Hello everyone! Test your PMP exam preparation and answer this Free PMPยฎ Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
This presentation is mainly about the 5 important elements in Project Management from the experience they have gained from their site visits and work.
Done by: Keith Lim & Joel Neo, Narada Interns '16.
The document describes a sample PMP exam question and answer about resource management. It provides a scenario where a project leader has ordered materials, equipment, and secured space to test a solar cell design. The question asks what has been accomplished by these efforts. The answer is that physical resource assignments have been made, which is an output of the Acquire Resources process and documents what materials, equipment, locations and other physical resources will be used in the project. The document encourages trying a free PMP exam simulator to practice more questions.
The document provides a sample question from the PMP exam about resource management. The question stem describes a project to design a solar cell that has secured copper, silver, silicon, manufacturing equipment, permission to use a roof for testing, and a conference room for meetings. The correct answer is identified as D, Physical resource assignments, as this output from the Acquire Resources process documents the physical resources that will be used for the project. The explanation notes that based on the details provided, the efforts have resulted in physical resource assignments being completed.
At 8-koiโข, we design, build, staff and supply. We are your EDWOSB government contractor of choice for engineering, construction, and technical services.
8-koiโข can be found on the frontlines supplying PPE for COVID-19 response and direct patient care to Wounded Warriors. Our people are working behind the scenes to manage electronic medical records and train personnel using advanced medical simulation. We are designing and building healthcare facilities, hospitals, colleges and academic institutions for the next generation. Our technical services extend to constructing the infrastructure needed to support the operations of NASA Kennedy Space Center and Cape Canaveral Space Force Station in the 21st Century.
John Dick has over 25 years of experience in process development engineering for manufacturing integrated circuits, solar cells, LEDs, and other devices. He has expertise in process development, equipment specification, project management, and more. Currently seeking a position allowing him to utilize his diverse skill set and expand his capabilities in program management and process development.
This document provides a summary of William Henry Rogers' qualifications and experience as an Electrical and Instrumentation Engineer, including his educational background, employment history, roles and responsibilities. It details over 25 years of experience in various industries such as petrochemical, mining, water treatment and manufacturing. His experience includes capital project development, instrumentation design, hazardous area inspections, process control systems design and commissioning.
Steven James has over 25 years of experience in chemical engineering, project management, and quality control. He has expertise in areas such as capital project management, process engineering, environmental technologies, risk analysis, and quality assurance. He aims to leverage skills in areas like computer programming, CAD, process simulation, and instrumentation towards improving process efficiency and quality control.
This document provides a summary of Earl Dombroski's extensive experience in management, testing and evaluation, software design, and direct customer support over the past 30 years. It details his roles and accomplishments at various employers, including managing teams, designing and developing software and testing solutions, negotiating contracts, and supporting customers. He has experience across industries such as the US military, Department of Energy, semiconductor industry, and document imaging.
This presentation is mainly about the 5 important elements in Project Management from the experience they have gained from their site visits and work.
Done by: Keith Lim & Joel Neo, Narada Interns '16.
The document describes a sample PMP exam question and answer about resource management. It provides a scenario where a project leader has ordered materials, equipment, and secured space to test a solar cell design. The question asks what has been accomplished by these efforts. The answer is that physical resource assignments have been made, which is an output of the Acquire Resources process and documents what materials, equipment, locations and other physical resources will be used in the project. The document encourages trying a free PMP exam simulator to practice more questions.
The document provides a sample question from the PMP exam about resource management. The question stem describes a project to design a solar cell that has secured copper, silver, silicon, manufacturing equipment, permission to use a roof for testing, and a conference room for meetings. The correct answer is identified as D, Physical resource assignments, as this output from the Acquire Resources process documents the physical resources that will be used for the project. The explanation notes that based on the details provided, the efforts have resulted in physical resource assignments being completed.
At 8-koiโข, we design, build, staff and supply. We are your EDWOSB government contractor of choice for engineering, construction, and technical services.
8-koiโข can be found on the frontlines supplying PPE for COVID-19 response and direct patient care to Wounded Warriors. Our people are working behind the scenes to manage electronic medical records and train personnel using advanced medical simulation. We are designing and building healthcare facilities, hospitals, colleges and academic institutions for the next generation. Our technical services extend to constructing the infrastructure needed to support the operations of NASA Kennedy Space Center and Cape Canaveral Space Force Station in the 21st Century.
John Dick has over 25 years of experience in process development engineering for manufacturing integrated circuits, solar cells, LEDs, and other devices. He has expertise in process development, equipment specification, project management, and more. Currently seeking a position allowing him to utilize his diverse skill set and expand his capabilities in program management and process development.
This document provides a summary of William Henry Rogers' qualifications and experience as an Electrical and Instrumentation Engineer, including his educational background, employment history, roles and responsibilities. It details over 25 years of experience in various industries such as petrochemical, mining, water treatment and manufacturing. His experience includes capital project development, instrumentation design, hazardous area inspections, process control systems design and commissioning.
Steven James has over 25 years of experience in chemical engineering, project management, and quality control. He has expertise in areas such as capital project management, process engineering, environmental technologies, risk analysis, and quality assurance. He aims to leverage skills in areas like computer programming, CAD, process simulation, and instrumentation towards improving process efficiency and quality control.
This document provides a summary of Earl Dombroski's extensive experience in management, testing and evaluation, software design, and direct customer support over the past 30 years. It details his roles and accomplishments at various employers, including managing teams, designing and developing software and testing solutions, negotiating contracts, and supporting customers. He has experience across industries such as the US military, Department of Energy, semiconductor industry, and document imaging.
Michael J. Taylor has over 30 years of experience in manufacturing technology, operations management, and environmental compliance. He has held several leadership roles at DuPont where he optimized processes, improved quality and capacity, resolved regulatory issues, and implemented safety and environmental programs. Taylor has a proven record of on-time and under-budget project delivery while ensuring safety and compliance. He is a results-oriented leader with expertise in process optimization, project management, and developing strategies to address complex technical and regulatory challenges.
Robert E. Hershberger has over 30 years of experience in production and test engineering, research, and product design. He has worked for companies such as TRW, Pyramid Technology, Echelon Corp, Oregon State University, and the University of Oregon. His skills include technical writing, existing and new product development, equipment specification, custom apparatus design, vendor management, manufacturing technologies, product reliability, training, and team meetings. He has proficiency in programming languages, test equipment, and software tools. He holds a Master of Science in Physics from the University of Oregon and a Bachelor of Science in Electronic Engineering from Cal Poly, San Luis Obispo. He has authored several peer-reviewed publications.
This document is a resume for Jens Peter Hedegaard, who has 24 years of experience in manufacturing engineering and project management. He has worked at Sierra Nevada Corporation since 2007 where he helped develop manufacturing processes for rocket motors and space vehicles. Prior to that, he worked at ATK Space Systems supporting composite satellite and space hardware manufacturing. He has a Bachelor's degree in Industrial Technology and certifications in project management, safety training, and computer systems.
J.D. Squire has over 10 years of experience in mechanical engineering, construction estimating, and field engineering roles. He has a B.S. in Mechanical Engineering from South Dakota School of Mines. His most recent roles include field engineer for a water project in New York City where he managed subcontractors, procurement, and equipment maintenance. Prior to that he was an office engineer setting up templates to estimate future work. He has extensive experience estimating projects and serving as a field engineer on projects like power plants, aquariums, and tunnels.
103Chapter 6 PROJECT TIME MANAGEMENT .docxpaynetawnya
ย
103
Chapter 6
PROJECT TIME MANAGEMENT
This chapter presents cases which address the processes required to manage
timely completion of a project, which can be found in Chapter 6 of the PMBOK ยฎ
Guide , Project Time Management. There are seven cases in this chapter โ four
critical incidents and three issue - based cases.
1. How Long Does It Take to Catch a Fish โ TAD?
The focus of this issue - based case study is scheduling, particularly the
development of a time - scale arrow diagram (TAD) for a project. The TAD is
a member of the network diagram family, where it requires a determination
of each activity timeline. Similar to when using other scheduling tools, team
members should be included in creating the schedule to ensure the accuracy
of the project timeline.
2. Workshop: The Jogging Line in Action
Workshop: The Jogging Line in Action is one of the critical incident cases
in the Workshop series, which specifically demonstrates a jogging line. The
joggling line exhibits the amount of time each project activity is ahead of or
behind schedule, which can be viewed as a step in the proactive management
of the schedule.
3. Sequencing
Sequencing is an issue - based case discussing the basic concepts of schedule
development. The case presents how a team defines some of their project
activities and identifies the sequence of activities.
CASE STUDIES IN PROJECT, PROGRAM, AND ORGANIZATIONAL PROJECT MANAGEMENT
Dragan Z . Milosevic, Peerasit Patanakul & Sabin Srivannaboon
Copyright 0 2010 by John Wiley & Sons, Inc. All rights reserved.
104 CASE STUDIES
4. The Rolling Wave
The Rolling Wave is an issue - based case study which concentrates on
the development of the Rolling Wave schedule for a project under high
u ncertainty. The Rolling Wave is a form of progressing elaboration planning
where the work to be accomplished in the near term is planned in detail and
future work is planned at a higher level of the WBS.
5. Schedule Accuracy
Schedule Accuracy is a critical incident that briefly talks about the PERT
(Program Evaluation and Review Technique) approach (calls it โ schedule
accuracy โ ) and explains major assumptions needed in identifying the prob-
ability of completing the project โ s critical path.
6. AltasCom
AtlasCom is a critical incident that talks about the Critical Path Method
(CPM) for project scheduling. CPM is a technique used to predict duration of
a project by analyzing which sequence of activities has the least amount
of scheduling flexibility.
7. Workshop: The Milestone Chart
Workshop: The Milestone Chart is one of the critical incident cases in the
Workshop series, which specifically presents a milestone chart. The milestone
chart shows milestones against the timescale in order to signify the key events
and to draw management attention to them.
CHAPTER SUMMARY
Name of Case
Ar ...
This document provides information about AES Global Services, an engineering services company with locations in the US, Japan, and India. It summarizes AES's capabilities including design and engineering, simulation, manufacturing, electrical design, project management practices, infrastructure and team size. It also provides examples of projects AES has worked on including battery pack design, fuel system design, and developing advanced product configurators.
The candidate has over 15 years of experience in engineering roles related to refrigeration systems. He currently works as a Manager of Refrigeration Engineering and Design, where he is responsible for designing commercial refrigeration systems for new construction and remodels. Previously, he worked as an Engineering Manager designing refrigeration equipment for supermarkets. He also has experience in manufacturing engineering, facilities engineering, and naval engineering roles. The candidate possesses skills in areas such as project management, budgeting, system design, and working independently or as part of a team.
Charles Suh has extensive experience managing commercial real estate projects for clients such as Kia Motors America, Emulex, Fox Studios, McDermott Will & Emery, Western Digital, Mercury Payment Systems, ReachLocal, and ibotta. The document outlines over a dozen projects ranging from 38,700 square foot tenant improvements to 404,000 square foot build to suit facilities. Suh's projects are located across the United States and involve new construction, tenant improvements, and relocations. He focuses on meeting tight schedules and budgets through value engineering and risk management.
Karthik Elangovan is a civil engineer with 8 years of experience in site execution, estimating, and drafting in the construction sector in Dubai. He is currently a QA/QC Engineer at China State Construction Engineering Corp. where he is responsible for project quality plans, specifications, inspections, material submissions and testing, and reporting. Previously he held roles as a Site Engineer at Al Wosool Contracting and JRBC Building where he supervised building and swimming pool construction projects. He received a B.E. in Civil Engineering from Anna University in 2009.
William J. DeWilkins has over 10 years of experience managing global test engineering teams. He has a proven track record of reducing costs through business process improvements and outsourcing strategies. Most recently, he served as the Director of Test Engineering at Open-Silicon where he reduced project costs by 20% and negotiated outsourcing agreements that lowered costs by 10%. Prior to that, he held leadership roles at various semiconductor companies where he improved productivity, created strategic plans, and brought new training programs to reduce expenses.
Beth Klucher has over 30 years of experience in quality management, program management, engineering, and business development across the aerospace and chemical industries. She held several leadership roles at Ball Aerospace developing quality management systems and assessing customer satisfaction. Prior to that, she managed technology development programs at AlliedSignal Aerospace and process engineering projects at Air Products. She has a B.S. in Chemical Engineering and an M.B.A.
Shaune Hankins is seeking a full time position in electrical engineering. He has a Bachelor of Science in Electrical Engineering from Kennesaw State University with a 3.62 GPA. He has work experience as an electrical engineering co-op at Newcomb & Boyd Consulting and Engineering where he assisted with designing building layouts using AutoCAD and Revit MEP. He also has experience working at Chick-Fil-A. Some of his academic projects include designing a hydroelectric generator using rainwater and researching Wi-Fi signal strength on his university campus.
Resume of Spence stockbridge mechanical engineering professionalsstockbridge
ย
Spence Stockbridge is an engineering manager with over 25 years of experience leading teams and improving engineering processes. He has a proven track record of increasing productivity, reducing costs, and improving quality. Through process improvements such as implementing new software and standardizing designs, he increased productivity by 22% and reduced engineering costs by 36% at one company. At another company, he developed an engineering solution that reduced development time by 95% and increased capacity by 25%, generating $9 million in additional revenue. Stockbridge has expertise in engineering management, automation, knowledge engineering, coaching teams, and mechanical design fields including plastics and metals. He holds an Associate of Science degree in Engineering and various technical certificates.
The document describes a sample PMP exam question about responding to an unexpected change in an office space resource for a software development project. The correct answer is to revise the resource management plan, which is a component of the project management plan that describes how project resources are acquired, allocated, monitored, and controlled. Updating the resource management plan reflects the actual experience in managing project resources as required by the Control Resources process.
Bogdan Radu has over 8 years of experience leading validation and product development teams at AMD, where he reduced timelines and increased coverage through process improvements and creative planning. He has expertise in hardware security, GPU and APU validation, and custom product development for Xbox One. Radu also has skills in electronics design, lab work, programming, scripting, server deployment and troubleshooting diverse computer hardware and software issues.
This workshop focused on developing industry priorities and actions for smart process manufacturing. Participants discussed the current state and future vision for SPM, and identified actionable steps, key performance indicators, and metrics related to energy, sustainability, and people. Breakout groups addressed topics like cross-industry planning, data sharing standards, and monitoring/risk assessment. The conclusion was that industry is moving toward SPM, with technology creating opportunities to accelerate progress. Participants were called to action to engage, collaborate, and help define the roadmap.
This document provides a skills profile and work experience summary for an individual with over 20 years of experience in process engineering for oil, gas, petrochemical and nuclear power projects. The individual has extensive experience in conceptual design, front-end engineering, detailed engineering, commissioning, and plant optimization. They have strong leadership skills and have managed numerous projects from inception through completion.
David Kissack is an honorary member of the ASME (American Society of Mechanical Engineers). ASME is a not-for-profit membership organization that encourages knowledge sharing, collaboration, skills development and career enrichment across all engineering disciplines.
Mark Peterson is a Lead Nuclear Engineer at PSEG Nuclear in Hancock's Bridge, NJ with over 9 years of experience in chemical engineering. He has a Bachelor of Science in Chemical Engineering from Rowan University with a 3.446 GPA. At PSEG Nuclear, he is responsible for various systems and has optimized maintenance strategies to reduce costs. Previously, he worked as an Engineer II at General Dynamics Electric Boat where he designed ion exchange and condenser systems for submarines. He has skills in thermal analysis, equipment failure analysis, economic analysis, documentation, and computer programs including AutoCAD, MatLab, Microsoft Office, and various engineering tools.
The document provides a summary of James Castronova's professional experience as a senior controls engineer. It outlines his expertise in designing, managing and marketing electrical control systems. It also lists his areas of specialization including industrial control, PLC programming, MMI/SCADA/WEB systems, mechanical design, project engineering and management skills. His experience includes roles at Corning Inc., various controls contractual assignments, and Nova Technology International where he was the chief engineer and owner.
Michael J. Taylor has over 30 years of experience in manufacturing technology, operations management, and environmental compliance. He has held several leadership roles at DuPont where he optimized processes, improved quality and capacity, resolved regulatory issues, and implemented safety and environmental programs. Taylor has a proven record of on-time and under-budget project delivery while ensuring safety and compliance. He is a results-oriented leader with expertise in process optimization, project management, and developing strategies to address complex technical and regulatory challenges.
Robert E. Hershberger has over 30 years of experience in production and test engineering, research, and product design. He has worked for companies such as TRW, Pyramid Technology, Echelon Corp, Oregon State University, and the University of Oregon. His skills include technical writing, existing and new product development, equipment specification, custom apparatus design, vendor management, manufacturing technologies, product reliability, training, and team meetings. He has proficiency in programming languages, test equipment, and software tools. He holds a Master of Science in Physics from the University of Oregon and a Bachelor of Science in Electronic Engineering from Cal Poly, San Luis Obispo. He has authored several peer-reviewed publications.
This document is a resume for Jens Peter Hedegaard, who has 24 years of experience in manufacturing engineering and project management. He has worked at Sierra Nevada Corporation since 2007 where he helped develop manufacturing processes for rocket motors and space vehicles. Prior to that, he worked at ATK Space Systems supporting composite satellite and space hardware manufacturing. He has a Bachelor's degree in Industrial Technology and certifications in project management, safety training, and computer systems.
J.D. Squire has over 10 years of experience in mechanical engineering, construction estimating, and field engineering roles. He has a B.S. in Mechanical Engineering from South Dakota School of Mines. His most recent roles include field engineer for a water project in New York City where he managed subcontractors, procurement, and equipment maintenance. Prior to that he was an office engineer setting up templates to estimate future work. He has extensive experience estimating projects and serving as a field engineer on projects like power plants, aquariums, and tunnels.
103Chapter 6 PROJECT TIME MANAGEMENT .docxpaynetawnya
ย
103
Chapter 6
PROJECT TIME MANAGEMENT
This chapter presents cases which address the processes required to manage
timely completion of a project, which can be found in Chapter 6 of the PMBOK ยฎ
Guide , Project Time Management. There are seven cases in this chapter โ four
critical incidents and three issue - based cases.
1. How Long Does It Take to Catch a Fish โ TAD?
The focus of this issue - based case study is scheduling, particularly the
development of a time - scale arrow diagram (TAD) for a project. The TAD is
a member of the network diagram family, where it requires a determination
of each activity timeline. Similar to when using other scheduling tools, team
members should be included in creating the schedule to ensure the accuracy
of the project timeline.
2. Workshop: The Jogging Line in Action
Workshop: The Jogging Line in Action is one of the critical incident cases
in the Workshop series, which specifically demonstrates a jogging line. The
joggling line exhibits the amount of time each project activity is ahead of or
behind schedule, which can be viewed as a step in the proactive management
of the schedule.
3. Sequencing
Sequencing is an issue - based case discussing the basic concepts of schedule
development. The case presents how a team defines some of their project
activities and identifies the sequence of activities.
CASE STUDIES IN PROJECT, PROGRAM, AND ORGANIZATIONAL PROJECT MANAGEMENT
Dragan Z . Milosevic, Peerasit Patanakul & Sabin Srivannaboon
Copyright 0 2010 by John Wiley & Sons, Inc. All rights reserved.
104 CASE STUDIES
4. The Rolling Wave
The Rolling Wave is an issue - based case study which concentrates on
the development of the Rolling Wave schedule for a project under high
u ncertainty. The Rolling Wave is a form of progressing elaboration planning
where the work to be accomplished in the near term is planned in detail and
future work is planned at a higher level of the WBS.
5. Schedule Accuracy
Schedule Accuracy is a critical incident that briefly talks about the PERT
(Program Evaluation and Review Technique) approach (calls it โ schedule
accuracy โ ) and explains major assumptions needed in identifying the prob-
ability of completing the project โ s critical path.
6. AltasCom
AtlasCom is a critical incident that talks about the Critical Path Method
(CPM) for project scheduling. CPM is a technique used to predict duration of
a project by analyzing which sequence of activities has the least amount
of scheduling flexibility.
7. Workshop: The Milestone Chart
Workshop: The Milestone Chart is one of the critical incident cases in the
Workshop series, which specifically presents a milestone chart. The milestone
chart shows milestones against the timescale in order to signify the key events
and to draw management attention to them.
CHAPTER SUMMARY
Name of Case
Ar ...
This document provides information about AES Global Services, an engineering services company with locations in the US, Japan, and India. It summarizes AES's capabilities including design and engineering, simulation, manufacturing, electrical design, project management practices, infrastructure and team size. It also provides examples of projects AES has worked on including battery pack design, fuel system design, and developing advanced product configurators.
The candidate has over 15 years of experience in engineering roles related to refrigeration systems. He currently works as a Manager of Refrigeration Engineering and Design, where he is responsible for designing commercial refrigeration systems for new construction and remodels. Previously, he worked as an Engineering Manager designing refrigeration equipment for supermarkets. He also has experience in manufacturing engineering, facilities engineering, and naval engineering roles. The candidate possesses skills in areas such as project management, budgeting, system design, and working independently or as part of a team.
Charles Suh has extensive experience managing commercial real estate projects for clients such as Kia Motors America, Emulex, Fox Studios, McDermott Will & Emery, Western Digital, Mercury Payment Systems, ReachLocal, and ibotta. The document outlines over a dozen projects ranging from 38,700 square foot tenant improvements to 404,000 square foot build to suit facilities. Suh's projects are located across the United States and involve new construction, tenant improvements, and relocations. He focuses on meeting tight schedules and budgets through value engineering and risk management.
Karthik Elangovan is a civil engineer with 8 years of experience in site execution, estimating, and drafting in the construction sector in Dubai. He is currently a QA/QC Engineer at China State Construction Engineering Corp. where he is responsible for project quality plans, specifications, inspections, material submissions and testing, and reporting. Previously he held roles as a Site Engineer at Al Wosool Contracting and JRBC Building where he supervised building and swimming pool construction projects. He received a B.E. in Civil Engineering from Anna University in 2009.
William J. DeWilkins has over 10 years of experience managing global test engineering teams. He has a proven track record of reducing costs through business process improvements and outsourcing strategies. Most recently, he served as the Director of Test Engineering at Open-Silicon where he reduced project costs by 20% and negotiated outsourcing agreements that lowered costs by 10%. Prior to that, he held leadership roles at various semiconductor companies where he improved productivity, created strategic plans, and brought new training programs to reduce expenses.
Beth Klucher has over 30 years of experience in quality management, program management, engineering, and business development across the aerospace and chemical industries. She held several leadership roles at Ball Aerospace developing quality management systems and assessing customer satisfaction. Prior to that, she managed technology development programs at AlliedSignal Aerospace and process engineering projects at Air Products. She has a B.S. in Chemical Engineering and an M.B.A.
Shaune Hankins is seeking a full time position in electrical engineering. He has a Bachelor of Science in Electrical Engineering from Kennesaw State University with a 3.62 GPA. He has work experience as an electrical engineering co-op at Newcomb & Boyd Consulting and Engineering where he assisted with designing building layouts using AutoCAD and Revit MEP. He also has experience working at Chick-Fil-A. Some of his academic projects include designing a hydroelectric generator using rainwater and researching Wi-Fi signal strength on his university campus.
Resume of Spence stockbridge mechanical engineering professionalsstockbridge
ย
Spence Stockbridge is an engineering manager with over 25 years of experience leading teams and improving engineering processes. He has a proven track record of increasing productivity, reducing costs, and improving quality. Through process improvements such as implementing new software and standardizing designs, he increased productivity by 22% and reduced engineering costs by 36% at one company. At another company, he developed an engineering solution that reduced development time by 95% and increased capacity by 25%, generating $9 million in additional revenue. Stockbridge has expertise in engineering management, automation, knowledge engineering, coaching teams, and mechanical design fields including plastics and metals. He holds an Associate of Science degree in Engineering and various technical certificates.
The document describes a sample PMP exam question about responding to an unexpected change in an office space resource for a software development project. The correct answer is to revise the resource management plan, which is a component of the project management plan that describes how project resources are acquired, allocated, monitored, and controlled. Updating the resource management plan reflects the actual experience in managing project resources as required by the Control Resources process.
Bogdan Radu has over 8 years of experience leading validation and product development teams at AMD, where he reduced timelines and increased coverage through process improvements and creative planning. He has expertise in hardware security, GPU and APU validation, and custom product development for Xbox One. Radu also has skills in electronics design, lab work, programming, scripting, server deployment and troubleshooting diverse computer hardware and software issues.
This workshop focused on developing industry priorities and actions for smart process manufacturing. Participants discussed the current state and future vision for SPM, and identified actionable steps, key performance indicators, and metrics related to energy, sustainability, and people. Breakout groups addressed topics like cross-industry planning, data sharing standards, and monitoring/risk assessment. The conclusion was that industry is moving toward SPM, with technology creating opportunities to accelerate progress. Participants were called to action to engage, collaborate, and help define the roadmap.
This document provides a skills profile and work experience summary for an individual with over 20 years of experience in process engineering for oil, gas, petrochemical and nuclear power projects. The individual has extensive experience in conceptual design, front-end engineering, detailed engineering, commissioning, and plant optimization. They have strong leadership skills and have managed numerous projects from inception through completion.
David Kissack is an honorary member of the ASME (American Society of Mechanical Engineers). ASME is a not-for-profit membership organization that encourages knowledge sharing, collaboration, skills development and career enrichment across all engineering disciplines.
Mark Peterson is a Lead Nuclear Engineer at PSEG Nuclear in Hancock's Bridge, NJ with over 9 years of experience in chemical engineering. He has a Bachelor of Science in Chemical Engineering from Rowan University with a 3.446 GPA. At PSEG Nuclear, he is responsible for various systems and has optimized maintenance strategies to reduce costs. Previously, he worked as an Engineer II at General Dynamics Electric Boat where he designed ion exchange and condenser systems for submarines. He has skills in thermal analysis, equipment failure analysis, economic analysis, documentation, and computer programs including AutoCAD, MatLab, Microsoft Office, and various engineering tools.
The document provides a summary of James Castronova's professional experience as a senior controls engineer. It outlines his expertise in designing, managing and marketing electrical control systems. It also lists his areas of specialization including industrial control, PLC programming, MMI/SCADA/WEB systems, mechanical design, project engineering and management skills. His experience includes roles at Corning Inc., various controls contractual assignments, and Nova Technology International where he was the chief engineer and owner.
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumMJDuyan
ย
(๐๐๐ ๐๐๐) (๐๐๐ฌ๐ฌ๐จ๐ง ๐)-๐๐ซ๐๐ฅ๐ข๐ฆ๐ฌ
๐๐ข๐ฌ๐๐ฎ๐ฌ๐ฌ ๐ญ๐ก๐ ๐๐๐ ๐๐ฎ๐ซ๐ซ๐ข๐๐ฎ๐ฅ๐ฎ๐ฆ ๐ข๐ง ๐ญ๐ก๐ ๐๐ก๐ข๐ฅ๐ข๐ฉ๐ฉ๐ข๐ง๐๐ฌ:
- Understand the goals and objectives of the Edukasyong Pantahanan at Pangkabuhayan (EPP) curriculum, recognizing its importance in fostering practical life skills and values among students. Students will also be able to identify the key components and subjects covered, such as agriculture, home economics, industrial arts, and information and communication technology.
๐๐ฑ๐ฉ๐ฅ๐๐ข๐ง ๐ญ๐ก๐ ๐๐๐ญ๐ฎ๐ซ๐ ๐๐ง๐ ๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐ง ๐๐ง๐ญ๐ซ๐๐ฉ๐ซ๐๐ง๐๐ฎ๐ซ:
-Define entrepreneurship, distinguishing it from general business activities by emphasizing its focus on innovation, risk-taking, and value creation. Students will describe the characteristics and traits of successful entrepreneurs, including their roles and responsibilities, and discuss the broader economic and social impacts of entrepreneurial activities on both local and global scales.
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...EduSkills OECD
ย
Andreas Schleicher, Director of Education and Skills at the OECD presents at the launch of PISA 2022 Volume III - Creative Minds, Creative Schools on 18 June 2024.
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.pptHenry Hollis
ย
The History of NZ 1870-1900.
Making of a Nation.
From the NZ Wars to Liberals,
Richard Seddon, George Grey,
Social Laboratory, New Zealand,
Confiscations, Kotahitanga, Kingitanga, Parliament, Suffrage, Repudiation, Economic Change, Agriculture, Gold Mining, Timber, Flax, Sheep, Dairying,
2. You are leading a project to design a high-efficiency solar cell. The materials that you are acquiring for this
project include copper, silver, and silicon among others, and you have also ordered custom built
manufacturing equipment. Additionally, you have secured permission from the landlord to install a solar
array on the roof of the corporate office for testing, and reserved a conference room for daily stand-up
meetings. What is the result of your efforts?
A. Resource histogram
B. Resource management plan
C. Resource assignment matrix
D. Physical resource assignments
HINT: What output of the Acquire Resources process describes the physical resources reserved for the
project?
Question
3. The correct answer is D
It can be inferred from the question that the process of acquiring resources is being performed.
One of the outputs from the Acquire Resources process is physical resource assignments.
Documentation of the physical resource assignments records the material, equipment, supplies,
locations, and other physical resources that will be used during the project. Based on the
description provided by the question, the physical resource assignments is what has been
accomplished.
Answer
4. All our questions are updated to the latestย
A Guide to the Project Management Body of Knowledge
(PMBOKยฎ Guide)ย standard.
Stop by atย free.pm-exam-simulator.com/ย and try the
PM Exam Simulator free for 7 days.
We are a trusted and experienced education provider.