SlideShare a Scribd company logo
1 of 2
Download to read offline
8-koi® is a dynamic woman-owned small business ready to help you meet your government contract procurement and delivery goals.
Full-spectrum
contracting solutions
with a human touch.
Experience:
At 8-koi®, we design, build, staff, and supply.
We deliver service excellence across three divisions: Construction, Design
Engineering, and Technical Services. 8-koi is a certified EDWOSB
headquartered in Melbourne, FL. We are passionate about solving problems
and dependably completing projects on time and within budget. We
thoughtfully stand ready to help you meet your goals in MEP and structural
engineering, building and renovation, delivering seamless renovation of
obsolesced properties with the least interruption.
UEI: HUZ2XKV2KLS5 | DUNS: 829197503 | Cage Code: 5FCT4
Construction
• New & Existing Construction
• Contract Management
• Demolition
• Vertical / Horizontal
• Government / Private
• Commercial / Industrial
• Underground / Infrastructure
• Safety / Communications /
Logistics Planning
• A&E Support
• Constructability Study
• Estimating / Design Budget
Validations
• Quality Control Services
• Inspection Services
• Facility Stabilization
• Emergency Response
Design Engineering
• MEP Engineering
• Structural Engineering
• BIM Modeling / Energy
Simulations
• LEED / Energy Conservation
• PV / Solar Designs
• Peer Review
• Wind and Seismic Analysis
• Failure Analysis
• Renovation / Retrofit /
Modernization Design
• New Construction Design
• Special Inspections
• Investigations / Forensics
• Cost Estimation / LCCA
• Post-Catastrophe Response
• Dune Walkover Designs
Florida Certified General Contractor
 Fully integrated inhouse design and build
 Successful environmental compliance and
management
 Over 200 construction projects managed
 Over 3,500 completed design projects
 Project size from $200K to multi million dollars
 CQM-C certified managers and superintendents
 Quality control plans for design and construction
phases
 Currently operates in 10 states and the District
of Columbia (DC)
 Past performance of over $120 Million Dollars in
support of the US Military, the DoD, NASA and
other federal agencies
 DCAA-audited financial system
 Integrated safety planning, training, and controls
 Specialized services and products available
Contact Us . Our Clients .
8-koi Headquarters
2725 Center Place
Melbourne, FL 32940
Inga Young
President
iyoung@8-koi.com
Otto Herrera
VP, Construction
oherrera@8-koi.com
Office: (321) 802-6768
Fax: (321) 802-6769
newbusiness@8-koi.com
Dean Rosenquist
Chief Operating Officer
drosenquist@8-koi.com
Matt Charmbury
Director of Engineering
mcharmbury@8-koi.com
2725 Center Place | Melbourne, FL 32940
(321) 802-6768 | www.8-koi.com | newbusiness@8-koi.com
PAST PERFORMANCE
CONSTRUCTION
US Naval Facilities Command SE Naval Hospital
Exam Room and Communications Modernization
8-koi provides all labor, material, equipment, transportation, and supervision necessary to effect renovation of
Naval Hospital Jacksonville, to standardize 94 exam rooms, operational areas, common areas and update the
communications infrastructure. The work includes deconstruction, walls, ceilings, floors, other general construction
trades, mechanical, plumbing, and electrical. All work is performed while the facility is staffed and remains fully
operational. Extensive coordination is required with the facility, departments and vendors. Logistics and planning
are key for the successful acceptance of the new systems prior to dismantling and removing the older ones.
Trident Wharf at CCAFS Naval Ordnance Test Unit (NOTU)
Design Build Utility Replacement
8-koi designed, removed, and replaced the shore support utility systems including water, sewer, oily waste, fire
control system, and the low-pressure air systems on the wharf. 8-koi conducted, performed and implemented a
value engineering study that resulted in approximately $10,000 in savings to the customer. 8-koi performed all
environmental assessments and met all permitting thresholds. Some value engineering that was conducted was
changing the pipe material in the underground distribution to HDPE for corrosion resistance. Measures were taken
for all the pier side utility replacement to ensure environmental permitting would not be required.
Naval Air Station (NAS) Jacksonville
Fuel Farm Storage Building Project
8-koi provided all the labor, materials, equipment, supervision, and quality control necessary to construct the pre-
engineered metal Fuel Farm Storage building within the airfield control area. The scope of work also encompassed
horizontal site improvements, utilities, and pavements. This work was carried out within an operational Fueling
area, ensuring that it did not disrupt the facility's operational and mission objectives.
DESIGN ENGINEERING
NASA Space Station Processing Facility
Design-Build Science Annex
The 8-koi team performed the complete design and build of the biological science laboratory facility at the SSPF,
which included site civil, architectural, structural, electrical, mechanical, plumbing, process piping, controls, fire
detection and protection, as well as data systems. The building and systems were modeled using BIM. LEED Silver®
certification was awarded to the facility through the team's utilization of a high efficiency roofing system, energy
efficient equipment, variable frequency drive motors, LED lighting, occupancy sensors, and building control and
automation system. The facility was completed on schedule and within budget. The facility is currently in use and
continues to impact scientific research being performed aboard the International Space Station (ISS).
Eastern Florida State College
CHW System Upgrades for Melbourne Campus
The 8-koi team studied the impact of adding two new buildings, totaling approximately 120,000 sqft, would have
on the chiller and hot water systems. Based on that study, the team designed appropriate modifications and
additions to the chiller plant. This involved developing a parallel loop on the campus’ south side, with a separate
pumping system configuration for future buildings, as well as replacing one of the cooling towers to maximize the
plant’s capacity within the existing footprint. One of the challenges involved the condenser water system, which
was piped without redundancy considerations. The upgrade ensured that any chiller and cooling tower
combination would work. This was done by devising an outdoor CW pumping system. In order to guarantee long-
term reliability, the team designed an open enclosure with a roof structure to stave off tower spray and corrosion.
Cape Canaveral Air Force Station
Design SLC-46 Lightning Protection System
The 8-koi team provided the complete electrical design for the
Lightning Protection System (LPS) and beacon lights, including
power, grounding and bonding per all code and regulatory
requirements. The team of engineers performed transient load
analysis for the catenary LPS and provided the criteria to design
the structural steel tower and fiber reinforced plastic (FRP) mast
on top of the tower. The tower and FRP mast were designed to
support dead loads, live loads, thermal loads, splash pressures
from the launch vehicle, hurricane wind loads, as well as all loads
imposed on the tower and mast from the catenary system itself.
Construction support for this project included submittal reviews,
RFI, field observations, test result verifications, FRP mast
manufacturing inspection and record drawings.
8-koi Operations Map
Cape Design Engineering is a wholly-owned subsidiary of 8-koi.

More Related Content

Similar to 8-koi_Construction & Design Engineering_20240209.pdf

Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16John Coffman PMP
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10gueste65323
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeedignagni
 
Leacroft Lawrence - SIX SIGMA LAB RENOVATION
Leacroft Lawrence - SIX SIGMA LAB RENOVATIONLeacroft Lawrence - SIX SIGMA LAB RENOVATION
Leacroft Lawrence - SIX SIGMA LAB RENOVATIONLeacroft Lawrence
 
PDeJesus-List of projects-2014
PDeJesus-List of projects-2014PDeJesus-List of projects-2014
PDeJesus-List of projects-2014Pedro De Jesus
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For FoldersJessica Rearick
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resumeZade Couch
 
Hedegaard Jens - Resume
Hedegaard Jens - ResumeHedegaard Jens - Resume
Hedegaard Jens - ResumeJens Hedegaard
 
THEODORE H Soper - resume
THEODORE H Soper - resumeTHEODORE H Soper - resume
THEODORE H Soper - resumeTheodore Soper
 
Tia presentation draft 3 06_jul12
Tia presentation draft 3 06_jul12Tia presentation draft 3 06_jul12
Tia presentation draft 3 06_jul12johnNPE
 

Similar to 8-koi_Construction & Design Engineering_20240209.pdf (20)

Resume
ResumeResume
Resume
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
Resume
ResumeResume
Resume
 
WE Firm Profile
WE Firm ProfileWE Firm Profile
WE Firm Profile
 
Leacroft Lawrence - SIX SIGMA LAB RENOVATION
Leacroft Lawrence - SIX SIGMA LAB RENOVATIONLeacroft Lawrence - SIX SIGMA LAB RENOVATION
Leacroft Lawrence - SIX SIGMA LAB RENOVATION
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
PDeJesus-List of projects-2014
PDeJesus-List of projects-2014PDeJesus-List of projects-2014
PDeJesus-List of projects-2014
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Hedegaard Jens - Resume
Hedegaard Jens - ResumeHedegaard Jens - Resume
Hedegaard Jens - Resume
 
MGoutho_Res_0816
MGoutho_Res_0816MGoutho_Res_0816
MGoutho_Res_0816
 
JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 
THEODORE H Soper - resume
THEODORE H Soper - resumeTHEODORE H Soper - resume
THEODORE H Soper - resume
 
Tia presentation draft 3 06_jul12
Tia presentation draft 3 06_jul12Tia presentation draft 3 06_jul12
Tia presentation draft 3 06_jul12
 
Capability statement
Capability statementCapability statement
Capability statement
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 

8-koi_Construction & Design Engineering_20240209.pdf

  • 1. 8-koi® is a dynamic woman-owned small business ready to help you meet your government contract procurement and delivery goals. Full-spectrum contracting solutions with a human touch. Experience: At 8-koi®, we design, build, staff, and supply. We deliver service excellence across three divisions: Construction, Design Engineering, and Technical Services. 8-koi is a certified EDWOSB headquartered in Melbourne, FL. We are passionate about solving problems and dependably completing projects on time and within budget. We thoughtfully stand ready to help you meet your goals in MEP and structural engineering, building and renovation, delivering seamless renovation of obsolesced properties with the least interruption. UEI: HUZ2XKV2KLS5 | DUNS: 829197503 | Cage Code: 5FCT4 Construction • New & Existing Construction • Contract Management • Demolition • Vertical / Horizontal • Government / Private • Commercial / Industrial • Underground / Infrastructure • Safety / Communications / Logistics Planning • A&E Support • Constructability Study • Estimating / Design Budget Validations • Quality Control Services • Inspection Services • Facility Stabilization • Emergency Response Design Engineering • MEP Engineering • Structural Engineering • BIM Modeling / Energy Simulations • LEED / Energy Conservation • PV / Solar Designs • Peer Review • Wind and Seismic Analysis • Failure Analysis • Renovation / Retrofit / Modernization Design • New Construction Design • Special Inspections • Investigations / Forensics • Cost Estimation / LCCA • Post-Catastrophe Response • Dune Walkover Designs Florida Certified General Contractor  Fully integrated inhouse design and build  Successful environmental compliance and management  Over 200 construction projects managed  Over 3,500 completed design projects  Project size from $200K to multi million dollars  CQM-C certified managers and superintendents  Quality control plans for design and construction phases  Currently operates in 10 states and the District of Columbia (DC)  Past performance of over $120 Million Dollars in support of the US Military, the DoD, NASA and other federal agencies  DCAA-audited financial system  Integrated safety planning, training, and controls  Specialized services and products available Contact Us . Our Clients . 8-koi Headquarters 2725 Center Place Melbourne, FL 32940 Inga Young President iyoung@8-koi.com Otto Herrera VP, Construction oherrera@8-koi.com Office: (321) 802-6768 Fax: (321) 802-6769 newbusiness@8-koi.com Dean Rosenquist Chief Operating Officer drosenquist@8-koi.com Matt Charmbury Director of Engineering mcharmbury@8-koi.com
  • 2. 2725 Center Place | Melbourne, FL 32940 (321) 802-6768 | www.8-koi.com | newbusiness@8-koi.com PAST PERFORMANCE CONSTRUCTION US Naval Facilities Command SE Naval Hospital Exam Room and Communications Modernization 8-koi provides all labor, material, equipment, transportation, and supervision necessary to effect renovation of Naval Hospital Jacksonville, to standardize 94 exam rooms, operational areas, common areas and update the communications infrastructure. The work includes deconstruction, walls, ceilings, floors, other general construction trades, mechanical, plumbing, and electrical. All work is performed while the facility is staffed and remains fully operational. Extensive coordination is required with the facility, departments and vendors. Logistics and planning are key for the successful acceptance of the new systems prior to dismantling and removing the older ones. Trident Wharf at CCAFS Naval Ordnance Test Unit (NOTU) Design Build Utility Replacement 8-koi designed, removed, and replaced the shore support utility systems including water, sewer, oily waste, fire control system, and the low-pressure air systems on the wharf. 8-koi conducted, performed and implemented a value engineering study that resulted in approximately $10,000 in savings to the customer. 8-koi performed all environmental assessments and met all permitting thresholds. Some value engineering that was conducted was changing the pipe material in the underground distribution to HDPE for corrosion resistance. Measures were taken for all the pier side utility replacement to ensure environmental permitting would not be required. Naval Air Station (NAS) Jacksonville Fuel Farm Storage Building Project 8-koi provided all the labor, materials, equipment, supervision, and quality control necessary to construct the pre- engineered metal Fuel Farm Storage building within the airfield control area. The scope of work also encompassed horizontal site improvements, utilities, and pavements. This work was carried out within an operational Fueling area, ensuring that it did not disrupt the facility's operational and mission objectives. DESIGN ENGINEERING NASA Space Station Processing Facility Design-Build Science Annex The 8-koi team performed the complete design and build of the biological science laboratory facility at the SSPF, which included site civil, architectural, structural, electrical, mechanical, plumbing, process piping, controls, fire detection and protection, as well as data systems. The building and systems were modeled using BIM. LEED Silver® certification was awarded to the facility through the team's utilization of a high efficiency roofing system, energy efficient equipment, variable frequency drive motors, LED lighting, occupancy sensors, and building control and automation system. The facility was completed on schedule and within budget. The facility is currently in use and continues to impact scientific research being performed aboard the International Space Station (ISS). Eastern Florida State College CHW System Upgrades for Melbourne Campus The 8-koi team studied the impact of adding two new buildings, totaling approximately 120,000 sqft, would have on the chiller and hot water systems. Based on that study, the team designed appropriate modifications and additions to the chiller plant. This involved developing a parallel loop on the campus’ south side, with a separate pumping system configuration for future buildings, as well as replacing one of the cooling towers to maximize the plant’s capacity within the existing footprint. One of the challenges involved the condenser water system, which was piped without redundancy considerations. The upgrade ensured that any chiller and cooling tower combination would work. This was done by devising an outdoor CW pumping system. In order to guarantee long- term reliability, the team designed an open enclosure with a roof structure to stave off tower spray and corrosion. Cape Canaveral Air Force Station Design SLC-46 Lightning Protection System The 8-koi team provided the complete electrical design for the Lightning Protection System (LPS) and beacon lights, including power, grounding and bonding per all code and regulatory requirements. The team of engineers performed transient load analysis for the catenary LPS and provided the criteria to design the structural steel tower and fiber reinforced plastic (FRP) mast on top of the tower. The tower and FRP mast were designed to support dead loads, live loads, thermal loads, splash pressures from the launch vehicle, hurricane wind loads, as well as all loads imposed on the tower and mast from the catenary system itself. Construction support for this project included submittal reviews, RFI, field observations, test result verifications, FRP mast manufacturing inspection and record drawings. 8-koi Operations Map Cape Design Engineering is a wholly-owned subsidiary of 8-koi.