STEVEN E. JAMES, P.E., C.P.E., P.M.P.
                                              6825 DeSoto Avenue, #9
                                              Canoga Park, CA 91303
                                                   (858) 335-5932
                                              4stevejames@gmail.com

CAPABILITIES SUMMARY
•   Capital Project Management, Estimates, Budgeting,      Computer Applications: Microsoft Word, Microsoft Excel, Microsoft
    Scheduling, and Coordination                           Access, Microsoft Powerpoint, Microsoft Project, Microsoft Outlook,
•   Process Engineering, Material and Energy Balances,     AutoCAD, Autosketch, CADWorx P&ID, ChemCad, MathCAD,
    Equipment/Piping Specification                         PhotoShop, and others
•   Environmental Technologies
                                                               •    Computer Programming: Fortran, BASIC, Pascal, C/C++
•   Risk and Safety Analysis
                                                                    (self-taught), and some assembler (self-taught)
•   Wet Lab Analysis
•   Field Testing and Equipment Troubleshooting
•   Quality Control/Quality Assurance
                                                               • Hardware: IBM PC's/compatibles, Apple Macintosh, DEC
                                                                    VAX's, DeltaV control networks, and some IBM mainframe
•   Total Quality Management & Statistical Process Control
                                                                    familiarity
•   Computer Aided Design and Drafting
•   Numerical Methods, Process Simulation & Modeling           •    Software Testing: Development of Test Plans and Testing
•   DCS Systems, Instrumentation, & Data Acquisition Systems        Methods, Performance Appraisals, Beta Testing and
•   Process Control Theory                                          Debugging
•   Polymer Chemistry, Composites, & Related Technologies
                                                               •    Software Documentation: Proposals, Requirements
•   Cleanroom Technologies
                                                                    Specifications, and Designs
•   Ultrapure Water Systems
•   Precision Cleaning Technologies                            •    4 yrs. Commercial Software Programming Experience
•   Inspection Technologies
•   Production Management
•

EXPERIENCE
    Project Manager. Energy and Power Solutions, Inc., Costa Mesa, CA                                         3/09 to present

    Project Manager. Independent Consultant, R.C. Costello & Assoc., Redondo Beach, CA 7/06 to 9/08
    • Completed utilities capacity study for Chevron’s El Segundo refinery in advance of major $1 billion
       refinery upgrade project. Successfully captured information for the study from the refinery’s control
       system PI database. Successfully completed the report after the lead engineer quit the project.
    • Completed upfront engineering and cost estimate for a 3.5 MMSCFD biogas plant for Microgy to be
       located at a Texas dairy. The process would purify off-gas from anaerobic digesters in to marketable
       natural gas, and would consist of an amine unit, a glycol drying unit, compressors, and biological
       destruction of hydrogen sulfide.
    • Served as local project coordinator for a large, state-of-the-art biodiesel project for Kreido Biofuels
    • Investigated and implemented an online project file management system (Worksmart).

    •   Designed and implemented a custom MS Access database that interfaced with AutoCAD drawings.
            o Database produced automated equipment lists, instrument lists, and drawing lists.
            o Database also included queries that performed a variety of basic drawing checks such as
                finding duplicate item tags.
    •   Project Manager for the upfront engineering and cost estimate for 6 biogas plants employing
        pressure swing adsorption and caustic scrubbers for the purification of the gas stream. Developed
        improved ChemCAD models that modeled both material balances and process hydraulics.
    •   Authored a comprehensive report surveying current biomass gasification technology.

    Contract Project Engineer. Capita Tech. at Baxter Bioscience, Thousand Oaks, CA                               1/06 to 4/06
    • Commissioned a refrigerated product truck used for transporting finished product.
    • Support of facility shutdown projects for formal facility shutdown.
•   Project management of modifications to existing reverse osmosis skid to improve CIP process.
•   Development of exhaust duct improvements for liquid nitrogen flash freezing for lyophilization.
•   Taught a younger project manager how to effectively use Microsoft Project.

Project Engineer. Independent Consultant at Alberto-Culver, Chatsworth, CA               1/05 to 1/06
• Scope development and conceptual design of a relocated & upgraded Clean-Out-Of-Place parts
   washing area for cosmetics manufacturing facility.
• Scope development and conceptual design of modifications to the wastewater treatment process to
   make it operate more robustly. Created P&ID for system using AutoCAD.
• Scope development and project management of installation of a new 150 gpm pH Adjustment
   System. Got system installed and operational within 60 days of management request.
• Technical input for a new $2 million purified water system.
• Resolved pumping issues with product totes costing over $10K each in repairs with a $300 part.

Project Engineer. Independent Consultant, R.C. Costello & Assoc., Redondo Beach, CA 10/04 to 1/05
• Prepared feasibility study of petroleum waste disposal upgrades for major refinery.
• Scaled-up the design of a 7 column distillation train and batch reactor for a manufacturer of
   water treatment chemicals. Used ChemCAD process simulator to facilitate rapid design changes.

Project Manager. Aerotek Staffing at New England Controls, Mansfield, MA               10/03 to 5/04
• Managed execution of various Emerson DeltaV DCS system implementations for biopharma clients.
   o Created resource-loaded Microsoft Project schedules that were used for tracking progress.
   o Interfaced with clients, ran meetings, and prepared status reports.
   o Prepared detailed project financial projections to track estimated costs at completion.
•   Redesigned and reimplemented major MS Access databases used for commissioning.

Temporary Process Engineer. Kelly Engineering at Cabot, Inc., Haverhill, MA             6/03 to 10/03
• Provided key insights to the cause of leaking product drums. Implemented solution I developed.
• Authored user documentation of recipes for new DeltaV DCS system implementation.
• Provided periodic analysis of batch historian data for troubleshooting production issues.
Contract Project Engineer. Kelly Engineering at Millipore, Inc., Billerica, MA       12/02 to 2/03
• Successfully completed the redesign of 9 chromatography systems 2 weeks prior to the due date.
Senior Chemical Engineer. EarthTech, Inc. at Pharmacia, Inc., Kalamazoo, MI           11/99 to 5/02
• Managed the design and implementation of $1.3M of Clean-In-Place upgrades to eight pilot
   plant work centers from start to finish.
• Completed a detailed estimate, process model, process design, and process validation of a $600K
   sulfuric acid distribution system upgrade.
• Completed the process design of a $700K product unloading facility in Puerto Rico.
• Specified and used an ultrasonic flowmeter to complete an operating parameter characterization of
   an industrial rotary dryer.
• Designed and coordinated the replacement of a lab water distribution system.
• Coordinated the completion of detailed estimates to upgrade jacket service, condenser service, and
   instrumentation for a glass lined reactor.
• Completed a detailed cost estimate and process design for a $75K header extension for a liquid
   nitrogen distribution system.
• Designed and implemented an award-winning Microsoft Access database to replace EarthTech's
   outdated spreadsheet timesheet system and streamline the time reporting process. Was awarded
   EarthTech’s Eagle Award for my leadership and initiative in this endeavor.
Senior Process Engineer. Fru-Con Engineering, Inc., Loveland, Ohio                          12/97 to 4/99
• Served as Fru-Con's Project Engineer for a glycerin plant expansion project for a northern Ohio
   client using vacuum distillation, wiped-film evaporation, multi-pass condensers, and a steam-jet
   vacuum system.
   o Investigated and specified optimal transportation of equipment modules to site.
   o Completed material balance for entire project.
   o Sized all lines, spray nozzles, and pumps. Verified the use of existing pumps as acceptable.
   o Correctly identified the lack of a vent on a head tank (added near the end of the design cycle)
        that would prevent proper system functioning.
   o Correctly identified the need for a safety relief valve in the design.
•  Stepped in as a Fru-Con cleanroom consultant for a semiconductor client and restored faith in Fru-
   Con's ability to make a cleanroom addition functional. Reduced airborne particulate levels to meet
   client requirements within one day of my arrival at the client's plant.
• Successfully worked as both Project Environmental Engineer and Process Engineer for a multi-
   firm consortium working on a half billion dollar paper plant construction project.
   o Served as environmental consultant for entire project to ensure all appropriate regulations
         were addressed in the design. Signed off on all project P&IDs for environmental protection.
         Worked closely with client environmental engineers.
   o Specified and reviewed spill protection measures for the entire project.
   o Completed a Global Spill Protection study to verify adequate spill protection across the entire
         project.
   o Assisted in completion of process design of utilities in Fru-Con scope work. Assisted in
         completion of material balances and PFD's.
   o Managed and reviewed the specification of all specialty items in Fru-Con scope.
Process Engineer. Borden Chemical, Inc., Woodlawn, Ohio                                    3/96 to 12/97
• Supervised the production of fiber optic coatings while the normal production supervisor was on
   vacation.
• Designed and managed the implementation of a new production line for the fiber optic coatings
   production plant. My improved design cut heating water usage by 50%.
• Developed the preventative maintenance program for fiber optic coatings in order to meet ISO
   9000 requirements
• Developed the production planning approach for fiber optic coatings production; planned and
   initiated raw materials purchases for each month of production
• Developed a test method for determining how effectively pigments are wetted out in ink dispersions
   Identified and eliminated a source of coating contamination in the compressed air supply by
   implementing a new desiccant dryer system.
• Re-wrote over 15 manufacturing procedures to eliminate product and process dependencies

Process Engineer. Crysteco, Inc., Wilmington, Ohio                                         7/93 to 2/96
• Developed and implemented new processes and procedures for cleaning and inspection of silicon
   wafers
• Played an instrumental role in the specification and design of a new 1 million dollar state-of-the-
   art ultrapure water system--defined project scope and functional specs.
• Led new employee orientations in hazardous chemical handling and safe lifting practices
• Developed and implemented improvements to Product Engineering's work order development
   process that resulted in a 50% reduction in preparation time
• Developed and implemented data acquisition software to expedite cleanroom particle measurements
   which reduced data processing time by 75%
• Designed and implemented a modification to inspection lighting systems that reduced emitted
   airborne particles by 99%
• Identified and corrected a weakness in the sanitization procedure for the ultrapure water system
which resulted in cutting the downtime requirement by 36%
•   Proved that static charge buildup on wafers is a key factor in particulate contamination; implemented
    equipment that reduced particulate contamination losses by 25%
•   Designed and implemented the incoming inspection program for cleaning chemicals in order to
    meet ISO 9000 requirements
•   Effectively used Kepner-Tregoe Decision Analysis techniques to select and implement shipping
    cassette equipment from a new vendor which helped cut downtime by 20%
STEVEN E. JAMES (cont'd.)
  EXPERIENCE (cont'd.)
  Process Engineer. Hexcel Corporation, Lancaster, Ohio                                       8/92 to 3/93

  Process Engineer. Corp. Staffing Resources at MTM Chemicals, Inc., Cols., OH                1/92 to 3/92

  Engineering Associate. Primatech Inc., Columbus, Ohio                                      8/90 to 11/91

EDUCATION
  University of Cincinnati, Cincinnati, Ohio
  B.S. in Chemical Engineering, 1989

PROFESSIONAL TRAINING
  Kepner-Tregoe Analytic Troubleshooting                          Zanger-Miller Frontline Leadership
  SkillPath Managing Multiple Projects                       Toastmasters(CTM, Sergeant-At-Arms)
  Landmark Education: Self-Expression and Leadership Program, Communication Program,
                        Team Management & Leadership Program I/II (Team Coach, also)
  ISPE San Diego Process Systems & Piping Course

PROFESSIONAL ORGANIZATIONS
  A.I.Ch.E. Member since 1989                                                    P.M.I. Member since 2003
  I.S.P.E. Member since 2001

REGISTRATIONS/CERTIFICATIONS
                                                                                            Year Registered/
              Description               Designation              Organization                  Certified

  Registered Professional Engineer             PE     State of Ohio                              1997

  Registered Professional Engineer             PE     State of Michigan                          2002

  Certified Plant Engineer                     CPE    Association of Facilities Engineers        2002

  Project Management Professional              PMP    Project Management Institute               2002




                              PORTFOLIO AVAILABLE UPON REQUEST

                                          WILLING TO TRAVEL

More Related Content

What's hot

Aqt Email Flier 051712
Aqt Email Flier 051712Aqt Email Flier 051712
Aqt Email Flier 051712
Baysgroup
 
Brian may resume_finaldraft
Brian may resume_finaldraftBrian may resume_finaldraft
Brian may resume_finaldraft
Brian May
 
Chips.Daniel On Line 6 1 10
Chips.Daniel On Line 6 1 10Chips.Daniel On Line 6 1 10
Chips.Daniel On Line 6 1 10dchips
 
Brian may resume_finaldraft
Brian may resume_finaldraftBrian may resume_finaldraft
Brian may resume_finaldraft
Brian May
 
Danielle Carpenter Test Resume
Danielle Carpenter Test ResumeDanielle Carpenter Test Resume
Danielle Carpenter Test ResumeDanielle Carpenter
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTONGary Shelton
 
ChrisWardRes.03
ChrisWardRes.03ChrisWardRes.03
ChrisWardRes.03
Logistix
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
PhilSuter
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2John Setty
 
Resume bertrand
Resume bertrandResume bertrand
Resume bertrand
Byron Bertrand
 
Procurement Professional
Procurement ProfessionalProcurement Professional
Procurement ProfessionalLarry Kittilsen
 
Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Michael Ilasi
 
Peter Ed Love Offshore Technology Conference
Peter Ed Love Offshore Technology ConferencePeter Ed Love Offshore Technology Conference
Peter Ed Love Offshore Technology Conferencepedlove
 
Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015Andy Feinberg
 
StuartMcDonaldResume 2016
StuartMcDonaldResume   2016StuartMcDonaldResume   2016
StuartMcDonaldResume 2016Stuart McDonald
 

What's hot (20)

Aqt Email Flier 051712
Aqt Email Flier 051712Aqt Email Flier 051712
Aqt Email Flier 051712
 
Brian may resume_finaldraft
Brian may resume_finaldraftBrian may resume_finaldraft
Brian may resume_finaldraft
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
W White Resume
W White ResumeW White Resume
W White Resume
 
Chips.Daniel On Line 6 1 10
Chips.Daniel On Line 6 1 10Chips.Daniel On Line 6 1 10
Chips.Daniel On Line 6 1 10
 
Brian may resume_finaldraft
Brian may resume_finaldraftBrian may resume_finaldraft
Brian may resume_finaldraft
 
Danielle Carpenter Test Resume
Danielle Carpenter Test ResumeDanielle Carpenter Test Resume
Danielle Carpenter Test Resume
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
ChrisWardRes.03
ChrisWardRes.03ChrisWardRes.03
ChrisWardRes.03
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
 
VinceResume2016.7
VinceResume2016.7VinceResume2016.7
VinceResume2016.7
 
Resume
ResumeResume
Resume
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
Resume bertrand
Resume bertrandResume bertrand
Resume bertrand
 
Procurement Professional
Procurement ProfessionalProcurement Professional
Procurement Professional
 
Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014
 
Peter Ed Love Offshore Technology Conference
Peter Ed Love Offshore Technology ConferencePeter Ed Love Offshore Technology Conference
Peter Ed Love Offshore Technology Conference
 
Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015Andrew Feinberg Resume October 2015
Andrew Feinberg Resume October 2015
 
Ammonite cormetrics presentation english october 2012
Ammonite cormetrics presentation english october 2012Ammonite cormetrics presentation english october 2012
Ammonite cormetrics presentation english october 2012
 
StuartMcDonaldResume 2016
StuartMcDonaldResume   2016StuartMcDonaldResume   2016
StuartMcDonaldResume 2016
 

Similar to Steve James Resume

ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
Akachidike (AkaChi) Kanu
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV history
acdnexpat
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers
 
Revised: Presentation of my SCADA-Petroleum Engineering Suite
Revised:  Presentation of my SCADA-Petroleum Engineering SuiteRevised:  Presentation of my SCADA-Petroleum Engineering Suite
Revised: Presentation of my SCADA-Petroleum Engineering Suite
Colin Jordan
 
Matt Watters Resume 2017
Matt Watters Resume 2017Matt Watters Resume 2017
Matt Watters Resume 2017Matt Watters
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz HabidFeroz Habid
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill
 
ChristopherEldridge_Resume
ChristopherEldridge_ResumeChristopherEldridge_Resume
ChristopherEldridge_ResumeChris Eldridge
 
Resume Mda2
Resume Mda2Resume Mda2
Resume Mda2
pgodavarti
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015Jeff Merrill
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
Sam Najmi
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
Sam Najmi
 
Sam Najmi resume 04-20-2016
Sam Najmi resume 04-20-2016Sam Najmi resume 04-20-2016
Sam Najmi resume 04-20-2016
Sam Najmi
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
Gary Giblock
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
Twaddle_resume_160523
Twaddle_resume_160523Twaddle_resume_160523
Twaddle_resume_160523Thomas Waddle
 
Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Thomas Rallis
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resumeSteve Majors
 

Similar to Steve James Resume (20)

ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV history
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Revised: Presentation of my SCADA-Petroleum Engineering Suite
Revised:  Presentation of my SCADA-Petroleum Engineering SuiteRevised:  Presentation of my SCADA-Petroleum Engineering Suite
Revised: Presentation of my SCADA-Petroleum Engineering Suite
 
Matt Watters Resume 2017
Matt Watters Resume 2017Matt Watters Resume 2017
Matt Watters Resume 2017
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
 
ChristopherEldridge_Resume
ChristopherEldridge_ResumeChristopherEldridge_Resume
ChristopherEldridge_Resume
 
Resume Mda2
Resume Mda2Resume Mda2
Resume Mda2
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
 
Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
 
Sam Najmi resume 04-20-2016
Sam Najmi resume 04-20-2016Sam Najmi resume 04-20-2016
Sam Najmi resume 04-20-2016
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Twaddle_resume_160523
Twaddle_resume_160523Twaddle_resume_160523
Twaddle_resume_160523
 
Nithya resume
Nithya resumeNithya resume
Nithya resume
 
Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015Electrical_Designer_10_11_2015
Electrical_Designer_10_11_2015
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 

Steve James Resume

  • 1. STEVEN E. JAMES, P.E., C.P.E., P.M.P. 6825 DeSoto Avenue, #9 Canoga Park, CA 91303 (858) 335-5932 4stevejames@gmail.com CAPABILITIES SUMMARY • Capital Project Management, Estimates, Budgeting, Computer Applications: Microsoft Word, Microsoft Excel, Microsoft Scheduling, and Coordination Access, Microsoft Powerpoint, Microsoft Project, Microsoft Outlook, • Process Engineering, Material and Energy Balances, AutoCAD, Autosketch, CADWorx P&ID, ChemCad, MathCAD, Equipment/Piping Specification PhotoShop, and others • Environmental Technologies • Computer Programming: Fortran, BASIC, Pascal, C/C++ • Risk and Safety Analysis (self-taught), and some assembler (self-taught) • Wet Lab Analysis • Field Testing and Equipment Troubleshooting • Quality Control/Quality Assurance • Hardware: IBM PC's/compatibles, Apple Macintosh, DEC VAX's, DeltaV control networks, and some IBM mainframe • Total Quality Management & Statistical Process Control familiarity • Computer Aided Design and Drafting • Numerical Methods, Process Simulation & Modeling • Software Testing: Development of Test Plans and Testing • DCS Systems, Instrumentation, & Data Acquisition Systems Methods, Performance Appraisals, Beta Testing and • Process Control Theory Debugging • Polymer Chemistry, Composites, & Related Technologies • Software Documentation: Proposals, Requirements • Cleanroom Technologies Specifications, and Designs • Ultrapure Water Systems • Precision Cleaning Technologies • 4 yrs. Commercial Software Programming Experience • Inspection Technologies • Production Management • EXPERIENCE Project Manager. Energy and Power Solutions, Inc., Costa Mesa, CA 3/09 to present Project Manager. Independent Consultant, R.C. Costello & Assoc., Redondo Beach, CA 7/06 to 9/08 • Completed utilities capacity study for Chevron’s El Segundo refinery in advance of major $1 billion refinery upgrade project. Successfully captured information for the study from the refinery’s control system PI database. Successfully completed the report after the lead engineer quit the project. • Completed upfront engineering and cost estimate for a 3.5 MMSCFD biogas plant for Microgy to be located at a Texas dairy. The process would purify off-gas from anaerobic digesters in to marketable natural gas, and would consist of an amine unit, a glycol drying unit, compressors, and biological destruction of hydrogen sulfide. • Served as local project coordinator for a large, state-of-the-art biodiesel project for Kreido Biofuels • Investigated and implemented an online project file management system (Worksmart). • Designed and implemented a custom MS Access database that interfaced with AutoCAD drawings. o Database produced automated equipment lists, instrument lists, and drawing lists. o Database also included queries that performed a variety of basic drawing checks such as finding duplicate item tags. • Project Manager for the upfront engineering and cost estimate for 6 biogas plants employing pressure swing adsorption and caustic scrubbers for the purification of the gas stream. Developed improved ChemCAD models that modeled both material balances and process hydraulics. • Authored a comprehensive report surveying current biomass gasification technology. Contract Project Engineer. Capita Tech. at Baxter Bioscience, Thousand Oaks, CA 1/06 to 4/06 • Commissioned a refrigerated product truck used for transporting finished product. • Support of facility shutdown projects for formal facility shutdown.
  • 2. Project management of modifications to existing reverse osmosis skid to improve CIP process. • Development of exhaust duct improvements for liquid nitrogen flash freezing for lyophilization. • Taught a younger project manager how to effectively use Microsoft Project. Project Engineer. Independent Consultant at Alberto-Culver, Chatsworth, CA 1/05 to 1/06 • Scope development and conceptual design of a relocated & upgraded Clean-Out-Of-Place parts washing area for cosmetics manufacturing facility. • Scope development and conceptual design of modifications to the wastewater treatment process to make it operate more robustly. Created P&ID for system using AutoCAD. • Scope development and project management of installation of a new 150 gpm pH Adjustment System. Got system installed and operational within 60 days of management request. • Technical input for a new $2 million purified water system. • Resolved pumping issues with product totes costing over $10K each in repairs with a $300 part. Project Engineer. Independent Consultant, R.C. Costello & Assoc., Redondo Beach, CA 10/04 to 1/05 • Prepared feasibility study of petroleum waste disposal upgrades for major refinery. • Scaled-up the design of a 7 column distillation train and batch reactor for a manufacturer of water treatment chemicals. Used ChemCAD process simulator to facilitate rapid design changes. Project Manager. Aerotek Staffing at New England Controls, Mansfield, MA 10/03 to 5/04 • Managed execution of various Emerson DeltaV DCS system implementations for biopharma clients. o Created resource-loaded Microsoft Project schedules that were used for tracking progress. o Interfaced with clients, ran meetings, and prepared status reports. o Prepared detailed project financial projections to track estimated costs at completion. • Redesigned and reimplemented major MS Access databases used for commissioning. Temporary Process Engineer. Kelly Engineering at Cabot, Inc., Haverhill, MA 6/03 to 10/03 • Provided key insights to the cause of leaking product drums. Implemented solution I developed. • Authored user documentation of recipes for new DeltaV DCS system implementation. • Provided periodic analysis of batch historian data for troubleshooting production issues. Contract Project Engineer. Kelly Engineering at Millipore, Inc., Billerica, MA 12/02 to 2/03 • Successfully completed the redesign of 9 chromatography systems 2 weeks prior to the due date. Senior Chemical Engineer. EarthTech, Inc. at Pharmacia, Inc., Kalamazoo, MI 11/99 to 5/02 • Managed the design and implementation of $1.3M of Clean-In-Place upgrades to eight pilot plant work centers from start to finish. • Completed a detailed estimate, process model, process design, and process validation of a $600K sulfuric acid distribution system upgrade. • Completed the process design of a $700K product unloading facility in Puerto Rico. • Specified and used an ultrasonic flowmeter to complete an operating parameter characterization of an industrial rotary dryer. • Designed and coordinated the replacement of a lab water distribution system. • Coordinated the completion of detailed estimates to upgrade jacket service, condenser service, and instrumentation for a glass lined reactor. • Completed a detailed cost estimate and process design for a $75K header extension for a liquid nitrogen distribution system. • Designed and implemented an award-winning Microsoft Access database to replace EarthTech's outdated spreadsheet timesheet system and streamline the time reporting process. Was awarded EarthTech’s Eagle Award for my leadership and initiative in this endeavor.
  • 3. Senior Process Engineer. Fru-Con Engineering, Inc., Loveland, Ohio 12/97 to 4/99 • Served as Fru-Con's Project Engineer for a glycerin plant expansion project for a northern Ohio client using vacuum distillation, wiped-film evaporation, multi-pass condensers, and a steam-jet vacuum system. o Investigated and specified optimal transportation of equipment modules to site. o Completed material balance for entire project. o Sized all lines, spray nozzles, and pumps. Verified the use of existing pumps as acceptable. o Correctly identified the lack of a vent on a head tank (added near the end of the design cycle) that would prevent proper system functioning. o Correctly identified the need for a safety relief valve in the design. • Stepped in as a Fru-Con cleanroom consultant for a semiconductor client and restored faith in Fru- Con's ability to make a cleanroom addition functional. Reduced airborne particulate levels to meet client requirements within one day of my arrival at the client's plant. • Successfully worked as both Project Environmental Engineer and Process Engineer for a multi- firm consortium working on a half billion dollar paper plant construction project. o Served as environmental consultant for entire project to ensure all appropriate regulations were addressed in the design. Signed off on all project P&IDs for environmental protection. Worked closely with client environmental engineers. o Specified and reviewed spill protection measures for the entire project. o Completed a Global Spill Protection study to verify adequate spill protection across the entire project. o Assisted in completion of process design of utilities in Fru-Con scope work. Assisted in completion of material balances and PFD's. o Managed and reviewed the specification of all specialty items in Fru-Con scope. Process Engineer. Borden Chemical, Inc., Woodlawn, Ohio 3/96 to 12/97 • Supervised the production of fiber optic coatings while the normal production supervisor was on vacation. • Designed and managed the implementation of a new production line for the fiber optic coatings production plant. My improved design cut heating water usage by 50%. • Developed the preventative maintenance program for fiber optic coatings in order to meet ISO 9000 requirements • Developed the production planning approach for fiber optic coatings production; planned and initiated raw materials purchases for each month of production • Developed a test method for determining how effectively pigments are wetted out in ink dispersions Identified and eliminated a source of coating contamination in the compressed air supply by implementing a new desiccant dryer system. • Re-wrote over 15 manufacturing procedures to eliminate product and process dependencies Process Engineer. Crysteco, Inc., Wilmington, Ohio 7/93 to 2/96 • Developed and implemented new processes and procedures for cleaning and inspection of silicon wafers • Played an instrumental role in the specification and design of a new 1 million dollar state-of-the- art ultrapure water system--defined project scope and functional specs. • Led new employee orientations in hazardous chemical handling and safe lifting practices • Developed and implemented improvements to Product Engineering's work order development process that resulted in a 50% reduction in preparation time • Developed and implemented data acquisition software to expedite cleanroom particle measurements which reduced data processing time by 75% • Designed and implemented a modification to inspection lighting systems that reduced emitted airborne particles by 99% • Identified and corrected a weakness in the sanitization procedure for the ultrapure water system
  • 4. which resulted in cutting the downtime requirement by 36% • Proved that static charge buildup on wafers is a key factor in particulate contamination; implemented equipment that reduced particulate contamination losses by 25% • Designed and implemented the incoming inspection program for cleaning chemicals in order to meet ISO 9000 requirements • Effectively used Kepner-Tregoe Decision Analysis techniques to select and implement shipping cassette equipment from a new vendor which helped cut downtime by 20%
  • 5. STEVEN E. JAMES (cont'd.) EXPERIENCE (cont'd.) Process Engineer. Hexcel Corporation, Lancaster, Ohio 8/92 to 3/93 Process Engineer. Corp. Staffing Resources at MTM Chemicals, Inc., Cols., OH 1/92 to 3/92 Engineering Associate. Primatech Inc., Columbus, Ohio 8/90 to 11/91 EDUCATION University of Cincinnati, Cincinnati, Ohio B.S. in Chemical Engineering, 1989 PROFESSIONAL TRAINING Kepner-Tregoe Analytic Troubleshooting Zanger-Miller Frontline Leadership SkillPath Managing Multiple Projects Toastmasters(CTM, Sergeant-At-Arms) Landmark Education: Self-Expression and Leadership Program, Communication Program, Team Management & Leadership Program I/II (Team Coach, also) ISPE San Diego Process Systems & Piping Course PROFESSIONAL ORGANIZATIONS A.I.Ch.E. Member since 1989 P.M.I. Member since 2003 I.S.P.E. Member since 2001 REGISTRATIONS/CERTIFICATIONS Year Registered/ Description Designation Organization Certified Registered Professional Engineer PE State of Ohio 1997 Registered Professional Engineer PE State of Michigan 2002 Certified Plant Engineer CPE Association of Facilities Engineers 2002 Project Management Professional PMP Project Management Institute 2002 PORTFOLIO AVAILABLE UPON REQUEST WILLING TO TRAVEL