Seminar On
““High Speed TiltingHigh Speed Tilting
TrainsTrains””
Mr. KONAL SINGHMr. KONAL SINGH
Director and Founder of
ProBotiZ Group, NagpurProBotiZ Group, Nagpur
(W) - Probotizgroup.com (M) - 8862098889, 9423632068 (E) - probotizinfo@gmail.com
@ ProBotiZ Group
Concept of high-speedConcept of high-speed
TrainTrain
The council of the European union in their directivedirective
no. 96/48/ECno. 96/48/EC has defined the term “High Speed”
covering all railway express services operated at speeds
in the 200 to 300 km/h range. This includes railway lines:
1. Built specially for high speed generally equal to or
greater than 250 km/h250 km/h..
2. Specially upgraded for high speed travels of the order of
200 km/h200 km/h.
@ ProBotiZ Group
• A tilting train is a train that has a mechanism enabling
increased speed on regular rail tracksincreased speed on regular rail tracks .
• As a train (or other vehicle) rounds a curve at speed,
objects inside the train experience inertiainertia.
• This can cause
- packages to slideslide about or
- seated passengers to feel squashedsquashed.
• Standing passengersStanding passengers to lose their balance.
IntroductionIntroduction
@ ProBotiZ Group
• Tilting trains are designed to counteract this discomfortdiscomfort.
• In a curve to the leftleft, the train tilts to the left to compensate for
the g-force push to the rightg-force push to the right, and vice versa
• The train may be constructed such that inertial forces cause the
tilting (passive tiltpassive tilt), or it may have a computer-controlled power
mechanism (active tiltactive tilt).
IntroductionIntroduction Cont.
@ ProBotiZ Group
HistoryHistory
• The first tilting train publically ran was 381 sreies electric
multiple unit train by JAPANESE NATIONALJAPANESE NATIONAL
RAILWAYSRAILWAYS from 10th
july 1973 between Nagoya &Nagoya &
NaganoNagano cities.
• The British advanced passengerBritish advanced passenger train was first train
to implement active tilt mechanism in year 1984-851984-85
@ ProBotiZ Group
HistoryHistory Cont.
• The first tilting train for commercially used United AircraftUnited Aircraft
TurbotrainTurbotrain by CANADIAN NATIONAL RAILWAYS inCANADIAN NATIONAL RAILWAYS in
1968.1968.
• The first European high speed trainEuropean high speed train was named TALGOTALGO
enabled with passive tilt in 19701970
@ ProBotiZ Group
Tilting TrainsTilting Trains
Problems with corners :Problems with corners :
– for building a high speed railway transport system...
• They can either invest money in the train to make it
tilt but use existing railway lines or they invest money
in a new railway but don't need to spend money on
expensive tilting mechanisms.
• This is why TGV, and ICE and bullet trains do not tilt,
because they have their own dedicated high speed
railway lines where curves are built with very high
radii. Tilting trains
Radius less then 600m
@ ProBotiZ Group
It is worth pointing out that the centrifugal force
is a function of
v2/r ,
where v is the velocity and r is the radius.
– if you double the velocity, you quadruple the
centrifugal force.
– Similarly, if you want to triple the velocity but
keep the centrifugal force the same, you must
increase the radius by a factor of nine!
Something not always possible.
– This is why even apparently gentle curves can
be much more of a problem with high speeds
than one might thing, because the force rises
with the square of velocity.
Tilting TrainsTilting Trains Cont.
@ ProBotiZ Group
Swede high-Speed TrainSwede high-Speed Train
The first high-speed tilting train, X 2000,
was delivered to Swedish State Railways in
1990 on the Stockholm - Gothenburg route.
Travel time for this route was reduced by
more than 25 percent with only minor
upgrading of the infrastructure.
The key to increased speeds lie in the radial
self-steering bogies whereby track forces
are reduced, allowing up to 50 percent
higher speed through curves.
Microprocessor-controlled, active
passenger car tilting technology assures
passenger comfort in curves.
@ ProBotiZ Group
Cornering force in high-Cornering force in high-
Speed TrainSpeed Train
Tilt is used primarily for comfort.
An accelerometer is fitted in the first
bogie of the train in the direction of
travel and measures lateral forces as
the train enters a curve. Computer-
controlled hydraulic ram tilt each
coach into the curve, up to a
maximum inclination of 6.5º. The
tilting system compensates for up to
75% of the lateral force of a curve.
Incidents of 'sea-sickness' or 'tilt
nausea’ can occur as 25% of lateral
forces are still felt by the passengers.
@ ProBotiZ Group
Trains with tilting by inertial forces:
Tilting Train Around theTilting Train Around the
WORLDWORLD
TalgoTalgo 350 (SPAIN)
381 – EMU (JAPAN)
Acela ExpressAcela Express (US)
APT (UK)
Advance passenger train
Alpha PendulaAlpha Pendula (PORTUGAL)
Elettro Treno
(ITALY)
@ ProBotiZ Group
Future scopeFuture scope
• L-R-C (Light,Rapid,Comfortable)(Light,Rapid,Comfortable) Tilt mechanism can
be used .
• This mechanism is power driven,driven by
accelerometeraccelerometer.
• This enables high quality ride /journey for passenger with
comfort & safety.
@ ProBotiZ Group
ConclusionConclusion
• High speeds can be achieved by tilting Mechanism to
reduce journey timereduce journey time with excellent comfort, safetycomfort, safety
& satisfaction& satisfaction by innovative Technological aspect of
TILTING TRAINS.
@ ProBotiZ Group
ThankThank
YouYou

More Related Content

What's hot

Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
dhara dattani
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
Deewan singh
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
SrinivasaRao Guduru
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotive
Akash Singh
 
Atp project
Atp projectAtp project
Atp project
shaktiprasaddash
 
Railway interlocking
Railway interlockingRailway interlocking
Railway interlocking
MOHIT DUREJA
 
Emu car shed ghaziabad
Emu car shed ghaziabadEmu car shed ghaziabad
Emu car shed ghaziabad
Abhishek Singh
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
srinivas2036
 
Skybus ppt
Skybus pptSkybus ppt
Skybus ppt
RATHOD NARAYAN
 
SEMI REPORT ON AIRBAG SYS
SEMI REPORT ON AIRBAG SYSSEMI REPORT ON AIRBAG SYS
SEMI REPORT ON AIRBAG SYS
kingz-edition
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
haxxo24
 
Geometric desing of railway track
Geometric desing of railway trackGeometric desing of railway track
Geometric desing of railway track
mohitjain123
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
Ajeet Kumar
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
Sahil arora
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllguda
zakriya furkhan
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
anand prasad
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
srinivas2036
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
Bhupesh Jangid
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
Itnesh Kumar
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
Ashutosh Khaitan
 

What's hot (20)

Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotive
 
Atp project
Atp projectAtp project
Atp project
 
Railway interlocking
Railway interlockingRailway interlocking
Railway interlocking
 
Emu car shed ghaziabad
Emu car shed ghaziabadEmu car shed ghaziabad
Emu car shed ghaziabad
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Skybus ppt
Skybus pptSkybus ppt
Skybus ppt
 
SEMI REPORT ON AIRBAG SYS
SEMI REPORT ON AIRBAG SYSSEMI REPORT ON AIRBAG SYS
SEMI REPORT ON AIRBAG SYS
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Geometric desing of railway track
Geometric desing of railway trackGeometric desing of railway track
Geometric desing of railway track
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllguda
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 

Viewers also liked

Tilting Mechanism for a Four Wheeler Vehicle
Tilting Mechanism for a Four Wheeler VehicleTilting Mechanism for a Four Wheeler Vehicle
Tilting Mechanism for a Four Wheeler VehicleRishabh Karnik
 
Dynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while CorneringDynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while Cornering
Siddharth Maniyar
 
Tilting of vehicle
Tilting of vehicleTilting of vehicle
Tilting of vehicle
Siddharth Maniyar
 
Titling Analysis
Titling AnalysisTitling Analysis
Titling Analysis
AnabelSMartin27
 
Tilting of vehicle
Tilting of vehicleTilting of vehicle
Tilting of vehicle
Siddharth Maniyar
 

Viewers also liked (6)

NARROW TILTING OF CAR
NARROW TILTING OF CARNARROW TILTING OF CAR
NARROW TILTING OF CAR
 
Tilting Mechanism for a Four Wheeler Vehicle
Tilting Mechanism for a Four Wheeler VehicleTilting Mechanism for a Four Wheeler Vehicle
Tilting Mechanism for a Four Wheeler Vehicle
 
Dynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while CorneringDynamic Balancing of the Vehicle while Cornering
Dynamic Balancing of the Vehicle while Cornering
 
Tilting of vehicle
Tilting of vehicleTilting of vehicle
Tilting of vehicle
 
Titling Analysis
Titling AnalysisTitling Analysis
Titling Analysis
 
Tilting of vehicle
Tilting of vehicleTilting of vehicle
Tilting of vehicle
 

Similar to High Speed Tilting Trains

seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
mechanical Singh
 
High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)
Kumar M.
 
Him cableways - An Introduction
Him cableways - An IntroductionHim cableways - An Introduction
Him cableways - An Introduction
Tuneer Garga
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat Shukla
 
UIC High Speed Rail Brochure
UIC High Speed Rail BrochureUIC High Speed Rail Brochure
UIC High Speed Rail Brochure
UICcom
 
High Speed Train - seminar ppt
High Speed Train - seminar pptHigh Speed Train - seminar ppt
High Speed Train - seminar ppt
NarayanKumar40
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
Pramod Chinchansur
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportationPramod Chinchansur
 
Transport poster
Transport posterTransport poster
Transport posterGordon Best
 
Do3211611166
Do3211611166Do3211611166
Do3211611166IJMER
 
The Futran System: a new technology innovation for improved performance in co...
The Futran System: a new technology innovation for improved performance in co...The Futran System: a new technology innovation for improved performance in co...
The Futran System: a new technology innovation for improved performance in co...
Tristan Wiggill
 
CAF Presentation
CAF PresentationCAF Presentation
CAF Presentation
MorganLaurent
 
Indian Railway Ajmer
Indian Railway AjmerIndian Railway Ajmer
Indian Railway Ajmer
student at SKIT college
 
Sky bus technology
Sky bus technologySky bus technology
Sky bus technology
Praniti Panda
 
2.02 mm agarwal(1)
2.02 mm agarwal(1)2.02 mm agarwal(1)
2.02 mm agarwal(1)
A. Jha
 
The Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk RoadThe Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk Road
Chartered Institute of Logistics and Transport (International)
 
7 raj dhani
7 raj dhani7 raj dhani
7 raj dhani
Arighna Dalal
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
vanam mareswara rao
 
French Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (TgvFrench Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (TgvRitesh choudhary
 
Part 1 T-Track - Introduction
Part 1 T-Track - IntroductionPart 1 T-Track - Introduction
Part 1 T-Track - IntroductionSean Wilson
 

Similar to High Speed Tilting Trains (20)

seminar presentation on high speed train
 seminar presentation on high speed train seminar presentation on high speed train
seminar presentation on high speed train
 
High speed rail (h2 s)
High speed rail (h2 s)High speed rail (h2 s)
High speed rail (h2 s)
 
Him cableways - An Introduction
Him cableways - An IntroductionHim cableways - An Introduction
Him cableways - An Introduction
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILURE
 
UIC High Speed Rail Brochure
UIC High Speed Rail BrochureUIC High Speed Rail Brochure
UIC High Speed Rail Brochure
 
High Speed Train - seminar ppt
High Speed Train - seminar pptHigh Speed Train - seminar ppt
High Speed Train - seminar ppt
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
 
Transport poster
Transport posterTransport poster
Transport poster
 
Do3211611166
Do3211611166Do3211611166
Do3211611166
 
The Futran System: a new technology innovation for improved performance in co...
The Futran System: a new technology innovation for improved performance in co...The Futran System: a new technology innovation for improved performance in co...
The Futran System: a new technology innovation for improved performance in co...
 
CAF Presentation
CAF PresentationCAF Presentation
CAF Presentation
 
Indian Railway Ajmer
Indian Railway AjmerIndian Railway Ajmer
Indian Railway Ajmer
 
Sky bus technology
Sky bus technologySky bus technology
Sky bus technology
 
2.02 mm agarwal(1)
2.02 mm agarwal(1)2.02 mm agarwal(1)
2.02 mm agarwal(1)
 
The Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk RoadThe Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk Road
 
7 raj dhani
7 raj dhani7 raj dhani
7 raj dhani
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
French Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (TgvFrench Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (Tgv
 
Part 1 T-Track - Introduction
Part 1 T-Track - IntroductionPart 1 T-Track - Introduction
Part 1 T-Track - Introduction
 

More from Konal Singh

CNC Basics
CNC BasicsCNC Basics
CNC Basics
Konal Singh
 
Malnutrition Monitoring Program Portal ( Idea for Project)
Malnutrition Monitoring Program Portal ( Idea for Project)Malnutrition Monitoring Program Portal ( Idea for Project)
Malnutrition Monitoring Program Portal ( Idea for Project)
Konal Singh
 
Design and fabrication of suitcase car (Project Report)
Design and fabrication of suitcase car  (Project Report)Design and fabrication of suitcase car  (Project Report)
Design and fabrication of suitcase car (Project Report)
Konal Singh
 
Thermoacoustic Refrigeration
Thermoacoustic RefrigerationThermoacoustic Refrigeration
Thermoacoustic Refrigeration
Konal Singh
 
BASICS OF NITRO RC CAR
BASICS OF NITRO RC CARBASICS OF NITRO RC CAR
BASICS OF NITRO RC CAR
Konal Singh
 
Equipment selection (RAC)
Equipment selection (RAC)Equipment selection (RAC)
Equipment selection (RAC)
Konal Singh
 
Basics of Refrigerartion
Basics of RefrigerartionBasics of Refrigerartion
Basics of Refrigerartion
Konal Singh
 
Rapid Prototyping
Rapid PrototypingRapid Prototyping
Rapid Prototyping
Konal Singh
 
Plastic moulding
Plastic mouldingPlastic moulding
Plastic moulding
Konal Singh
 
Grinding Machines
Grinding MachinesGrinding Machines
Grinding Machines
Konal Singh
 
Milling & Gear Cutting
Milling & Gear CuttingMilling & Gear Cutting
Milling & Gear Cutting
Konal Singh
 
Advance manufacturing process
Advance manufacturing process Advance manufacturing process
Advance manufacturing process
Konal Singh
 

More from Konal Singh (12)

CNC Basics
CNC BasicsCNC Basics
CNC Basics
 
Malnutrition Monitoring Program Portal ( Idea for Project)
Malnutrition Monitoring Program Portal ( Idea for Project)Malnutrition Monitoring Program Portal ( Idea for Project)
Malnutrition Monitoring Program Portal ( Idea for Project)
 
Design and fabrication of suitcase car (Project Report)
Design and fabrication of suitcase car  (Project Report)Design and fabrication of suitcase car  (Project Report)
Design and fabrication of suitcase car (Project Report)
 
Thermoacoustic Refrigeration
Thermoacoustic RefrigerationThermoacoustic Refrigeration
Thermoacoustic Refrigeration
 
BASICS OF NITRO RC CAR
BASICS OF NITRO RC CARBASICS OF NITRO RC CAR
BASICS OF NITRO RC CAR
 
Equipment selection (RAC)
Equipment selection (RAC)Equipment selection (RAC)
Equipment selection (RAC)
 
Basics of Refrigerartion
Basics of RefrigerartionBasics of Refrigerartion
Basics of Refrigerartion
 
Rapid Prototyping
Rapid PrototypingRapid Prototyping
Rapid Prototyping
 
Plastic moulding
Plastic mouldingPlastic moulding
Plastic moulding
 
Grinding Machines
Grinding MachinesGrinding Machines
Grinding Machines
 
Milling & Gear Cutting
Milling & Gear CuttingMilling & Gear Cutting
Milling & Gear Cutting
 
Advance manufacturing process
Advance manufacturing process Advance manufacturing process
Advance manufacturing process
 

Recently uploaded

14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 

Recently uploaded (20)

14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 

High Speed Tilting Trains

  • 1. @ ProBotiZ Group Seminar On ““High Speed TiltingHigh Speed Tilting TrainsTrains”” Mr. KONAL SINGHMr. KONAL SINGH Director and Founder of ProBotiZ Group, NagpurProBotiZ Group, Nagpur (W) - Probotizgroup.com (M) - 8862098889, 9423632068 (E) - probotizinfo@gmail.com
  • 2. @ ProBotiZ Group Concept of high-speedConcept of high-speed TrainTrain The council of the European union in their directivedirective no. 96/48/ECno. 96/48/EC has defined the term “High Speed” covering all railway express services operated at speeds in the 200 to 300 km/h range. This includes railway lines: 1. Built specially for high speed generally equal to or greater than 250 km/h250 km/h.. 2. Specially upgraded for high speed travels of the order of 200 km/h200 km/h.
  • 3. @ ProBotiZ Group • A tilting train is a train that has a mechanism enabling increased speed on regular rail tracksincreased speed on regular rail tracks . • As a train (or other vehicle) rounds a curve at speed, objects inside the train experience inertiainertia. • This can cause - packages to slideslide about or - seated passengers to feel squashedsquashed. • Standing passengersStanding passengers to lose their balance. IntroductionIntroduction
  • 4. @ ProBotiZ Group • Tilting trains are designed to counteract this discomfortdiscomfort. • In a curve to the leftleft, the train tilts to the left to compensate for the g-force push to the rightg-force push to the right, and vice versa • The train may be constructed such that inertial forces cause the tilting (passive tiltpassive tilt), or it may have a computer-controlled power mechanism (active tiltactive tilt). IntroductionIntroduction Cont.
  • 5. @ ProBotiZ Group HistoryHistory • The first tilting train publically ran was 381 sreies electric multiple unit train by JAPANESE NATIONALJAPANESE NATIONAL RAILWAYSRAILWAYS from 10th july 1973 between Nagoya &Nagoya & NaganoNagano cities. • The British advanced passengerBritish advanced passenger train was first train to implement active tilt mechanism in year 1984-851984-85
  • 6. @ ProBotiZ Group HistoryHistory Cont. • The first tilting train for commercially used United AircraftUnited Aircraft TurbotrainTurbotrain by CANADIAN NATIONAL RAILWAYS inCANADIAN NATIONAL RAILWAYS in 1968.1968. • The first European high speed trainEuropean high speed train was named TALGOTALGO enabled with passive tilt in 19701970
  • 7. @ ProBotiZ Group Tilting TrainsTilting Trains Problems with corners :Problems with corners : – for building a high speed railway transport system... • They can either invest money in the train to make it tilt but use existing railway lines or they invest money in a new railway but don't need to spend money on expensive tilting mechanisms. • This is why TGV, and ICE and bullet trains do not tilt, because they have their own dedicated high speed railway lines where curves are built with very high radii. Tilting trains Radius less then 600m
  • 8. @ ProBotiZ Group It is worth pointing out that the centrifugal force is a function of v2/r , where v is the velocity and r is the radius. – if you double the velocity, you quadruple the centrifugal force. – Similarly, if you want to triple the velocity but keep the centrifugal force the same, you must increase the radius by a factor of nine! Something not always possible. – This is why even apparently gentle curves can be much more of a problem with high speeds than one might thing, because the force rises with the square of velocity. Tilting TrainsTilting Trains Cont.
  • 9. @ ProBotiZ Group Swede high-Speed TrainSwede high-Speed Train The first high-speed tilting train, X 2000, was delivered to Swedish State Railways in 1990 on the Stockholm - Gothenburg route. Travel time for this route was reduced by more than 25 percent with only minor upgrading of the infrastructure. The key to increased speeds lie in the radial self-steering bogies whereby track forces are reduced, allowing up to 50 percent higher speed through curves. Microprocessor-controlled, active passenger car tilting technology assures passenger comfort in curves.
  • 10. @ ProBotiZ Group Cornering force in high-Cornering force in high- Speed TrainSpeed Train Tilt is used primarily for comfort. An accelerometer is fitted in the first bogie of the train in the direction of travel and measures lateral forces as the train enters a curve. Computer- controlled hydraulic ram tilt each coach into the curve, up to a maximum inclination of 6.5º. The tilting system compensates for up to 75% of the lateral force of a curve. Incidents of 'sea-sickness' or 'tilt nausea’ can occur as 25% of lateral forces are still felt by the passengers.
  • 11. @ ProBotiZ Group Trains with tilting by inertial forces: Tilting Train Around theTilting Train Around the WORLDWORLD TalgoTalgo 350 (SPAIN) 381 – EMU (JAPAN) Acela ExpressAcela Express (US) APT (UK) Advance passenger train Alpha PendulaAlpha Pendula (PORTUGAL) Elettro Treno (ITALY)
  • 12. @ ProBotiZ Group Future scopeFuture scope • L-R-C (Light,Rapid,Comfortable)(Light,Rapid,Comfortable) Tilt mechanism can be used . • This mechanism is power driven,driven by accelerometeraccelerometer. • This enables high quality ride /journey for passenger with comfort & safety.
  • 13. @ ProBotiZ Group ConclusionConclusion • High speeds can be achieved by tilting Mechanism to reduce journey timereduce journey time with excellent comfort, safetycomfort, safety & satisfaction& satisfaction by innovative Technological aspect of TILTING TRAINS.