This document provides the standard operating procedures for HR Textile Mills Ltd's fabrics finishing section. It outlines 20 steps for processing fabrics, including requirements to dry fabrics within 24 hours, check for special chemical finishes, confirm availability of accessories, adjust parameters like pressure and softener percentage as needed, set widths and GSM as per requirements, check for shrinkage, visibility of sinker marks, and ensure quality standards are met. Problematic fabrics must be corrected quickly, and quality issues should not be ignored.