SlideShare a Scribd company logo
1 of 4
JAMES CASTRONOVA
43 Bromley Road  Pittsford, NY 14534  Cell:(585) 739-8342  jccastronova@gmail.com
PROFESSIONAL SUMMARY
SENIOR CONTROLS ENGINEER offering expertise in the design, management, and worldwide marketing
of sophisticated, fully integrated electrical control systems. A highly effective solutions-focused communicator
and negotiator with extensive experience in managing and delivering projects from conception and design through
fabrication, installation and customer training. A commitment to excellence in all pursuits.
AREAS OF SPECIALIZATION
Industrial Control/Automation
Instrumentation and Electrical Controls
engineering
Research,specification and integration of
vendor equipment
Design and draw schematic wiring, power
distribution, motor controls and instrumentation
Design and draw field installation diagrams
Design and draw control panels and test fixtures
Technical writing of operations manuals
PLC Programming
Allen-Bradley family of PLCs incl. ControLogix
 Modicon family of PLCs
 RTP,OSI Soft
General Electric Series 90 family of PLCs
Allen-Bradley software:A.I. series,RS-Logix,
RS-Logix emulate, RS-Logix 5000
Industrial Networking: Allen-Bradley: DLR,
DH, DH+,RIO, DeviceNet, Ethernet, Fieldbus,
Microsoft Networks,Profibus
Allen-Bradley PanelView products
National Instruments LabView 7.1, 8.2
MMI/SCADA/WEB
Intouch-Wonderware products
 Allen-Bradley RSView products
 IFix 2.5-4.5
 National Instruments LabView 7.1
ODBC database development and interface
 Programming: VBA, Java,C++, Visual Basic
 HTML, DHTML,ASP,SQL, ADO, Flash
Mechanical Design
Mechanical system layout and detailing
Research,specification and integration of
mechanical vendor equipment
Project Engineering and Management
Project planning and scheduling
Project estimating
Project proposals
Project specs for fabrication and bid
Sub-contractor management
Construction management/field start-up
Purchasing
Field check-out and commissioning
Management and Office Skills
Management and coordination of multi-
disciplined technical activities for engineers and
designers
Preparation of budgets
Proficient with Microsoft Office products
Proficient with AutoCAD 2014
Proficient with Internet and computer security
Proficient with computer maintenance
Sales Engineering
Sold projects ranging from $25K to $4M
Sales of engineering, equipment and turn-key
projects
JAMES CASTRONOVA
Page Two
EXPERIENCE
CORNING INC, Corning, NY
Senior Controls Engineer [12/04-12/15]
Adecco Technical Consultant contracted to design and develop controls for Manufacturing Technology division.
Responsibilities include design and drafting of electrical control systems for various glassmanufacturing
processes.
 Provide project management service for three major glass fusion process systems by developing scope of
work, cost estimate, manpower allocation and project scheduling.
 Develop software scope of work for various glass fusion process modifications.
 Lead design of hardware and control panels required for major glass fusion process. Project included
development of Contrologix hardware solution including DLR Ethernet networking and interface to plant
wide network using managed switches.
 Lead design of control system team for glass furnace operation using Contrologix PLC and IFix HMI
platforms. My role included project management responsibilities, power system design oversight, HMI
design, programming oversight, electrical circuit/cabinet design and commissioning.
 Setup, checkout and commissioning of glass fusion process control and power systems in Taiwan, Japan and
Korea.
 Controls/PLC upgrade of various Steuben plant process systems and forming machinery.
 Twenty four month assignment as Senior Controls engineer for Corning Steuben facilities.
 Ten month assignments for Corning Japan to develop facility re-start plan and process conversion of
mothballed LCD glass production processes. Checked out and commissioned fusion processes for that
facilities.
 Sixteen month assignment to provide technical leadership and personnel management of controls team
assigned a fast tracked product development project for Corning Harrodsburg, KY. Technical disciplines
included process control development, drawing package development, software development/
implementation, procurement, control panel development, installation management, checkout and
commissioning.
 Eighteen month assignment as Lead Design Engineer for various glass fusion process modifications for
Corning Japan.
Other responsibilities include design process, controlsand software for various projects in the Research and
Development divisions.
 Redesign of control system drawings to meet conventional P&ID standards
 Designed test facility for materials R&D group including power, instrumentation and software. Used National
Instruments Fieldpoint hardware with LabView 7.1 Development system to implement PID control of
process,provide HMI for scientists and log experimental data to PC.
 Designed controls and software for Machine development R&D group. Used National Instruments Fieldpoint
hardware with LabView 8.0 Development system to implement PID control of process, provide HMI for
engineers and log experimental data to PC.
 Provided concept, estimate and presentation on multi-million dollar capital projects for various divisions in
company
 Control and power system redesign of Tube Kiln for Danville, NC facility. Developed and implemented
Contrologix PLC,Panelview Plus HMI and related programming.
 Provided concept and cost proposals for Delta V control system for Corning Canton, NY facility.
VARIOUS CONTROLS CONTRACTUAL ASSIGNMENTS
Controls Engineer [2003 – 2004]
Performed controls related work on various short term contracts for different agencies and businesses
after the demise of Nova Technology and before Corning.
JAMES CASTRONOVA
Page Three
EXPERIENCE (continued)
NOVA TECHNOLOGY INTERNATIONAL, INC., Rochester,NY
ChiefEngineer/Owner [1981 – 2003]
Comprehensive responsibility for the strategic launch, development, and day-to-day management of a project
engineering firmspecializing in the design,fabrication, and installation of custombulk material handling systems
for the glass industry. Sell systems to customersthroughout the U.S., South America, and part of Asia. Purchased
Dynamec Corporation in 1981.
 Built the business from the ground floor into a $3M/year operation
 Supervised 15 engineers and draftsman to manage multiple projects
 Managed all facets of electrical and mechanical design, estimating, sales, and project installation
Professional Accomplishments
Provided plant audits for a variety of manufacturers to identify problemareasand to make recommendations for
production, labor and environmental improvements.
Assisted major manufacturerin improving antiquated production facilities at a number of locationsthroughout
the U.S. These plantssought to address the following problems.
Inconsistency in product quality
Spillage of raw material leading to material waste,hazardous working environment and OSHA issues
Labor intensive system of production and maintenance
Archaic system to collect manufacturing data for quality control and production monitoring
 Frequent mechanical break-downs resulting in loss of production
Solution
Taking in budget and shut-down time constraints, implemented a multi-year plan for plant improvements.
Phases were prioritized by significance to production improvements and return on investment benefits.
First phase consisted of installation of state of the art process control system to address the quality and data
issues. Production efficiency improved from 65-75% to 88-90%.
Second phase consisted of replacing mechanical equipment to address breakdown and spillage issues.
Ensuing phases included installing new process control equipment to address various production,
environmental improvements and labor reduction issues.
Provided all engineering services including electrical, mechanical and automation controls
Provided project management including construction and fabrication bid packages, awarded sub-contracts and
supervised all installation contractors
Commissioned equipment and trained operators and maintenance personnel.
Presently plants are operating at mid-90% efficiency, meet OSHA requirements and labor is reduced 50 to
75%.
Assisted major manufacturerwho was undertaking significant capital improvements with in-house staff of
engineers. Prior to my involvement,construction was proceeding to meet aggressive production timetable.
Engineering fell behind schedule resulting in issuance of costly time and material contracts and inefficient
construction labor management.
Solution
Redirected engineers to prioritize areas that were pertinent to construction
Prepared electricalconstruction and wiring drawings.
Prepared bid packages for firm price quotations
Prepared installation schedule and managed installation contractors.
Delivered project on schedule and stopped construction cost overruns.
JAMES CASTRONOVA
Page Four
PREVIOUS EXPERIENCE _____
DYNAMEC CORPORATION, Rochester,NY
Manager Electrical Engineering [1979 – 1981]
Designed and installed various material handling projects for this engineering firm. Purchased the firmin 1981
which became the basis for Nova Technology International,Inc.
 Designed custom control system using microprocessor based board level components. Various glass
manufacturers throughout the US used the system to control bulk material unloading, weighing, mixing and
delivery operations.
 Designed PLC based control systems and related software code using Modicon and Allen-Bradley products.
 Designed electrical power and control circuits
 Prepared control system estimates and proposals
 Managed control group consisting of three engineers and two designers
 In-field management of sub-contractors and system commissioning responsibility
JOHN L. KLUG CORPORATION, Rochester,NY
Electrical Engineer [1976 – 1979]
Designed electrical controls and automation software forcompany that specialized in producing bulk
material storage and handling systems.
 Designed PLC based control systems and related software code using Modicon products.
 Designed electrical power and control circuits
 In-field management of sub-contractors and system commissioning responsibility
EDUCATIONAL BACKGROUND
STATE UNIVERSITY OF NEW YORK AT ALFRED, Alfred, NY
A.A.S., Electro-Mechanical Engineering. 1975
Continuing Study of new Control Technology: Emerson Delta V
Areas of Independent Study: Quantum Physics, Laser Science, Electricity and Magnetism, Chemistry
ADDITIONAL
References and other Project Descriptions Furnished Upon Request

More Related Content

What's hot

Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Ron Motonaga
 
ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14Jerry Sagli
 
Mike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General ManagerMike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General ManagerMike Schomas
 
Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_ResumeJason Harvey
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary Giblock
 
Feed brochure6 05
Feed brochure6 05Feed brochure6 05
Feed brochure6 05Umer Illias
 
Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1sgr1978
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015Jeff Merrill
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010Pierre Latour
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2PhilSuter
 

What's hot (20)

Resume william bickford
Resume william bickford Resume william bickford
Resume william bickford
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16
 
DonLewandosk_Resume 2015
DonLewandosk_Resume 2015DonLewandosk_Resume 2015
DonLewandosk_Resume 2015
 
Bill White Resume
Bill White ResumeBill White Resume
Bill White Resume
 
ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14
 
Mike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General ManagerMike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General Manager
 
Jason_Harvey_Resume
Jason_Harvey_ResumeJason_Harvey_Resume
Jason_Harvey_Resume
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Feed brochure6 05
Feed brochure6 05Feed brochure6 05
Feed brochure6 05
 
Allen D. Polowinczak 2016
Allen D. Polowinczak 2016Allen D. Polowinczak 2016
Allen D. Polowinczak 2016
 
Resume_LI
Resume_LIResume_LI
Resume_LI
 
8-10-2016 resume
8-10-2016 resume8-10-2016 resume
8-10-2016 resume
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
Eds Resume 063015
Eds Resume 063015Eds Resume 063015
Eds Resume 063015
 
Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1Richardson Stephen2009 P Mupdate Rev1
Richardson Stephen2009 P Mupdate Rev1
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015
 
HPControl Renewal2010
HPControl Renewal2010HPControl Renewal2010
HPControl Renewal2010
 
Civitano_resume_2017
Civitano_resume_2017Civitano_resume_2017
Civitano_resume_2017
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 

Viewers also liked

Viewers also liked (7)

RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
 
Jennell Crump Resume 101015
Jennell Crump Resume 101015Jennell Crump Resume 101015
Jennell Crump Resume 101015
 
Feria ceibal Río Branco 2016
Feria ceibal  Río Branco 2016Feria ceibal  Río Branco 2016
Feria ceibal Río Branco 2016
 
PREVENCIÓN DEL ABUSO SEXUAL EN MENORES.
PREVENCIÓN DEL ABUSO SEXUAL EN MENORES.PREVENCIÓN DEL ABUSO SEXUAL EN MENORES.
PREVENCIÓN DEL ABUSO SEXUAL EN MENORES.
 
Cuadernillo integracion
Cuadernillo integracionCuadernillo integracion
Cuadernillo integracion
 
E didact02
E didact02E didact02
E didact02
 
Convivencia 2013
Convivencia 2013Convivencia 2013
Convivencia 2013
 

Similar to James Castronova Senior Controls Engineer Resume

Similar to James Castronova Senior Controls Engineer Resume (20)

Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano Resume
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Luis Vargas Resume
Luis Vargas ResumeLuis Vargas Resume
Luis Vargas Resume
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Len Ashton Resume
Len Ashton ResumeLen Ashton Resume
Len Ashton Resume
 
Gary Blakeley CV
Gary Blakeley CVGary Blakeley CV
Gary Blakeley CV
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 
Anbazhagan_Resume
Anbazhagan_ResumeAnbazhagan_Resume
Anbazhagan_Resume
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume C
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Anthony Pistilli_1_13_2017
Anthony Pistilli_1_13_2017Anthony Pistilli_1_13_2017
Anthony Pistilli_1_13_2017
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Cv Dab 2009a
Cv Dab 2009aCv Dab 2009a
Cv Dab 2009a
 
robert-doucette_resume_
robert-doucette_resume_robert-doucette_resume_
robert-doucette_resume_
 

James Castronova Senior Controls Engineer Resume

  • 1. JAMES CASTRONOVA 43 Bromley Road  Pittsford, NY 14534  Cell:(585) 739-8342  jccastronova@gmail.com PROFESSIONAL SUMMARY SENIOR CONTROLS ENGINEER offering expertise in the design, management, and worldwide marketing of sophisticated, fully integrated electrical control systems. A highly effective solutions-focused communicator and negotiator with extensive experience in managing and delivering projects from conception and design through fabrication, installation and customer training. A commitment to excellence in all pursuits. AREAS OF SPECIALIZATION Industrial Control/Automation Instrumentation and Electrical Controls engineering Research,specification and integration of vendor equipment Design and draw schematic wiring, power distribution, motor controls and instrumentation Design and draw field installation diagrams Design and draw control panels and test fixtures Technical writing of operations manuals PLC Programming Allen-Bradley family of PLCs incl. ControLogix  Modicon family of PLCs  RTP,OSI Soft General Electric Series 90 family of PLCs Allen-Bradley software:A.I. series,RS-Logix, RS-Logix emulate, RS-Logix 5000 Industrial Networking: Allen-Bradley: DLR, DH, DH+,RIO, DeviceNet, Ethernet, Fieldbus, Microsoft Networks,Profibus Allen-Bradley PanelView products National Instruments LabView 7.1, 8.2 MMI/SCADA/WEB Intouch-Wonderware products  Allen-Bradley RSView products  IFix 2.5-4.5  National Instruments LabView 7.1 ODBC database development and interface  Programming: VBA, Java,C++, Visual Basic  HTML, DHTML,ASP,SQL, ADO, Flash Mechanical Design Mechanical system layout and detailing Research,specification and integration of mechanical vendor equipment Project Engineering and Management Project planning and scheduling Project estimating Project proposals Project specs for fabrication and bid Sub-contractor management Construction management/field start-up Purchasing Field check-out and commissioning Management and Office Skills Management and coordination of multi- disciplined technical activities for engineers and designers Preparation of budgets Proficient with Microsoft Office products Proficient with AutoCAD 2014 Proficient with Internet and computer security Proficient with computer maintenance Sales Engineering Sold projects ranging from $25K to $4M Sales of engineering, equipment and turn-key projects
  • 2. JAMES CASTRONOVA Page Two EXPERIENCE CORNING INC, Corning, NY Senior Controls Engineer [12/04-12/15] Adecco Technical Consultant contracted to design and develop controls for Manufacturing Technology division. Responsibilities include design and drafting of electrical control systems for various glassmanufacturing processes.  Provide project management service for three major glass fusion process systems by developing scope of work, cost estimate, manpower allocation and project scheduling.  Develop software scope of work for various glass fusion process modifications.  Lead design of hardware and control panels required for major glass fusion process. Project included development of Contrologix hardware solution including DLR Ethernet networking and interface to plant wide network using managed switches.  Lead design of control system team for glass furnace operation using Contrologix PLC and IFix HMI platforms. My role included project management responsibilities, power system design oversight, HMI design, programming oversight, electrical circuit/cabinet design and commissioning.  Setup, checkout and commissioning of glass fusion process control and power systems in Taiwan, Japan and Korea.  Controls/PLC upgrade of various Steuben plant process systems and forming machinery.  Twenty four month assignment as Senior Controls engineer for Corning Steuben facilities.  Ten month assignments for Corning Japan to develop facility re-start plan and process conversion of mothballed LCD glass production processes. Checked out and commissioned fusion processes for that facilities.  Sixteen month assignment to provide technical leadership and personnel management of controls team assigned a fast tracked product development project for Corning Harrodsburg, KY. Technical disciplines included process control development, drawing package development, software development/ implementation, procurement, control panel development, installation management, checkout and commissioning.  Eighteen month assignment as Lead Design Engineer for various glass fusion process modifications for Corning Japan. Other responsibilities include design process, controlsand software for various projects in the Research and Development divisions.  Redesign of control system drawings to meet conventional P&ID standards  Designed test facility for materials R&D group including power, instrumentation and software. Used National Instruments Fieldpoint hardware with LabView 7.1 Development system to implement PID control of process,provide HMI for scientists and log experimental data to PC.  Designed controls and software for Machine development R&D group. Used National Instruments Fieldpoint hardware with LabView 8.0 Development system to implement PID control of process, provide HMI for engineers and log experimental data to PC.  Provided concept, estimate and presentation on multi-million dollar capital projects for various divisions in company  Control and power system redesign of Tube Kiln for Danville, NC facility. Developed and implemented Contrologix PLC,Panelview Plus HMI and related programming.  Provided concept and cost proposals for Delta V control system for Corning Canton, NY facility. VARIOUS CONTROLS CONTRACTUAL ASSIGNMENTS Controls Engineer [2003 – 2004] Performed controls related work on various short term contracts for different agencies and businesses after the demise of Nova Technology and before Corning.
  • 3. JAMES CASTRONOVA Page Three EXPERIENCE (continued) NOVA TECHNOLOGY INTERNATIONAL, INC., Rochester,NY ChiefEngineer/Owner [1981 – 2003] Comprehensive responsibility for the strategic launch, development, and day-to-day management of a project engineering firmspecializing in the design,fabrication, and installation of custombulk material handling systems for the glass industry. Sell systems to customersthroughout the U.S., South America, and part of Asia. Purchased Dynamec Corporation in 1981.  Built the business from the ground floor into a $3M/year operation  Supervised 15 engineers and draftsman to manage multiple projects  Managed all facets of electrical and mechanical design, estimating, sales, and project installation Professional Accomplishments Provided plant audits for a variety of manufacturers to identify problemareasand to make recommendations for production, labor and environmental improvements. Assisted major manufacturerin improving antiquated production facilities at a number of locationsthroughout the U.S. These plantssought to address the following problems. Inconsistency in product quality Spillage of raw material leading to material waste,hazardous working environment and OSHA issues Labor intensive system of production and maintenance Archaic system to collect manufacturing data for quality control and production monitoring  Frequent mechanical break-downs resulting in loss of production Solution Taking in budget and shut-down time constraints, implemented a multi-year plan for plant improvements. Phases were prioritized by significance to production improvements and return on investment benefits. First phase consisted of installation of state of the art process control system to address the quality and data issues. Production efficiency improved from 65-75% to 88-90%. Second phase consisted of replacing mechanical equipment to address breakdown and spillage issues. Ensuing phases included installing new process control equipment to address various production, environmental improvements and labor reduction issues. Provided all engineering services including electrical, mechanical and automation controls Provided project management including construction and fabrication bid packages, awarded sub-contracts and supervised all installation contractors Commissioned equipment and trained operators and maintenance personnel. Presently plants are operating at mid-90% efficiency, meet OSHA requirements and labor is reduced 50 to 75%. Assisted major manufacturerwho was undertaking significant capital improvements with in-house staff of engineers. Prior to my involvement,construction was proceeding to meet aggressive production timetable. Engineering fell behind schedule resulting in issuance of costly time and material contracts and inefficient construction labor management. Solution Redirected engineers to prioritize areas that were pertinent to construction Prepared electricalconstruction and wiring drawings. Prepared bid packages for firm price quotations Prepared installation schedule and managed installation contractors. Delivered project on schedule and stopped construction cost overruns.
  • 4. JAMES CASTRONOVA Page Four PREVIOUS EXPERIENCE _____ DYNAMEC CORPORATION, Rochester,NY Manager Electrical Engineering [1979 – 1981] Designed and installed various material handling projects for this engineering firm. Purchased the firmin 1981 which became the basis for Nova Technology International,Inc.  Designed custom control system using microprocessor based board level components. Various glass manufacturers throughout the US used the system to control bulk material unloading, weighing, mixing and delivery operations.  Designed PLC based control systems and related software code using Modicon and Allen-Bradley products.  Designed electrical power and control circuits  Prepared control system estimates and proposals  Managed control group consisting of three engineers and two designers  In-field management of sub-contractors and system commissioning responsibility JOHN L. KLUG CORPORATION, Rochester,NY Electrical Engineer [1976 – 1979] Designed electrical controls and automation software forcompany that specialized in producing bulk material storage and handling systems.  Designed PLC based control systems and related software code using Modicon products.  Designed electrical power and control circuits  In-field management of sub-contractors and system commissioning responsibility EDUCATIONAL BACKGROUND STATE UNIVERSITY OF NEW YORK AT ALFRED, Alfred, NY A.A.S., Electro-Mechanical Engineering. 1975 Continuing Study of new Control Technology: Emerson Delta V Areas of Independent Study: Quantum Physics, Laser Science, Electricity and Magnetism, Chemistry ADDITIONAL References and other Project Descriptions Furnished Upon Request