FACILITY LAYOUT
DEFINED
Facility layout can be defined as the process by which
the placement of departments, workgroups within
departments, workstations, machines, and stock-
holding points within a facility are determined
This process requires the following inputs:
 Specification of objectives of the system in terms of
output and flexibility
 Estimation of product or service demand on the system
 Processing requirements in terms of number of
operations and amount of flow between departments
and work centers
 Space requirements for the elements in the layout
 Space availability within the facility itself
Layout decisions are concerned with the arrangement
of production, support, customer service and other
facilities. Layout can be costly investments, but they
effect material (non production cost) handling, capital
equipment utilization, inventory storage levels, worker
productivity, and even group communications and
employee morale. A good layout will be enable
materials, people, and information to flow in a safe and
efficient manner.
For this reason two of the major criteria for selecting
and designing a layout are;
1. Materials-handling cost
2.worker effectiveness.
 Material- handing cost has often been considered the
most important criteria of a layout. Cost are minimized by
using belts and conveyors to automate product flows belts
and keeping the flow distances as short as possible.
Sequential processing activities are usually located in
adjacent areas. In service systems such as subways,
customer are frequently the material that moves through
the system. So the customer service time becomes a
relevant variable.
 Workers effectiveness is an increasingly important
criterion in facilities today. Good layouts provide workers
with a satisfying job and permit them to work effectively at
the highest skill level for which they are being paid. This
applies just as much to a office layout (where an engineers
might spend unnecessary time delivering memos) as it does
to a factory layout (where a machinist might have to walk
long distances for tools). Good communications systems
and well-placed supporting activity locations are critical to
the success of any facility.
Changes in
environmental
or other legal
requirements
Changes in volume of
output or mix of
products
Changes in methods
and equipment
Morale problems
THE NEED FOR LAYOUT DESIGN
LAYOUT RELATİONSHIPS;
PRODUCY DESİGN PROCESS
DESİGN
LAYOUT DESİGN
SHEDULED DESİGN
TYPES OF LAYOUT
Basic types of layouts are
Process (functional) layouts
Product (line) layouts
Fixed position layouts
Cellular Layout
 
There are many combinations of these. Flexible production systems are
line layouts that use micro processor and robots to gain some of the
advantages of functional layouts.
 
The type of layout is generally determined by the following:
Type of product: This concerns whether the product is a good or a
service, the product design and quality standards and whether the
product is produced for stock or for order.
Type of production process: This relates to the technology used, the
type of materials, handled, and for the means of providing the services.
Volume of production: Volume affects the present facility design and
capacity utilization, plus provisions for expansion or change.
 Job shop
 Batch
 Assembly line
 Continuous flow
ARE RELATED WİTH
PROCESS TYPES
 Facility layout are influenced by the level of
automation and cost of manufacturing equipment.
Many numerically controlled (CNC) machines and
industrial robots perform simple tasks such as
drilling hales or welding joints. However, as the
number of task performed by automated machinery
increases, the machines can become quite large and
expensive. In these situations the equipment and
configuration significantly influence the layout and
product floor. The more advanced systems gaining
acceptance in U.S. firms today cellular
manufacturing which is building-block step toward
flexible manufacturing system.
*Manufacturing cells also enable a firm to operate
with less work-in-process inventory.
PROCESS LAYOUT: INTERDEPARTMENTAL
FLOW
 Given
 The flow (number of moves) to and from
all departments
 The cost of moving from one department
to another
 The existing or planned physical layout
of the plant
 Determine
 The “best” locations for each
department, where best means
maximizing flow, which minimizing
costs
Process Layout –
Position of equipment is dominant consideration
PROCESS LAYOUT
 Process layouts group the people and equipment
performing similar functions, such as x-raying,
typing or electroplating. They lend themselves to
low volumes of customized jobs and use a variety
of general purpose equipment.
 Work flow is typically intermittent and guided by
individual work orders. This figures illustrates
a process layout.
PROCESS LAYOUT (JOB SHOP)
FED
A B C
Product 1
Product 2
Product 3
Product 1
Product 2
Product 3
Different products on customers flow through the facility along
different path.
 
Similar equipment processed or similar skills are grouped
together by department (or work center).
Process layouts tend to rely heavily on the planning and
professional skills of employees at all level.
 Some of Advantages of functional layouts
 Flexible systems for custom work.
 Less costly general-purpose equipment
 Enhances job satisfaction (more diversity and challenge)
 Some of Disadvantages of process layouts
 Costly materials handling
 High-cost skilled labor
 Higher supervision cost Per employee
 Low equipment utilization
 More complex production control (for instance, scheduling,
inventory, control)
 
 These layout problems fall into two basic categories
 Those involving quantitative decision criteria
 Those involving qualitative criteria.
QUANTITATIVE CRITERIA
 Various types of process layout problem can be formulated with
quantitative criteria. These include the minimization of material-handling
costs in factories and warehouses and the minimization of employee or
customer traveling time in service operations. A choice of criteria, of
course, always requires a decision on the objectives of the operations for
example;
 
 Is it more important to minimize doctor or patient traveling time in a
hospital, or should the sum of both times be minimized?
 
 Many quantitative-criteria problems concerning the location of facilities
can be expressed in the flowing form:
Tij: trips between department I and department j
Cij: cost Per unit distance Per trip traveled
Dij: distance from I to j
C: Total cost
N: number of department.
 Example: A facility that will be used to produce a single
product has three departments (A,B,C) that must be housed
in the configuration shown in figure. The inter departmental
pork centers are given in Table. In addition two trial-and-
error optional layouts are shown. Assume that the cost to
transport this product is $1 Per load food.
QUALITATIVE CRITERIA
 Layout problems involving qualitative criteria occur when
relationships between in qualitative terms. In some cases,
these qualitative criteria may be more readily available or
more appropriate than quantitative criteria.
 The qualitative location problem has been studied in depth
by Muther (1962) who has proposed a method of
formulation and solution called SLP (systematic Layout
Planning).
 According to Muther’s approach, the desirability of locating
a given department next to any other department is rated
by one of the following terms: Absolutely necessary,
Especially important, important, Ordinary closeness okay,
Unimportant, undesirable.
 These qualitative ratings may be based on safety
considerations, customer convenience, or approximate
flows between departments.
 For example, it might be desirable to locate the baby food
department near the milk department in a supermarket
for convenience of shopping. In these example it is shown
for a typical supermarket. The solution is not necessarily
an optimal solution but simply a good solution chosen for
purposes of illustration.
 Qualitative layout problems are frequently encountered in
the service industries, where customers interact with the
facilities.
 Several computerized approaches are available for
developing and analyzing process layouts. Computerized
Relative Allocation of Facilities Technique CRAFT (Soft
ware) packages program attempts to minimize material-
handling costs by calculating cost a exchanging
department. ALDEP and CORELAP programs attempt to
maximize a nearness rating within the facility dimension
constraints. None of the methods guarantees optimality.
 For example;
SOLUTİON FOR EXAMPLE:
THE OTHER EXAMPLE OF
SYSTEMATIC LAYOUT PLANNING &
SOLUTİON:
IMPORTANCE OF CLOSENESS
Value
A
E
I
O
U
X
Closeness
Line
code
Numerical
weights
Absolutely necessary
Especially important
Important
Ordinary closeness OK
Unimportant
Undesirable
16
8
4
2
0
80
EXAMPLE OF SYSTEMATIC LAYOUT
PLANNING: RELATING REASONS AND
IMPORTANCE
From
1. Credit department
2. Toy department
3. Wine department
4. Camera department
5. Candy department
6
I
--
U
4
A
--
U
--
U
1
I
1,6
A
--
U
1
X
1
X
To
2 3 4 5
Area
(sq. ft.)
100
400
300
100
100
Closeness rating
Reason for rating
Letter
Number
EXAMPLE OF SYSTEMATIC LAYOUT
PLANNING:
INITIAL RELATIONSHIP DIAGRAM
1
2
4
3
5
U U
E
A
I
The number of lines here
represent paths required
to be taken in
transactions between the
departments. The more
lines, the more the
interaction between
departments.
The number of lines here
represent paths required
to be taken in
transactions between the
departments. The more
lines, the more the
interaction between
departments.
Note here again, Depts. (1) and (2)
are linked together, and Depts. (2)
and (5) are linked together by
multiple lines or required
transactions.
Note here again, Depts. (1) and (2)
are linked together, and Depts. (2)
and (5) are linked together by
multiple lines or required
transactions.
EXAMPLE OF SYSTEMATIC LAYOUT
PLANNING:
INITIAL AND FINAL LAYOUTS
1
2 4
3
5
Initial Layout
Ignoring space and
building constraints
2
5 1 4
3
50 ft
20 ft
Final Layout
Adjusted by square
footage and building
size
Note in the
Final Layout
that Depts. (1)
and (5) are
not both
placed
directly next
to Dept. (2).
Note in the
Final Layout
that Depts. (1)
and (5) are
not both
placed
directly next
to Dept. (2).
HTTP://WWW.YOUTUBE.COM/WATCH?
V=2GBMATGAGDG&FEATURE=PLAYER_DETAİL
PAGE
http://www.youtube.com/watch?
v=uF4l1Imnc0c&feature=player_detailpage?
http://www.youtube.com/watch?
v=gpp6CvCgtNY&feature=player_detailpage
http://www.youtube.com/watch?
v=7ezjHnOATQs&feature=player_detailpage
HTTP://WWW.YOUTUBE.COM/WATCH?
V=CDM2T952JYG&FEATURE=PLAYER_DETAİLPAGEP
HTTP://WWW.YOUTUBE.COM/WATCH?
V=İ6H7NFHJHTY&FEATURE=PLAYER_DETAİLPAG
E
http://www.youtube.com/watch?
v=Cdm2t952jYg&feature=player_detailpage
http://www.youtube.com/watch?
v=i6H7nfHjHtY&feature=player_detailpageoutube.com/
watch?v=PusvVnC_4Uc&feature=player_detailpage
Product Layout – Flow of product is
dominant consideration
Adam Smith: Division of Labor
Whitney:Interchangeable parts
Ranked Positional Weight,
COMSOAL
PRODUCT LAYOUT (LINE
LAYOUT)
 Product layouts group the workers and equipment
according to the sequence of operations performed on
the product or customer. They lend themselves to the
use of (assembly line) conveyors and automated
equipment to produce large volumes of relatively few
items (for instance, refrigerators and freezers).
 Work flow is typically continuous and guided by
standardized instructions. 
 Product layout are used in both discrete
manufacturing and in process industry plants.
 It is important to distinguish process layouts from
process industries.
 Advantages
 High utilization of people and equipment
 Low material-handling cost
 Low-cost unskilled labor
 Less work-in-process inventory
 Disadvantages
 Inflexible system (unless designed for flexibility)
 High-cost specialized equipment
 Interdependent operations
 Dull, monotonous jobs (unless products are
customized or system is flexible)
 expensive machine investment.
Layout analysis has focused primarily upon these two
concerns:
Process layout attempt to minimize material-handling
costs by arranging departmental sizes and locations
according to the volume and flow rate of products.
Product layout attempt to maximize worker effectiveness
by grouping sequential work activities in to work stations
that field a high utilization of labor and equipment with a
minimum of idle time.
 
Line balancing is the apportionment of sequential work
activities in to work stations in order to gain a high
utilization of labor and equipment and therefore minimize
idle time in product layouts.
Compatible work activities are combined in to
approximately equal time groupings that do not violate
precedence relationships. The length of work time that a
component is available at each work station is the cycle
time, CT.
0.62 0.39 0.27 0.14/0.56 0.35 0.28
FIXED POSITION LAYOUT
Question: What are our primary considerations
for a fixed position layout?
Answer: Arranging materials and equipment
concentrically around the production point in their
order of use.
FIXED-POSITION LAYOUTS
 They are arrangements where labor, materials, and
equipment are brought to the work side.
 
 They apply to construction, farming, mining, and
other activities that must be completed in a particular
place. Project activities can take advantage of
network techniques (CPM and RERT) for planning
and control. Manufacturing Cells Manufacturing cells
are smaller groups of machines that are arranged
according to a similarity in the operations performed.
A close grouping of equipment for performing a
sequence of operations on multiple units of a
component or family of similar components or
products is called manufacturing a cell.
•Assembly Line Cells
Group Technology&
Celular Layout
HTTP://WWW.YOUTUBE.COM/WATCH?
V=WBPY34JCMOS&FEATURE=PLAYER_DETAİ
LPAGE
http://www.youtube.com/watch?v=iY0oBGo0-
W4&feature=player_detailpage
http://www.youtube.com/watch?
v=DkNVhtOCcrE&feature=player_detailpage
 Cellular Production
 Layout in which machines are grouped into a cell that
can process items that have similar processing
requirements
 Group Technology
 The grouping into part families of items with similar
design or manufacturing characteristics
CELLULAR LAYOUTS
BENEFITS OF GROUP TECHNOLOGY
 Changeover setup time reduced for tooling
and equipment
 Automation may be possible
 Operator may be specially trained with
improved expertise
 Quality of output improved
 In-process inventory reduced
 Productivity improved
 Lead time reduced
 Improved human relations
 Departmental (Batch Process) Specialization
Saw Saw
Lathe PressPress
Grinder
LatheLathe
Saw
Press
Heat Treat
Grinder
WE CAN SAY İN STEAD OF;
BATCH/LOT THINKING
Press
Lathe
Grinder
Grinder
A
2
BSaw
Heat Treat
LatheSaw Lathe
PressLathe
1
 Group Technology Cells
SINGLE-PIECE FLOW
THINKING
© Wiley 2007
PROCESS FLOWS BEFORE THE
USE OF GT CELLS
© Wiley 2007
PROCESS FLOWS AFTER THE USE
OF GT CELLS
Use of cellular manufacturing-affords advantages beyond
reduction of the distances that parts must be moved
between machines. Since movement reduces and is there
fore not expensive parts do not have to be moved in large
batches to spread the cost of a move over a number of units.
Frequently parts are processed one by one through the steps
of production, making the throughput time short and the
work-in-process inventory low. Cells are typically connected
with material handling equipment so that these cost are
reduced. The use of cells in repetitive manufacturing plants
greatly enhances just-in-time production methods. In
companies that hove a large variety of parts, group
technology is often helpful in selecting appropriate families
of pants that can be run in cell. Figure-3 is represented it.
They can be expended to words a FMS by adding a
supervisory computer and machines.
LAYOUT & CAPACITY AND LOADLAYOUT & CAPACITY AND LOAD
RELATİONSHİPSRELATİONSHİPS
LAYOUT & CAPACITY AND LOADLAYOUT & CAPACITY AND LOAD
RELATİONSHİPSRELATİONSHİPS
“TR 6-5 Capacitiy and
load” eklenecek!
DEPENDENT DEMAND EXAMPLEDEPENDENT DEMAND EXAMPLEDEPENDENT DEMAND EXAMPLEDEPENDENT DEMAND EXAMPLE
LOW LEVEL CODE ANALYSISLOW LEVEL CODE ANALYSISLOW LEVEL CODE ANALYSISLOW LEVEL CODE ANALYSIS
ROUGH-CUT CAPACITY PLANNING &ROUGH-CUT CAPACITY PLANNING &
DETAİLED CAPACİTY PLANNİNGDETAİLED CAPACİTY PLANNİNG
ROUGH-CUT CAPACITY PLANNING &ROUGH-CUT CAPACITY PLANNING &
DETAİLED CAPACİTY PLANNİNGDETAİLED CAPACİTY PLANNİNG
Warehouse and storage layouts
Retail layouts
Office layouts
Hospital layout
Fast Food Layout
Hotel and Motel Layout
Car Rental Layout
SPA & Healthcare Layout
SERVICE FACİLİTİES LAYOUTS
8-54
Designing Physical Surroundings to Affect Employee and
Customer Behavior
 Ambient Conditions: background characteristics such as
noise level, music, lighting, temperature, and scent.
 Spatial Layout and Functionality: reception area,
circulation paths of employees and customers, and focal
points.
 Signs, Symbols, and Artifacts: selection, orientation,
location, and size of objects.
İN THE SERVICES SECTOR
OFFICE LAYOUTS
 Human interaction and communication are
the primary considerations in office layouts
 People who need to interact frequently
should be close to each other
 One key layout tradeoff is between
closeness and privacy
OFFICE LAYOUTS
 Open concept offices promote understanding
and trust.
 A few closed rooms are needed for private
discussions, such as personnel matters.
 Moveable walls provide flexibility to change
the layout when needed.
OFFICE LAYOUT EXAMPLE
 Hi-tech company – provides equipment and
materials for rapid product design and
manufacturing
 Open office plan
 Conference room
 Areas for informal meetings
 Product showroom for customers
 Cyber café and fitness center for employees
THE OTHER EXAMPLES
• http://www.authorstream.com/Presentation/Sudiksha-
65030-Facility-Layout-Lecture-Notes-Innovations-
McDonalds-Supermarket-Retail-Education-ppt-
powerpoint/
THANKS!!!

More Related Content

What's hot

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Rajendran Ananda Krishnan
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
Anju Rana
 
Production Management
Production ManagementProduction Management
Production Management
Hiten Patel
 
Performance rating
Performance ratingPerformance rating
Performance rating
Shivam Kumar
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
Ankit Walia
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysis
Noopur Koli
 
Plant layout Production Management
Plant layout Production Management Plant layout Production Management
Plant layout Production Management
Sujen G George
 
10 principles of material handling
10 principles of material handling10 principles of material handling
10 principles of material handling
Eshwari Eshu
 
Product and process design
Product and process designProduct and process design
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
Swati Luthra
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Layout and its types.
Layout and its types.Layout and its types.
Layout and its types.
Saransh Arora
 
job shop production system in productions and operations system
job shop production system in productions and operations systemjob shop production system in productions and operations system
job shop production system in productions and operations system
ar9530
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
MANI KRISHNA
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its typesHammaduddin
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Work study
Work studyWork study
Process selection
Process selectionProcess selection
Process selection
Harold B. Duran, LCB
 

What's hot (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Production Management
Production ManagementProduction Management
Production Management
 
Performance rating
Performance ratingPerformance rating
Performance rating
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
Process selection, design & analysis
Process selection, design & analysisProcess selection, design & analysis
Process selection, design & analysis
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Plant layout Production Management
Plant layout Production Management Plant layout Production Management
Plant layout Production Management
 
10 principles of material handling
10 principles of material handling10 principles of material handling
10 principles of material handling
 
Product and process design
Product and process designProduct and process design
Product and process design
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
Layout and its types.
Layout and its types.Layout and its types.
Layout and its types.
 
Plant layout
Plant layoutPlant layout
Plant layout
 
job shop production system in productions and operations system
job shop production system in productions and operations systemjob shop production system in productions and operations system
job shop production system in productions and operations system
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Work study
Work studyWork study
Work study
 
Process selection
Process selectionProcess selection
Process selection
 

Viewers also liked

material handling system
material handling systemmaterial handling system
material handling systemDinesh Nikam
 
Material handling (Production Technology)
Material handling (Production Technology) Material handling (Production Technology)
Material handling (Production Technology)
naturesbuilder
 
Material handling
Material handlingMaterial handling
Material handling
Aditya Shah
 
Distribution management
Distribution managementDistribution management
Distribution management
Mohd Affan Ali
 
Materials Handling Ppt
Materials Handling PptMaterials Handling Ppt
Materials Handling PptColleen True
 
Material Handling
Material HandlingMaterial Handling
Material Handling
vishakeb
 
Materials handling
Materials handlingMaterials handling
Materials handling
Rohit Verma
 

Viewers also liked (8)

material handling system
material handling systemmaterial handling system
material handling system
 
Material handling (Production Technology)
Material handling (Production Technology) Material handling (Production Technology)
Material handling (Production Technology)
 
Material handling
Material handlingMaterial handling
Material handling
 
Distribution management
Distribution managementDistribution management
Distribution management
 
Materials Handling Ppt
Materials Handling PptMaterials Handling Ppt
Materials Handling Ppt
 
material-handling
material-handlingmaterial-handling
material-handling
 
Material Handling
Material HandlingMaterial Handling
Material Handling
 
Materials handling
Materials handlingMaterials handling
Materials handling
 

Similar to Facility layout-material-handling

Product service -profiling
Product service -profilingProduct service -profiling
Product service -profiling
Meenakshi Singh
 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility LayoutMOHD ARISH
 
Plant layout
Plant layout Plant layout
Plant layout
Gaurang Joshi
 
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
CyrilAlbertMercado
 
Lecture_3 (1).pptx facility layout and capacity
Lecture_3 (1).pptx facility layout and capacityLecture_3 (1).pptx facility layout and capacity
Lecture_3 (1).pptx facility layout and capacity
poonam1812yadav
 
Design of Production and Service Systems - Facilities
Design of Production and Service Systems - FacilitiesDesign of Production and Service Systems - Facilities
Design of Production and Service Systems - Facilities
Casey Ordoña
 
Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)
FNian
 
Ch09
Ch09Ch09
Ch09FNian
 
Chapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and ProductivityChapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and Productivitydpd
 
Managing the operations function
Managing the operations functionManaging the operations function
Managing the operations function
teacherTLE
 
Managing the operations function
Managing the operations functionManaging the operations function
Managing the operations function
teacherTLE
 
Layout strategy ppt @ bec doms
Layout strategy ppt @ bec domsLayout strategy ppt @ bec doms
Layout strategy ppt @ bec doms
Babasab Patil
 
Facility layout
Facility  layoutFacility  layout
Facility layout
NIPER hyderabad
 
Unit 3 outcome 3 revision pp
Unit 3 outcome 3 revision ppUnit 3 outcome 3 revision pp
Unit 3 outcome 3 revision ppcoburgpsych
 
Layout & capacity
Layout & capacityLayout & capacity
Layout & capacity
Aishwarya Malhotra
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
Fatima Aliza
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
Kealeboga Mogapi
 
Layout
LayoutLayout
LayoutFNian
 
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 BHazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
hazenbw
 

Similar to Facility layout-material-handling (20)

Product service -profiling
Product service -profilingProduct service -profiling
Product service -profiling
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility Layout
 
Plant layout
Plant layout Plant layout
Plant layout
 
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
BA205 -POM_TOPIC 9-PROCESS SELECTION, FACILITIES LAY-OUT AND LOCATION DECISIO...
 
Lecture_3 (1).pptx facility layout and capacity
Lecture_3 (1).pptx facility layout and capacityLecture_3 (1).pptx facility layout and capacity
Lecture_3 (1).pptx facility layout and capacity
 
Design of Production and Service Systems - Facilities
Design of Production and Service Systems - FacilitiesDesign of Production and Service Systems - Facilities
Design of Production and Service Systems - Facilities
 
Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)
 
Ch09
Ch09Ch09
Ch09
 
Chapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and ProductivityChapter 14 - Operations, Quality, and Productivity
Chapter 14 - Operations, Quality, and Productivity
 
Managing the operations function
Managing the operations functionManaging the operations function
Managing the operations function
 
Managing the operations function
Managing the operations functionManaging the operations function
Managing the operations function
 
Layout strategy ppt @ bec doms
Layout strategy ppt @ bec domsLayout strategy ppt @ bec doms
Layout strategy ppt @ bec doms
 
Facility layout
Facility  layoutFacility  layout
Facility layout
 
Unit 3 outcome 3 revision pp
Unit 3 outcome 3 revision ppUnit 3 outcome 3 revision pp
Unit 3 outcome 3 revision pp
 
Layout & capacity
Layout & capacityLayout & capacity
Layout & capacity
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Layout
LayoutLayout
Layout
 
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 BHazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
Hazenberg 20090527 Kennisdagen Presentatie Versie Final1 B
 

More from Ajit Kumar

Chap013 corporate culture ane leadership
Chap013  corporate culture ane leadershipChap013  corporate culture ane leadership
Chap013 corporate culture ane leadershipAjit Kumar
 
Chap012 manging internal operations
Chap012  manging internal operationsChap012  manging internal operations
Chap012 manging internal operationsAjit Kumar
 
Chap011 budiling resource strength and capabilties
Chap011  budiling resource strength and capabiltiesChap011  budiling resource strength and capabilties
Chap011 budiling resource strength and capabiltiesAjit Kumar
 
Chap010 strategy. ethics and social resposnsibility
Chap010  strategy. ethics and social resposnsibilityChap010  strategy. ethics and social resposnsibility
Chap010 strategy. ethics and social resposnsibilityAjit Kumar
 
Chap009 managing diversifcation and group
Chap009  managing diversifcation and groupChap009  managing diversifcation and group
Chap009 managing diversifcation and groupAjit Kumar
 
Chap008 fitting strategy to company and industry
Chap008  fitting strategy to company and industryChap008  fitting strategy to company and industry
Chap008 fitting strategy to company and industryAjit Kumar
 
Chap007 competing in foreign markets
Chap007 competing in foreign marketsChap007 competing in foreign markets
Chap007 competing in foreign marketsAjit Kumar
 
Chap006 alternate strategies
Chap006  alternate strategiesChap006  alternate strategies
Chap006 alternate strategiesAjit Kumar
 
Chap005 five genric strategies
Chap005  five genric strategiesChap005  five genric strategies
Chap005 five genric strategiesAjit Kumar
 
Chap004 understanding company's resources and position
Chap004  understanding company's resources and positionChap004  understanding company's resources and position
Chap004 understanding company's resources and positionAjit Kumar
 
Chap003 analysing external envrnmt
Chap003  analysing external envrnmtChap003  analysing external envrnmt
Chap003 analysing external envrnmtAjit Kumar
 
Subsidies and countervailing measures new
Subsidies and countervailing measures newSubsidies and countervailing measures new
Subsidies and countervailing measures newAjit Kumar
 
Multinational and participation strategies 1
Multinational and participation strategies 1Multinational and participation strategies 1
Multinational and participation strategies 1Ajit Kumar
 
Global recession and new business environment
Global recession and new business environmentGlobal recession and new business environment
Global recession and new business environmentAjit Kumar
 
Foreign exchange markets
Foreign exchange marketsForeign exchange markets
Foreign exchange marketsAjit Kumar
 
Anti dumping new
Anti dumping newAnti dumping new
Anti dumping newAjit Kumar
 

More from Ajit Kumar (20)

Chap013 corporate culture ane leadership
Chap013  corporate culture ane leadershipChap013  corporate culture ane leadership
Chap013 corporate culture ane leadership
 
Chap012 manging internal operations
Chap012  manging internal operationsChap012  manging internal operations
Chap012 manging internal operations
 
Chap011 budiling resource strength and capabilties
Chap011  budiling resource strength and capabiltiesChap011  budiling resource strength and capabilties
Chap011 budiling resource strength and capabilties
 
Chap010 strategy. ethics and social resposnsibility
Chap010  strategy. ethics and social resposnsibilityChap010  strategy. ethics and social resposnsibility
Chap010 strategy. ethics and social resposnsibility
 
Chap009 managing diversifcation and group
Chap009  managing diversifcation and groupChap009  managing diversifcation and group
Chap009 managing diversifcation and group
 
Chap008 fitting strategy to company and industry
Chap008  fitting strategy to company and industryChap008  fitting strategy to company and industry
Chap008 fitting strategy to company and industry
 
Chap007 competing in foreign markets
Chap007 competing in foreign marketsChap007 competing in foreign markets
Chap007 competing in foreign markets
 
Chap006 alternate strategies
Chap006  alternate strategiesChap006  alternate strategies
Chap006 alternate strategies
 
Chap005 five genric strategies
Chap005  five genric strategiesChap005  five genric strategies
Chap005 five genric strategies
 
Chap004 understanding company's resources and position
Chap004  understanding company's resources and positionChap004  understanding company's resources and position
Chap004 understanding company's resources and position
 
Chap003 analysing external envrnmt
Chap003  analysing external envrnmtChap003  analysing external envrnmt
Chap003 analysing external envrnmt
 
Wto intro
Wto introWto intro
Wto intro
 
Subsidies and countervailing measures new
Subsidies and countervailing measures newSubsidies and countervailing measures new
Subsidies and countervailing measures new
 
Multinational and participation strategies 1
Multinational and participation strategies 1Multinational and participation strategies 1
Multinational and participation strategies 1
 
Ib rt as
Ib rt asIb rt as
Ib rt as
 
Global recession and new business environment
Global recession and new business environmentGlobal recession and new business environment
Global recession and new business environment
 
Foreign exchange markets
Foreign exchange marketsForeign exchange markets
Foreign exchange markets
 
Anti dumping new
Anti dumping newAnti dumping new
Anti dumping new
 
Design notes5
Design notes5Design notes5
Design notes5
 
Design notes5
Design notes5Design notes5
Design notes5
 

Recently uploaded

Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
bosssp10
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 

Recently uploaded (20)

Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta 143
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 

Facility layout-material-handling

  • 1. FACİLİTİES LAYOUT & MATERİAL HANDLİNG SYSTEMS Prepared by evkinaz Gümü o luŞ ş ğPrepared by evkinaz Gümü o luŞ ş ğ using different references about POMusing different references about POM
  • 2.
  • 3. FACILITY LAYOUT DEFINED Facility layout can be defined as the process by which the placement of departments, workgroups within departments, workstations, machines, and stock- holding points within a facility are determined This process requires the following inputs:  Specification of objectives of the system in terms of output and flexibility  Estimation of product or service demand on the system  Processing requirements in terms of number of operations and amount of flow between departments and work centers  Space requirements for the elements in the layout  Space availability within the facility itself
  • 4. Layout decisions are concerned with the arrangement of production, support, customer service and other facilities. Layout can be costly investments, but they effect material (non production cost) handling, capital equipment utilization, inventory storage levels, worker productivity, and even group communications and employee morale. A good layout will be enable materials, people, and information to flow in a safe and efficient manner. For this reason two of the major criteria for selecting and designing a layout are; 1. Materials-handling cost 2.worker effectiveness.
  • 5.  Material- handing cost has often been considered the most important criteria of a layout. Cost are minimized by using belts and conveyors to automate product flows belts and keeping the flow distances as short as possible. Sequential processing activities are usually located in adjacent areas. In service systems such as subways, customer are frequently the material that moves through the system. So the customer service time becomes a relevant variable.  Workers effectiveness is an increasingly important criterion in facilities today. Good layouts provide workers with a satisfying job and permit them to work effectively at the highest skill level for which they are being paid. This applies just as much to a office layout (where an engineers might spend unnecessary time delivering memos) as it does to a factory layout (where a machinist might have to walk long distances for tools). Good communications systems and well-placed supporting activity locations are critical to the success of any facility.
  • 6. Changes in environmental or other legal requirements Changes in volume of output or mix of products Changes in methods and equipment Morale problems THE NEED FOR LAYOUT DESIGN
  • 7. LAYOUT RELATİONSHIPS; PRODUCY DESİGN PROCESS DESİGN LAYOUT DESİGN SHEDULED DESİGN
  • 8. TYPES OF LAYOUT Basic types of layouts are Process (functional) layouts Product (line) layouts Fixed position layouts Cellular Layout   There are many combinations of these. Flexible production systems are line layouts that use micro processor and robots to gain some of the advantages of functional layouts.   The type of layout is generally determined by the following: Type of product: This concerns whether the product is a good or a service, the product design and quality standards and whether the product is produced for stock or for order. Type of production process: This relates to the technology used, the type of materials, handled, and for the means of providing the services. Volume of production: Volume affects the present facility design and capacity utilization, plus provisions for expansion or change.
  • 9.  Job shop  Batch  Assembly line  Continuous flow ARE RELATED WİTH PROCESS TYPES
  • 10.  Facility layout are influenced by the level of automation and cost of manufacturing equipment. Many numerically controlled (CNC) machines and industrial robots perform simple tasks such as drilling hales or welding joints. However, as the number of task performed by automated machinery increases, the machines can become quite large and expensive. In these situations the equipment and configuration significantly influence the layout and product floor. The more advanced systems gaining acceptance in U.S. firms today cellular manufacturing which is building-block step toward flexible manufacturing system. *Manufacturing cells also enable a firm to operate with less work-in-process inventory.
  • 11. PROCESS LAYOUT: INTERDEPARTMENTAL FLOW  Given  The flow (number of moves) to and from all departments  The cost of moving from one department to another  The existing or planned physical layout of the plant  Determine  The “best” locations for each department, where best means maximizing flow, which minimizing costs
  • 12. Process Layout – Position of equipment is dominant consideration
  • 13. PROCESS LAYOUT  Process layouts group the people and equipment performing similar functions, such as x-raying, typing or electroplating. They lend themselves to low volumes of customized jobs and use a variety of general purpose equipment.  Work flow is typically intermittent and guided by individual work orders. This figures illustrates a process layout.
  • 14. PROCESS LAYOUT (JOB SHOP) FED A B C Product 1 Product 2 Product 3 Product 1 Product 2 Product 3
  • 15. Different products on customers flow through the facility along different path.   Similar equipment processed or similar skills are grouped together by department (or work center). Process layouts tend to rely heavily on the planning and professional skills of employees at all level.
  • 16.  Some of Advantages of functional layouts  Flexible systems for custom work.  Less costly general-purpose equipment  Enhances job satisfaction (more diversity and challenge)  Some of Disadvantages of process layouts  Costly materials handling  High-cost skilled labor  Higher supervision cost Per employee  Low equipment utilization  More complex production control (for instance, scheduling, inventory, control)    These layout problems fall into two basic categories  Those involving quantitative decision criteria  Those involving qualitative criteria.
  • 17. QUANTITATIVE CRITERIA  Various types of process layout problem can be formulated with quantitative criteria. These include the minimization of material-handling costs in factories and warehouses and the minimization of employee or customer traveling time in service operations. A choice of criteria, of course, always requires a decision on the objectives of the operations for example;    Is it more important to minimize doctor or patient traveling time in a hospital, or should the sum of both times be minimized?    Many quantitative-criteria problems concerning the location of facilities can be expressed in the flowing form: Tij: trips between department I and department j Cij: cost Per unit distance Per trip traveled Dij: distance from I to j C: Total cost N: number of department.
  • 18.  Example: A facility that will be used to produce a single product has three departments (A,B,C) that must be housed in the configuration shown in figure. The inter departmental pork centers are given in Table. In addition two trial-and- error optional layouts are shown. Assume that the cost to transport this product is $1 Per load food.
  • 19. QUALITATIVE CRITERIA  Layout problems involving qualitative criteria occur when relationships between in qualitative terms. In some cases, these qualitative criteria may be more readily available or more appropriate than quantitative criteria.  The qualitative location problem has been studied in depth by Muther (1962) who has proposed a method of formulation and solution called SLP (systematic Layout Planning).  According to Muther’s approach, the desirability of locating a given department next to any other department is rated by one of the following terms: Absolutely necessary, Especially important, important, Ordinary closeness okay, Unimportant, undesirable.  These qualitative ratings may be based on safety considerations, customer convenience, or approximate flows between departments.
  • 20.  For example, it might be desirable to locate the baby food department near the milk department in a supermarket for convenience of shopping. In these example it is shown for a typical supermarket. The solution is not necessarily an optimal solution but simply a good solution chosen for purposes of illustration.  Qualitative layout problems are frequently encountered in the service industries, where customers interact with the facilities.  Several computerized approaches are available for developing and analyzing process layouts. Computerized Relative Allocation of Facilities Technique CRAFT (Soft ware) packages program attempts to minimize material- handling costs by calculating cost a exchanging department. ALDEP and CORELAP programs attempt to maximize a nearness rating within the facility dimension constraints. None of the methods guarantees optimality.
  • 23. THE OTHER EXAMPLE OF SYSTEMATIC LAYOUT PLANNING & SOLUTİON: IMPORTANCE OF CLOSENESS Value A E I O U X Closeness Line code Numerical weights Absolutely necessary Especially important Important Ordinary closeness OK Unimportant Undesirable 16 8 4 2 0 80
  • 24. EXAMPLE OF SYSTEMATIC LAYOUT PLANNING: RELATING REASONS AND IMPORTANCE From 1. Credit department 2. Toy department 3. Wine department 4. Camera department 5. Candy department 6 I -- U 4 A -- U -- U 1 I 1,6 A -- U 1 X 1 X To 2 3 4 5 Area (sq. ft.) 100 400 300 100 100 Closeness rating Reason for rating Letter Number
  • 25. EXAMPLE OF SYSTEMATIC LAYOUT PLANNING: INITIAL RELATIONSHIP DIAGRAM 1 2 4 3 5 U U E A I The number of lines here represent paths required to be taken in transactions between the departments. The more lines, the more the interaction between departments. The number of lines here represent paths required to be taken in transactions between the departments. The more lines, the more the interaction between departments. Note here again, Depts. (1) and (2) are linked together, and Depts. (2) and (5) are linked together by multiple lines or required transactions. Note here again, Depts. (1) and (2) are linked together, and Depts. (2) and (5) are linked together by multiple lines or required transactions.
  • 26. EXAMPLE OF SYSTEMATIC LAYOUT PLANNING: INITIAL AND FINAL LAYOUTS 1 2 4 3 5 Initial Layout Ignoring space and building constraints 2 5 1 4 3 50 ft 20 ft Final Layout Adjusted by square footage and building size Note in the Final Layout that Depts. (1) and (5) are not both placed directly next to Dept. (2). Note in the Final Layout that Depts. (1) and (5) are not both placed directly next to Dept. (2).
  • 29. Product Layout – Flow of product is dominant consideration Adam Smith: Division of Labor Whitney:Interchangeable parts Ranked Positional Weight, COMSOAL
  • 30. PRODUCT LAYOUT (LINE LAYOUT)  Product layouts group the workers and equipment according to the sequence of operations performed on the product or customer. They lend themselves to the use of (assembly line) conveyors and automated equipment to produce large volumes of relatively few items (for instance, refrigerators and freezers).  Work flow is typically continuous and guided by standardized instructions.   Product layout are used in both discrete manufacturing and in process industry plants.  It is important to distinguish process layouts from process industries.
  • 31.
  • 32.  Advantages  High utilization of people and equipment  Low material-handling cost  Low-cost unskilled labor  Less work-in-process inventory  Disadvantages  Inflexible system (unless designed for flexibility)  High-cost specialized equipment  Interdependent operations  Dull, monotonous jobs (unless products are customized or system is flexible)  expensive machine investment.
  • 33. Layout analysis has focused primarily upon these two concerns: Process layout attempt to minimize material-handling costs by arranging departmental sizes and locations according to the volume and flow rate of products. Product layout attempt to maximize worker effectiveness by grouping sequential work activities in to work stations that field a high utilization of labor and equipment with a minimum of idle time.   Line balancing is the apportionment of sequential work activities in to work stations in order to gain a high utilization of labor and equipment and therefore minimize idle time in product layouts. Compatible work activities are combined in to approximately equal time groupings that do not violate precedence relationships. The length of work time that a component is available at each work station is the cycle time, CT.
  • 34.
  • 35.
  • 36.
  • 37. 0.62 0.39 0.27 0.14/0.56 0.35 0.28
  • 38. FIXED POSITION LAYOUT Question: What are our primary considerations for a fixed position layout? Answer: Arranging materials and equipment concentrically around the production point in their order of use.
  • 39. FIXED-POSITION LAYOUTS  They are arrangements where labor, materials, and equipment are brought to the work side.    They apply to construction, farming, mining, and other activities that must be completed in a particular place. Project activities can take advantage of network techniques (CPM and RERT) for planning and control. Manufacturing Cells Manufacturing cells are smaller groups of machines that are arranged according to a similarity in the operations performed. A close grouping of equipment for performing a sequence of operations on multiple units of a component or family of similar components or products is called manufacturing a cell.
  • 40. •Assembly Line Cells Group Technology& Celular Layout
  • 42.  Cellular Production  Layout in which machines are grouped into a cell that can process items that have similar processing requirements  Group Technology  The grouping into part families of items with similar design or manufacturing characteristics CELLULAR LAYOUTS
  • 43. BENEFITS OF GROUP TECHNOLOGY  Changeover setup time reduced for tooling and equipment  Automation may be possible  Operator may be specially trained with improved expertise  Quality of output improved  In-process inventory reduced  Productivity improved  Lead time reduced  Improved human relations
  • 44.  Departmental (Batch Process) Specialization Saw Saw Lathe PressPress Grinder LatheLathe Saw Press Heat Treat Grinder WE CAN SAY İN STEAD OF; BATCH/LOT THINKING
  • 45. Press Lathe Grinder Grinder A 2 BSaw Heat Treat LatheSaw Lathe PressLathe 1  Group Technology Cells SINGLE-PIECE FLOW THINKING
  • 46. © Wiley 2007 PROCESS FLOWS BEFORE THE USE OF GT CELLS
  • 47. © Wiley 2007 PROCESS FLOWS AFTER THE USE OF GT CELLS
  • 48. Use of cellular manufacturing-affords advantages beyond reduction of the distances that parts must be moved between machines. Since movement reduces and is there fore not expensive parts do not have to be moved in large batches to spread the cost of a move over a number of units. Frequently parts are processed one by one through the steps of production, making the throughput time short and the work-in-process inventory low. Cells are typically connected with material handling equipment so that these cost are reduced. The use of cells in repetitive manufacturing plants greatly enhances just-in-time production methods. In companies that hove a large variety of parts, group technology is often helpful in selecting appropriate families of pants that can be run in cell. Figure-3 is represented it. They can be expended to words a FMS by adding a supervisory computer and machines.
  • 49. LAYOUT & CAPACITY AND LOADLAYOUT & CAPACITY AND LOAD RELATİONSHİPSRELATİONSHİPS LAYOUT & CAPACITY AND LOADLAYOUT & CAPACITY AND LOAD RELATİONSHİPSRELATİONSHİPS “TR 6-5 Capacitiy and load” eklenecek!
  • 50. DEPENDENT DEMAND EXAMPLEDEPENDENT DEMAND EXAMPLEDEPENDENT DEMAND EXAMPLEDEPENDENT DEMAND EXAMPLE
  • 51. LOW LEVEL CODE ANALYSISLOW LEVEL CODE ANALYSISLOW LEVEL CODE ANALYSISLOW LEVEL CODE ANALYSIS
  • 52. ROUGH-CUT CAPACITY PLANNING &ROUGH-CUT CAPACITY PLANNING & DETAİLED CAPACİTY PLANNİNGDETAİLED CAPACİTY PLANNİNG ROUGH-CUT CAPACITY PLANNING &ROUGH-CUT CAPACITY PLANNING & DETAİLED CAPACİTY PLANNİNGDETAİLED CAPACİTY PLANNİNG
  • 53. Warehouse and storage layouts Retail layouts Office layouts Hospital layout Fast Food Layout Hotel and Motel Layout Car Rental Layout SPA & Healthcare Layout SERVICE FACİLİTİES LAYOUTS
  • 54. 8-54 Designing Physical Surroundings to Affect Employee and Customer Behavior  Ambient Conditions: background characteristics such as noise level, music, lighting, temperature, and scent.  Spatial Layout and Functionality: reception area, circulation paths of employees and customers, and focal points.  Signs, Symbols, and Artifacts: selection, orientation, location, and size of objects. İN THE SERVICES SECTOR
  • 55. OFFICE LAYOUTS  Human interaction and communication are the primary considerations in office layouts  People who need to interact frequently should be close to each other  One key layout tradeoff is between closeness and privacy
  • 56. OFFICE LAYOUTS  Open concept offices promote understanding and trust.  A few closed rooms are needed for private discussions, such as personnel matters.  Moveable walls provide flexibility to change the layout when needed.
  • 57. OFFICE LAYOUT EXAMPLE  Hi-tech company – provides equipment and materials for rapid product design and manufacturing  Open office plan  Conference room  Areas for informal meetings  Product showroom for customers  Cyber café and fitness center for employees
  • 58. THE OTHER EXAMPLES • http://www.authorstream.com/Presentation/Sudiksha- 65030-Facility-Layout-Lecture-Notes-Innovations- McDonalds-Supermarket-Retail-Education-ppt- powerpoint/