IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...Duane Aritonang
Work Management is designed to cover all of the applications that would be necessary for maintenance/asset management professionals in their work roles.
The applications covered include the MAXIMO 7 Environment, Navigation, Locations, Assets (Equipment), Work Orders (creation, planning and reporting of actual charges) and Failure Classifications.
In addition, the Work Planning components are included which focuses on the roles of Maintenance Craft Leads, Planners and Supervisors.
Speaker: Darlene Nerden, IBM
Overview: In this session will review the Maximo architecture and factors that influence performance. We will discuss some details for those factors regarding tuning for a performance impact. We will look at troubleshooting tools and Maximo settings to help identify and resolve a Maximo performance issue.
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...Duane Aritonang
Work Management is designed to cover all of the applications that would be necessary for maintenance/asset management professionals in their work roles.
The applications covered include the MAXIMO 7 Environment, Navigation, Locations, Assets (Equipment), Work Orders (creation, planning and reporting of actual charges) and Failure Classifications.
In addition, the Work Planning components are included which focuses on the roles of Maintenance Craft Leads, Planners and Supervisors.
Speaker: Darlene Nerden, IBM
Overview: In this session will review the Maximo architecture and factors that influence performance. We will discuss some details for those factors regarding tuning for a performance impact. We will look at troubleshooting tools and Maximo settings to help identify and resolve a Maximo performance issue.
Maximo integration to other systems by Bashar MahasenBashar Mahasen
The presentation shows Standard Maximo integration adapters along with well-established integration's implemented with Maximo.
It also goes through Maximo Integration framework (MIF) and available reports integration for Maximo 7.5
Rail, Metro and Monorail Networks
Industry Trends –Rolling Stock Challenges
IBM Maximo Solutions for Metro and Rail
Critical Capabilities of Maximo for Transportation
Maximo for Transportation 7.5 Features
Critical Capabilities of Maximo Asset Configuration Manager (ACM)
Maximo Asset Configuration Manager (ACM) 7.5 Features
Maximo has traditionally been a very powerful maintenance management tool, but with pressures from a new younger workforce and competing products, there are a lot of new and exciting investment areas coming up for 2016.
The City of Santa Rosa Utilities Department uses FME for key GIS data processing and integration tasks that support several city-wide asset management initiatives. For example, FME is used to convert data from/to CAD, Enterprise Geodatabase, SQL, Access, shapefile and other formats. FME proved to be a vital component in a recent project involving loading a new Enterprise Geodatabase from CAD and prepping that data for integration with a Hansen Maintenance Management System in SQL for Sewer and Water infrastructure. This presentation will highlight the role FME plays within these projects, as well as other Asset Management applications.
Maximo integration to other systems by Bashar MahasenBashar Mahasen
The presentation shows Standard Maximo integration adapters along with well-established integration's implemented with Maximo.
It also goes through Maximo Integration framework (MIF) and available reports integration for Maximo 7.5
Rail, Metro and Monorail Networks
Industry Trends –Rolling Stock Challenges
IBM Maximo Solutions for Metro and Rail
Critical Capabilities of Maximo for Transportation
Maximo for Transportation 7.5 Features
Critical Capabilities of Maximo Asset Configuration Manager (ACM)
Maximo Asset Configuration Manager (ACM) 7.5 Features
Maximo has traditionally been a very powerful maintenance management tool, but with pressures from a new younger workforce and competing products, there are a lot of new and exciting investment areas coming up for 2016.
The City of Santa Rosa Utilities Department uses FME for key GIS data processing and integration tasks that support several city-wide asset management initiatives. For example, FME is used to convert data from/to CAD, Enterprise Geodatabase, SQL, Access, shapefile and other formats. FME proved to be a vital component in a recent project involving loading a new Enterprise Geodatabase from CAD and prepping that data for integration with a Hansen Maintenance Management System in SQL for Sewer and Water infrastructure. This presentation will highlight the role FME plays within these projects, as well as other Asset Management applications.
IBM Maximo Asset Management Training - Inventory Management for Chang Shin In...Duane Aritonang
The Maximo Inventory Management Training Workshop provides attendees with solid understanding of Maximo’s inventory and purchasing capabilities and functions to perform day-to-day transactions in Maximo.
Topics include: the integration between maintenance & materials, repairable spares, creating/managing items and inventory, performing adjustments, physical counts, the reorder process, purchase requisitions and receiving materials.
Safety plans provide all the safety related information about an asset or location in one record, which you can then copy to job plans and work orders. You must clearly associate safety requirements and procedures with work orders to fulfill the requirements of regulatory agencies.
A safety plan includes all the information needed to safely perform a specific type of work or job plan. To create a safety plan, you need to understand the relationship between its work assets and locations, related assets and locations, and all related hazards, hazardous materials, precautions, and tag out procedures.
- Associate Safety Plans to Locations, Assets, Rotating Items and Job Plans for association with Work Orders
- Inform employees of hazards they may encounter while performing work, as well as the actions they must take to prevent accidents
- Familiarize and train employees to reduce, report and avoid hazards.
IBM Maximo Asset Management solutions for the oil and gas industryIBM Chemical Petroleum
As oil and gas companies strive for operational excellence in a world becoming smaller and smarter, IBM Maximo for Oil & Gas ensures a competitive advantage. Maximo software provides the control and automation necessary to provide detailed risk analysis for improved operational efficiency.
Trends, Potentials and Challenges in ICT MarketNovida Global
Trends, Potentials, Challenges in ICT Market has been discussed at co-developed MSc. Program by Yıldız Technical University and Warwick University. Presented by Işık Deliorman Aydın, Founder and CEO of Novida Strategic Management Services on March 2014.
Since the past couple of years, the manufacturing industry has been going through turbulent times, and some of the following, asset management challenges are among the most pressing concerns for them today.
Drop in Asset ROI
Complex distribution network
High unplanned outages
Reduced asset availability
To combat such challenges, enterprises have started embracing mobile initiatives, in effectively tracking and sharing asset information and optimize their supply chain operations in real time.This presentation talks about how mobile can help, you efficiently track and maintain disparate assets, regardless of their category, complexity, or location, with Streebo's Manufacturing Apps Suite
Since the past couple of years, the manufacturing industry has been going through turbulent times, and some of the following, asset management challenges are among the most pressing concerns for them today.
Drop in Asset ROI
Complex distribution network
High unplanned outages
Reduced asset availability
To combat such challenges, enterprises have started embracing mobile initiatives, in effectively tracking and sharing asset information and optimize their supply chain operations in real time. This presentation talks about how mobile can help, you efficiently track and maintain disparate assets, regardless of their category, complexity, or location, with Streebo Manufacturing Apps Suite
Preparing for the Future: How Asset Management Will Evolve in the Age of Smar...Schneider Electric
Most utilities struggle to organize information about their distribution network assets. Operations, engineering, accounting, and other business functions all use different tools and systems, forcing grid operators to synchronize separate databases. This paper presents an improved approach to managing grid assets by establishing a ‘single source of the truth,’ eliminating special-purpose databases, utilizing spatial databases, and incorporating a workflow management tool to support database updates.
The Innovative Service Platform for Small and Medium Manufacturing CompanyHatio, Lab.
We are preparing for new SaaS based service for Small and Medium Manufacturing Companies.
This is just a draft of the advanced planning document.
Any recommendations and comments are welcome.
This presentation was given by Prof. Chiara Francalanci from Politecnico di Milano during the second Virtual BenchLearning organised by the H2020 DataBench project.
Website Design Company Astin Softech is offering custom website design, custom website development, website maintenance,SEO & PPC Service in Delhi, Noida, NCR India.
The Energy Management Application enables plant personnel to monitor real-time energy flow and automatically notifies operators, supervisors and cost accountants of energy inefficiencies and non-compliance of configured policies. Application functionality includes recording consumption and demand at main and sub-meters for a wide range of energy types, including power, water, chill, gas, air and steam. For more information, please go through the slide.
iARMS-EMS/PMS is developed by Envision Enterprise Solutions
Envision Enterprise Solutions is one of the fast growing global technology and innovation companies offering services in IT consulting, software implementation, system integration and development, with presence in USA, UAE, Singapore and India. Envision has solutions portfolio that range from Enterprise Asset Management, Port Automation Solutions, ERP Solutions, Application Services, Enterprise Mobility Solutions, Cloud Solutions, Performance Optimization and Real Time Monitoring Solutions. Envision is partnered with leading technology giants like IBM, SAP, Oracle and Microsoft.
It is an analytic solution for an oil and gas industry. This will provide the business intelligence solution for the industry business for management and deep insights.
VMWare Sponsor Presentation: Accelerating the journey to cloudVincent Kwon
Join VMware to find out how businesses of all sizes can benefit from taking a less tactical consolidation of non-critical systems by making a strategic investment for all applications through virtualisation and virtualisation management. This presentation covers what business can do now to pave the path to Cloud computing, leveraging the efficient pooling of on-demand, self managed virtual infrastructure, consumed as a service.
Turn data into intelligence: Uncover insights. Take actionVincent Kwon
Spreadsheets alone aren’t the answer to your reporting, analysis and planning problems. If you want to compete against big enterprises with big budgets, you need to use proper tools that extend the value of what you have and deliver a more insightful and accurate view of the business. With the right analytics solution, you can do just that. Cognos Express provides a complete reporting, analysis and planning solution for midsized organisations. This session will demonstrate how this solution can integrate into existing infrastructure and provide the dashboards, reports, forecasts and budgets your organisations needs. All of this with minimal implementation and at an affordable cost.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
7. A Comprehensive Approach to Industry Solutions Products Services Approach & Strategy Closed Loop Program Industry Thought Leaders Best Practices Advisory Councils Industry User Communities Development Partners Domain Expertise on Staff Architecting for Industry “Ecosystem” Specialized Support Staff Certified Personnel Specialized Tools & Accelerators Implementation Methodology Deep Domain Expertise We invest across the business to develop, deliver, and support a solution to help your business address challenges, manage risk, and seize opportunities.
11. Maximo for Utilities Industry Solution Covers a large footprint with most distribution customers Project Mgt Mobile Data Supply Chain Supply Chain Work Management Asset Management Spatial Systems Real-Time Systems Repair Work Outage Management SCADA / EMS /DMS Network Events Trouble Calls Outage Status Back-Office Back-Office Resource Management Customer Service Work Data Historian Data Historian Data Historian Service Status Customer Service Service Work Follow-up Work Initiated Work Planned Work Scheduled Work Mgt. Data Mgt. Data CUs Unplanned Work Work Initiation Work Planning & Estimating Work Management & Tracking Work Reporting & Closing Work Scheduling Compatible Units (CUs) Mgt. Data Project Work Work Status Project Management Maintenance Rules Asset Investment Planning Routine Work Generation Asset Analysis Asset Analysis Asset Analysis Asset Records Management Investment Programs Asset Analytics Asset History Asset Condition As-Built Facilities and Field Data Inspection & Routine Maint. Actual Contractor Contract Management Materials Management Actual Materials Finance & Accounting GL Accounts Billing Requests Crew Composition Capacity Planning & Forecasting Work Forecast Crew Configuration Material Reservations Materials Management Procurement Material Status Purchase Requests Re-Order Requests Property Units HR Payroll Actual Labor Asset Value Time Entry Actual Labor Plant Accounting Finance & Accounting Actual Payments CUs Designs & As-Builts Existing Facilities Changed Facilities Graphic Design GIS Work to Design As-Designed Network Model Asset Attributes Customer Data Work Completion Details GIS Data Work Details Work Details Work Dispatch Work to Dispatch Work Status Field Recording Mobile Network
12. Data Historian Project Mgt Mobile Data Supply Chain Supply Chain Work Management Asset Management Spatial Systems Real-Time Systems Back-Office Back-Office Resource Management Customer Service Work Maximo Add-on Products, Partner Solutions, and the MIF can provide interoperability to the rest Repair Work Outage Management SCADA / EMS Network Events Trouble Calls Outage Status Service Status Customer Service Service Work Follow-up Work Initiated Work Planned Work Scheduled Work Mgt. Data Mgt. Data CUs Unplanned Work Work Initiation Work Planning & Estimating Work Management & Tracking Work Reporting & Closing Work Scheduling Compatible Units (CUs) Mgt. Data Project Work Work Status Project Management Maintenance Rules Asset Investment Planning Routine Work Generation Asset Analysis Asset Analysis Asset Analysis Asset Records Management Investment Programs Asset Analytics Asset History Asset Condition As-Built Facilities and Field Data Inspection & Routine Maint. Actual Contractor Contract Management Materials Management Actual Materials Finance & Accounting GL Accounts Billing Requests Crew Composition Capacity Planning & Forecasting Work Forecast Crew Configuration Material Reservations Materials Management Procurement Material Status Purchase Requests Re-Order Requests Property Units HR Payroll Actual Labor Asset Value Time Entry Actual Labor Plant Accounting Finance & Accounting Actual Payments CUs Designs & As-Builts Existing Facilities Changed Facilities Graphic Design GIS Work to Design As-Designed Network Model Asset Attributes Customer Data Work Completion Details GIS Data Work Details Work Details Work Dispatch Work to Dispatch Work Status Field Recording Mobile Network
28. IBM Maximo Spatial Asset Management The core of the SAFE architecture software stack, spatially - enabled with ESRI ArcGIS ® IBM Maximo IBM Maximo ® ® with ESRI with ESRI ArcGIS ArcGIS ® ® Server Server for service management for service management Perform asset editing and work orders spatially.. Extensible – – e.g., workforce routing, geo - - spatial processing.. GIS GIS digital infrastructure data is the System of Record GIS
29. Maximo Spatial - Features and Benefits More Accurately define work locations When a new service request is created, either manually or through a call center, having access to a map of the region to determine the location of the problem leads to a more efficient resolution. Plan and schedule work by area Query a map by Address Optimize technicians travel time Advanced analytics Ability to look at a number of open work orders and create a project or work package using a map view. Query work order by status, work type or craft requirements to find related work. When trying to locate an asset or work order users can query the map by a specific address. By having a work orders location accurately specified, there is less time spent on travel trying to find the correct address or location, and less time traveling between work locations inefficiently. Ability to overlay information on a map like traffic or weather information, asset failure history or population to prioritize work, schedule outages or plan future maintenance projects.
30. Demonstration of Maximo for Utilities 7.1.2 – Beta – Revenue Meter Lifecycle Asset Management
32. Test Results Tab Create WO Supports test results Able to import an XML or text file from a third party testing application Work order creation is needed for replacing or retiring a meter
33. Define Meter Templates Templates determine the number of meters that will be sampled depending on the population size. Both linear and non linear sampling templates can be defined.
34.
35.
36. Q u e s t i o n s ? Terry Saunders ( [email_address] ) for general product questions Gary Cooper ( [email_address] ) for Maximo Spatial questions (GIS) Jerry Miller ( [email_address] ) for Utilities T&D questions Ron Wallace ( [email_address] ) Utilities & EAM Marketing Dianne DePuy ( [email_address] ) Utilities Industry Leader Kim Woodbury ( [email_address] ) for commercial & product questions Don Fenhagen ( [email_address] ) for Spatial Implementation questions Let’s build a smarter planet
40. Maximo for Utilities CU Library Business Process Create New CU at PENDING Update Control Flags Add Details Add CU Classifications Test and Verify CU Change Status to ACTIVE
42. Maximo for Utilities CU Estimate Business Process Create Master Work Order Work Order Tracking Identify Est Requirements Perform Site Assessment Create Sketch/Design Manual Process Next Page Apply WO Plan to Master WO Accept Estimate Generate Estimate Enter Work Required Enter Station / Design Points Apply CU Parameters Apply CU’s Estimate Request
43. Maximo for Utilities CU Estimate Process Cont. Work Order Tracking Estimate Request Variance NO YES Prior Page Close Work Compare To Estimate Report Actuals Approve & Execute WOs Create As Built Estimate