The Secret of BIM:
Intelligent Building Design
A Case Study for Building Information Modeling for Plant Environments
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
• Mr. Meissner leads Ethernautics I.T. Architecture Practice.
• 30 years of IT Engineering experience across the entire Development Cycle
• Extensive best practice experiences.
• Meissner has lead multiple large system infrastructure and integration
projects.
Michael W. Meissner, RCDD
• Solutions Architect/Infrastructure - Cyber Security Engineer
Intelligent Building Design
• Problem Statement
• Building 3D Model does not include intelligent objects that will identify the components in each
subsystem
• Clash detection is incomplete because all subsystems are not included in the 3D Model
• A building BOM is not available from the 3D Model which impacts effective cost analysis
• The building 3D Model is not transitioned to Operations and Maintenance for on-going mod packages,
etc
• Concerns
• Lessons Learned from prior buildings are not captured as complete as possible.
• Construction encounters issues related to clashes between subsystems which impact cost and schedule
• Due to a lack of information as to the components installed in each subsystem in a building, cost are
difficult to obtain.
• Operations and Maintenance must rely on red lined 2D drawings to support mod packages
• Question:
• How can Client lower the building construction cost and impact the cost of production?
• Answer:
• Ethernautics, Inc. uses technology to improve the building design to include the elimination of
subsystem clashes, create a building BOM, improve construction sequencing, and transition a working
3D Model to Operations and Maintenance.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Implementing Intelligent 3D Building Models
Answer:
Ethernautics, Inc. uses technology to improve the building design to include the elimination of
subsystem clashes, create a building BOM, improve construction sequencing, and transition a working
3D Model to Operations and Maintenance that will serve as a tool for regulatory compliance.
Establish an Intelligent 3D Model
All subsystems will be entered into
the 3D Model as intelligent objects.
Design contractors will provide
Ethernautics intelligent objects and
AutoCAD files as a design deliverable.
Intelligent objects provides the ability
to create a BOM for each subsystem.
Procurement Engineering will utilize
the intelligent objects designs to
validate construction cost.
A building BOM will be created and
cost analysis conducted to incorporate
lessons learned into future buildings.
Improve Construction Cost
Subsystem clashes will be detected
and resolved during design rather
than at the construction site.
The 3D Model will be integrated
with Primavera or other Project
Management Tool to develop a
preferred construction sequence
by vetting design, procurement,
and construction sequencing,
issues that impact construction .
All Red Lines will be modeled
before approval in order to
eliminate cascading clashes.
Transition an Intelligent 3D Building
Model to Operations & Maintenance
Information will be extracted from
the 3D Model into Cable Attributes
and Routing Schedule (CARS) for
cable management, SAP (ERP) and
Master Equipment List (MEL) for
equipment meta data.
Provide Configuration
Management records to support
regulatory compliance.
The 3D Model will be transitioned
to Operations & Maintenance and
utilized to develop Mod Packages,
Maintenance Schedules, Work
Plans and serve as a tool for
regulatory compliance.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Implementing an Intelligent 3D Building Model
Saves Time and Money
Ethernautics, Inc. has the technology to improve the building design to include the elimination of subsystem
clashes, create a building BOM, improve construction sequencing, and transition a working 3D Model to
Operations and Maintenance that will serve as a tool for Operations/Maintenance and regulatory
compliance.
Procurement Engineering will utilize the
intelligent objects designs to validate
construction cost.
A building BOM will be created and
cost analysis conducted to
incorporate lessons learned and
design improvement, easing building
replication and reducing $/Unit in
future buildings.
Improve Construction
Cost
Subsystem clashes will be detected and
resolved during design rather than at
the construction site.
All Red Lines will be modeled before
approval in order to eliminate cascading
clashes.
Current Examples
Mechanical Engineering Contractor’s structural steel design was integrated in
the 3D Model with a different vendors Process Piping design and over 200
clashes were discovered. Process Piping had to be redesigned. After BIM
Piping Contractor is redesigning the piping before it is manufactured and
shipped.
Without using the 3D Model the clashes wound not have been discovered
until installation and the piping would have had to been redesigned,
remanufactured and reshipped, impacting $’s and schedule
Low Voltage Systems communications and power conduit and pathway was
installed using “field routing” without using the 3D Model and clashed with the
Elevated Walkway, Control Power, Control Signal, Electrical Power and All
Specialty Systems backbone pathway. Systems were redesigned using the
3D Model recognizing considerable cost reduction in materials and
constructions schedule improvements.
When GEVS piping was added to the 3D Model it was discovered that the
piping was passing through Support Steel
Currently “Project Esimating” spends +$1B per year outsourcing BOM
preparation and estimating.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Clash Detection
Process
Piping Not
going thru
Penetrations
and not
connecting
with next
segment of
piping – a
muli-million
dollar
mistake?
Ethernautics – BigFoot Shoe Co.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Clash Detection
• Over 200 Hundred Clashes detected when Mechanical and
Architectural Models were merged.
• 200 X 300/hr.X 16 hrs to fix per clash
• $240,000 design hours to fix
• 200 Clashes @ $50,000 Manufacturing piping= $1,000,000
• Net Savings $760,000
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Generate BOM’s
2D Drawing to
Material Take Off
(BOM)
3D Model to
2D Drawing
Bill Of Material
Estimating
Ethernautics – BigFoot Shoe Co.
BigFoot Shoe Company – Del Mar, CA
Report Approximate Cable Lengths
Ethernautics Drawing Standards (B).vsdx
Drawn By: Michael W. Meissner
Issue Date: 09/01/2015
SIZE RMS NO DWG NO REV
SCALE 1 : 1 SHEET 1 OF 17
LEGEND:
NOTES LIST:
GENERAL NOTES:
NEXT ASSEMBLY:
DESCRIPTION:
REVISIONS
REVISION DESCRIPTION:RevNo: DATE: APPROVED:
BigFoot Shoe Company
#4 Big ToeBlvd., Crestone CO 81131 (339) 368-6453
File Creation: Meissner, Michael 9/1/2015 µ
10655 Mo onshell Ct., Suite #10, San Digo, CA 92130 (339) 368-6453
© Ethernautics Inc.- Confi dential and Proprietary- Al l Rights Reserved 2015
©1994-2016 Copyright Michael W. Meissner – Ethernautics, Inc.
Author: Michael W. Meissner
Last revised: 02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Construction Sequencing
4D Modeling (Space/Time)
•Integrate 3D model with scheduling data
•Links to Primavera and Microsoft Project
•Simulates and optimizes construct sequence
•Review impact of scheduling changes
through a simulation
•Simultaneously play multiple
scenarios: i.e. Planned vs. Actual
•Provides for the early detection of
potential scheduling issues
•Results in schedule improvements,
superior resource utilization, and
more efficient purchasing
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Schedule Simulator
•Integrate 3D model with scheduling data to
create 4D Model
•Direct links to Primavera and Microsoft Project
•Simulate scheduling sequence using a 3D
model
•Review impact of scheduling changes through
a simulation
•Simultaneously play multiple scenarios, such
as Planned vs. Actual
•Provides for the early detection of potential
scheduling issues
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
4D Model (Space/Time)
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Dynamic Animator
• Apply accurate motion to 3D objects
• Animate construction, work plans, plant mods,
operation or maintenance sequences
• Record, replay and modify scenarios
• Clash detection to identify potential problems with
the scenario
• Output to video for presentation, documentation or
training purposes
• Project savings through successful “virtual”
construction or operation prior to actual application.
• Applicability to Plant Control System (PCS) and
SCADA Systems
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Success Stories
Design Time Reduced 25% in Polymer Plant Expansion. User:
AMEC - Manchester, UK
Use of 3D Modeling Reduces New Pharmaceutical Plant
Lead-Time by 12 Months. User: VECO Rocky Mountain, Inc. -
Englewood, Colorado
3D Model of Advanced Water Reclamation Facility
Decreases Design Staffing by 10%, Construction Staffing
35%. User: Jordan, Jones & Goulding (JJG) - Atlanta, Georgia
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Return on Investment Calculator
$1.5 Million in
First year in
Rework alone
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Plant Lifecycle and SDLC
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Key Issues
• Why do we create an intelligent 2D/3D model and not use it for plant
training/operations/maintenance?
• How can we start new projects faster and complete them sooner by
leveraging data in the existing plant documents?
• How can we share engineering data with the Maintenance Management
applications?
• How do we work with non-Integrated generated data?
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Arguments for 3D Modeling
• Faster (save money, time to market, etc)
• More accurate (save money on change orders, lower total installed cost)
• Less checking (save money on man hours)
• More accurate BOM (save money on purchasing)
• More time spent doing value added engineering, less producing/managing
documents (more efficient use of expensive engineers – save money)
• Less Construction Rework and Redesign
• Customer input earlier
• Value added deliverables – e.g. 3D models instead of drawings, useful for
operator training, etc
• Better progress reporting – e.g. report on modeling and design progress rather
than drafting progress.
• Better able to handle design changes – one modeling change automatically
updates many drawings.
• Improve competitiveness vs. other E&Cs
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Minimizing Risks
• Hire an expert from another company
• Make yourself an expert by getting training and by involving our
consultants
• Plan your implementation (Hint: Build specs first)
• Avoid drafting shortcuts e.g. Don’t edit the iso, instead change the
model
• Try a pilot on a low risk project
• Build in steps
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Design Phase
• Establish/Maintain Design Basis-All Design agencies will provide data in
expectable format
• Need to share information between owners/engineering contractors-All Design
agencies will provide data in expectable format – including meta-data,
specification and equipment in digital format
• Integrate and Optimize Designs taking advantage of common pathways, anchors,
trapezes, support steel, and “real estate”
• Avoid and resolve clashes and conflicts
• Control Drawing/Document Revisions and limit field routing
• Document Workflow
• Document Review include SME’s
• Model Walkthru/Review prior to installation
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Construction Phase
• On-line access to current design information
• Materials Management, commercial grade dedication
• Construction Simulation/Constructability/Schedule Integration
• Check and Balance “red lines” to avoid cascading clashes
• Progress Tracking
• Completion of as-built drawing information as part of installation
deliverable
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Operations/Maintenance
• Integration of engineering data with maintenance/asset
management and trouble ticketing systems
• On-line access/content publishing of engineering
information to plant personnel through an easy-to-use
interface
• Maintenance of engineering data to reflect current plant
state
• Management of change
• Development of maintenance work packages
• Development of plant modification packages
• Provides reference documents of change for regulatory
compliance
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Retrofit/Revamp/Decommission
• Re-use of current design information
• As-building of existing facility information
• Check-out/transmittal of information to EPC contractors
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Capabilities
• Focus is on reuse of design data
• Common Project Environment
• Split/Merge Project Utility
• Tag Import/Export
• Data mining/extraction from legacy files
• Content publishing/management
• Component ID centric approach to data management
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Design Lifecycles
Pre-CAD Stage I Stage II
Issued
Drawing
CAD
Issued
Drawing
Manual
Layout
Issued
Drawing
CAD
Manual
Layout
Stage III
3D
CAD
Issued
Drawings
Reports
Spec Sheets
And BOM
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Engineering Content Publishing
The picture can't be displayed.
The picture can't be displayed.
The picture can't be displayed.
The picture can't be displayed.
Design Drawings
Reports
•Specifications
•Cable Attributes and Route
Scheduling (CARS)
•Master Equipment List (MEL)
•Bill of Material (BOM’s)
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Ethernautics - Data Model
FILE
SYSTEM
ODBC
DATABASE
ADD-INSDOC MGMT
DATABASE
INVENTORY
DATABASE
MAINTENANCE
DATABASE
INSPECTION
DATABASE
STRUCTURAL INSTRUM.
3D PIPING P & ID
FULL TEXT
SEARCH
PROJECT
DATABASE
AutoPLANT
Data Manager)
AUTOPLANT GENERATED
CONTENT
THIRD PARTY
APPLICATIONS
LEGACY SYSTEM
CONTENT
Data Manager
TAG #’s
DOC #’s
TEXT
.DWG
.DXF
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Collaborative Efficiency
Across the Lifecycle
Greenfield Project Workflow
Detailed
Design/
Project Mgmt
Detailed
Design
Detailed
Design
Review/
Approval
Construction
Operations/
Maintenance
Update/
Retrofit
Preliminary
Design
Evaluation
Owner/Operator
EPC Lead
Sub-Contractor
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Project Characteristics
• Drawings & data are newly generated from AutoPLANT content
• AutoPLANT design apps are used for content creation
• Director used for content review and management
• The ‘perfect world’ approach
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Split/Merge/Update Utility
• Used to facilitate hand over/return of project information
• Split – breaks one project into two or more
• Transmittal to EPC/Sub-contractors
• Create separate engineering work packages
• At the completion the new project is read to be transmitted
via FTP, CD, etc.
•
• Merge – combine two or more projects into one
• Check/validate tags
• Import sub-projects into master
• Clash Detection Reports
• Update – updates child project back to parent project
• Import sub-projects into master
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Split Project
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Revamp Project Workflow
Detailed
Design/
Project Mgmt
Detailed
Design
Review/
Approval
Legacy
CAD files
As-build to
current state
Non-Rebis
Design
ContentConstruction
Operations/
Maintenance
Inventory
Files
Evaluate
Retrofit
Vendor
Prints
Detailed
Design
Operations
Documents
Owner/Operator
EPC Lead
Sub-Contractor
Non-Rebis
Content
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Project Characteristics
• Large number of legacy files
• Substantial non-AutoPLANT design content
• As-building requires a significant effort
• More typical of a live facility
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Plant Model
Project
Database
Process & Instrumentation
• Instrumentation & Wiring
• Data Manager
• Hookups
• Datasheets
Bentley Navigator
• Design Review
• Interference Detection
• Schedule simulation
• Animation
Prosteel
• Modeling
• Engineering
• Detailing
AutoPLANT 3D Plant Design
• Piping
• Equipment
• Raceways / Conduit
• Isometrics
Piping Stress Analysis
• AutoPipe
• Plant Flow
AutoPLANT P&ID
Structural Analysis
• Staad / RAM Products
Product Selection
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Bentley Data Manager
● Dynamic Data Input and Management – Data entered in the project database can be viewed, edited and
compiled into reports. Because all AutoPLANT applications share the same common database all
additions, deletions and modifications made in Data Manager are reflected in the other applications.
● Diverse Functions – Powerful filter, query, sort
and replace functions reduce time-intensive tasks
of searching for and modifying specific data. The
Property Sheet function dramatically reduces data
entry tasks by allowing users to edit common
data for multiple records.
● Data Manager provides an automated link to
the Datasheets module to dynamically create
datasheets from process, instrumentation and
equipment data.
Bentley Data Manager is a powerful content management tool designed to automate the time-intensive
task of managing plant data, creating reports and customizing project structures. Data Manager is fully
integrated with all Bentley’s Process and Instrumentation applications and may be used throughout the
entire project Lifecycle.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
•Graphical interface into the Project Database.
• Manage project tag data outside of the CAD
interface.
• Make global modifications easily which in turn
modifies the Cad drawings and models.
• Filter / Querying / Sorting Project Information.
• Extensive reporting capabilities.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Bentley Data Sheets
• Bentley Datasheets is an add-on module for the Process &
Instrumentation applications enabling the user to produce and manage
both equipment and instrumentation datasheets. Like the other
products, it is fully linked to the project database.
• Data can be modified offsite with Microsoft Excel and returned
electronically to the central office. Changes are easily re-synchronized
with the project database.
• A library of industry-standard templates including orifice
plates and flanges, magnetic flow meters thermocouples,
thermowells and pressure instruments. Equipment
datasheet templates are provided for heat exchangers,
boilers, pumps and tanks.
• Templates can be easily modified to company standards.
Existing datasheet templates in Excel format. They can be
reused by mapping the cell name to the appropriate
database field.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
• Detailed Excel spreadsheets linked to the Project Database.
• Fields in the datasheet can be synchronized with fields in the Project
database.
• Many Datasheet templates delivered out of the box for Valves,
Equipment and Instruments (Clients have a good start point).
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Bentley Instrument & Wiring
● Industry Standard Templates – An extensive
library of industry-standard templates for DCS and
PC controllers is provided.
● Fast, Accurate Data Entry – A user friendly interface with menu-driven help features. Easily configurable
views displays all instrument and electrical related data generated in the other AutoPLANT modules.
● Intuitive Connection Interface – An intuitive drag-and-drop
feature within the Layout Designer function lets the user
quickly define instruments, motor loops and panels with
their terminal strips and connections. After creation,
layouts they can be saved as templates for quick
generation of similar loops.
Instrumentation & Wiring is the ideal tool for creating loop and termination drawings, wiring diagrams,
motor schematics and single line diagrams. It is linked to the relational project database and thus all
AutoPLANT / PlantSpace applications. Changes made in the database via other modules are reflected
in the loop sheets and electrical diagrams.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
•Instrumentation and Wiring reads the same Project
Database as the AutoPLANT
•P&ID program so all Instruments in the P&ID’s are
ready for more detailed information.
•Graphical Interface (Layout Designer) used for
connecting Instruments together.
•Automated Loop Diagrams and other Electrical
Schematics.
•Bentley Hook-ups Add in module.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
AutoPLANT P&ID
• Bentley AutoPLANT P&ID is an AutoCAD-based program that
enables you to create intelligent Piping and Instrument Diagrams
(P&ID), Process Flow Diagrams (PFD) and other Piping Schematics.
• Provides multi-user access to graphical intelligence stored in SQL, Oracle or other
popular database formats
• Windows-based, user-friendly drafting tool automates the insertion of typical symbols
assuring consistency and shortening overall design time
• Detailed Process Line, Valve, Instrument and
Equipment lists are produced automatically
• Bidirectional functionality using Process and
instrumentation programs
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
• Delivered with hundreds of intelligent symbols using various industry
standards for Rapid
• Creation of intelligent P&ID’s.
• Bi-directional link to Project Database using Data Manager.
• Create Equipment, Valve, Instrument and Line list reports.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
AutoPLANT Equipment
3D layout and design of intelligent vessels, nozzles and equipment
drawings
• Parametric Equipment – Changes to parametric
values are applied to the model updating the
equipment.
• Standard Equipment Types – Equipment includes a
wide range of standard equipment types including
pumps, vessels, tanks, filters, heaters and
exchangers.
• Custom Equipment – Custom equipment is easily
built from intelligent parametric primitives.
• User-defined Equipment – Equipment can be
constructed from solids and other geometry
inserted into an equipment model.
• Intelligent Nozzles – provides a variety of options
for placing and orientating nozzles, that can be edited
after insertion. The intelligence associated to the
nozzle is available to the Piping application.
• Integration – integrated with the schematic
information entered using P&ID.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
• Tools to integrate AutoPLANT P&ID with the 3d
interface.
• All Equipment is parametric so it is easy to modify
after Placement.
• Create fast and accurate reports for Equipment and
Nozzles.
• Create Orthographic drawings from 3d models.
• Quickly start modeling using AutoPLANT Piping
connecting Flanges to the
• Nozzles placed using the Equipment Module.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
AutoPLANT Piping
Detailed Design of piping systems in a 3D environment
• Specification Driven – Piping utilizes a Spec-Driven
approach to design maximizing quality by ensuring
compliance with applicable design criteria.
• Easy to learn - User-friendly menus and toolbars
enables users to easily create models.
• Powerful Editing – React to design changes. Editing
features such as change size/change spec, rotate
components, delete and mend.
• Multiple Piping System Modules - Modules included
are Ductile, Victalic, PVC, Lined Pipe, HVAC, Cable
Tray, Conduit and more.
• Integration – Piping is integrated with the schematic
information entered using P&ID.
• Any Industry - an overall solution for process and
manufacturing industries, including automotive, biotech,
chemicals, electronics, food and beverage, mineral and
metals, oil and gas, pharmaceutical, power, pulp and
paper, shipbuilding and Water Wastewater.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
• Get fast and accurate Reports and Bill of Materials from
the 3d model.
• Create automated Isometrics using ISOGEN which is
delivered with the Piping products.
• Create Orthographic drawings from 3d models.
• Both products are Spec / Catalog driven and thousands
of vendor components are delivered with the product.
• Integrated with Bentley AutoPIPE for pipe stress analysis.
• Both products come with modules for Modeling Cable
Tray, Conduit. and HVAC.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
AutoPLANT Raceways
Detailed modeling of cable tray and conduit systems in a 3D environment
• Intelligent – Component data is dynamically linked to an external project database.
The database information can be used to generate reports, or to globally
manipulate and revise the descriptive component data.
• Easy to learn – RACEWAYS combines speed and power into an intuitive, graphical
interface that makes the process of creating models easier than ever.
• Efficiency – RACEWAYS has been
designed to make your job easier by
reducing drawing time and automating
traditionally time-intensive tasks.
• Integration – You can easily share
data between the entire suite of
Bentley AutoPLANT products.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
• Model Cable Tray and Conduit in a 3D
environment for Interference detection.
• Both products are Spec / Catalog driven
with vendor components.
• Get fast and accurate Reports and
material take offs from the 3d model.
• Create Orthographic drawings from 3d
models.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
AutoPLANT ISOMETRICS
AutoPLANT ISOMETRICS produces intelligent isometric drawings
• Spec-Driven - ISOMETRICS provides database catalogs of tens of thousands of
components from which manufacturer-specific specifications may be produced.
• Easy to learn – AutoPLANT ISOMETRICS combines speed and power into an
intuitive, graphical interface that makes the process of creating isometrics easier
than ever.
• Efficiency – The automatic generation of isometrics includes the capability to
automatically generate and place annotation, dimensions, and Bill of Materials.
• Integration – Integrated with AutoPLANT
piping which lets you create intelligent
isometrics from your 3d models.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
•Enables the ability to create intelligent ISOMETRICS.
•Get fast and accurate Bill of materials from the
ISOMETRIC.
•Create Intelligent ISOMETRICS from your
AutoPLANT Piping model.
•Both products are Spec / Catalog driven with
vendor components.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Isometric Clarification
AutoPLANT
•ISOGEN is included with the AutoPLANT Piping
Product – Used for automatic generation of “Non-
Intelligent” Isometric drawings from your 3D model.
•AutoPLANT Isometrics – Used to generate
“Intelligent” isometrics manually. AutoPLANT
Isometrics also INCLUDES a program called
AUTOISO that is used to create “Intelligent”
Isometric drawings from your 3D model.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
ProSteel
Modeler - Allows you to quickly generate accurate 3D steel models in an AutoCAD-
based environment. Using the extensive toolset, engineers and designers can
model virtually any steel arrangement for any type of construction. Modeler is
delivered complete with many shapes and standards so you can begin designing
immediately.
Engineering- Includes all the powerful features of Modeler, plus the ability to generate
engineering drawings and part/material lists.
Detailer/Professional- is a complete structural solution. It includes all the features
of Modeler and Engineering, plus the ability to automatically generate
the following directly from the model:
• Fabrication drawings
• NC (Numerically Controlled) data
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
•Both products are delivered with imperial and
metrics shape catalogs from around the world.
•Quickly model any steel structure with intuitive
commands from either program.
•Get fast and accurate Reports / Parts list from the
3d model.
•Create Plans and Sections with the 2d Detail center
in Prosteel.
•Integrated with Bentley Staad and RAM products
for stress analysis.
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Bentley Navigator
● Database Polling – Allows the user to select and isolate individual
objects for review. The user can interrogate database information from
the AutoPLANT Piping and Equipment modules.
● Complete Photo Realistic rendering and animation with output to
popular formats
● Output to 3D PDF format directly from within ProjectWise Navigator or
Publish to an i-model which adds intelligence.
● Clash Resolution add in.
● Schedule Simulation add in – Primavera and MS Project
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Advantages
•View and Redline DWG and DGN files
•Model review / Component Review
•Fly through / walk through / Animations
•Interference detection
•Schedule Simulation
•Photo Realistic rendering
•Creation of 3d PDF’s and i-models for model review
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
Mr. Michael William Meissner, RCDD
Solutions and Infrastructure Architect: Cyber Security Engineer
Business Phone: +1.339.368.6453
Mobile: +1.720.257.3933
Email: Michael@ethernautics.com
Web Site: https://sites.google.com/site/michaelwmeissner/home
LinkedIn: http://www.linkedin.com/in/michaelwmeissner
Ethernautics, Inc.
10655 Moonshell Ct.
Suite #10
San Diego, California 9213
U.S.A.
Business Phone: 1.339.368.6453
Facsimile: 1.877.871.6453
www.ethernautics.com
©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc.
Author:MichaelW. Meissner
Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)

More Related Content

Viewers also liked

Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
Khaled Ali
 
Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)
Ridhwan Zakaria
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
gatti Teja
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
Khyati Saggu
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
Rupesh Chaurasia
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
Mohd. Ikhwan
 
Smart building controls and energy management system trends
Smart building controls and energy management system trends  Smart building controls and energy management system trends
Smart building controls and energy management system trends
BSRIA
 
Smart Buildings + Intelligent Solutions
Smart Buildings + Intelligent SolutionsSmart Buildings + Intelligent Solutions
Smart Buildings + Intelligent Solutions
Bob Sawhill, CFM
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
Vinay M
 
Intelligent building ppt
Intelligent building pptIntelligent building ppt
Intelligent building ppt
Being Deepak
 

Viewers also liked (10)

Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
 
Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Smart building controls and energy management system trends
Smart building controls and energy management system trends  Smart building controls and energy management system trends
Smart building controls and energy management system trends
 
Smart Buildings + Intelligent Solutions
Smart Buildings + Intelligent SolutionsSmart Buildings + Intelligent Solutions
Smart Buildings + Intelligent Solutions
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
Intelligent building ppt
Intelligent building pptIntelligent building ppt
Intelligent building ppt
 

Similar to Ethernautics Intelligent Building Design (BIM)

The Importance of MEP Coordination in Construction Project.
The Importance of MEP Coordination in Construction Project.The Importance of MEP Coordination in Construction Project.
The Importance of MEP Coordination in Construction Project.
Chandresh Chudasama
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)Sara Teymoor
 
MEP Modeling Services New
MEP Modeling Services NewMEP Modeling Services New
MEP Modeling Services New
AEO Design Consultants
 
Building information modeling services new zealand
Building information modeling services new zealand  Building information modeling services new zealand
Building information modeling services new zealand
Silicon Engineering Consultants Ltd
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
IRJET Journal
 
What you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxWhat you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docx
eubanksnefen
 
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdfUnleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
MarsBIM1
 
Autodesk revit MEP performance by design
Autodesk revit MEP performance by designAutodesk revit MEP performance by design
Autodesk revit MEP performance by design
ali lemssefer
 
Building Information Modeling Services New Zealand
Building Information Modeling Services New ZealandBuilding Information Modeling Services New Zealand
Building Information Modeling Services New Zealand
Silicon Engineering Consultants Limited
 
Cape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKCape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKClarke Morrison
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...
Ravindra SSK Medicharla
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...
IRJET Journal
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
IRJET Journal
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
Ruchy Lakhani
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
vaibhavchaudhary7017
 
BIM Coordination Services | Silicon Engineering Consultant NZ.pptx
BIM Coordination Services | Silicon Engineering Consultant NZ.pptxBIM Coordination Services | Silicon Engineering Consultant NZ.pptx
BIM Coordination Services | Silicon Engineering Consultant NZ.pptx
Siliconecnewzealand
 
Enhancing Efficiency: MEP BIM Services in Building Systems
Enhancing Efficiency: MEP BIM Services in Building SystemsEnhancing Efficiency: MEP BIM Services in Building Systems
Enhancing Efficiency: MEP BIM Services in Building Systems
Michael William
 
Introduction to BIM - by Sagar Kagathara
Introduction to BIM - by Sagar KagatharaIntroduction to BIM - by Sagar Kagathara
Introduction to BIM - by Sagar Kagathara
piratedsoul
 
ARQvision keynote
ARQvision keynoteARQvision keynote
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
BIMLABS GLOBAL
 

Similar to Ethernautics Intelligent Building Design (BIM) (20)

The Importance of MEP Coordination in Construction Project.
The Importance of MEP Coordination in Construction Project.The Importance of MEP Coordination in Construction Project.
The Importance of MEP Coordination in Construction Project.
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
 
MEP Modeling Services New
MEP Modeling Services NewMEP Modeling Services New
MEP Modeling Services New
 
Building information modeling services new zealand
Building information modeling services new zealand  Building information modeling services new zealand
Building information modeling services new zealand
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
What you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxWhat you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docx
 
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdfUnleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
Unleashing Innovation Advancing MEP Projects with 3D Modeling.pdf
 
Autodesk revit MEP performance by design
Autodesk revit MEP performance by designAutodesk revit MEP performance by design
Autodesk revit MEP performance by design
 
Building Information Modeling Services New Zealand
Building Information Modeling Services New ZealandBuilding Information Modeling Services New Zealand
Building Information Modeling Services New Zealand
 
Cape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKCape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESK
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
 
BIM Coordination Services | Silicon Engineering Consultant NZ.pptx
BIM Coordination Services | Silicon Engineering Consultant NZ.pptxBIM Coordination Services | Silicon Engineering Consultant NZ.pptx
BIM Coordination Services | Silicon Engineering Consultant NZ.pptx
 
Enhancing Efficiency: MEP BIM Services in Building Systems
Enhancing Efficiency: MEP BIM Services in Building SystemsEnhancing Efficiency: MEP BIM Services in Building Systems
Enhancing Efficiency: MEP BIM Services in Building Systems
 
Introduction to BIM - by Sagar Kagathara
Introduction to BIM - by Sagar KagatharaIntroduction to BIM - by Sagar Kagathara
Introduction to BIM - by Sagar Kagathara
 
ARQvision keynote
ARQvision keynoteARQvision keynote
ARQvision keynote
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 

Recently uploaded

ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 

Recently uploaded (20)

ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 

Ethernautics Intelligent Building Design (BIM)

  • 1. Welcome The Secret of BIM: Intelligent Building Design A Case Study for Building Information Modeling for Plant Environments ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 2. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7) • Mr. Meissner leads Ethernautics I.T. Architecture Practice. • 30 years of IT Engineering experience across the entire Development Cycle • Extensive best practice experiences. • Meissner has lead multiple large system infrastructure and integration projects. Michael W. Meissner, RCDD • Solutions Architect/Infrastructure - Cyber Security Engineer
  • 3. Intelligent Building Design • Problem Statement • Building 3D Model does not include intelligent objects that will identify the components in each subsystem • Clash detection is incomplete because all subsystems are not included in the 3D Model • A building BOM is not available from the 3D Model which impacts effective cost analysis • The building 3D Model is not transitioned to Operations and Maintenance for on-going mod packages, etc • Concerns • Lessons Learned from prior buildings are not captured as complete as possible. • Construction encounters issues related to clashes between subsystems which impact cost and schedule • Due to a lack of information as to the components installed in each subsystem in a building, cost are difficult to obtain. • Operations and Maintenance must rely on red lined 2D drawings to support mod packages • Question: • How can Client lower the building construction cost and impact the cost of production? • Answer: • Ethernautics, Inc. uses technology to improve the building design to include the elimination of subsystem clashes, create a building BOM, improve construction sequencing, and transition a working 3D Model to Operations and Maintenance. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 4. Implementing Intelligent 3D Building Models Answer: Ethernautics, Inc. uses technology to improve the building design to include the elimination of subsystem clashes, create a building BOM, improve construction sequencing, and transition a working 3D Model to Operations and Maintenance that will serve as a tool for regulatory compliance. Establish an Intelligent 3D Model All subsystems will be entered into the 3D Model as intelligent objects. Design contractors will provide Ethernautics intelligent objects and AutoCAD files as a design deliverable. Intelligent objects provides the ability to create a BOM for each subsystem. Procurement Engineering will utilize the intelligent objects designs to validate construction cost. A building BOM will be created and cost analysis conducted to incorporate lessons learned into future buildings. Improve Construction Cost Subsystem clashes will be detected and resolved during design rather than at the construction site. The 3D Model will be integrated with Primavera or other Project Management Tool to develop a preferred construction sequence by vetting design, procurement, and construction sequencing, issues that impact construction . All Red Lines will be modeled before approval in order to eliminate cascading clashes. Transition an Intelligent 3D Building Model to Operations & Maintenance Information will be extracted from the 3D Model into Cable Attributes and Routing Schedule (CARS) for cable management, SAP (ERP) and Master Equipment List (MEL) for equipment meta data. Provide Configuration Management records to support regulatory compliance. The 3D Model will be transitioned to Operations & Maintenance and utilized to develop Mod Packages, Maintenance Schedules, Work Plans and serve as a tool for regulatory compliance. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 5. Implementing an Intelligent 3D Building Model Saves Time and Money Ethernautics, Inc. has the technology to improve the building design to include the elimination of subsystem clashes, create a building BOM, improve construction sequencing, and transition a working 3D Model to Operations and Maintenance that will serve as a tool for Operations/Maintenance and regulatory compliance. Procurement Engineering will utilize the intelligent objects designs to validate construction cost. A building BOM will be created and cost analysis conducted to incorporate lessons learned and design improvement, easing building replication and reducing $/Unit in future buildings. Improve Construction Cost Subsystem clashes will be detected and resolved during design rather than at the construction site. All Red Lines will be modeled before approval in order to eliminate cascading clashes. Current Examples Mechanical Engineering Contractor’s structural steel design was integrated in the 3D Model with a different vendors Process Piping design and over 200 clashes were discovered. Process Piping had to be redesigned. After BIM Piping Contractor is redesigning the piping before it is manufactured and shipped. Without using the 3D Model the clashes wound not have been discovered until installation and the piping would have had to been redesigned, remanufactured and reshipped, impacting $’s and schedule Low Voltage Systems communications and power conduit and pathway was installed using “field routing” without using the 3D Model and clashed with the Elevated Walkway, Control Power, Control Signal, Electrical Power and All Specialty Systems backbone pathway. Systems were redesigned using the 3D Model recognizing considerable cost reduction in materials and constructions schedule improvements. When GEVS piping was added to the 3D Model it was discovered that the piping was passing through Support Steel Currently “Project Esimating” spends +$1B per year outsourcing BOM preparation and estimating. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 6. Clash Detection Process Piping Not going thru Penetrations and not connecting with next segment of piping – a muli-million dollar mistake? Ethernautics – BigFoot Shoe Co. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7) ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 7. Clash Detection • Over 200 Hundred Clashes detected when Mechanical and Architectural Models were merged. • 200 X 300/hr.X 16 hrs to fix per clash • $240,000 design hours to fix • 200 Clashes @ $50,000 Manufacturing piping= $1,000,000 • Net Savings $760,000 ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 8. Generate BOM’s 2D Drawing to Material Take Off (BOM) 3D Model to 2D Drawing Bill Of Material Estimating Ethernautics – BigFoot Shoe Co. BigFoot Shoe Company – Del Mar, CA Report Approximate Cable Lengths Ethernautics Drawing Standards (B).vsdx Drawn By: Michael W. Meissner Issue Date: 09/01/2015 SIZE RMS NO DWG NO REV SCALE 1 : 1 SHEET 1 OF 17 LEGEND: NOTES LIST: GENERAL NOTES: NEXT ASSEMBLY: DESCRIPTION: REVISIONS REVISION DESCRIPTION:RevNo: DATE: APPROVED: BigFoot Shoe Company #4 Big ToeBlvd., Crestone CO 81131 (339) 368-6453 File Creation: Meissner, Michael 9/1/2015 µ 10655 Mo onshell Ct., Suite #10, San Digo, CA 92130 (339) 368-6453 © Ethernautics Inc.- Confi dential and Proprietary- Al l Rights Reserved 2015 ©1994-2016 Copyright Michael W. Meissner – Ethernautics, Inc. Author: Michael W. Meissner Last revised: 02/15/2016 1:53:59 PM PDT (UTC/GMT –7) ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 9. Construction Sequencing 4D Modeling (Space/Time) •Integrate 3D model with scheduling data •Links to Primavera and Microsoft Project •Simulates and optimizes construct sequence •Review impact of scheduling changes through a simulation •Simultaneously play multiple scenarios: i.e. Planned vs. Actual •Provides for the early detection of potential scheduling issues •Results in schedule improvements, superior resource utilization, and more efficient purchasing ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 10. Schedule Simulator •Integrate 3D model with scheduling data to create 4D Model •Direct links to Primavera and Microsoft Project •Simulate scheduling sequence using a 3D model •Review impact of scheduling changes through a simulation •Simultaneously play multiple scenarios, such as Planned vs. Actual •Provides for the early detection of potential scheduling issues ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 11. 4D Model (Space/Time) ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 12. Dynamic Animator • Apply accurate motion to 3D objects • Animate construction, work plans, plant mods, operation or maintenance sequences • Record, replay and modify scenarios • Clash detection to identify potential problems with the scenario • Output to video for presentation, documentation or training purposes • Project savings through successful “virtual” construction or operation prior to actual application. • Applicability to Plant Control System (PCS) and SCADA Systems ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 13. Success Stories Design Time Reduced 25% in Polymer Plant Expansion. User: AMEC - Manchester, UK Use of 3D Modeling Reduces New Pharmaceutical Plant Lead-Time by 12 Months. User: VECO Rocky Mountain, Inc. - Englewood, Colorado 3D Model of Advanced Water Reclamation Facility Decreases Design Staffing by 10%, Construction Staffing 35%. User: Jordan, Jones & Goulding (JJG) - Atlanta, Georgia ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 14. Return on Investment Calculator $1.5 Million in First year in Rework alone ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 15. Plant Lifecycle and SDLC ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 16. Key Issues • Why do we create an intelligent 2D/3D model and not use it for plant training/operations/maintenance? • How can we start new projects faster and complete them sooner by leveraging data in the existing plant documents? • How can we share engineering data with the Maintenance Management applications? • How do we work with non-Integrated generated data? ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 17. Arguments for 3D Modeling • Faster (save money, time to market, etc) • More accurate (save money on change orders, lower total installed cost) • Less checking (save money on man hours) • More accurate BOM (save money on purchasing) • More time spent doing value added engineering, less producing/managing documents (more efficient use of expensive engineers – save money) • Less Construction Rework and Redesign • Customer input earlier • Value added deliverables – e.g. 3D models instead of drawings, useful for operator training, etc • Better progress reporting – e.g. report on modeling and design progress rather than drafting progress. • Better able to handle design changes – one modeling change automatically updates many drawings. • Improve competitiveness vs. other E&Cs ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 18. Minimizing Risks • Hire an expert from another company • Make yourself an expert by getting training and by involving our consultants • Plan your implementation (Hint: Build specs first) • Avoid drafting shortcuts e.g. Don’t edit the iso, instead change the model • Try a pilot on a low risk project • Build in steps ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 19. Design Phase • Establish/Maintain Design Basis-All Design agencies will provide data in expectable format • Need to share information between owners/engineering contractors-All Design agencies will provide data in expectable format – including meta-data, specification and equipment in digital format • Integrate and Optimize Designs taking advantage of common pathways, anchors, trapezes, support steel, and “real estate” • Avoid and resolve clashes and conflicts • Control Drawing/Document Revisions and limit field routing • Document Workflow • Document Review include SME’s • Model Walkthru/Review prior to installation ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 20. Construction Phase • On-line access to current design information • Materials Management, commercial grade dedication • Construction Simulation/Constructability/Schedule Integration • Check and Balance “red lines” to avoid cascading clashes • Progress Tracking • Completion of as-built drawing information as part of installation deliverable ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 21. Operations/Maintenance • Integration of engineering data with maintenance/asset management and trouble ticketing systems • On-line access/content publishing of engineering information to plant personnel through an easy-to-use interface • Maintenance of engineering data to reflect current plant state • Management of change • Development of maintenance work packages • Development of plant modification packages • Provides reference documents of change for regulatory compliance ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 22. Retrofit/Revamp/Decommission • Re-use of current design information • As-building of existing facility information • Check-out/transmittal of information to EPC contractors ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 23. Capabilities • Focus is on reuse of design data • Common Project Environment • Split/Merge Project Utility • Tag Import/Export • Data mining/extraction from legacy files • Content publishing/management • Component ID centric approach to data management ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 24. Design Lifecycles Pre-CAD Stage I Stage II Issued Drawing CAD Issued Drawing Manual Layout Issued Drawing CAD Manual Layout Stage III 3D CAD Issued Drawings Reports Spec Sheets And BOM ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 25. Engineering Content Publishing The picture can't be displayed. The picture can't be displayed. The picture can't be displayed. The picture can't be displayed. Design Drawings Reports •Specifications •Cable Attributes and Route Scheduling (CARS) •Master Equipment List (MEL) •Bill of Material (BOM’s) ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 26. Ethernautics - Data Model FILE SYSTEM ODBC DATABASE ADD-INSDOC MGMT DATABASE INVENTORY DATABASE MAINTENANCE DATABASE INSPECTION DATABASE STRUCTURAL INSTRUM. 3D PIPING P & ID FULL TEXT SEARCH PROJECT DATABASE AutoPLANT Data Manager) AUTOPLANT GENERATED CONTENT THIRD PARTY APPLICATIONS LEGACY SYSTEM CONTENT Data Manager TAG #’s DOC #’s TEXT .DWG .DXF ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 27. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7) Collaborative Efficiency Across the Lifecycle
  • 28. Greenfield Project Workflow Detailed Design/ Project Mgmt Detailed Design Detailed Design Review/ Approval Construction Operations/ Maintenance Update/ Retrofit Preliminary Design Evaluation Owner/Operator EPC Lead Sub-Contractor ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 29. Project Characteristics • Drawings & data are newly generated from AutoPLANT content • AutoPLANT design apps are used for content creation • Director used for content review and management • The ‘perfect world’ approach ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 30. Split/Merge/Update Utility • Used to facilitate hand over/return of project information • Split – breaks one project into two or more • Transmittal to EPC/Sub-contractors • Create separate engineering work packages • At the completion the new project is read to be transmitted via FTP, CD, etc. • • Merge – combine two or more projects into one • Check/validate tags • Import sub-projects into master • Clash Detection Reports • Update – updates child project back to parent project • Import sub-projects into master ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 31. Split Project ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 32. Revamp Project Workflow Detailed Design/ Project Mgmt Detailed Design Review/ Approval Legacy CAD files As-build to current state Non-Rebis Design ContentConstruction Operations/ Maintenance Inventory Files Evaluate Retrofit Vendor Prints Detailed Design Operations Documents Owner/Operator EPC Lead Sub-Contractor Non-Rebis Content ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 33. Project Characteristics • Large number of legacy files • Substantial non-AutoPLANT design content • As-building requires a significant effort • More typical of a live facility ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 34. Plant Model Project Database Process & Instrumentation • Instrumentation & Wiring • Data Manager • Hookups • Datasheets Bentley Navigator • Design Review • Interference Detection • Schedule simulation • Animation Prosteel • Modeling • Engineering • Detailing AutoPLANT 3D Plant Design • Piping • Equipment • Raceways / Conduit • Isometrics Piping Stress Analysis • AutoPipe • Plant Flow AutoPLANT P&ID Structural Analysis • Staad / RAM Products Product Selection ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 35. Bentley Data Manager ● Dynamic Data Input and Management – Data entered in the project database can be viewed, edited and compiled into reports. Because all AutoPLANT applications share the same common database all additions, deletions and modifications made in Data Manager are reflected in the other applications. ● Diverse Functions – Powerful filter, query, sort and replace functions reduce time-intensive tasks of searching for and modifying specific data. The Property Sheet function dramatically reduces data entry tasks by allowing users to edit common data for multiple records. ● Data Manager provides an automated link to the Datasheets module to dynamically create datasheets from process, instrumentation and equipment data. Bentley Data Manager is a powerful content management tool designed to automate the time-intensive task of managing plant data, creating reports and customizing project structures. Data Manager is fully integrated with all Bentley’s Process and Instrumentation applications and may be used throughout the entire project Lifecycle. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 36. Advantages •Graphical interface into the Project Database. • Manage project tag data outside of the CAD interface. • Make global modifications easily which in turn modifies the Cad drawings and models. • Filter / Querying / Sorting Project Information. • Extensive reporting capabilities. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 37. Bentley Data Sheets • Bentley Datasheets is an add-on module for the Process & Instrumentation applications enabling the user to produce and manage both equipment and instrumentation datasheets. Like the other products, it is fully linked to the project database. • Data can be modified offsite with Microsoft Excel and returned electronically to the central office. Changes are easily re-synchronized with the project database. • A library of industry-standard templates including orifice plates and flanges, magnetic flow meters thermocouples, thermowells and pressure instruments. Equipment datasheet templates are provided for heat exchangers, boilers, pumps and tanks. • Templates can be easily modified to company standards. Existing datasheet templates in Excel format. They can be reused by mapping the cell name to the appropriate database field. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 38. Advantages • Detailed Excel spreadsheets linked to the Project Database. • Fields in the datasheet can be synchronized with fields in the Project database. • Many Datasheet templates delivered out of the box for Valves, Equipment and Instruments (Clients have a good start point). ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 39. Bentley Instrument & Wiring ● Industry Standard Templates – An extensive library of industry-standard templates for DCS and PC controllers is provided. ● Fast, Accurate Data Entry – A user friendly interface with menu-driven help features. Easily configurable views displays all instrument and electrical related data generated in the other AutoPLANT modules. ● Intuitive Connection Interface – An intuitive drag-and-drop feature within the Layout Designer function lets the user quickly define instruments, motor loops and panels with their terminal strips and connections. After creation, layouts they can be saved as templates for quick generation of similar loops. Instrumentation & Wiring is the ideal tool for creating loop and termination drawings, wiring diagrams, motor schematics and single line diagrams. It is linked to the relational project database and thus all AutoPLANT / PlantSpace applications. Changes made in the database via other modules are reflected in the loop sheets and electrical diagrams. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 40. Advantages •Instrumentation and Wiring reads the same Project Database as the AutoPLANT •P&ID program so all Instruments in the P&ID’s are ready for more detailed information. •Graphical Interface (Layout Designer) used for connecting Instruments together. •Automated Loop Diagrams and other Electrical Schematics. •Bentley Hook-ups Add in module. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 41. AutoPLANT P&ID • Bentley AutoPLANT P&ID is an AutoCAD-based program that enables you to create intelligent Piping and Instrument Diagrams (P&ID), Process Flow Diagrams (PFD) and other Piping Schematics. • Provides multi-user access to graphical intelligence stored in SQL, Oracle or other popular database formats • Windows-based, user-friendly drafting tool automates the insertion of typical symbols assuring consistency and shortening overall design time • Detailed Process Line, Valve, Instrument and Equipment lists are produced automatically • Bidirectional functionality using Process and instrumentation programs ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 42. Advantages • Delivered with hundreds of intelligent symbols using various industry standards for Rapid • Creation of intelligent P&ID’s. • Bi-directional link to Project Database using Data Manager. • Create Equipment, Valve, Instrument and Line list reports. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 43. AutoPLANT Equipment 3D layout and design of intelligent vessels, nozzles and equipment drawings • Parametric Equipment – Changes to parametric values are applied to the model updating the equipment. • Standard Equipment Types – Equipment includes a wide range of standard equipment types including pumps, vessels, tanks, filters, heaters and exchangers. • Custom Equipment – Custom equipment is easily built from intelligent parametric primitives. • User-defined Equipment – Equipment can be constructed from solids and other geometry inserted into an equipment model. • Intelligent Nozzles – provides a variety of options for placing and orientating nozzles, that can be edited after insertion. The intelligence associated to the nozzle is available to the Piping application. • Integration – integrated with the schematic information entered using P&ID. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 44. Advantages • Tools to integrate AutoPLANT P&ID with the 3d interface. • All Equipment is parametric so it is easy to modify after Placement. • Create fast and accurate reports for Equipment and Nozzles. • Create Orthographic drawings from 3d models. • Quickly start modeling using AutoPLANT Piping connecting Flanges to the • Nozzles placed using the Equipment Module. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 45. AutoPLANT Piping Detailed Design of piping systems in a 3D environment • Specification Driven – Piping utilizes a Spec-Driven approach to design maximizing quality by ensuring compliance with applicable design criteria. • Easy to learn - User-friendly menus and toolbars enables users to easily create models. • Powerful Editing – React to design changes. Editing features such as change size/change spec, rotate components, delete and mend. • Multiple Piping System Modules - Modules included are Ductile, Victalic, PVC, Lined Pipe, HVAC, Cable Tray, Conduit and more. • Integration – Piping is integrated with the schematic information entered using P&ID. • Any Industry - an overall solution for process and manufacturing industries, including automotive, biotech, chemicals, electronics, food and beverage, mineral and metals, oil and gas, pharmaceutical, power, pulp and paper, shipbuilding and Water Wastewater. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 46. Advantages • Get fast and accurate Reports and Bill of Materials from the 3d model. • Create automated Isometrics using ISOGEN which is delivered with the Piping products. • Create Orthographic drawings from 3d models. • Both products are Spec / Catalog driven and thousands of vendor components are delivered with the product. • Integrated with Bentley AutoPIPE for pipe stress analysis. • Both products come with modules for Modeling Cable Tray, Conduit. and HVAC. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 47. AutoPLANT Raceways Detailed modeling of cable tray and conduit systems in a 3D environment • Intelligent – Component data is dynamically linked to an external project database. The database information can be used to generate reports, or to globally manipulate and revise the descriptive component data. • Easy to learn – RACEWAYS combines speed and power into an intuitive, graphical interface that makes the process of creating models easier than ever. • Efficiency – RACEWAYS has been designed to make your job easier by reducing drawing time and automating traditionally time-intensive tasks. • Integration – You can easily share data between the entire suite of Bentley AutoPLANT products. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 48. Advantages • Model Cable Tray and Conduit in a 3D environment for Interference detection. • Both products are Spec / Catalog driven with vendor components. • Get fast and accurate Reports and material take offs from the 3d model. • Create Orthographic drawings from 3d models. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 49. AutoPLANT ISOMETRICS AutoPLANT ISOMETRICS produces intelligent isometric drawings • Spec-Driven - ISOMETRICS provides database catalogs of tens of thousands of components from which manufacturer-specific specifications may be produced. • Easy to learn – AutoPLANT ISOMETRICS combines speed and power into an intuitive, graphical interface that makes the process of creating isometrics easier than ever. • Efficiency – The automatic generation of isometrics includes the capability to automatically generate and place annotation, dimensions, and Bill of Materials. • Integration – Integrated with AutoPLANT piping which lets you create intelligent isometrics from your 3d models. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 50. Advantages •Enables the ability to create intelligent ISOMETRICS. •Get fast and accurate Bill of materials from the ISOMETRIC. •Create Intelligent ISOMETRICS from your AutoPLANT Piping model. •Both products are Spec / Catalog driven with vendor components. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 51. Isometric Clarification AutoPLANT •ISOGEN is included with the AutoPLANT Piping Product – Used for automatic generation of “Non- Intelligent” Isometric drawings from your 3D model. •AutoPLANT Isometrics – Used to generate “Intelligent” isometrics manually. AutoPLANT Isometrics also INCLUDES a program called AUTOISO that is used to create “Intelligent” Isometric drawings from your 3D model. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 52. ProSteel Modeler - Allows you to quickly generate accurate 3D steel models in an AutoCAD- based environment. Using the extensive toolset, engineers and designers can model virtually any steel arrangement for any type of construction. Modeler is delivered complete with many shapes and standards so you can begin designing immediately. Engineering- Includes all the powerful features of Modeler, plus the ability to generate engineering drawings and part/material lists. Detailer/Professional- is a complete structural solution. It includes all the features of Modeler and Engineering, plus the ability to automatically generate the following directly from the model: • Fabrication drawings • NC (Numerically Controlled) data ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 53. Advantages •Both products are delivered with imperial and metrics shape catalogs from around the world. •Quickly model any steel structure with intuitive commands from either program. •Get fast and accurate Reports / Parts list from the 3d model. •Create Plans and Sections with the 2d Detail center in Prosteel. •Integrated with Bentley Staad and RAM products for stress analysis. ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 54. Bentley Navigator ● Database Polling – Allows the user to select and isolate individual objects for review. The user can interrogate database information from the AutoPLANT Piping and Equipment modules. ● Complete Photo Realistic rendering and animation with output to popular formats ● Output to 3D PDF format directly from within ProjectWise Navigator or Publish to an i-model which adds intelligence. ● Clash Resolution add in. ● Schedule Simulation add in – Primavera and MS Project ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 55. Advantages •View and Redline DWG and DGN files •Model review / Component Review •Fly through / walk through / Animations •Interference detection •Schedule Simulation •Photo Realistic rendering •Creation of 3d PDF’s and i-models for model review ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)
  • 56. Mr. Michael William Meissner, RCDD Solutions and Infrastructure Architect: Cyber Security Engineer Business Phone: +1.339.368.6453 Mobile: +1.720.257.3933 Email: Michael@ethernautics.com Web Site: https://sites.google.com/site/michaelwmeissner/home LinkedIn: http://www.linkedin.com/in/michaelwmeissner Ethernautics, Inc. 10655 Moonshell Ct. Suite #10 San Diego, California 9213 U.S.A. Business Phone: 1.339.368.6453 Facsimile: 1.877.871.6453 www.ethernautics.com ©1994-2016 Copyright MichaelW.Meissner – Ethernautics,Inc. Author:MichaelW. Meissner Last revised:02/15/2016 1:53:59 PM PDT (UTC/GMT –7)