities:
On Site Construction Coordination plus Engineering Design Coordinator for PDMS 10.5 S.G Model
CHECKING PDMS 10.5 S.G Model All Disciplines plus Coordinate Construction of Piping & Structural
Approval of O&M Manuals, QC & As-built Documentation for Construction Sub-contracts Close-outs
Set-up and coordinated test packs for non-hazardous system
Q-File and Job Book Coordinator for Project Turn-Over
Mar 1999 - Aug 1999
Company: KILBORN GROUP/SNC-LAVALIN, (Ontario, Canada)
Location: On Site Imperial Oil Refinery Sarnia, Ontario
Project: Fractionation Tower Design, Fabrication and Installation
Role: Piping Stress/Pipe Supports Coordinator & Senior Piping Checker
Responsibilities:
Verifying Fabrication, Erection and Commissioning of Fractionation Tower
Updated Oct 18th
2016 3
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
Jan 1999 - Feb 1999
Company: RAYTHEON ENGINEERS & CONSTRUCTORS (PA, USA)
Location: On Site Puerto Rico
Project: Merck Industries Spa Project
Role: Piping Design/Supports Coordinator for PDMS 10.5 S.G Model
Responsibilities:
CHECKING PDMS 10.5 S.G Model All Disciplines plus Coordinate Construction of Piping & Structural
Coordinate Tie-Ins to Existing Operations Plant plus Design of Piping for New Expansion Project.
(Project held pending New Process Requirements)
Mar 1998 - Dec 1998
Company: MUSTANG ENGINEERING INC
Location: Houston, USA
Project: Jade, Drilling/Production Platform for Mobil Equaterial Guinea Inc
Role: Piping Design/Supports Coordinator for PDMS 10.5 S.G (N.T)
Responsibilities:
CHECKING PDMS 10.5 S.G Model All Disciplines
Coordinate Piping Design Systems, Supports, Structural, Equipment, Cable trays and PDMS Draft.
Coordinated Equipment layout, Design and Purchase, Liaison with Purchasing Agent and Vendors.
Oct 1997 – Mar 1998
Company: McDERMOTT ENGINEERING LLC
Location: Houston, USA
Project: Pailin, Unocal, Thailand - Central Process Platform.
Role: PDMS Piping, Mechanical, Structural & Pipe Supports Lead/Coordinator
Responsibilities:
CHECKING PDMS 10.5 S.G Model All Disciplines
Coordinate Piping Design Systems, Supports, Structural, Equipment, Cable trays and PDMS Draft.
Supervising 7 PDMS Senior Piping Designers, 4 Piping Checkers, 1 PDMS Admin 1 PDMS Cats & Specs
Review meetings with Client - PDMS Design of Process Piping.
Coordinated Equipment layout, Design and Purchase.
Jan 1997 – Sep 1997
Company: W. H. LINDER & ASSOCIATES, INC
Location: New Orleans, USA
Project: Texaco Petronius Process Platform for the Gulf of Mexico.1850 feet Deep Sea Rig.
Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports
Responsibilities:
Design and CHECKING PDMS 10.5 S.G Model All Disciplines
Piping Design Drain Systems Drill Deck, Production Deck, Cellar Deck & Oil Pipeline Pump System.
Updated Oct 18th
2016 4
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
Aug 1996 – Dec 1996
Company: FRONEK GROUP
Location: TORONTO CANADA
Project: 600 MWT Utility Power Plant.
Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports
Responsibilities:
Designed Fuel Oil, Feed Water, Heat Recovery Systems
Checked Structural Database Including Pipe Supports
Apr 1996 – Aug 1996
Company: KILBORN GROUP
Location: TORONTO CANADA
Project: Shell Refinery, Sarnia, Ontario.
Role: Senior Piping Construction Supervisor
Responsibilities:
Front-end Development for De-bottlenecking Project, Coordinated Piping Design, Supports and
Equipment layouts, Commissioning of Equipment/Piping/Supports on Site
Jan 1996 – Apr 1996
Company: ERECTOWELD COMPANY, LTD
Location: Oakville, Ontario
Project: Shell Refinery, Sarnia, Ontario.
Role: Senior Piping Designer
Responsibilities:
Design & Fabrication of Piping Spools using ACORN 7.39 system.
Aug 1995 - Nov 1995
Company: BE&K
Location: Delaware, USA
Project: LaPorte Plant Terathane Facility
Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports
Responsibilities:
Designed 200 Piping Systems and Checked Structural Database Including Pipe Supports
Apr 1995 - Aug 1995
Company: JOHN BROWNE & Co
Location: Bridgewater, USA
Project: Merck Protease Pharmaceutical Project
Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports
Responsibilities:
PDMS Piping Designer/Checker – On Site Piping & Pipe Support tie-ins to Existing plant.
Updated Oct 18th
2016 5
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
Checked Structural Database Including Pipe Supports
EXPERIENCE (Cont’d):
Sep 1994 – Mar 1995
Company: EASTERN POWER DEVELOP
Location: TORONTO CANADA
Project: 35 MW Co-Generation Power Plant at Keele Valley Landfill Site Maple, Ontario
Role: On Site: Chief Checker and Construction Piping Supports Coordinator
Responsibilities:
Supervised the Installation of Equipment, fabrication and Construction of Piping and Pipe Supports
Liaison with various vendors, Commissioning of Equipment at Vendor premises and on Site.
Mar 1994 – Sep 1994
Company: TECHWORK TORONTO CANADA
Location: Cayeli Bakir Isetmeleri A.S. Turkey
Project Copper/Zinc Mine
Role: On Site: Project Construction Coordinator
Responsibilities:
Supervised Installation Commissioned Equipment, Process Piping plus Designed Pipe Supports on Site.
Coordinated 4 Architectural Plastic Models for Operational Training Program.
Apr 1992 - Feb 1994
Company: TECHWORK
Location: TORONTO CANADA
Role: Various Plant layout, Piping/Supports & Site Supervision Projects.
Some CAD work (PDMS S.G & AutoCAD 12).
Dec 1990 – Apr 1992
Company: DAVY CANADA TORONTO
Location: INCO Sudbury Ontario
Project: Smelter Refurbishing Project
Role: On Site: Project Construction Coordinator
Responsibilities:
Supervised Installation Commissioned Smelter Refurbishing Project
Jul 1990 - Dec 1990
Company: ATLANTIC PACKAGING
Location: Whitby, Ontario
Project: Construction of New Paper Mill
Role: On Site: Senior Piping Construction Coordinator
Responsibilities:
Design and Installation of Equipment & Utility Piping with Pipe Supports for a New Paper Mill.
Updated Oct 18th
2016 6
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
Mar 1990 – Jul 1990
Company: EASTERN POWER
Location: Toronto, Ontario
Project: 26 MW Co-Generation Power Plant at Pickering Ontario
Role: On Site: Chief Checker and Construction Piping Supports Coordinator
Responsibilities:
On Site: Piping Supports & Equipment Construction Co-ordinator.
Supervised the Installation of Equipment, Fabrication and Construction Piping and Piping Supports.
Liaison with Vendors, Commissioning Equipment at Vendor premises and on Site.
Oct 1989 – Mar 1990
Company: KIDD CREEK MINES
Location: Timmins, Ontario
Project: Construction of New Paper Mill
Role: On Site: Senior Piping Designer/Checker
Responsibilities:
On Site: Supervised the Installation of Equipment, Fabrication and Construction Piping and Piping
Feb 1989 - Oct 1989
Company: LUMMUS CANADA INC
Location: Timmins, Ontario
Project: Various Projects
Role: Senior Piping Designer/Checker
1988 - 1989
Company: STONE & WEBSTER CANADA, (Toronto, Ontario
Location: Dartmouth Refinery Nova Scotia
Project: On Site PID As-Built Verification Project
Role: Senior Piping Designer/Checker
Responsibilities:
On Site: Supervised the Verification/As-Builts for PID Process Piping Systems
1985 – 1988
Company: GENERAL MOTORS
Location: Oshawa, Ontario
Project: $60m Aluminium and Plastic Car Radiator Facility
Role: Engineering Construction Coordinator and Supervisor
Responsibilities:
Supervised Installation and Commissioning of $6 Million Fully-Automated System, consisting of furnace,
robotic operated automated Turn-Tables, overhead conveyor systems, 42 station continuous assembly
line plus unloading shipping and packaging conveyor systems.
Organized Call for Bids of equipment and material handling systems.
Attending vendor premises for fabrication review and commissioning.
One-year (3 days per week) continually Pre-commissioned equipment at vendor premises
Updated Oct 18th
2016 7
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
Supervised Construction Crew of Millwrights, Fitters, Welders Toolmen to fabricate/erect operating
platforms and safety features.
EXPERIENCE (Cont’d):
Apr 1985 – Sep 1985
Company: FORD GLASS
Location: Toronto, Ontario
Project: $30m Conveyor System.
Role: Senior Designer Checker/ Construction Coordinator
Responsibilities:
Designed and Supervised the Installation & Commissioning of $30m Conveyor System.
Dec 1984 – Mar 1985
Company: DYNATEC, Mining Company Ltd
Location: Richmond Hill, Ontario
Project: Head Frame Design
Role: Senior Designer/Checker
Responsibilities:
Designed and Supervised the Fabrication of Head Frame.
Feb 1984 – Dec 1984
Company: MATHEW HALL
Location: Sale Manchester
Project: British Nuclear Fuels Ltd
Role: Senior Vessel Designer
Responsibilities:
Vessel Designer for BNFL, (British Nuclear Fuels Limited)
June 1983 – Jan 1984
Company: AIR PRODUCTS
Location: Wrexham, North Wales
Project: Triaxle Co-Gen Piping Design
Role: Senior Designer/Checker
Responsibilities:
Designed and Supervised the Fabrication and Installation of Cryogenic Piping for Triaxle Trailers
Apr 1981 – Nov 1982
Company: LUMMUS CANADA LTD
Location: Esso Oil Refinery Sarnia Ontario/Elderado Nuclear Facility Port Hope Ontario
Project: De-Bottlenecking Project Plus Elderado Nuclear Project
Role: Site Lead Piping/Supports (PDMS Training Course 1981 taught by ISOPIPE Coventry UK)
Responsibilities:
Supervised Installation and Commissioning of Equipment, Process Utility Piping, Plus Piping Supports
for Esso Oil Refinery Sarnia Ontario
Coordinated Piping Group for Elderado Nuclear Project in Port Hope Ontario
Updated Oct 18th
2016 8
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
1980-1981
Company: EUROTECH INTERNATIONAL LIMITED
Location: Birmingham England
Project: Inward Pumping Pump Oil Extraction/Reclamation Project
Role: Design Engineer
Responsibilities:
Designed and Coordinated Fabrication and Commissioning of Oil Extraction/Reclamation System
1978 – 1980
Company: SPIE BATINGNOLLES
Location: Peuteaux, Paris France
Project: Project in Jordan
Role: Project Engineer
Responsibilities:
Liaison with PurchasingAgents, Vendor’s. Design & Supervising of Equipment Piping & Supports
Feb 1978 – Jun 1978
Company: SPIE BATINGNOLLES
Location: Petrokimia, Indonesia
Project: Fertilizer Project
Role: On site Piping & Supports Supervisor and Quantity Surveyor
Responsibilities:
Supervised Installation plus Commissioning of Equipment, Conveyors Process Piping & Supports on Site
1975 - 1978
Company: SPIE BATINGNOLLES
Location: Peuteaux, Paris France
Project: Various Projects
Role: Senior Piping /Supports Designer/Project Engineer.
Responsibilities:
Design of Sulphuric Acid Tanks and appropriate Piping Systems
1974 - 1975
Company: ICI MOND DIVISION
Location: Liverpool, England
Project: Various Projects
Role: Vessel Designer
Responsibilities:
Design and Overseeing Fabrication of coded Vessels. On site Construction Support.
Updated Oct 18th
2016 9
BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835
EXPERIENCE (Cont’d):
1973 - 1974
Company: HYDRONYL LTD./NORTON CHEM LTD
Location: Fenton Stoke-On-Trent Staffs England
Project: Various Projects
Role: Planning Engineer / Construction Supervisor
Responsibilities:
Design, Overseeing Fabrication of Fractionation Towers. On site Construction Support.
1972 - 1973
Company: INSULL & POINTON LIMITED
Location: Tunstall Stoke-On-Trent Staffs England
Project: Various Projects
Role: Senior Designer
Responsibilities:
Design Pressure Vessels & Mechanical Lifting Gear.
1965 - 1972
Company: HYDRONYL LTD./NORTON CHEM LTD
Location: Fenton Stoke-On-Trent Staffs England
Project: Various Projects
Role: Mechanical Engineering Apprenticeship
Responsibilities:
2 Years Shop Floor Experience of Fractionation Towers & Internals Fabrication , Prior to 5yrs in
Drawing office, Planning, Scheduling, Estimating and Purchasing Assignments.
Updated Oct 18th
2016 10

More Related Content

What's hot

CIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssCIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssbhagyesh thorat
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss ResumeTroy Weiss
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015Des Jameson
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_DarrDavid Darr
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16bill ure
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resumecarlos betts
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Kerry Polkinghorne
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09arosental
 

What's hot (20)

RESUME_080615_FLUOR
RESUME_080615_FLUORRESUME_080615_FLUOR
RESUME_080615_FLUOR
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
CIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssCIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssss
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss Resume
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_Darr
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Roy Shilling
Roy ShillingRoy Shilling
Roy Shilling
 
RESUME 4-16
RESUME 4-16RESUME 4-16
RESUME 4-16
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
sharndencv
sharndencvsharndencv
sharndencv
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resume
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09
 

Similar to BJD Curriculum Vitae Oct 2016.doc-10

Phil Keeley's resume_1
Phil Keeley's resume_1Phil Keeley's resume_1
Phil Keeley's resume_1Philip Keeley
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15Dave Beveridge
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford ResumeDustin Crawford
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
James R Smith Resume May-2015
James R Smith Resume May-2015James R Smith Resume May-2015
James R Smith Resume May-2015Jim Smith
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisaLarry Bisa
 
Matt cirriculum vitae
Matt cirriculum vitaeMatt cirriculum vitae
Matt cirriculum vitaeMATTHEW QUINN
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015aJohn Flores
 

Similar to BJD Curriculum Vitae Oct 2016.doc-10 (20)

Phil Keeley's resume_1
Phil Keeley's resume_1Phil Keeley's resume_1
Phil Keeley's resume_1
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford Resume
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Current Resume 2016
Current Resume 2016Current Resume 2016
Current Resume 2016
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
James R Smith Resume May-2015
James R Smith Resume May-2015James R Smith Resume May-2015
James R Smith Resume May-2015
 
Rahman cv
Rahman cvRahman cv
Rahman cv
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Resume_Amol Buttepatil
Resume_Amol ButtepatilResume_Amol Buttepatil
Resume_Amol Buttepatil
 
GK_cv_2015_Mar
GK_cv_2015_MarGK_cv_2015_Mar
GK_cv_2015_Mar
 
RESUME2.doc
RESUME2.docRESUME2.doc
RESUME2.doc
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Matt cirriculum vitae
Matt cirriculum vitaeMatt cirriculum vitae
Matt cirriculum vitae
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015a
 
CV2014
CV2014CV2014
CV2014
 

BJD Curriculum Vitae Oct 2016.doc-10

  • 1. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EDUCATION: North Staffordshire University “School of Engineering” HNC Mechanical Engineering (Technician 1-6) City & Guilds Mechanical Engineering Navisworks Freedom 2015 plus Bluebeam Revu 2016 for PDMS Version 12.4 PDMS Silicon Graphics 10.3, 10.4.3, 10.5.1a (UNIX) PDMS Silicon Graphics Version 11.2 (NT) Version 12.4 PDMS Silicon Graphics DRAFT 11.2 (NT) Version12.4 Microsoft Access 97 AutoCAD Release 10, 11, 12, 13, 14 & Advanced Level 3D Microstation Version 5 Acorn Systems "Iso Express" Version 7.39 LANGUAGES: English and French SKILLS: Engineering Design, Construction Supervision with Major International Contracting Organizations in Offshore, Petro-Chemical, Oil & Gas, Pharmaceutical & Associated Industries, covering 42 years. Experience in Piping Design, Supports, Installation Mechanical Handling, Pressure Vessel design, Nuclear Plants, Co-gen Power plants, Material specification, Planning Scheduling Estimating throughout the United Kingdom, France, Indonesia, Puerto Rico, Turkey , Canada & USA SUMMARY: My Experience in Engineering Design, Supervision and Construction Coordination covers 40 + years I Utilize Microsoft Scheduler to progress the Construction Contractors Activities also Utilize Excel to Track Construction Progress to Approve Finances. I am well Versed in Microsoft Scheduler, Excel and Word. EXPERIENCE: Feb 2015 – Present Company: AECON | Mining Construction Services Project: K+S Legacy project Sask Location: REGINA Saskatchewan Role: Piping Coordinator Responsibilities: Created Fabrication Isometrics from PDMS 3D Model utilizing Navisworks Freedom 2015 plus Bluebeam Revu 2016 software. Coordinating Material take-Off for Overall Construction Project. Designed and Created BOLT-UP Excel spreadsheet for Overall Construction Project Created Fabrication Small Bore Work Packages from PDMS 3D Model May 2013 – Dec 2014 Company: VALE Canada Limited Location: St John’s Newfoundland Project: Construction of Long Harbour Processing Plant Role: Engineering Review Coordinator Responsibilities: Coordinating Engineering Review Team (Verify Construction Utilizing 3D PDS Model) Updated Oct 18th 2016 1
  • 2. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): Jan 2007 – To May 2013 Company: VALE Canada Limited Location: Voisey’s Bay Remote Mine-Site Newfoundland Labrador Project: Construction of New & Improvement Sustainability Projects All Disciplines Role: Capital Project Coordinator Responsibilities: Oversee and Progress Construction Activities of Numerous Contractors and Trades Coordinate Contractor Bids, Budget Control, Project Scheduling, Purchasing, Engineering Design, Commissioning Final Close-Out & Turn-Over Packages for $20 + Million Construction Budgets 2012-2013 Major Project $15Million Pebble Crusher Including Infrastructure and 3 Conveyor Systems Mar 2006 – To Dec 2006 Company: SNC-Lavalin Mount Pearl Newfoundland Canada Location: Voisey’s Bay Remote Mine-Site Newfoundland Labrador Project: Construction of New & Improvement Sustainability Projects All Disciplines Role: Project Manager Responsibilities: Coordinating Construction for New & Improvement Projects All Disciplines. Final Close-Out & Turn-Over Packages for $8.5 Million Construction Budget Aug 2004 – To Feb 2006 Company: SNC-Lavalin Mount Pearl Newfoundland Canada Location: Voisey’s Bay Remote Mine-Site Newfoundland Labrador Project: Construction of New Mine Site Process Facility Role: Construction Piping Superintendent. Responsibilities: Duties Included Coordinating Piping, Supports, HVAC, Pump Installations Heat Tracing & Insulation. Overseeing Construction of 5 x 4.5 Meg Gen-Sets Power Plant plus Heat Recovery System Coordinating Hydrotesting and Commissioning of All Systems. On Site Re-Design, Project Close-Out “As-Builts Drawings Coordination and Turn-Over Documentation. Jan 2004 – 31st July 2004 Company: FENCO Division of SNC-Lavalin lake Shore Blvd Toronto Ontario Location: Bandirma Turkey. Project: Sulphuric Acid Plant Role: Piping & Mechanical Superintendent Site Construction Support Responsibilities: On Site Coordinating Piping, Supports, Mechanical & HVAC. Controlling Piping & Mechanical Installation, Heat Tracing & Insulation. Commissioning with Vendors for Start-Up. Updated Oct 18th 2016 2
  • 3. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): May 2003 – Dec 2003 Company: AMEC Location: HALIFAX Nova Scotia Project: SOUTH VENTURE PRODUCTION PLATFORM for Exxon Mobil Sable Island Role: PDMS COORDINATION Responsibilities: Coordinating and CHECKING 3D PDMS Model for HVAC, Mechanical, Piping, Structural & Supports Duties included: On Site Coordinating and CHECKING Piping, Structural Including Supports, Mechanical & HVAC. Controlling Isometric and Pipe Supports Construction Issues. Construction Support for PDMS Piping/Supports, Mechanical & HVAC. Coordinating Draft Layouts of Hydrotest Systems for Construction. Aug 2001 – April 2003 Company: KVAERNA/SNC-LAVALIN (KSLO) Location: HALIFAX Nova Scotia Project: ALMA PRODUCTION PLATFORM for Exxon Mobil Sable Island Role: PDMS PIPING & DRAFT Coordinator Responsibilities: Coordinating and CHECKING 3D PDMS Model for HVAC, Mechanical, Piping, Structural & Supports Duties included: Coordinating and CHECKING PDMS Piping, Structural Including Supports, Mechanical & HVAC. Controlling Piping Isometrics and Pipe Supports Construction Issues. Construction Support for PDMS Piping/Supports, Mechanical & HVAC. Coordinated PDMS Draft Layouts for Construction & Installation. Coordinated PDMS Draft Pipe Supports for Construction & Installation Aug 1999 – Aug 2001 Company: RAYTHEON ENGINEERS & CONSTRUCTORS (PA, USA) Location: On Site Puerto Rico Project: Merck Industries Spa Project Role: Chief Field Engineer and PDMS Engineering Coordinator Responsibilities: On Site Construction Coordination plus Engineering Design Coordinator for PDMS 10.5 S.G Model CHECKING PDMS 10.5 S.G Model All Disciplines plus Coordinate Construction of Piping & Structural Approval of O&M Manuals, QC & As-built Documentation for Construction Sub-contracts Close-outs Set-up and coordinated test packs for non-hazardous system Q-File and Job Book Coordinator for Project Turn-Over Mar 1999 - Aug 1999 Company: KILBORN GROUP/SNC-LAVALIN, (Ontario, Canada) Location: On Site Imperial Oil Refinery Sarnia, Ontario Project: Fractionation Tower Design, Fabrication and Installation Role: Piping Stress/Pipe Supports Coordinator & Senior Piping Checker Responsibilities: Verifying Fabrication, Erection and Commissioning of Fractionation Tower Updated Oct 18th 2016 3
  • 4. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): Jan 1999 - Feb 1999 Company: RAYTHEON ENGINEERS & CONSTRUCTORS (PA, USA) Location: On Site Puerto Rico Project: Merck Industries Spa Project Role: Piping Design/Supports Coordinator for PDMS 10.5 S.G Model Responsibilities: CHECKING PDMS 10.5 S.G Model All Disciplines plus Coordinate Construction of Piping & Structural Coordinate Tie-Ins to Existing Operations Plant plus Design of Piping for New Expansion Project. (Project held pending New Process Requirements) Mar 1998 - Dec 1998 Company: MUSTANG ENGINEERING INC Location: Houston, USA Project: Jade, Drilling/Production Platform for Mobil Equaterial Guinea Inc Role: Piping Design/Supports Coordinator for PDMS 10.5 S.G (N.T) Responsibilities: CHECKING PDMS 10.5 S.G Model All Disciplines Coordinate Piping Design Systems, Supports, Structural, Equipment, Cable trays and PDMS Draft. Coordinated Equipment layout, Design and Purchase, Liaison with Purchasing Agent and Vendors. Oct 1997 – Mar 1998 Company: McDERMOTT ENGINEERING LLC Location: Houston, USA Project: Pailin, Unocal, Thailand - Central Process Platform. Role: PDMS Piping, Mechanical, Structural & Pipe Supports Lead/Coordinator Responsibilities: CHECKING PDMS 10.5 S.G Model All Disciplines Coordinate Piping Design Systems, Supports, Structural, Equipment, Cable trays and PDMS Draft. Supervising 7 PDMS Senior Piping Designers, 4 Piping Checkers, 1 PDMS Admin 1 PDMS Cats & Specs Review meetings with Client - PDMS Design of Process Piping. Coordinated Equipment layout, Design and Purchase. Jan 1997 – Sep 1997 Company: W. H. LINDER & ASSOCIATES, INC Location: New Orleans, USA Project: Texaco Petronius Process Platform for the Gulf of Mexico.1850 feet Deep Sea Rig. Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports Responsibilities: Design and CHECKING PDMS 10.5 S.G Model All Disciplines Piping Design Drain Systems Drill Deck, Production Deck, Cellar Deck & Oil Pipeline Pump System. Updated Oct 18th 2016 4
  • 5. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): Aug 1996 – Dec 1996 Company: FRONEK GROUP Location: TORONTO CANADA Project: 600 MWT Utility Power Plant. Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports Responsibilities: Designed Fuel Oil, Feed Water, Heat Recovery Systems Checked Structural Database Including Pipe Supports Apr 1996 – Aug 1996 Company: KILBORN GROUP Location: TORONTO CANADA Project: Shell Refinery, Sarnia, Ontario. Role: Senior Piping Construction Supervisor Responsibilities: Front-end Development for De-bottlenecking Project, Coordinated Piping Design, Supports and Equipment layouts, Commissioning of Equipment/Piping/Supports on Site Jan 1996 – Apr 1996 Company: ERECTOWELD COMPANY, LTD Location: Oakville, Ontario Project: Shell Refinery, Sarnia, Ontario. Role: Senior Piping Designer Responsibilities: Design & Fabrication of Piping Spools using ACORN 7.39 system. Aug 1995 - Nov 1995 Company: BE&K Location: Delaware, USA Project: LaPorte Plant Terathane Facility Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports Responsibilities: Designed 200 Piping Systems and Checked Structural Database Including Pipe Supports Apr 1995 - Aug 1995 Company: JOHN BROWNE & Co Location: Bridgewater, USA Project: Merck Protease Pharmaceutical Project Role: PDMS Senior Piping Designer/Checker, Mechanical, Structural & Pipe Supports Responsibilities: PDMS Piping Designer/Checker – On Site Piping & Pipe Support tie-ins to Existing plant. Updated Oct 18th 2016 5
  • 6. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 Checked Structural Database Including Pipe Supports EXPERIENCE (Cont’d): Sep 1994 – Mar 1995 Company: EASTERN POWER DEVELOP Location: TORONTO CANADA Project: 35 MW Co-Generation Power Plant at Keele Valley Landfill Site Maple, Ontario Role: On Site: Chief Checker and Construction Piping Supports Coordinator Responsibilities: Supervised the Installation of Equipment, fabrication and Construction of Piping and Pipe Supports Liaison with various vendors, Commissioning of Equipment at Vendor premises and on Site. Mar 1994 – Sep 1994 Company: TECHWORK TORONTO CANADA Location: Cayeli Bakir Isetmeleri A.S. Turkey Project Copper/Zinc Mine Role: On Site: Project Construction Coordinator Responsibilities: Supervised Installation Commissioned Equipment, Process Piping plus Designed Pipe Supports on Site. Coordinated 4 Architectural Plastic Models for Operational Training Program. Apr 1992 - Feb 1994 Company: TECHWORK Location: TORONTO CANADA Role: Various Plant layout, Piping/Supports & Site Supervision Projects. Some CAD work (PDMS S.G & AutoCAD 12). Dec 1990 – Apr 1992 Company: DAVY CANADA TORONTO Location: INCO Sudbury Ontario Project: Smelter Refurbishing Project Role: On Site: Project Construction Coordinator Responsibilities: Supervised Installation Commissioned Smelter Refurbishing Project Jul 1990 - Dec 1990 Company: ATLANTIC PACKAGING Location: Whitby, Ontario Project: Construction of New Paper Mill Role: On Site: Senior Piping Construction Coordinator Responsibilities: Design and Installation of Equipment & Utility Piping with Pipe Supports for a New Paper Mill. Updated Oct 18th 2016 6
  • 7. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): Mar 1990 – Jul 1990 Company: EASTERN POWER Location: Toronto, Ontario Project: 26 MW Co-Generation Power Plant at Pickering Ontario Role: On Site: Chief Checker and Construction Piping Supports Coordinator Responsibilities: On Site: Piping Supports & Equipment Construction Co-ordinator. Supervised the Installation of Equipment, Fabrication and Construction Piping and Piping Supports. Liaison with Vendors, Commissioning Equipment at Vendor premises and on Site. Oct 1989 – Mar 1990 Company: KIDD CREEK MINES Location: Timmins, Ontario Project: Construction of New Paper Mill Role: On Site: Senior Piping Designer/Checker Responsibilities: On Site: Supervised the Installation of Equipment, Fabrication and Construction Piping and Piping Feb 1989 - Oct 1989 Company: LUMMUS CANADA INC Location: Timmins, Ontario Project: Various Projects Role: Senior Piping Designer/Checker 1988 - 1989 Company: STONE & WEBSTER CANADA, (Toronto, Ontario Location: Dartmouth Refinery Nova Scotia Project: On Site PID As-Built Verification Project Role: Senior Piping Designer/Checker Responsibilities: On Site: Supervised the Verification/As-Builts for PID Process Piping Systems 1985 – 1988 Company: GENERAL MOTORS Location: Oshawa, Ontario Project: $60m Aluminium and Plastic Car Radiator Facility Role: Engineering Construction Coordinator and Supervisor Responsibilities: Supervised Installation and Commissioning of $6 Million Fully-Automated System, consisting of furnace, robotic operated automated Turn-Tables, overhead conveyor systems, 42 station continuous assembly line plus unloading shipping and packaging conveyor systems. Organized Call for Bids of equipment and material handling systems. Attending vendor premises for fabrication review and commissioning. One-year (3 days per week) continually Pre-commissioned equipment at vendor premises Updated Oct 18th 2016 7
  • 8. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 Supervised Construction Crew of Millwrights, Fitters, Welders Toolmen to fabricate/erect operating platforms and safety features. EXPERIENCE (Cont’d): Apr 1985 – Sep 1985 Company: FORD GLASS Location: Toronto, Ontario Project: $30m Conveyor System. Role: Senior Designer Checker/ Construction Coordinator Responsibilities: Designed and Supervised the Installation & Commissioning of $30m Conveyor System. Dec 1984 – Mar 1985 Company: DYNATEC, Mining Company Ltd Location: Richmond Hill, Ontario Project: Head Frame Design Role: Senior Designer/Checker Responsibilities: Designed and Supervised the Fabrication of Head Frame. Feb 1984 – Dec 1984 Company: MATHEW HALL Location: Sale Manchester Project: British Nuclear Fuels Ltd Role: Senior Vessel Designer Responsibilities: Vessel Designer for BNFL, (British Nuclear Fuels Limited) June 1983 – Jan 1984 Company: AIR PRODUCTS Location: Wrexham, North Wales Project: Triaxle Co-Gen Piping Design Role: Senior Designer/Checker Responsibilities: Designed and Supervised the Fabrication and Installation of Cryogenic Piping for Triaxle Trailers Apr 1981 – Nov 1982 Company: LUMMUS CANADA LTD Location: Esso Oil Refinery Sarnia Ontario/Elderado Nuclear Facility Port Hope Ontario Project: De-Bottlenecking Project Plus Elderado Nuclear Project Role: Site Lead Piping/Supports (PDMS Training Course 1981 taught by ISOPIPE Coventry UK) Responsibilities: Supervised Installation and Commissioning of Equipment, Process Utility Piping, Plus Piping Supports for Esso Oil Refinery Sarnia Ontario Coordinated Piping Group for Elderado Nuclear Project in Port Hope Ontario Updated Oct 18th 2016 8
  • 9. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): 1980-1981 Company: EUROTECH INTERNATIONAL LIMITED Location: Birmingham England Project: Inward Pumping Pump Oil Extraction/Reclamation Project Role: Design Engineer Responsibilities: Designed and Coordinated Fabrication and Commissioning of Oil Extraction/Reclamation System 1978 – 1980 Company: SPIE BATINGNOLLES Location: Peuteaux, Paris France Project: Project in Jordan Role: Project Engineer Responsibilities: Liaison with PurchasingAgents, Vendor’s. Design & Supervising of Equipment Piping & Supports Feb 1978 – Jun 1978 Company: SPIE BATINGNOLLES Location: Petrokimia, Indonesia Project: Fertilizer Project Role: On site Piping & Supports Supervisor and Quantity Surveyor Responsibilities: Supervised Installation plus Commissioning of Equipment, Conveyors Process Piping & Supports on Site 1975 - 1978 Company: SPIE BATINGNOLLES Location: Peuteaux, Paris France Project: Various Projects Role: Senior Piping /Supports Designer/Project Engineer. Responsibilities: Design of Sulphuric Acid Tanks and appropriate Piping Systems 1974 - 1975 Company: ICI MOND DIVISION Location: Liverpool, England Project: Various Projects Role: Vessel Designer Responsibilities: Design and Overseeing Fabrication of coded Vessels. On site Construction Support. Updated Oct 18th 2016 9
  • 10. BARRY DRAYCOTT 16 HILL TOP TRAIL STOUFFVILLE ONTARIO L4A 7X4 TEL 905 642 0835 EXPERIENCE (Cont’d): 1973 - 1974 Company: HYDRONYL LTD./NORTON CHEM LTD Location: Fenton Stoke-On-Trent Staffs England Project: Various Projects Role: Planning Engineer / Construction Supervisor Responsibilities: Design, Overseeing Fabrication of Fractionation Towers. On site Construction Support. 1972 - 1973 Company: INSULL & POINTON LIMITED Location: Tunstall Stoke-On-Trent Staffs England Project: Various Projects Role: Senior Designer Responsibilities: Design Pressure Vessels & Mechanical Lifting Gear. 1965 - 1972 Company: HYDRONYL LTD./NORTON CHEM LTD Location: Fenton Stoke-On-Trent Staffs England Project: Various Projects Role: Mechanical Engineering Apprenticeship Responsibilities: 2 Years Shop Floor Experience of Fractionation Towers & Internals Fabrication , Prior to 5yrs in Drawing office, Planning, Scheduling, Estimating and Purchasing Assignments. Updated Oct 18th 2016 10