By Suresh.N – MEP Tutor
Hydraulic calculation on Elite Software
Fire Fighting Calculation
CADPOINT
R
AUTHORIZED TRAINING CENTRE
What is MEP ?
Why it is needed ?
CADPOINT
R
AUTHORIZED TRAINING CENTRE
It is enough to live in this structure ?
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Without MEP can’t able use the Space
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Fire – Fire Inform Response Evacuate
➢Good Servant But bad Master
➢Under Control
➢Not allow fire to be our master.
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Fire Triangle
Human brain Survive
without oxygen only
4 min
Fire estinguishes if oxygen
supply stop for 2 sec
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Causes of Fire
▪ House Keeping
▪ Smoking
▪ Welding / Gas cutting
▪ Ignorance of Fire hazard
▪ Kitchen
▪ Electrical Panel
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Classification of Fire
NFPA Standard for Fire fighting
National Fire protection Association
▪ Fire Alarm
▪ Fire Fighting
▪ Smoke Management
CADPOINT
R
AUTHORIZED TRAINING CENTRE
NFPA Common Codes
Nfpa 1 Uniform Fire Code
Nfpa 10 Portable Fire Extinguishers
Nfpa 11 Low-, Medium-, and High-Expansion Foam
Nfpa 12 Carbon Dioxide Extinguishing Systems
Nfpa 13 Installation of Sprinkler Systems
Nfpa 14 Installation of Standpipe and Hose Systems
Nfpa 20 Installation of Stationary Pumps for Fire Protection
Nfpa 22 Water Tanks for Private Fire Protection
Nfpa 25 Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
Nfpa 92A Smoke-Control Systems Utilizing Barriers and Pressure
Differences
Nfpa 99 Health Care Facilities
Nfpa 101 Life Safety Code
Nfpa 750 Water Mist Fire Protection Systems
Nfpa 2001 Clean Agent Fire Extinguishing Systems
Nfpa 5000 Building Construction and Safety Code
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Approved organization
1- ul Underwriters Laboratories
2- c-ul ( CSA ) Underwriters’ Laboratories of Canada
3-FM Factory Mutual Research Corporation
4-LPS Loss Prevention Standards
5- VDS Verband der Schadenversicherer
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Fire fighting systems
1- Water systems
2- Gas systems ( Co2 , FM200 , aresol , novac, …
3- Foam system
Types of Systems
Wet pipe --------- by far the most common,
Dry-pipe --------- where water freezing is possible,
Deluge ------------ for high hazard applications,
Pre-Action ------- where concerns over water
damage.
CADPOINT
R
AUTHORIZED TRAINING CENTRE
An opening sprinkler head triggers the system
❑ Pipes in protected space are filled with air or inert gas; a
n opening sprinkler head, triggers the system by releasing th
e air or gas, which allows water to flow into the pipes and th
en out through the open sprinkler head,
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Deluge Sprinkler
❑ Pipes are not filled with water (or gas),
❑All sprinkler heads are pre-opened,
❑A signal from a detection device mechanically opens a wate
r valve,
▪ water fills the pipes and flows from all heads,
▪ water flows until shut off,
▪ system is reset.
❑ Pipes in protected area are empty; a detector signal trigger
s the system, allowing water/foam to enter pipes and flow fr
om all sprinkler heads (which are already open),
❑ Pipes in protected area are empty; a detector signal trigger
s the system, allowing water to enter pipes and flow into pipi
ng network; heat from a fire may then open a sprinkler head;
accidental damage to a head will not result in water flow,
System component
1- water tank
2- pump
3- control valve
4- FCV or ZCV
5- water discharge
element ( sprinkler ,
hose )
Sprinkler
2- Temperature rating (color code ) .
Sprinkler
2- Temperature rating (color code ) fast response .
Sprinkler
4-Installation orientation (3.6.2)
Sprinkler Heads
❑ Storage Cabinet;
▪ extra heads
▪ sprinkler wrench
❑ Cabinets hold a minimum of six sprinklers and sprinkler wre
nch in accordance with NFPA® 13.
• Less than 300 heads min 6 spares
• 300 – 1,000 heads min 12 spares
• More than 1000 heads min 24 spares
Fire water tank & Pump
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Zone control Valve
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Sprinkler system
classification of system based on occupancy :
1- light hazard
Light hazard occupancies shall be defined as occupancies or portions of other occupancies wh
ere the quantity and/or combustibility of contents is low and fires with relatively low rates of h
eat release are expected
Ex : A.5.2 Light hazard occupancies include occupancies having uses and conditions similar t
o the following:
(1) Animal shelters (2) Churches
(3) Clubs
(4) Educational (5) Hospitals, including animal hospitals and veterinary facilities
(6) Institutional (7) Kennels
(8) Libraries, except large stack rooms (9) Museums
(10) Nursing or convalescent homes
(11) Offices, including data processing
(12) Residential
(13) Restaurant seating areas
(14) Theaters and auditoriums, excluding stages and prosceniums CADPOINT
R
AUTHORIZED TRAINING CENTRE
Sprinkler system
classification of system based on occupancy :
Ordinary 1 :
A.5.3.1 Ordinary hazard (Group 1) occupancies include occupancies
having uses and conditions similar to the following:
(1) Automobile parking and showrooms
(2) Bakeries
(3) Beverage manufacturing
(4) Canneries (5) Dairy products manufacturing and processing
(6) Electronic plants
(7) Glass and glass products manufacturing
(8) Laundries
(9) Restaurant service areas
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Sprinkler system
classification of system based on occupancy :
Ordinary 2 :
A.5.3.2 Ordinary hazard (Group 2) occupancies include occupancies having us
es and conditions similar to the following: (1)Agricultural facilities
(2) Cereal mills (3) Confectionery products (4) Distilleries
(5) Dry cleaners (6) Feed mills (7) Horse stables (8) Leather goods manufacturin
g
(9) Libraries — large stack room areas (10) Machine shops
(11) Metal working (12) Mercantile (13) Paper and pulp mills
(14) Paper process plants (15) Piers and wharves
(16) Plastics fabrication (17) Post offices (18) Printing and publishing (19) Repair
garages (20) Stages (21) Textile manufacturing
(22) Tire manufacturing (23) Tobacco products manufacturing
(24) Wood machining (25) Wood product assembly
classification of system based on occupancy :
Extra Hazard (Group 1).
A.5.4.1 Extra hazard (Group 1) occupancies include occupancies
having uses and conditions similar to the following
(1) Aircraft hangars (except as governed by NFPA 409)
(2) Combustible hydraulic fluid use areas
(3) Die casting
(4) Metal extruding
(5) Plywood and particleboard manufacturing
(6) Printing [using inks having flash points below 100°F (38°C)]
(7) Rubber reclaiming, compounding, drying, milling, vulcanizing
(8) Textile picking, opening, blending, garneting, or carding, combining of cotton,
synthetics, wool shoddy.
(10) Upholstering with plastic foams.
classification of system based on occupancy :
Extra Hazard (Group 2).
A.5.4.2 Extra hazard (Group 2) occupancies include occupancies
having uses and conditions similar to the following:
(1) Asphalt saturating
(2) Flammable liquids spraying
(3) Flow coating
(5) Open oil quenching
(6) Plastics manufacturing
(7) Solvent cleaning
(8) Varnish and paint dipping
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Sprinkler system Net work
Elite Hydraulic Calculation
Flowrate and Pressure
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Pump Capacity
Calculation
CADPOINT
R
AUTHORIZED TRAINING CENTRE
If the calculated pressure is below 100 psi it is not sufficient to
Operate 2 ½” Hose reel then the pressure is set to 100 psi
Pumps
Jocky Pump
1. Min requirement – 50 gpm or 10%of total water demand
Electrical Pump
1. 100 % of total calculated value
Diesel Pump
1. 100 % of total Calculated Value
BHP = Flowrate x Head / 3960 x Efficiency of Pump
Efficiency from – 0.5 to 0.75 / 1 Eq ft of pipe = 0.43 psi
Motor Horse power losses
MHP = BHP + Drive loss (5%)
Jocky Pump =
Electric Pump =
Diesel Pump =
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Tank Sizing
CADPOINT
R
AUTHORIZED TRAINING CENTRE
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Fire Tank Sizing
Tank size = Total water demand + time duration
Time duration = 90 mins ( UL laboratories std )
1 gallon = 3.785 litres
Diesel Tank Sizing
1 Hp = 1 gallon of diesel + evaporative losses
Any Questions
CADPOINT
R
AUTHORIZED TRAINING CENTRE
Johnselvaraj Nagar, Near bus stand, Kumbakonam
Contact : 0435 2423305, 9865778250, 97915 07858

More Related Content

What's hot

Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...
Bowen Ngo
 
Fire Pump Presentation.pptx
Fire Pump Presentation.pptxFire Pump Presentation.pptx
Fire Pump Presentation.pptx
Thushan9
 
Fire protection systems
Fire protection systemsFire protection systems
Fire protection systems
Her Riv
 

What's hot (20)

2. Hydrant System.pdf
2. Hydrant System.pdf2. Hydrant System.pdf
2. Hydrant System.pdf
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
Nfpa coods list2
Nfpa coods list2Nfpa coods list2
Nfpa coods list2
 
Fire Protection System Design
Fire Protection System DesignFire Protection System Design
Fire Protection System Design
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
 
Water mist prepared by salah ramadan
Water mist prepared by salah ramadanWater mist prepared by salah ramadan
Water mist prepared by salah ramadan
 
Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
 
Fire_Fighting_Course_Prepared_by.pdf
Fire_Fighting_Course_Prepared_by.pdfFire_Fighting_Course_Prepared_by.pdf
Fire_Fighting_Course_Prepared_by.pdf
 
Fundamental training on Fire Detection & Alarm System
Fundamental training on Fire Detection & Alarm SystemFundamental training on Fire Detection & Alarm System
Fundamental training on Fire Detection & Alarm System
 
Basic Guide to NFPA 13 Occupancy and Commodity Classifications
Basic Guide to NFPA 13 Occupancy and Commodity ClassificationsBasic Guide to NFPA 13 Occupancy and Commodity Classifications
Basic Guide to NFPA 13 Occupancy and Commodity Classifications
 
Fully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standardFully calculated firefighting systems with EN 12845 standard
Fully calculated firefighting systems with EN 12845 standard
 
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATIONFIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
 
Fire fighting -1 By Er. Ezaz
Fire fighting -1 By Er. EzazFire fighting -1 By Er. Ezaz
Fire fighting -1 By Er. Ezaz
 
Fire Hydrant System/Sprinkler System Fire Fighting Systems Fire Hydrant Syst...
Fire Hydrant System/Sprinkler System Fire Fighting Systems  Fire Hydrant Syst...Fire Hydrant System/Sprinkler System Fire Fighting Systems  Fire Hydrant Syst...
Fire Hydrant System/Sprinkler System Fire Fighting Systems Fire Hydrant Syst...
 
Fire Pump Presentation.pptx
Fire Pump Presentation.pptxFire Pump Presentation.pptx
Fire Pump Presentation.pptx
 
Fire hydrant system
Fire hydrant systemFire hydrant system
Fire hydrant system
 
Fire protection systems
Fire protection systemsFire protection systems
Fire protection systems
 
Fm 200 system - working and isolation method
Fm 200 system - working and isolation method Fm 200 system - working and isolation method
Fm 200 system - working and isolation method
 

Similar to FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard

K85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdfK85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdf
SecorpSAS
 
SemiStar Corp Brochure All for website.pdf
SemiStar Corp Brochure All for website.pdfSemiStar Corp Brochure All for website.pdf
SemiStar Corp Brochure All for website.pdf
Emily Tan
 
Allwin21 Product Brochures-2024.5-email.pdf
Allwin21 Product Brochures-2024.5-email.pdfAllwin21 Product Brochures-2024.5-email.pdf
Allwin21 Product Brochures-2024.5-email.pdf
Peter Chen
 
My Culligan Commercial Capabilities
My Culligan Commercial CapabilitiesMy Culligan Commercial Capabilities
My Culligan Commercial Capabilities
Marcus Montez
 
SL ENGINEERS COMPANY PROFILE__
SL ENGINEERS COMPANY PROFILE__SL ENGINEERS COMPANY PROFILE__
SL ENGINEERS COMPANY PROFILE__
Nitin Gupta
 

Similar to FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard (20)

EMERGENCY ISOLATION OF CHEMICAL PLANTS
EMERGENCY ISOLATION OF CHEMICAL PLANTS EMERGENCY ISOLATION OF CHEMICAL PLANTS
EMERGENCY ISOLATION OF CHEMICAL PLANTS
 
Bachelor’s Thesis
Bachelor’s ThesisBachelor’s Thesis
Bachelor’s Thesis
 
CTM Brochure
CTM BrochureCTM Brochure
CTM Brochure
 
CTM Brochure
CTM BrochureCTM Brochure
CTM Brochure
 
Continuous Emissions Monitoring presentation by ET
Continuous Emissions Monitoring presentation by ETContinuous Emissions Monitoring presentation by ET
Continuous Emissions Monitoring presentation by ET
 
ACI New Corporate Brochure
ACI New Corporate BrochureACI New Corporate Brochure
ACI New Corporate Brochure
 
K85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdfK85000-0391 -- Releasing Module Flyer.pdf
K85000-0391 -- Releasing Module Flyer.pdf
 
Total Chlorine Analyzer System
Total Chlorine Analyzer SystemTotal Chlorine Analyzer System
Total Chlorine Analyzer System
 
nfluids Master Technical Presentation Dec 2018
nfluids Master Technical Presentation Dec 2018 nfluids Master Technical Presentation Dec 2018
nfluids Master Technical Presentation Dec 2018
 
SemiStar Corp Brochure All for website.pdf
SemiStar Corp Brochure All for website.pdfSemiStar Corp Brochure All for website.pdf
SemiStar Corp Brochure All for website.pdf
 
Heatpulse 4100 Rapid Thermal Processor.pdf
Heatpulse 4100 Rapid Thermal Processor.pdfHeatpulse 4100 Rapid Thermal Processor.pdf
Heatpulse 4100 Rapid Thermal Processor.pdf
 
Wgcme supportive tool presentation -01-2017
Wgcme   supportive tool presentation -01-2017Wgcme   supportive tool presentation -01-2017
Wgcme supportive tool presentation -01-2017
 
Pressure Relief Systems Vol 2
Pressure Relief Systems   Vol 2Pressure Relief Systems   Vol 2
Pressure Relief Systems Vol 2
 
Containment Filtered Venting - A new approach
Containment Filtered Venting - A new approachContainment Filtered Venting - A new approach
Containment Filtered Venting - A new approach
 
How to Avoid OSHA and EPA Traps at Your Collision Center
How to Avoid OSHA and EPA Traps at Your Collision CenterHow to Avoid OSHA and EPA Traps at Your Collision Center
How to Avoid OSHA and EPA Traps at Your Collision Center
 
Allwin21 Product Brochures-2024.5-email.pdf
Allwin21 Product Brochures-2024.5-email.pdfAllwin21 Product Brochures-2024.5-email.pdf
Allwin21 Product Brochures-2024.5-email.pdf
 
My Culligan Commercial Capabilities
My Culligan Commercial CapabilitiesMy Culligan Commercial Capabilities
My Culligan Commercial Capabilities
 
Internship Report
Internship ReportInternship Report
Internship Report
 
SL ENGINEERS COMPANY PROFILE__
SL ENGINEERS COMPANY PROFILE__SL ENGINEERS COMPANY PROFILE__
SL ENGINEERS COMPANY PROFILE__
 
Drippers cataloge 2016
Drippers cataloge 2016Drippers cataloge 2016
Drippers cataloge 2016
 

Recently uploaded

Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 

Recently uploaded (20)

Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 

FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard

  • 1. By Suresh.N – MEP Tutor Hydraulic calculation on Elite Software Fire Fighting Calculation CADPOINT R AUTHORIZED TRAINING CENTRE
  • 2. What is MEP ? Why it is needed ? CADPOINT R AUTHORIZED TRAINING CENTRE
  • 3. It is enough to live in this structure ? CADPOINT R AUTHORIZED TRAINING CENTRE
  • 4. Without MEP can’t able use the Space CADPOINT R AUTHORIZED TRAINING CENTRE
  • 5.
  • 6.
  • 7. Fire – Fire Inform Response Evacuate ➢Good Servant But bad Master ➢Under Control ➢Not allow fire to be our master. CADPOINT R AUTHORIZED TRAINING CENTRE
  • 8. Fire Triangle Human brain Survive without oxygen only 4 min Fire estinguishes if oxygen supply stop for 2 sec CADPOINT R AUTHORIZED TRAINING CENTRE
  • 9. Causes of Fire ▪ House Keeping ▪ Smoking ▪ Welding / Gas cutting ▪ Ignorance of Fire hazard ▪ Kitchen ▪ Electrical Panel CADPOINT R AUTHORIZED TRAINING CENTRE
  • 11. NFPA Standard for Fire fighting National Fire protection Association ▪ Fire Alarm ▪ Fire Fighting ▪ Smoke Management CADPOINT R AUTHORIZED TRAINING CENTRE
  • 12. NFPA Common Codes Nfpa 1 Uniform Fire Code Nfpa 10 Portable Fire Extinguishers Nfpa 11 Low-, Medium-, and High-Expansion Foam Nfpa 12 Carbon Dioxide Extinguishing Systems Nfpa 13 Installation of Sprinkler Systems Nfpa 14 Installation of Standpipe and Hose Systems Nfpa 20 Installation of Stationary Pumps for Fire Protection Nfpa 22 Water Tanks for Private Fire Protection Nfpa 25 Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Nfpa 92A Smoke-Control Systems Utilizing Barriers and Pressure Differences Nfpa 99 Health Care Facilities Nfpa 101 Life Safety Code Nfpa 750 Water Mist Fire Protection Systems Nfpa 2001 Clean Agent Fire Extinguishing Systems Nfpa 5000 Building Construction and Safety Code CADPOINT R AUTHORIZED TRAINING CENTRE
  • 13. Approved organization 1- ul Underwriters Laboratories 2- c-ul ( CSA ) Underwriters’ Laboratories of Canada 3-FM Factory Mutual Research Corporation 4-LPS Loss Prevention Standards 5- VDS Verband der Schadenversicherer CADPOINT R AUTHORIZED TRAINING CENTRE
  • 14. Fire fighting systems 1- Water systems 2- Gas systems ( Co2 , FM200 , aresol , novac, … 3- Foam system
  • 15. Types of Systems Wet pipe --------- by far the most common, Dry-pipe --------- where water freezing is possible, Deluge ------------ for high hazard applications, Pre-Action ------- where concerns over water damage. CADPOINT R AUTHORIZED TRAINING CENTRE
  • 16. An opening sprinkler head triggers the system
  • 17. ❑ Pipes in protected space are filled with air or inert gas; a n opening sprinkler head, triggers the system by releasing th e air or gas, which allows water to flow into the pipes and th en out through the open sprinkler head, CADPOINT R AUTHORIZED TRAINING CENTRE
  • 18. Deluge Sprinkler ❑ Pipes are not filled with water (or gas), ❑All sprinkler heads are pre-opened, ❑A signal from a detection device mechanically opens a wate r valve, ▪ water fills the pipes and flows from all heads, ▪ water flows until shut off, ▪ system is reset.
  • 19. ❑ Pipes in protected area are empty; a detector signal trigger s the system, allowing water/foam to enter pipes and flow fr om all sprinkler heads (which are already open),
  • 20. ❑ Pipes in protected area are empty; a detector signal trigger s the system, allowing water to enter pipes and flow into pipi ng network; heat from a fire may then open a sprinkler head; accidental damage to a head will not result in water flow,
  • 21.
  • 22. System component 1- water tank 2- pump 3- control valve 4- FCV or ZCV 5- water discharge element ( sprinkler , hose )
  • 24. Sprinkler 2- Temperature rating (color code ) fast response .
  • 26. Sprinkler Heads ❑ Storage Cabinet; ▪ extra heads ▪ sprinkler wrench ❑ Cabinets hold a minimum of six sprinklers and sprinkler wre nch in accordance with NFPA® 13. • Less than 300 heads min 6 spares • 300 – 1,000 heads min 12 spares • More than 1000 heads min 24 spares
  • 27. Fire water tank & Pump CADPOINT R AUTHORIZED TRAINING CENTRE
  • 29.
  • 30. Sprinkler system classification of system based on occupancy : 1- light hazard Light hazard occupancies shall be defined as occupancies or portions of other occupancies wh ere the quantity and/or combustibility of contents is low and fires with relatively low rates of h eat release are expected Ex : A.5.2 Light hazard occupancies include occupancies having uses and conditions similar t o the following: (1) Animal shelters (2) Churches (3) Clubs (4) Educational (5) Hospitals, including animal hospitals and veterinary facilities (6) Institutional (7) Kennels (8) Libraries, except large stack rooms (9) Museums (10) Nursing or convalescent homes (11) Offices, including data processing (12) Residential (13) Restaurant seating areas (14) Theaters and auditoriums, excluding stages and prosceniums CADPOINT R AUTHORIZED TRAINING CENTRE
  • 31. Sprinkler system classification of system based on occupancy : Ordinary 1 : A.5.3.1 Ordinary hazard (Group 1) occupancies include occupancies having uses and conditions similar to the following: (1) Automobile parking and showrooms (2) Bakeries (3) Beverage manufacturing (4) Canneries (5) Dairy products manufacturing and processing (6) Electronic plants (7) Glass and glass products manufacturing (8) Laundries (9) Restaurant service areas CADPOINT R AUTHORIZED TRAINING CENTRE
  • 32. Sprinkler system classification of system based on occupancy : Ordinary 2 : A.5.3.2 Ordinary hazard (Group 2) occupancies include occupancies having us es and conditions similar to the following: (1)Agricultural facilities (2) Cereal mills (3) Confectionery products (4) Distilleries (5) Dry cleaners (6) Feed mills (7) Horse stables (8) Leather goods manufacturin g (9) Libraries — large stack room areas (10) Machine shops (11) Metal working (12) Mercantile (13) Paper and pulp mills (14) Paper process plants (15) Piers and wharves (16) Plastics fabrication (17) Post offices (18) Printing and publishing (19) Repair garages (20) Stages (21) Textile manufacturing (22) Tire manufacturing (23) Tobacco products manufacturing (24) Wood machining (25) Wood product assembly
  • 33. classification of system based on occupancy : Extra Hazard (Group 1). A.5.4.1 Extra hazard (Group 1) occupancies include occupancies having uses and conditions similar to the following (1) Aircraft hangars (except as governed by NFPA 409) (2) Combustible hydraulic fluid use areas (3) Die casting (4) Metal extruding (5) Plywood and particleboard manufacturing (6) Printing [using inks having flash points below 100°F (38°C)] (7) Rubber reclaiming, compounding, drying, milling, vulcanizing (8) Textile picking, opening, blending, garneting, or carding, combining of cotton, synthetics, wool shoddy. (10) Upholstering with plastic foams.
  • 34. classification of system based on occupancy : Extra Hazard (Group 2). A.5.4.2 Extra hazard (Group 2) occupancies include occupancies having uses and conditions similar to the following: (1) Asphalt saturating (2) Flammable liquids spraying (3) Flow coating (5) Open oil quenching (6) Plastics manufacturing (7) Solvent cleaning (8) Varnish and paint dipping CADPOINT R AUTHORIZED TRAINING CENTRE
  • 36. Elite Hydraulic Calculation Flowrate and Pressure CADPOINT R AUTHORIZED TRAINING CENTRE
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 82. If the calculated pressure is below 100 psi it is not sufficient to Operate 2 ½” Hose reel then the pressure is set to 100 psi Pumps Jocky Pump 1. Min requirement – 50 gpm or 10%of total water demand Electrical Pump 1. 100 % of total calculated value Diesel Pump 1. 100 % of total Calculated Value BHP = Flowrate x Head / 3960 x Efficiency of Pump Efficiency from – 0.5 to 0.75 / 1 Eq ft of pipe = 0.43 psi
  • 83. Motor Horse power losses MHP = BHP + Drive loss (5%) Jocky Pump = Electric Pump = Diesel Pump = CADPOINT R AUTHORIZED TRAINING CENTRE
  • 85. CADPOINT R AUTHORIZED TRAINING CENTRE Fire Tank Sizing Tank size = Total water demand + time duration Time duration = 90 mins ( UL laboratories std ) 1 gallon = 3.785 litres
  • 86. Diesel Tank Sizing 1 Hp = 1 gallon of diesel + evaporative losses
  • 88. CADPOINT R AUTHORIZED TRAINING CENTRE Johnselvaraj Nagar, Near bus stand, Kumbakonam Contact : 0435 2423305, 9865778250, 97915 07858