City of Rochester, Main Street Makeover
1. P R O J E C T T E A M
City of Rochester
MAKEOVER
AIN STREET
Owners
Michigan Department of Transportation
City of Rochester Rochester DDA
Construction Engineer
Fishbeck, Thompson, Carr & Huber Inc.
Engineers | Architects | Scientists | Constructors
What
Providing services for over 50 years.
Contractor Design Engineers was
Angelo Iafrate Construction Co. NCI Engineering
Hubbell Roth & Clark Inc.
done?
• Reconstruction of downtown Main Street
Questions? between the Clinton River Bridge and Paint
Creek Bridge.
Jaymes Vettraino Tom Gray II, P.E. • Water main replacement and utility upgrades.
City Manager Vice President/Senior Civil Engineer • Traffic signal and sign upgrades.
jvettraino@rochestermi.org tlgray@ftch.com • Streetscape and lighting improvements.
248.609.0606 248.324.2133
2. M-150
11.21
RECONSTRUCTION
PROJECT OPEN
TO TRAFFIC
• Full closure opened to traffic.
• One lane of traffic in each direction and a center
Full closure starts turn lane is opened to traffic between Second
• Single lane closures begin Exposed aggregate
between Second Street Street and University Drive.
along NB and SB M-150. sidewalk complete.
• Pavement removal begins and University Drive. Concrete paving begins.
Water main complete.
• Sidewalk removal begins.
• Pedestrian traffic is maintained
07.09 08.02 10.15
04.24 06.01
along sidewalk adjacent to
building using temporary fence.
07.17 09.27 11.17
05.15 06.04
04.22 Placement of concrete
pavement is completed.
Exposed aggregate sidewalk
RT
construction begins.
STA
Water main installation begins. Human remains discovered in front of
Home Bakery at the NE corner of Third
Street and Main Street.
Human remains discovered in
front of bridal shop at the SE
corner of Third Street and Main
Street.