Human Resource Management
By – Dr.
By- Dr. Dharmendra Gahwai
Guided by-
Dr. Y.D.Badgaiyan
Prof. and Head
Deptt.of Community Medicine
CIMS, Bilaspur (CG).
•Human resource management is the
critical management area that is the
most important asset for any
organization as well as health care
system.
Definition-
“Human resource management is the integrated use of
system, policies and management practices to support
the organization to meet its desired goal through
recruitment, maintaining and development of
employees.”
- According to Management Sciences for Health.
Functions of HRM
– Planning
– Organizing
– Directing
– Controlling
Operative Functions
P/HRM
Managerial
functions:
Procureme
nt
Job Analysis
HR planning
Recruitment
Selection
Placement
Induction
Internal
mobility
Developmen
t:
Training
Executive
development
Career
planning
Succession
planning
Human
resources
development
strategies
Motivation
and
Compensation
:
Job design
Work scheduling
Motivation
Job evaluation
Performance and
potential
appraisal
Compensation
administration
Incentives
benefits and
services
Maintenance
:
Health
Safety
Welfare
Social security
Integration:
Grievances
Discipline
Teams and
teamwork
Collective
bargaining
Participation
Empowerment
Trade unions
Employers‟
associations
Industrial
relations
Emerging
Issues:
Personnel
records
Personnel
audit
Personnel
research
HR
accounting
HRIS
Job stress
Mentoring
International
HRM
PROCESSES OF HUMAN RESOURCE MANAGEMENT
HRM
SYSTEM
ON
S
Good
employment
Policy
Adequate
Financial
resource
Pre-service
education/
training
Partnership
with local
community,
private sector,
donors, other
key stake
holders
Leadership
and
advocacy
Better
health
outcome
Benefits of a strong HRM system
• FOR THE ORGANIZATION:
1.Increases the organization’s capacity to retain staffs
and achieve its goals.
2. Increases the level of employee’s performance.
3. Uses employee’s skills and knowledge efficiently.
4. Saves costs through the improved efficiency and
productivity of workers.
5. Improves the organization’s ability to manage
change.
Benefits of a strong HRM system
• FOR THE EMPLOYEE:
1. Improves equity between compensation of employee
and level of responsibility.
2. Helps employees to understand how their work
relates to the mission and values of organization.
3. Helps to motivate employees.
4. Increases employee’s job satisfaction.
5. Encourages employees to work as a team.
Importance Of HRM Components
1.HRM capacity
HRM budget
Allows for consistent HR planning and for relating
costs.
HRM staff
Staff are essential for policy development and
implementation.
2. HRM planning
Allows HRM resources to be used efficiently in
support of organization goals.
3.Personnel policy & practice
Allows organization to standardize the jobs and
types of skills it requires.
4. HRM data
Allows for appropriate allocation and training of staff
and tracking of personnel costs.
5. Performance management
Defines what should be done by people and how they
would work together.
6.Training
A cost-effective way to develop staff skill and
organizational capacity.
•Since India gained independence,
universal and affordable health
care has been central to the
planning of the country‟s health
system.
• However, attempts to establish such a
network have been unsuccessful
because substantial socioeconomic
and geographical inequities in access
to health care and health outcomes.
• Health manpower requirement of the of the
country are based on
• 1. Health needs and demands of the population
and
• 2. desired output.
• Health manpower planning is an important
aspect of community health planning.
• It is based on series of accepted ratio like –
• - Doctor- population ratio.
• - Nurse- population ratio.
• - Bed- population ratio.
CATEGORIES OF HR FOR HEALTH
1.Medical doctors and specialists including
public health specialists and health
administrators.
2. Nurses, ANMs and allied workers –
includes MPWs.
3. Lab techs, pharmacists, and technical
support staff .
4. Public health support staff .
(MOHFW , New Delhi)
SUGGESTED NORMS FOR HEALTH PERSONNEL
CATEGORIES NORMS SUGGESTED
1
.
Doctors 1 Per 3500 population.
2
.
Nurses 1 Per 5000 population.
3
.
Health worker M/F 1 Per 5000 population in plain area
1 per 3000 population in tribal and hilly
area.
4
.
Trained dais One for each village.
5
.
Health assistant
M/F
1 per 30000 population in plain area
1 Per 20000 population in tribal and hilly
area.
6
.
Pharmacist 1 Per 10000 population
7
.
Lab. Technicians 1 Per 10000 population
8
.
ASHA 1 Per 1000 population
Health Manpower in some countries
2005-2011 (World Health Statistics 2012)
COUNTRY DOCTORS
Per 10000
population
NURSES
and
MIDWIFES
BEDS
Per 10000
population
1 INDIA 6.5 10 9.0
2 BANGLADESH 3.0 2.7 3.0
3 SHRI LANKA 4.9 19.3 29.0
4 THAIAND 21.0 53.0 21.0
5 MYANMAR 4.6 8.0 6.0
HEALTH MANPOWER OF INDIA
(As on March 2011)
CATEGORIES IN POSITION
1 Doctors in PHCs 26,329
2 ANM at Sub centre and PHCs 207,868
3 MPW (Male) 52,215
4 Nurse midwife 65,344
5 Radiographer 2221
6 Pharmacist 24,671
7 Lab technicians 16,208
However average number of health
care staff are satisfactory on national
basis, but they vary widely within the
country.
There is also mal-distribution of
health manpower between rural and
urban areas.
• This mal-distribution is due to
- Absence of amenities in rural areas.
- Lack of job satisfaction .
- Professional isolation.
- Lack of rural experience.
- Inability to adjust in rural life.
• Studies in India have shown that
there is concentration of doctors in
urban areas is up to 73.6 % where
only 26.4 % population live.
• While the rural population (72%)
remains largely underserved.
(Task force on Medical Education, 2006)
1.Availability for recruitment..
• 1.There are insufficient institutions in most
states.
• 2.70% seats concentrated in six states – 30% of
seats in rest.
• 3.For specialists an estimated 10% migration
and increasing private sector preference.
• 4.Available pool does not necessarily translate
into public sector recruitment- more so if
the expansion is in the private sector.
• 5.There is a reluctance to join, if the posting
is in remote areas.
• 6.The ratio of women doctors joining is even less
than of men.
2.Product Does Not Match Requirements:
• 1. Those who join are not from the underserved
areas or social groups.
- but relatively privileged persons who see
medical education as best way to break out of
their social class or retain existing class status.
• 2. Even those who join with noble motives,
change through the educational process into
“objective” professionals.
- more interested in the disease than in the
patient..
3. There no faculty development programmes.
4. Growth in the private sector is particularly
haphazard and of very poor quality.
5. Skills they learn are not appropriate nor is the
quality as desired.
• 7. Focus is on knowledge and certification – little
on skills.
• 8. There is often no match between skills
required and skills imparted.
3.Poor Quality of In- service Capacity Building …
• 1. Multiple short duration fragmented training
programmes.
• 2. Little evaluation of training and no evaluation
of whether training led to improved service
delivery outcomes.
• 3. No decentralized planning to ensure that all
the facilities have the desired skill sets.
• 4. No continuing medical education
programmes.
• 5.Weak training infrastructure.
4. Workforce Issues
• 1. Transfers, postings, promotions, disciplinary
actions, pensions:
- are they timely, transparent, fair and
non discriminatory ?
(One of the surest indicators of good
governance)
• 2.Issue of incentives…
- Do those who work more or in more difficult
circumstances get rewarded more… or
- do they actually feel penalized and
discriminated against!!
• 3. Inadequacy of compensation package…. Both
financial and non financial..
• 4. Lack of a career path…
• 5. Availability of positive role models and team
leadership.
• 6. Accountability.. …??? And accountability
pyramids…
The center – state divide…
• Health is a state subject and only family
planning- (expanded into RCH) and a few
disease control programmes on the concurrent
list.
• Central manpower support assumes that the
core manpower issues are managed by state and
center needs only supplement manpower.
• States constrained by lack of funds and most
state funds being deployed for salaries and
establishment.
1. Lack of data
• In India, there is no comprehensive information
available on HRH for health facilities across
public and private sectors.
• Data available with professional councils for
doctors, dentists, nurses and pharmacists are
cumulative and do not exclude attrition (from
death, retirement, migration, etc.), as there is no
periodic renewal of registration.
2. Skewed production of HRH
• The distribution of medical colleges,
nursing colleges, nursing and ANM
schools, paramedical institutions is
uneven across the states with wide
disparities inequality of education.
• Six ‘high HRH production’ states (i.e. Andhra
Pradesh, Karnataka, Kerala, Maharashtra,
Pondicherry and Tamil Nadu) represent 31% of the
Indian population, but have a disproportionately
high share of MBBS seats (58%) and nursing
colleges (63%) as compared to the eight „low HRH
production’ states (i.e. Bihar, Chhattisgarh,
Jharkhand, Madhya Pradesh, Odisha, Rajasthan,
Uttaranchal and Uttar Pradesh), which comprise
46% of India‟s population, but have far fewer MBBS
seats (21%) and nursing colleges (20%).
3. Uneven HRH deployment and distribution
• India‟s major limitation has been in the
production and distribution of human resources
across multiple levels of care.
• Non-creation of posts at health facilities is
pervasive.
4. Disconnected education and training
• Health curricula in the country have not kept
pace with the changing dynamics of public
health, health policies and demographics.
• Current medical and nursing graduates in the
country, trained in urban environments, are ill-
prepared and unmotivated to practice in rural
settings.
• There is an increased drive towards
super specialization in various
medical disciplines, further pushing
the focus of care towards tertiary
health models rather than essential
primary care services.
• a. Regulatory:
Insisting of rural service as pre-qualification to
be considered for admission to post graduation
courses or bonds which insists on doing rural
service after the course.
• b. Workforce management:
Transfer policies that provide for rotational
posting in difficult areas and give preference to
those who would work in a remote area of their
own choice.
• c. Incentives-
financial and non-financial.
(CRMC scheme in CG)
• d. Educational Strategies:
Measures to preferentially admit only those
students who are likely to serve in under-
serviced areas and mould education to retain
this commitment.
• e. Multi-skilling existing staff:
• Introduction of three year course
as rural medical assistants and
posting of Ayush doctors.
1.Creating the norms: The IPHS
• two ANMs per sub-center and one male MPW.
• Three nurses/ANMs per PHC plus two medical
officers.
• Adding AYUSH staff into available pool.
• Nine nurses per CHC plus 5 specialists and 3 to
4 medical officers .
2.Expanding available skilled human resource
• More medical colleges- government and private
and through public private partnerships.
• More government seats in private medical
colleges
• More nursing schools & nursing colleges.
• More technical and paramedical courses.
• Reviving ANM and MPW training centers.
3.Increasing availability in priority areas..
1. Compulsory rural postings- pre- post graduation – eg
Orissa, Chhattisgarh and Tamilnadu.
2. Contractual appointments .
3. fair transfer policy- rotational postings… tamil nadu..
4. Incentives for difficult areas: eg Chhattisgarh, Himachal and
Orissa.
4.Community level service providers
1. ASHA: 4 lakh ASHAs - one of most visible
components of NRHM.
2. Anganwadi worker- increasing her
effectiveness as health care provider.
3. The RMP: Would training them help?
4. The traditional birth attendant: continuing role
for the TBA where institutional delivery levels
are low.
5. Community midwifes and maternity huts.
5.Strengthening Capacity building activity…
• Strengthening SIHFWs.
• Developing an integrated training approach.
• Need to redefine the role of SIHFWs/NIHFWs
as apex of a pyramid of institutions that ensure
that all the necessary skills required for quality
service delivery are in place.
6.Improving workforce performance..
• Putting an accountability framework in place:
▫ Hospital development committees.
• Bringing in a cadre of health managers and data
managers and financial managers.
• Introducing health management courses and promoting
health management certification for key posts.
• Insisting on public health qualifications for key
public health posts…!?!
Future challenges include
- Planning for human resource for public health
at State/national level,
- Framing of State specific human resource
development and training policy,
- Creation of human resource management
information system,
- Reorientation of medical and para-medical
education and
- Ensuring proper utilization of the trained
manpower and standardization of training.
The whys?
1. Why was HR not planned along with infrastructure ?
2. Why are so many institutions dismantled in the last decade?
ANM training schools? MPW training schools?
3. Why are SIHFWs and RHFWTCs poorly functional?
Why have district training centers fallen into disuse?
4. Why this very uneven growth of professional education?
5. Why Public Health Specialist are not posted in key
managerial posts in Public Health departments.
Human resource management in public health ppt

Human resource management in public health ppt

  • 1.
    Human Resource Management By– Dr. By- Dr. Dharmendra Gahwai Guided by- Dr. Y.D.Badgaiyan Prof. and Head Deptt.of Community Medicine CIMS, Bilaspur (CG).
  • 2.
    •Human resource managementis the critical management area that is the most important asset for any organization as well as health care system.
  • 3.
    Definition- “Human resource managementis the integrated use of system, policies and management practices to support the organization to meet its desired goal through recruitment, maintaining and development of employees.” - According to Management Sciences for Health.
  • 4.
    Functions of HRM –Planning – Organizing – Directing – Controlling Operative Functions P/HRM Managerial functions: Procureme nt Job Analysis HR planning Recruitment Selection Placement Induction Internal mobility Developmen t: Training Executive development Career planning Succession planning Human resources development strategies Motivation and Compensation : Job design Work scheduling Motivation Job evaluation Performance and potential appraisal Compensation administration Incentives benefits and services Maintenance : Health Safety Welfare Social security Integration: Grievances Discipline Teams and teamwork Collective bargaining Participation Empowerment Trade unions Employers‟ associations Industrial relations Emerging Issues: Personnel records Personnel audit Personnel research HR accounting HRIS Job stress Mentoring International HRM
  • 5.
    PROCESSES OF HUMANRESOURCE MANAGEMENT HRM SYSTEM ON S Good employment Policy Adequate Financial resource Pre-service education/ training Partnership with local community, private sector, donors, other key stake holders Leadership and advocacy Better health outcome
  • 6.
    Benefits of astrong HRM system • FOR THE ORGANIZATION: 1.Increases the organization’s capacity to retain staffs and achieve its goals. 2. Increases the level of employee’s performance. 3. Uses employee’s skills and knowledge efficiently. 4. Saves costs through the improved efficiency and productivity of workers. 5. Improves the organization’s ability to manage change.
  • 7.
    Benefits of astrong HRM system • FOR THE EMPLOYEE: 1. Improves equity between compensation of employee and level of responsibility. 2. Helps employees to understand how their work relates to the mission and values of organization. 3. Helps to motivate employees. 4. Increases employee’s job satisfaction. 5. Encourages employees to work as a team.
  • 8.
    Importance Of HRMComponents 1.HRM capacity HRM budget Allows for consistent HR planning and for relating costs. HRM staff Staff are essential for policy development and implementation.
  • 9.
    2. HRM planning AllowsHRM resources to be used efficiently in support of organization goals. 3.Personnel policy & practice Allows organization to standardize the jobs and types of skills it requires.
  • 10.
    4. HRM data Allowsfor appropriate allocation and training of staff and tracking of personnel costs. 5. Performance management Defines what should be done by people and how they would work together.
  • 11.
    6.Training A cost-effective wayto develop staff skill and organizational capacity.
  • 13.
    •Since India gainedindependence, universal and affordable health care has been central to the planning of the country‟s health system.
  • 14.
    • However, attemptsto establish such a network have been unsuccessful because substantial socioeconomic and geographical inequities in access to health care and health outcomes.
  • 15.
    • Health manpowerrequirement of the of the country are based on • 1. Health needs and demands of the population and • 2. desired output.
  • 16.
    • Health manpowerplanning is an important aspect of community health planning. • It is based on series of accepted ratio like – • - Doctor- population ratio. • - Nurse- population ratio. • - Bed- population ratio.
  • 17.
    CATEGORIES OF HRFOR HEALTH 1.Medical doctors and specialists including public health specialists and health administrators. 2. Nurses, ANMs and allied workers – includes MPWs. 3. Lab techs, pharmacists, and technical support staff . 4. Public health support staff .
  • 18.
  • 19.
    SUGGESTED NORMS FORHEALTH PERSONNEL CATEGORIES NORMS SUGGESTED 1 . Doctors 1 Per 3500 population. 2 . Nurses 1 Per 5000 population. 3 . Health worker M/F 1 Per 5000 population in plain area 1 per 3000 population in tribal and hilly area. 4 . Trained dais One for each village. 5 . Health assistant M/F 1 per 30000 population in plain area 1 Per 20000 population in tribal and hilly area. 6 . Pharmacist 1 Per 10000 population 7 . Lab. Technicians 1 Per 10000 population 8 . ASHA 1 Per 1000 population
  • 20.
    Health Manpower insome countries 2005-2011 (World Health Statistics 2012) COUNTRY DOCTORS Per 10000 population NURSES and MIDWIFES BEDS Per 10000 population 1 INDIA 6.5 10 9.0 2 BANGLADESH 3.0 2.7 3.0 3 SHRI LANKA 4.9 19.3 29.0 4 THAIAND 21.0 53.0 21.0 5 MYANMAR 4.6 8.0 6.0
  • 21.
    HEALTH MANPOWER OFINDIA (As on March 2011) CATEGORIES IN POSITION 1 Doctors in PHCs 26,329 2 ANM at Sub centre and PHCs 207,868 3 MPW (Male) 52,215 4 Nurse midwife 65,344 5 Radiographer 2221 6 Pharmacist 24,671 7 Lab technicians 16,208
  • 23.
    However average numberof health care staff are satisfactory on national basis, but they vary widely within the country. There is also mal-distribution of health manpower between rural and urban areas.
  • 24.
    • This mal-distributionis due to - Absence of amenities in rural areas. - Lack of job satisfaction . - Professional isolation. - Lack of rural experience. - Inability to adjust in rural life.
  • 25.
    • Studies inIndia have shown that there is concentration of doctors in urban areas is up to 73.6 % where only 26.4 % population live. • While the rural population (72%) remains largely underserved. (Task force on Medical Education, 2006)
  • 27.
    1.Availability for recruitment.. •1.There are insufficient institutions in most states. • 2.70% seats concentrated in six states – 30% of seats in rest. • 3.For specialists an estimated 10% migration and increasing private sector preference.
  • 28.
    • 4.Available pooldoes not necessarily translate into public sector recruitment- more so if the expansion is in the private sector. • 5.There is a reluctance to join, if the posting is in remote areas. • 6.The ratio of women doctors joining is even less than of men.
  • 29.
    2.Product Does NotMatch Requirements: • 1. Those who join are not from the underserved areas or social groups. - but relatively privileged persons who see medical education as best way to break out of their social class or retain existing class status. • 2. Even those who join with noble motives, change through the educational process into “objective” professionals. - more interested in the disease than in the patient..
  • 30.
    3. There nofaculty development programmes. 4. Growth in the private sector is particularly haphazard and of very poor quality. 5. Skills they learn are not appropriate nor is the quality as desired.
  • 31.
    • 7. Focusis on knowledge and certification – little on skills. • 8. There is often no match between skills required and skills imparted.
  • 32.
    3.Poor Quality ofIn- service Capacity Building … • 1. Multiple short duration fragmented training programmes. • 2. Little evaluation of training and no evaluation of whether training led to improved service delivery outcomes. • 3. No decentralized planning to ensure that all the facilities have the desired skill sets.
  • 33.
    • 4. Nocontinuing medical education programmes. • 5.Weak training infrastructure.
  • 34.
    4. Workforce Issues •1. Transfers, postings, promotions, disciplinary actions, pensions: - are they timely, transparent, fair and non discriminatory ? (One of the surest indicators of good governance) • 2.Issue of incentives… - Do those who work more or in more difficult circumstances get rewarded more… or - do they actually feel penalized and discriminated against!!
  • 35.
    • 3. Inadequacyof compensation package…. Both financial and non financial.. • 4. Lack of a career path… • 5. Availability of positive role models and team leadership. • 6. Accountability.. …??? And accountability pyramids…
  • 36.
    The center –state divide… • Health is a state subject and only family planning- (expanded into RCH) and a few disease control programmes on the concurrent list. • Central manpower support assumes that the core manpower issues are managed by state and center needs only supplement manpower. • States constrained by lack of funds and most state funds being deployed for salaries and establishment.
  • 38.
    1. Lack ofdata • In India, there is no comprehensive information available on HRH for health facilities across public and private sectors. • Data available with professional councils for doctors, dentists, nurses and pharmacists are cumulative and do not exclude attrition (from death, retirement, migration, etc.), as there is no periodic renewal of registration.
  • 39.
    2. Skewed productionof HRH • The distribution of medical colleges, nursing colleges, nursing and ANM schools, paramedical institutions is uneven across the states with wide disparities inequality of education.
  • 40.
    • Six ‘highHRH production’ states (i.e. Andhra Pradesh, Karnataka, Kerala, Maharashtra, Pondicherry and Tamil Nadu) represent 31% of the Indian population, but have a disproportionately high share of MBBS seats (58%) and nursing colleges (63%) as compared to the eight „low HRH production’ states (i.e. Bihar, Chhattisgarh, Jharkhand, Madhya Pradesh, Odisha, Rajasthan, Uttaranchal and Uttar Pradesh), which comprise 46% of India‟s population, but have far fewer MBBS seats (21%) and nursing colleges (20%).
  • 41.
    3. Uneven HRHdeployment and distribution • India‟s major limitation has been in the production and distribution of human resources across multiple levels of care. • Non-creation of posts at health facilities is pervasive.
  • 42.
    4. Disconnected educationand training • Health curricula in the country have not kept pace with the changing dynamics of public health, health policies and demographics. • Current medical and nursing graduates in the country, trained in urban environments, are ill- prepared and unmotivated to practice in rural settings.
  • 43.
    • There isan increased drive towards super specialization in various medical disciplines, further pushing the focus of care towards tertiary health models rather than essential primary care services.
  • 45.
    • a. Regulatory: Insistingof rural service as pre-qualification to be considered for admission to post graduation courses or bonds which insists on doing rural service after the course.
  • 46.
    • b. Workforcemanagement: Transfer policies that provide for rotational posting in difficult areas and give preference to those who would work in a remote area of their own choice.
  • 47.
    • c. Incentives- financialand non-financial. (CRMC scheme in CG) • d. Educational Strategies: Measures to preferentially admit only those students who are likely to serve in under- serviced areas and mould education to retain this commitment.
  • 48.
    • e. Multi-skillingexisting staff: • Introduction of three year course as rural medical assistants and posting of Ayush doctors.
  • 50.
    1.Creating the norms:The IPHS • two ANMs per sub-center and one male MPW. • Three nurses/ANMs per PHC plus two medical officers. • Adding AYUSH staff into available pool. • Nine nurses per CHC plus 5 specialists and 3 to 4 medical officers .
  • 51.
    2.Expanding available skilledhuman resource • More medical colleges- government and private and through public private partnerships. • More government seats in private medical colleges • More nursing schools & nursing colleges. • More technical and paramedical courses. • Reviving ANM and MPW training centers.
  • 52.
    3.Increasing availability inpriority areas.. 1. Compulsory rural postings- pre- post graduation – eg Orissa, Chhattisgarh and Tamilnadu. 2. Contractual appointments . 3. fair transfer policy- rotational postings… tamil nadu.. 4. Incentives for difficult areas: eg Chhattisgarh, Himachal and Orissa.
  • 53.
    4.Community level serviceproviders 1. ASHA: 4 lakh ASHAs - one of most visible components of NRHM. 2. Anganwadi worker- increasing her effectiveness as health care provider. 3. The RMP: Would training them help? 4. The traditional birth attendant: continuing role for the TBA where institutional delivery levels are low. 5. Community midwifes and maternity huts.
  • 54.
    5.Strengthening Capacity buildingactivity… • Strengthening SIHFWs. • Developing an integrated training approach. • Need to redefine the role of SIHFWs/NIHFWs as apex of a pyramid of institutions that ensure that all the necessary skills required for quality service delivery are in place.
  • 55.
    6.Improving workforce performance.. •Putting an accountability framework in place: ▫ Hospital development committees. • Bringing in a cadre of health managers and data managers and financial managers. • Introducing health management courses and promoting health management certification for key posts. • Insisting on public health qualifications for key public health posts…!?!
  • 56.
    Future challenges include -Planning for human resource for public health at State/national level, - Framing of State specific human resource development and training policy, - Creation of human resource management information system, - Reorientation of medical and para-medical education and - Ensuring proper utilization of the trained manpower and standardization of training.
  • 57.
    The whys? 1. Whywas HR not planned along with infrastructure ? 2. Why are so many institutions dismantled in the last decade? ANM training schools? MPW training schools? 3. Why are SIHFWs and RHFWTCs poorly functional? Why have district training centers fallen into disuse? 4. Why this very uneven growth of professional education? 5. Why Public Health Specialist are not posted in key managerial posts in Public Health departments.