ORIGINAL PAPER
Estimating Design Effect and Calculating Sample Size
for Respondent-Driven Sampling Studies of Injection
Drug Users in the United States
Cyprian Wejnert • Huong Pham • Nevin Krishna •
Binh Le • Elizabeth DiNenno
Published online: 15 February 2012
Ó Springer Science+Business Media, LLC (outside the USA) 2012
Abstract Respondent-driven sampling (RDS) has become
increasingly popular for sampling hidden populations,
including injecting drug users (IDU). However, RDS data
are unique and require specialized analysis techniques,
many of which remain underdeveloped. RDS sample size
estimation requires knowing design effect (DE), which can
only be calculated post hoc. Few studies have analyzed
RDS DE using real world empirical data. We analyze
estimated DE from 43 samples of IDU collected using a
standardized protocol. We find the previous recommenda-
tion that sample size be at least doubled, consistent with
DE = 2, underestimates true DE and recommend
researchers use DE = 4 as an alternate estimate when
calculating sample size. A formula for calculating sample
size for RDS studies among IDU is presented. Researchers
faced with limited resources may wish to accept slightly
higher standard errors to keep sample size requirements
low. Our results highlight dangers of ignoring sampling
design in analysis.
Keywords Respondent-driven sampling Á Design effect Á
Sample size Á Injecting drug users Á HIV Á Hidden
populations
Resumen El muestreo dirigido por los participantes
(RDS, por sus siglas en ingle´s) es cada vez ma´s utilizado
para tomar muestras de poblaciones ocultas, como las de
usuarios de drogas inyectables (UDI). Sin embargo, los
datos del RDS son muy particulares y requieren de te´cnicas
de ana´lisis especializado, muchas de las cuales no se han
desarrollado. Para estimar el taman˜o de la muestra del RDS
es necesario conocer los efectos del disen˜o (DE, por sus
siglas en ingle´s), los cuales solo pueden ser calculados en
forma posterior. Pocos estudios han analizado el DE del
RDS utilizando datos empı´ricos reales. Nosotros analiza-
mos el DE de 43 muestras de UDI recolectadas a trave´s de
un protocolo estandarizado. Determinamos que la recom-
endacio´n anterior de que por lo menos se duplique el
taman˜o de la muestra, congruente con DE = 2, subestima
DE verdaderos, por lo que recomendamos a los investiga-
dores utilizar DE = 4 como una estimacio´n alternativa
para calcular el taman˜o de la muestra. Se presenta una
fo´rmula para calcular el taman˜o de la muestra para estudios
con RDS que incluyan UDI. Es posible que los investiga-
dores que cuenten con pocos recursos tengan que aceptar
errores estandarizados ligeramente superiores para man-
tener limitados los requisitos del taman˜o de la muestra.
Nuestros resultados destacan los peligros al ignorar el
disen˜o del muestreo en el ana´lisis.
Introduction
Although the number of human immunodeficiency virus
(HIV) infections attributed to injection drug use decreased
between 2006 and 2009 in the United States [1], persons
who inject drugs remain at increased risk of HIV infection.
A recent analysis of IDU in 23 cities in the United States
Disclaimer The findings and conclusions in this paper are those
of the authors and do not necessarily represent the official position
of the Centers for Disease Control and Prevention
C. Wejnert (&) Á N. Krishna Á B. Le Á E. DiNenno
Division of HIV/AIDS Prevention, National Center for HIV/
AIDS, Viral Hepatitis, STD and TB Prevention, Centers for
Disease Control and Prevention, 1600 Clifton Road NE,
Mailstop E-46, Atlanta, GA 30333, USA
e-mail: cwejnert@cdc.gov
H. Pham
ICF International, Atlanta, GA, USA
123
AIDS Behav (2012) 16:797–806
DOI 10.1007/s10461-012-0147-8
[2] found high proportions engaging in HIV risk behaviors.
The National HIV/AIDS Strategy for the United States [3]
identifies injecting drug users (IDU) as a priority popula-
tion for HIV prevention efforts. However, the illicit, stig-
matized nature of injection drug use makes surveillance
and sampling of IDU for research difficult. IDU are a
hidden population which cannot be accessed using standard
sampling methodologies.
Respondent-driven sampling (RDS) is a peer-referral
sampling and analysis method that provides a way to
account for several sources of bias and calculate population
estimates [4–6] now widely used to reach hidden popula-
tions including many at high risk for HIV [7]. IDU are an
especially well-suited population for RDS methodology
because they rely on social networks for much of their
livelihood, including access to drugs, income, and safety.
This reliance requires them to form cohesive social
exchange networks, which are ideal for RDS. Furthermore,
IDU are difficult for researchers to study due to the stig-
matized, illegal nature of their activities and the danger
posed to field researchers working in their communities [8].
RDS’ peer-to-peer recruitment of respondents fosters trust
and promotes participation while also reducing field staff’s
exposure to dangerous environments while conducting
research [9].
RDS has become increasingly popular in studies of IDU
in the U.S. [10, 11] and abroad [7]. While studies collecting
RDS data are numerous, many RDS analytical techniques
are still under development due to the complex nature of
RDS data and relatively short time since its debut in 1997
[12]. One currently under-developed technique is a priori
sample size calculation.
Calculating sample size requirements is a necessary
preliminary step to proposing, planning, and implementing
a successful study. However, in RDS, this calculation is
complicated by the peer-driven nature of RDS data and
their analysis [13]. RDS analysis is similar to analysis of
stratified samples where sampling weights are applied
during analysis to adjust for non-uniform sampling prob-
ability. However, while such samples are usually stratified
by variables of interest, such as race or income, with preset
selection probabilities determined by the researcher, RDS
samples are stratified by the target population’s underlying
network structure which is unknown to researchers. For
this reason, data on network structure are collected during
sampling and used to calculate sampling weights post hoc
[4]. Thus, sample size estimation, which requires knowing
selection probabilities, cannot currently be directly calcu-
lated a priori.
Cornfield [14] proposed that sample size for complex
surveys can be calculated by first calculating the sample
size required for a simple random sample (SRS) and then
adjusted by a measure of the complex sampling method’s
efficiency compared to SRS, termed the design effect (DE)
[15]:
n ¼ DE Á
Pa 1 À Pað Þ
SE Pað Þð Þ2
ð1Þ
where n is the sample size; Pa 1ÀPað Þ
SE Pað Þð Þ
2 is the common for-
mula for calculating required SRS sample size for some
proportion Pa; SE is the standard error; and DE is the
design effect of the actual sampling method used.
Following Kish [15] we define DE as the ratio of the
variance of the estimate observed with RDS, VarRDS
ðPaÞ,
to the expected variance of the estimate had the sample
been collected using simple random sampling (SRS),
VarSRS
ðPaÞ as follows:
DE ¼
VarRDS
ðPaÞ
VarSRS
ðPaÞ
ð2Þ
where VarSRS
ðPaÞ ¼ Pað1ÀPaÞ
n : Consequently, DE compares
the observed variance under a complex sampling method—
in this case RDS—to that expected for the same estimate
under an SRS of similar size [15]. Consequently, DE
measures the increase in sample size required to achieve the
same power as that of an SRS. For example, a sampling
design with DE = 3 requires a sample three times as large
as an SRS to achieve the same power [16]. Comparing
sampling methods to SRS is mathematically convenient
here because calculating power, and consequently estimat-
ing sample size, is straightforward for SRS. Consequently,
knowing DE for a given sampling method provides a means
for estimating sample size [14]. However, SRS and RDS are
not directly comparable in an empirical setting. RDS was
developed to reach hidden-populations which, by definition,
cannot be sampled using SRS methods. A comparison of
RDS to other hidden-population methodologies, such as
time-location sampling, is beyond the scope of this paper;
however we expect all such methods to have similar limi-
tations in comparison to SRS [17].
The definition of DE assumes knowledge of variance
associated with a given estimate. However, the only way to
truly measure the variance would be to take repeated
samples from the same population simultaneously. Given
limited resources, researchers are left with two options for
estimating the underlying variance: (1) estimate the vari-
ance based on a single sample of real world data or (2)
create an estimate of the population and simulate repeated
samples from that estimate. In both approaches, the
researcher is forced to make mathematical assumptions
regarding the behavior of participants and the probability
of selection. For established sampling methods, such as
SRS, this is not problematic because the probabilities of
selection are well understood and a single, agreed upon
variance calculation exists for real (not simulated) data. For
798 AIDS Behav (2012) 16:797–806
123
less established methods, such as RDS, the sampling
probabilities are not yet well understood and multiple
methods of calculating variance may exist with no agreed
upon best approach. In such cases, the calculated DE rep-
resents an estimated design effect, denoted cDE throughout
this paper.
To date, few studies of RDS cDEs have been conducted.
One often-cited publication suggests RDS samples have a
cDE of at least two and recommends samples sizes should be
at least double that required for a comparable SRS design
[18]. However, An RDS study of sex workers in Brazil
reported cDE = 2.63 [19]. Another RDS study of under-
graduate students found an average cDE of 3.14 [13]. Fur-
thermore, using simulated data, Goel and Salganik [20] find
RDS cDEs may reach above 20, suggestingRDS analysis may
produce highly unstable samples. While empirical evidence
suggests RDS estimates are too accurate to support such
large cDEs [21], further research is needed to determine if a
generalized cDE can be applied to RDS studies of certain
populations or if the commonly applied recommendation of
cDE = 2 should be adjusted. If, for example, a review of
many RDS studies found relatively consistent cDEs across
variables and samples, then this cDE could be applied to
calculate sample size in future RDS studies.
Methods and Data
Methods for NHBS among IDU (NHBS-IDU) are described
in detail elsewhere [10] and briefly reported here. NHBS is a
community-based survey that conducts interviews and HIV
testing among 3 high risk populations: IDU, men who have
sex with men, and heterosexuals at increased risk for HIV
infection [22]. Data used in this paper were collected during
the first two cycles of NHBS-IDU (NHBS-IDU1 from 2005
to 2006 and NHBS-IDU2 in 2009). NHBS-IDU is con-
ducted by the Centers for Disease Control and Prevention
(CDC) in collaboration with state and local health depart-
ments in over 20 of 96 large metropolitan statistical areas
(those with population greater than 500,000) within the
United States (termed ‘‘cities’’ throughout), where approx-
imately 60% of the nation’s AIDS cases had been reported
[23]. Health departments in each city received local IRB
approval for study activities. CDC reviewed the protocol
and determined CDC staff was not-engaged; therefore CDC
IRB approval was not required.
Each city operated at least one interview field site that
was chosen to be accessible to drug-use networks identified
during formative research. Following standard RDS pro-
cedures [12, 24], each city began RDS with a limited
number of diverse initial recruits, or ‘‘seeds’’ (n = 3–35).
Respondents were provided number-coded coupons with
which to recruit other IDU they knew personally. The
number of coupons given to each respondent varied by city
and ranged from three to six. Within some cities, the
number of coupons given varied throughout sampling to
regulate the flow of individuals seeking interviews and to
reduce the number of coupons in the community as the
sample size was approached. Respondents were compen-
sated both for their participation and for each eligible
recruit who completed the survey.
NHBS-IDU procedures included eligibility screening,
informed consent from participants, and an interviewer-
administered survey. Eligibility for NHBS-IDU included
being age 18 or older, a resident of the city, not having
previously participated in the current NHBS data collection
cycle, being able to complete the survey in English or
Spanish, and having injected drugs within 12 months pre-
ceding the interview date as measured by self-report and
either evidence of recent injection or adequate description
of injection practices [10]. The survey measured charac-
teristics of participants’ IDU networks, demographics, drug
use and injection practices, sexual behaviors, HIV testing
history, and use of HIV prevention services. Participants in
NHBS-IDU2 were also offered an HIV test in conjunction
with the survey.
NHBS-IDU1 was conducted from May 2005 through
February 2006 in 23 cities. NHBS-IDU2 was conducted
from June 2009 through December 2009 in 20 cities, 18 of
which were included in NHBS-IDU1. Our results are based
on two cycles of data collection from 18 cities and 1 cycle
of data collection from seven cities, five from NHBS-IDU1
and two from NHBS-IDU2 (Fig. 1). For this analysis, RDS
data from each city are treated as independent samples.
Data from each city were analyzed separately. Results from
city level analysis are pooled and presented here by cycle.
In total 43 samples (23 samples from NHBS-IDU1 and 20
from NHS-IDU2) were included. Data collection time
varied across cities, due to differences in timing for human
subjects approvals, logistics, and speed of sampling.
All cities implemented a single protocol during each
cycle. Field operations across all cities were standardized
and followed common RDS procedures [24], however,
individual cities were provided flexibility, such as deter-
mining the number of coupons given or interview locations
used, to meet local challenges. While not its primary pur-
pose, the presence of multiple simultaneous samples in the
NHBS-IDU research design provides a means for evalu-
ating RDS methodology when used to study populations at
increased risk for HIV.
To meet public health goals, NHBS focused on those
cites with the largest burden of AIDS disease based on
most recent available data at the time cites were being
AIDS Behav (2012) 16:797–806 799
123
chosen: NHBS-IDU1 cities were chosen based on AIDS
data available from 2000; NHBS-IDU2 cities were chosen
based on AIDS data available from 2004 [23]. As such, the
cities are not necessarily representative of all U.S. cities or
IDU populations. However, NHBS cities are chosen to
ensure coverage of diverse geographic areas in the United
States and likely represent typical U.S. cities in which RDS
studies of IDU or other hard-to-reach populations would be
conducted.
Measures
Efficiency of network-based samples, such as RDS, is
correlated with homophily in the social network [4].
Homophily is the network principal that similar individuals
are more likely to form social connections than dissimilar
ones.
In networks where members are defined by a specific
stigmatized activity—such as injection drug use—the
highest homophily variables tend to be basic demographic
characteristics [25]. Based on formative research, we
identified three key NHBS-IDU variables likely to have
high homophily and, consequently, the largest cDEs: race/
ethnicity, gender, and age. Race and Hispanic ethnicity
were asked separately, then coded into one variable with
mutually exclusive categories: white, black, Hispanic
(regardless of race), and other (including American Indian
or Alaska Natives, Asian, Native Hawaiian and Pacific
Islander, and multiracial). Gender was coded as male or
female. Age was grouped into five categories: 18–24,
25–29, 30–39, 40–49, 50 years and over. In addition, we
analyze cDE for two variables related to HIV risk: sharing
syringes and self-reported HIV status. Sharing syringes was
defined as having shared any syringes or needles in the past
12 months. Self-reported HIV status was coded as HIV-
positive or not (HIV-negative, indeterminate results or
status, never received the result, never tested).
Data
As shown in Fig. 2, during the NHBS-IDU1 and NHBS-
IDU2 a total of 26,705 persons were recruited to participate
(13,519 in NHBS-IDU1; 13,186 in NHBS-IDU2), 524 of
whom were seeds (384 in NHBS-IDU1; 140 in NHBS-
IDU2). The target sample size for each city in each cycle
was 500 IDU (range: 186–631 IDU).
In NHBS-IDU1, a total of 1,563 (12%) persons did not
meet NHBS-IDU eligibility criteria and were excluded
from analysis. An additional 46 persons had no recruitment
information and their records were also excluded. Among
the 11,910 eligible persons, we retained only recruitment
data for 439 (3.2%) persons whose survey data were either
lost during data transfer (334), who were not identified as
male or female (67) or whose responses to survey questions
were invalid (38). The purpose of this analysis procedure is
Fig. 1 Map of NHBS-IDU1 and NHBS-IDU2 sampling sites by participating cycle. Cycle for which data are available is shown in parenthesis
next to city names. If no cycle is shown, data are available for both NHBS-IDU1 and NHBS-IDU2
800 AIDS Behav (2012) 16:797–806
123
to maintain recruitment chains. Their survey data were
coded as missing thus excluded from analysis.
In NHBS-IDU2 a total of 2,692 (20.4%) persons were
screened ineligible. These included 2,687 persons who did not
meet NHBS-IDU eligibility criteria and 5 persons without
recruitment information. Among the 10,494 persons included
in the analysis, 279 persons (2.7%) were included with only
recruitmentdatainordertomaintainrecruitmentchains.These
include 142 lost records, 55 persons who were not identified as
male or female, 64 persons with incomplete survey, and 18
persons forother reasons(repeated participants, invalid survey
response or invalid participation coupons).
The final analysis sample included 21,686 persons
(11,471 for NHBS-IDU1 and 10,215 for NHBS-IDU2),
including seeds. As this analysis does not present test
results, participants with missing or indeterminate HIV test
results were not excluded from the analysis. Raw sample
proportions (unweighted), aggregated national estimates
(weighted), and median homophily for all five analysis
variables are presented in Table 1.
Analysis Techniques
As discussed above, measurement of cDE requires a means of
calculating variance. Several methods of estimating RDS
variance have been presented [5, 18, 19, 26]. A detailed dis-
cussion of these estimates is beyond the scope of this paper.
For this analysis, Salganik’s [18] bootstrap variance estimate
procedure was used for two reasons. First, this paper revisits
Salganik’s [18] recommendation that cDE = 2 should be used
in calculation of RDS sample size. Our use of the same vari-
ance estimation provides a consistent comparison. Second,
this is the variance estimate employed by RDS Analysis Tool
(RDSAT). To date, RDSAT is the only RDS analysis software
publically available. While multiple RDS variance estimators
have been proposed, RDSAT remains the primary RDS
analysis option for most researchers not involved in the
development of new estimators.
RDS analysis was conducted using RDSAT 8.0.8 with
a = 0.025 and 10,000 resamples for bootstrapping to cal-
culate estimates and estimate standard errors [27]. cDEs
were calculated as the ratio of RDS variance to variance
expected under SRS, as defined above. cDEs were calculated
independently for each variable within each city. Observed
cDEs for each variable across all cities within a given cycle
are presented in each box plot. A tall box plot represents
large variation in cDE across cities. Homophily was calcu-
lated in RDSAT using Heckathorn’s formula [4, 24]:
Ha ¼
Saa À cPa
1 À cPa
if Saa ! cPa
Ha ¼
Saa À cPa
cPa
if SaacPa
ð3Þ
where Ha is homophily of subgroup a, Saa is the proportion
of in-group recruitments of individuals in subgroup a, and
cPa is the estimated proportions of a individuals in the
population. As defined, homophily ranges from -1 to 1
Fig. 2 NHBS-IDU1 and NHBS-IDU2 analysis data
AIDS Behav (2012) 16:797–806 801
123
and provides of an estimate of the proportion of in-group
ties after accounting for group size.
We utilized NHBS-IDU’s extensive data to determine
whether and to what extent cDEs vary in RDS studies of
U.S. IDU and to test the current recommendation that a cDE
of at least two should be used when calculating sample size
requirements for RDS studies. A finding that cDEs remain
consistent across variables and cities would suggest a sin-
gle cDE can be applied to studies of U.S. IDU using RDS to
conduct a priori sample size estimation. If cDEs vary within
an identifiable range, then the upper bound of that range
can be used as a conservative estimate in the calculation of
sample size for future RDS studies of U.S. IDU.
Results
Figures 3, 4, 5, and 6 show box plots of cDE for five
analysis variables across two cycles of NHBS-IDU.
Figure 3 shows cDEs for estimates by gender, self-reported
HIV status, and syringe sharing behavior. In all cases, the
25th percentile occurs above cDE = 2 and the 75th per-
centile occurs below cDE = 4. The distribution of cDEs
differs between variables, but appears consistent across
cycles.
Figure 4 shows cDEs for age estimates by cycle. DEs for
younger age categories are more variant than those for
older age categories. Overall, Fig. 4 displays a similar
pattern to Fig. 3. The majority of DEs fall above cDE = 2
and below cDE = 4.
Figure 5 shows DEs for race estimates by cycle. Again
the majority of cDEs fall above cDE = 2, however, there is
more variation in cDE across racial categories and across
NHBS cycles by race than by other variables.
The association between homophily and cDE is shown in
Fig. 6. For both NHBS-IDU1 and NHBS-IDU2 data, a
non-linear model fits the data well, with approximately
Table 1 Demographic characteristics of participants: National HIV Behavioral Surveillance System—Injecting Drug Users, United States,
2005–2006 and 2009
NHBS-IDU1, 2005–2006 NHBS-IDU2, 2009
Unweighted Weighted Unweighted Weighted
N Sample (%) Proportion
(95% CI)
Median
homophily
N Sample (%) Proportion
(95% CI)
Median
homophily
Gender
Male 8,158 71.1 68.0 (66.1–70) 0.27 7,389 72.3 70.9 (69–72.7) 0.19
Female 3,313 28.9 32.0 (30–33.9) 0.11 2,825 27.7 29.1 (27.3–31) 0.15
Race/ethnicity
Hispanic 2,429 21.2 23.1 (21.1–25.2) 0.35 2,199 21.5 23.1 (21–25.2) 0.37
Black 5,630 49.1 47.7 (45.3–50.1) 0.47 4,756 46.6 40.5 (38.2–42.9) 0.57
White 2,921 25.5 24.8 (22.9–26.7) 0.37 2,786 27.3 31.8 (29.3–34.3) 0.37
Multiple/other 482 4.2 4.3 (3.5–5.1) 0.07 458 4.5 4.6 (3.8–5.4) 0.04
Age (years)
18–24 443 3.9 4.5 (3.6–5.4) 0.14 349 3.4 4.4 (3.5–5.3) 0.24
25–29 793 6.9 7.2 (6.3–8.1) 0.09 669 6.5 7.1 (6–8.1) 0.12
30–39 2,527 22.0 21.4 (19.9–22.9) 0.07 1,838 18.0 19.9 (18.3–21.6) 0.12
40–49 4,314 37.6 39.1 (37.2–41) 0.06 3,176 31.1 32.1 (30.2–34) 0.08
C50 3,394 29.6 27.8 (26–29.6) 0.18 4,183 40.9 36.5 (34.5–38.5) 0.23
Self-reported HIV status
HIV positive 882 7.7 7.8 (6.6–9) 0.18 549 5.4 5.8 (4.9–6.7) 0.10
HIV negativea
10,535 91.8 92.9 (91–93.4) 0.25 9,596 93.9 94.2 (93.3–95.1) 0.21
Share syringesb
Yes 4,133 36.0 33.0 (31.2–34.7) 0.16 3,575 35.0 33.3 (31.4–35.1) 0.17
No 7,322 63.8 67.0 (65.3–68.8) 0.01 6,495 63.6 66.7 (64.9–68.6) -0.01
Total 11,471 10,215
a
Includes participants who reported negative or unknown status
b
Sharing syringes or needles in the 12 months prior to interview
802 AIDS Behav (2012) 16:797–806
123
50% of the variation in cDE attributable to differences in
homophily. The intercept in both models, 2.55 in IDU1 and
2.73 in IDU2, is above 2. Thus, even when there is no
homophily, the expected cDE is greater than the current
recommendation. A linear fit was tested but ruled out when
the residuals plots showed non-random clear patterns
suggesting a non-linear fit. A non-linear association is
consistent with Heckathorn [4] who hypothesizes a non-
linear association between homophily and standard error in
RDS studies.
Discussion
Our results show that while RDS cDEs tend to vary by city
and analysis variable, the majority of cDEs fall between
cDE = 2 and cDE = 4 with the exception of several race
categories. As mentioned above, the NHBS populations
Fig. 3 cDE by gender, self-reported HIV status, and syringe sharing
behavior for two cycles of NHBS-IDU. cDEs of dichotomous variables
are equivalent across category (i.e. cDE of males = cDE of females)
Fig. 4 cDE of estimates for age of IDU in NHBS-IDU1 and NHBS-
IDU2
Fig. 5 cDE of estimates of race of IDU in NHBS-IDU1 and NHBS-
IDU2
Fig. 6 Association between cDE and homophily by gender, race, age,
HIV positive status and sharing syringes among IDU in 43 RDS
samples in NHBS-IDU1 and NHBS-IDU2. Poly (IDU1) and Poly
(IDU2) are the non-linear best fit lines for NHBS-IDU1 and NHBS-
IDU2, respectively. Linear fit lines were tested and ruled out when
residual plots showed clear nonrandom patterns
AIDS Behav (2012) 16:797–806 803
123
tended toward insularity by race. Consistent with other
work [4], we found high cDEs were associated with high
homophily. High cDEs for blacks, Hispanics, and whites are
likely due to the high homophily we observed for these
groups.
Our results support two conclusions. First, the original
cDE recommended by Salganik [18] for use in sample size
calculations of RDS studies ( cDE = 2), is unlikely to pro-
vide adequate statistical power in RDS studies of IDU in the
U.S. While some cDEs at or below two were observed, the
vast majority fell above cDE = 2. Second, with the excep-
tion of estimates of race, cDEs tended to fall below cDE = 4.
Coupled with our previous assessment that these data can be
viewed as representative of typical RDS studies of IDU in
the U.S., the results suggest that cDEs for successful RDS
studies focusing on this population will generally fall in the
range of two to four. Consequently, we recommend
cDE = 4 as a more appropriate, realistic estimate of cDE to
use when calculating sample size requirements for RDS
studies of IDU in the U.S. In multi-racial studies, formative
research should be conducted to determine the level of
racial homophily within the population. If race homophily
is too high, separate studies maybe necessary.
Calculating Sample Size
Based on our finding that cDE = 4 is a more realistic
estimate for the cDE of RDS studies of U.S. IDU popula-
tions, we can now calculate sample size estimates for
future research using Eq. 1 For example, if based on pre-
existing knowledge we suspect approximately 30% of IDU
engage in a high-risk behavior and we want to estimate this
prevalence with a standard error no greater than 0.03, the
required sample size is calculated as follows:
n ¼ 4 Á
ð0:3Þ 1 À 0:3ð Þ
0:03ð Þ2
¼ 933 ð4Þ
Thus, we would need a sample of 933 IDU in our study.
Note that while the relationship between sample size and
DE is linear, the relationship between sample size and
standard error is exponential. Therefore, while achieving
the same statistical power requires a sample size four times
larger than SRS, an RDS study with sample size similar to
SRS will reduce statistical power by less than four times.
For example, if we make the above estimate with a desired
maximum standard error of 0.04 instead of 0.03 the new
sample size requirement is:
n ¼ 4 Á
ð0:3Þ 1 À 0:3ð Þ
0:04ð Þ2
¼ 525 ð5Þ
By slightly reducing statistical power (i.e., increasing
maximum standard error), we reduce the required sample
size by about 50% to 525 IDU. Figure 7 shows the
relationship between sample size and standard error of
estimates for RDS studies with cDE = 4 for Pa = 0.3 and
Pa = 0.5. The relationship is exponential, so a reduction in
standard error from 0.03 to 0.04 provides a greater
reduction in absolute sample size than reducing standard
error from 0.04 to 0.05. A population proportion estimate
of 0.5 (Pa = 0.5) provides the most conservative estimates
and should be used in the absence of outside information.
Researchers faced with limited resources may be willing to
accept higher standard errors to keep sample size
requirements low. Additionally, because cDE = 4 is a
conservative estimate, studies planning for higher standard
errors may find observed standard errors are lower than
initially expected for many variables.
Conclusion
Our analyses suggest that a cDE of four ( cDE = 4) is pre-
ferred for applying to calculations of sample size for future
RDS studies of IDU in the U.S. This cDE is higher than
Salganik’s [18] estimate, but lower than some recent the-
oretical estimates suggested by Goel and Salganik [20].
The advantage of our recommendation is its empirical basis
and practical emphasis.
Our results are likely generalizable to RDS studies of
IDU populations in the U.S. Studies of non-IDU or popu-
lations outside the U.S. should apply our results with
caution. Second, our data originate from larger urban
populations. Studies of rural IDU may find different cDE
outcomes. Third, while the large number of cities included
in NHBS covers a wide range of IDU populations, city
selection favored those cities with the highest overall HIV
100
300
500
700
900
1100
1300
0.03 0.035 0.04 0.045 0.05 0.055 0.06
RequiredSampleSize
Maximum Standard Error
Pa=.5, DE=4
Pa=.3, DE=4
Fig. 7 Required sample size decreases sharply as the maximum
allowable standard error of estimates is relaxed for samples with cDE
of four based on Eq. 1 Pa is the population proportion of individuals
with characteristic ‘a’
804 AIDS Behav (2012) 16:797–806
123
burden. Thus, results from studies conducted in cities with
lower HIV burdens may differ from our own.
Beyond generalizability, our results have several limi-
tations. First, our recommendation that cDE = 4 should be
used in estimating sample size requirements may underes-
timate cDE with respect to race. The large cDEs we observed
are likely due to higher homophily by race than other
variables, a common finding in U.S. populations. Fortu-
nately, racial homophily is relatively easy to monitor during
sampling and to address in formative research. If racial
homophily is too high, stratified results can be reported by
race. If racial homophily is excessive, such that almost no
cross-race recruitment is observed, samples can be sepa-
rated by race and analyzed separately. If external informa-
tion on the relative size of the different racial groups is
available, the results can be aggregated. Second, our anal-
ysis relies on confidence interval bounds generated using
the RDSAT bootstrapping algorithm [18, 27]. The algo-
rithm is not the only method of calculating RDS variances
[5, 19, 26] and has been shown to underestimate variance
under certain conditions [20, 21]. If this variance estimation
procedure is not correct the true DE could be higher, pos-
sibly much higher, than cDE. Similarly, as new, more effi-
cient estimation procedures are developed a lower cDE may
become more appropriate for estimating sample size.
Unfortunately, there is often a significant delay between
when new methods are developed and when they are
accessible for use by the scientific community. For practi-
cality, we chose a variance estimate that is most accessible
to researchers utilizing RDS today. Third, differences in
implementation within city across time, such as the number
of coupons given to each respondent, negate our ability to
explore the effect of some implementation differences on
cDE. Fourth, our analysis focused on the relationship
between cDE and homophily, a trait level measure of clus-
tering. Recent work suggests bottlenecks may be a more
appropriate level of analysis than homophily [20]. Bottle-
necks are a function of the entire network structure and how
traits are distributed across that network structure. Unfor-
tunately, our RDS data do not provide sufficient information
to analyze the global network structure. Based on the lit-
erature, we expect the association between cDE and bottle-
necks to be stronger than the association between
homophily and cDE. Finally, this analysis analyzed data
from 43 RDS samples implementing a standard NHBS
protocol. While the NHBS protocol follows standard RDS
procedures and allowed flexibility meet the unique condi-
tions of each city, it is possible that different studies could
yield different results. This is especially true of studies that
use modified RDS procedures. Further research is needed to
explore the effect of differences in implementation on cDE.
Despite these limitations, we argue that these results
provide an alternative to earlier recommendations for cal-
culating RDS sample size in studies of U.S. IDU and serve
as a guide to researchers planning future RDS studies.
Previous research presenting weighted RDS estimates and
confidence intervals is not impacted by our results, as
confidence intervals from RDS analysis account for DE.
However, our results further highlight the need for con-
ducting RDS analysis on RDS data. Unweighted analyses
of RDS data, which treat the sample as an SRS, not only
risk presenting biased estimates, but also risk underesti-
mating the variance of those estimates by as much a factor
of four.
Public health researchers working with RDS data will
benefit from our results by ensuring they have adequate
power for identifying health outcomes such as HIV prev-
alence and/or risk behaviors. Data collections, including
NHBS-IDU, must balance the need for precise estimates
with the need to limit burden on the public and to ensure
the best use of limited resources. The current target sample
size for NHBS-IDU is 500 per city and 10,000 nationally.
This sample size is adequate for national estimates, but
may have limited power locally for some variables of
interest. Given the exponential relationship between stan-
dard error and sample size, researchers may be willing to
accept and plan for higher standard errors to keep sample
size requirements low.
Acknowledgments This paper is based, in part, on contributions by
National HIV Behavioral Surveillance System staff members,
including J. Taussig, R. Gern, T. Hoyte, L. Salazar, B. Hadsock,
Atlanta, Georgia; C. Flynn, F. Sifakis, Baltimore, Maryland; D.
Isenberg, M. Driscoll, E. Hurwitz, Boston, Massachusetts; N. Prac-
hand, N. Benbow, Chicago, Illinois; S. Melville, R. Yeager, A.
Sayegh, J. Dyer, A. Novoa, Dallas, Texas; M. Thrun, A. Al-Tayyib,
R. Wilmoth, Denver, Colorado; E. Higgins, V. Griffin, E. Mokotoff,
Detroit, Michigan; M. Wolverton, J. Risser, H. Rehman, Houston,
Texas; T. Bingham, E. Sey, Los Angeles, California; M. LaLota, L.
Metsch, D. Beck, D. Forrest, G. Cardenas, Miami, Florida; C. Ne-
meth, C.-A. Watson, Nassau-Suffolk, New York; W. T. Robinson, D.
Gruber, New Orleans, Louisiana; C. Murrill, A. Neaigus, S. Jenness,
H. Hagan, T. Wendel, New York, New York; H. Cross, B. Bolden, S.
D’Errico, Newark, New Jersey; K. Brady, A. Kirkland, Philadelphia,
Pennsylvania; V. Miguelino, A. Velasco, San Diego, California; H.
Raymond, W. McFarland, San Francisco, California; S. M. De Leo´n,
Y. Rolo´n-Colo´n, San Juan, Puerto Rico; M. Courogen, H. Thiede, N.
Snyder, R. Burt, Seattle, Washington; M. Herbert, Y. Friedberg, D.
Wrigley, J. Fisher, St. Louis, Missouri; and P. Cunningham, M.
Sansone, T. West-Ojo, M. Magnus, I. Kuo, District of Columbia.
References
1. CDC. HIV Surveillance Report, 20092011, vol. 21. Available
from www.cdc.gov/hiv/surveillance/resources/reports.
2. CDC. HIV-associated behaviors among injecting-drug users—23
Cities, United States, May 2005–February 2006. Morb Mortal
Wkly Rep. 2009;58(13):329–32.
AIDS Behav (2012) 16:797–806 805
123
3. White House Office of National AIDS Policy. National HIV/
AIDS Strategy for the United States. Washington: The White
House Office of National AIDS Policy; 2010.
4. Heckathorn DD. Respondent-driven sampling. II. Deriving valid
population estimates from chain-referral samples of hidden
populations. Soc Probl. 2002;49(1):11–34.
5. Volz E, Heckathorn DD. Probability based estimation theory for
respondent driven sampling. J Off Stat. 2008;24(1):79–97.
6. Salganik MJ, Heckathorn DD. Sampling and estimation in hidden
populations using respondent-driven sampling. Sociol Methodol.
2004;34:193–239.
7. Malekinejad M, Johnston LG, Kendall C, Kerr LR, Rifkin MR,
Rutherford GW. Using respondent-driven sampling methodology
for HIV biological and behavioral surveillance in international set-
tings:asystematicreview.AIDSBehav.2008;12(4Suppl):S105–30.
8. Broadhead RS, Heckathorn DD. Aids-prevention outreach among
injection-drug users—agency problems and new approaches. Soc
Probl. 1994;41(3):473–95.
9. Platt L, Wall M, Rhodes T, Judd A, Hickman M, Johnston LG,
et al. Methods to recruit hard-to-reach groups: comparing two
chain referral sampling methods of recruiting injecting drug users
across nine studies in Russia and Estonia. J Urban Health.
2006;83(6 Suppl):i39–53.
10. Lansky A, Abdul-Quader AS, Cribbin M, Hall T, Finlayson TJ,
Garfein RS, et al. Developing an HIV behavioral surveillance
system for injecting drug users: the National HIV Behavioral
Surveillance System. Public Health Rep. 2007;122(Suppl 1):
48–55.
11. Des Jarlais DC, Arasteh K, Perlis T, Hagan H, Abdul-Quader A,
Heckathorn DD, et al. Convergence of HIV seroprevalence
among injecting and non-injecting drug users in New York City.
AIDS. 2007;21(2):231–5.
12. Heckathorn DD. Respondent-driven sampling: a new approach to
the study of hidden populations. Soc Probl. 1997;44(2):174–99.
13. Wejnert C, Heckathorn DD. Web-based network sampling—
efficiency and efficacy of respondent-driven sampling for online
research. Sociol Method Res. 2008;37(1):105–34.
14. Cornfield J. The determination of sample size. Am J Public
Health Nations Health. 1951;41(6):654–61.
15. Kish L. Survey sampling. New York: Wiley; 1965.
16. Lohr S. Sampling: design and analysis. Pacific Grove: Brooks/
Cole Publishing Company; 1999.
17. Karon JM. The analysis of time-location sampling study data. In:
Proceeding of the joint statistical meeting, section on survey
research methods. Minneapolis, MN: American Statistical Asso-
ciation; 2005. p. 3180–6.
18. Salganik MJ. Variance estimation, design effects, and sample size
calculations for respondent-driven sampling. J Urban Health.
2006;83(6 Suppl):i98–112.
19. Szwarcwald CL, de Souza Junior PR, Damacena GN, Junior AB,
Kendall C. Analysis of data collected by RDS among sex workers
in 10 Brazilian cities, 2009: estimation of the prevalence of HIV,
variance, and design effect. J Acquir Immune Defic Syndr.
2011;57(Suppl 3):S129–35.
20. Goel S, Salganik MJ. Assessing respondent-driven sampling.
Proc Natl Acad Sci USA. 2010;107(15):6743–7.
21. Wejnert C. An empirical test of respondent-driven sampling:
point estimates, variance, degree measures, and out-of-equilib-
rium data. Sociol Methodol. 2009;39(1):73–116.
22. Lansky A, Brooks JT, Dinenno E, Heffelfinger J, Hall HI, Mer-
min J. Epidemiology of HIV in the United States. J Acquir
Immune Defic Syndr. 2010;55(Suppl 2):S64–8.
23. Gallagher KM, Sullivan PS, Lansky A, Onorato IM. Behavioral
surveillance among people at risk for HIV infection in the U.S.:
the National HIV Behavioral Surveillance System. Public Health
Rep. 2007;122(Suppl 1):32–8.
24. Wejnert C, Heckathorn D. Respondent-driven sampling: opera-
tional procedures, evolution of estimators, and topics for future
research. In: Williams M, Vogt P, editors. The SAGE handbook
of innovation in social research methods. London: SAGE Publi-
cations, Ltd.; 2011. p. 473–97.
25. McPherson M, Smith-Lovin L, Cook JM. Birds of a feather:
homophily in social networks. Annu Rev Sociol. 2001;27:
415–44.
26. Gile KJ. Improved inference for respondent-driven sampling data
with application to HIV prevalence estimation. J Am Stat Assoc.
2011;106(493):135–46.
27. Volz E, Wejnert C, Degani I, Heckathorn D. Respondent-driven
sampling analysis tool (RDSAT). 8th ed. Ithaca: Cornell Uni-
versity; 2010.
806 AIDS Behav (2012) 16:797–806
123

Estimating design effect and calculating sample size for respondent driven sampling studies of injection drug users in the united states

  • 1.
    ORIGINAL PAPER Estimating DesignEffect and Calculating Sample Size for Respondent-Driven Sampling Studies of Injection Drug Users in the United States Cyprian Wejnert • Huong Pham • Nevin Krishna • Binh Le • Elizabeth DiNenno Published online: 15 February 2012 Ó Springer Science+Business Media, LLC (outside the USA) 2012 Abstract Respondent-driven sampling (RDS) has become increasingly popular for sampling hidden populations, including injecting drug users (IDU). However, RDS data are unique and require specialized analysis techniques, many of which remain underdeveloped. RDS sample size estimation requires knowing design effect (DE), which can only be calculated post hoc. Few studies have analyzed RDS DE using real world empirical data. We analyze estimated DE from 43 samples of IDU collected using a standardized protocol. We find the previous recommenda- tion that sample size be at least doubled, consistent with DE = 2, underestimates true DE and recommend researchers use DE = 4 as an alternate estimate when calculating sample size. A formula for calculating sample size for RDS studies among IDU is presented. Researchers faced with limited resources may wish to accept slightly higher standard errors to keep sample size requirements low. Our results highlight dangers of ignoring sampling design in analysis. Keywords Respondent-driven sampling Á Design effect Á Sample size Á Injecting drug users Á HIV Á Hidden populations Resumen El muestreo dirigido por los participantes (RDS, por sus siglas en ingle´s) es cada vez ma´s utilizado para tomar muestras de poblaciones ocultas, como las de usuarios de drogas inyectables (UDI). Sin embargo, los datos del RDS son muy particulares y requieren de te´cnicas de ana´lisis especializado, muchas de las cuales no se han desarrollado. Para estimar el taman˜o de la muestra del RDS es necesario conocer los efectos del disen˜o (DE, por sus siglas en ingle´s), los cuales solo pueden ser calculados en forma posterior. Pocos estudios han analizado el DE del RDS utilizando datos empı´ricos reales. Nosotros analiza- mos el DE de 43 muestras de UDI recolectadas a trave´s de un protocolo estandarizado. Determinamos que la recom- endacio´n anterior de que por lo menos se duplique el taman˜o de la muestra, congruente con DE = 2, subestima DE verdaderos, por lo que recomendamos a los investiga- dores utilizar DE = 4 como una estimacio´n alternativa para calcular el taman˜o de la muestra. Se presenta una fo´rmula para calcular el taman˜o de la muestra para estudios con RDS que incluyan UDI. Es posible que los investiga- dores que cuenten con pocos recursos tengan que aceptar errores estandarizados ligeramente superiores para man- tener limitados los requisitos del taman˜o de la muestra. Nuestros resultados destacan los peligros al ignorar el disen˜o del muestreo en el ana´lisis. Introduction Although the number of human immunodeficiency virus (HIV) infections attributed to injection drug use decreased between 2006 and 2009 in the United States [1], persons who inject drugs remain at increased risk of HIV infection. A recent analysis of IDU in 23 cities in the United States Disclaimer The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the Centers for Disease Control and Prevention C. Wejnert (&) Á N. Krishna Á B. Le Á E. DiNenno Division of HIV/AIDS Prevention, National Center for HIV/ AIDS, Viral Hepatitis, STD and TB Prevention, Centers for Disease Control and Prevention, 1600 Clifton Road NE, Mailstop E-46, Atlanta, GA 30333, USA e-mail: cwejnert@cdc.gov H. Pham ICF International, Atlanta, GA, USA 123 AIDS Behav (2012) 16:797–806 DOI 10.1007/s10461-012-0147-8
  • 2.
    [2] found highproportions engaging in HIV risk behaviors. The National HIV/AIDS Strategy for the United States [3] identifies injecting drug users (IDU) as a priority popula- tion for HIV prevention efforts. However, the illicit, stig- matized nature of injection drug use makes surveillance and sampling of IDU for research difficult. IDU are a hidden population which cannot be accessed using standard sampling methodologies. Respondent-driven sampling (RDS) is a peer-referral sampling and analysis method that provides a way to account for several sources of bias and calculate population estimates [4–6] now widely used to reach hidden popula- tions including many at high risk for HIV [7]. IDU are an especially well-suited population for RDS methodology because they rely on social networks for much of their livelihood, including access to drugs, income, and safety. This reliance requires them to form cohesive social exchange networks, which are ideal for RDS. Furthermore, IDU are difficult for researchers to study due to the stig- matized, illegal nature of their activities and the danger posed to field researchers working in their communities [8]. RDS’ peer-to-peer recruitment of respondents fosters trust and promotes participation while also reducing field staff’s exposure to dangerous environments while conducting research [9]. RDS has become increasingly popular in studies of IDU in the U.S. [10, 11] and abroad [7]. While studies collecting RDS data are numerous, many RDS analytical techniques are still under development due to the complex nature of RDS data and relatively short time since its debut in 1997 [12]. One currently under-developed technique is a priori sample size calculation. Calculating sample size requirements is a necessary preliminary step to proposing, planning, and implementing a successful study. However, in RDS, this calculation is complicated by the peer-driven nature of RDS data and their analysis [13]. RDS analysis is similar to analysis of stratified samples where sampling weights are applied during analysis to adjust for non-uniform sampling prob- ability. However, while such samples are usually stratified by variables of interest, such as race or income, with preset selection probabilities determined by the researcher, RDS samples are stratified by the target population’s underlying network structure which is unknown to researchers. For this reason, data on network structure are collected during sampling and used to calculate sampling weights post hoc [4]. Thus, sample size estimation, which requires knowing selection probabilities, cannot currently be directly calcu- lated a priori. Cornfield [14] proposed that sample size for complex surveys can be calculated by first calculating the sample size required for a simple random sample (SRS) and then adjusted by a measure of the complex sampling method’s efficiency compared to SRS, termed the design effect (DE) [15]: n ¼ DE Á Pa 1 À Pað Þ SE Pað Þð Þ2 ð1Þ where n is the sample size; Pa 1ÀPað Þ SE Pað Þð Þ 2 is the common for- mula for calculating required SRS sample size for some proportion Pa; SE is the standard error; and DE is the design effect of the actual sampling method used. Following Kish [15] we define DE as the ratio of the variance of the estimate observed with RDS, VarRDS ðPaÞ, to the expected variance of the estimate had the sample been collected using simple random sampling (SRS), VarSRS ðPaÞ as follows: DE ¼ VarRDS ðPaÞ VarSRS ðPaÞ ð2Þ where VarSRS ðPaÞ ¼ Pað1ÀPaÞ n : Consequently, DE compares the observed variance under a complex sampling method— in this case RDS—to that expected for the same estimate under an SRS of similar size [15]. Consequently, DE measures the increase in sample size required to achieve the same power as that of an SRS. For example, a sampling design with DE = 3 requires a sample three times as large as an SRS to achieve the same power [16]. Comparing sampling methods to SRS is mathematically convenient here because calculating power, and consequently estimat- ing sample size, is straightforward for SRS. Consequently, knowing DE for a given sampling method provides a means for estimating sample size [14]. However, SRS and RDS are not directly comparable in an empirical setting. RDS was developed to reach hidden-populations which, by definition, cannot be sampled using SRS methods. A comparison of RDS to other hidden-population methodologies, such as time-location sampling, is beyond the scope of this paper; however we expect all such methods to have similar limi- tations in comparison to SRS [17]. The definition of DE assumes knowledge of variance associated with a given estimate. However, the only way to truly measure the variance would be to take repeated samples from the same population simultaneously. Given limited resources, researchers are left with two options for estimating the underlying variance: (1) estimate the vari- ance based on a single sample of real world data or (2) create an estimate of the population and simulate repeated samples from that estimate. In both approaches, the researcher is forced to make mathematical assumptions regarding the behavior of participants and the probability of selection. For established sampling methods, such as SRS, this is not problematic because the probabilities of selection are well understood and a single, agreed upon variance calculation exists for real (not simulated) data. For 798 AIDS Behav (2012) 16:797–806 123
  • 3.
    less established methods,such as RDS, the sampling probabilities are not yet well understood and multiple methods of calculating variance may exist with no agreed upon best approach. In such cases, the calculated DE rep- resents an estimated design effect, denoted cDE throughout this paper. To date, few studies of RDS cDEs have been conducted. One often-cited publication suggests RDS samples have a cDE of at least two and recommends samples sizes should be at least double that required for a comparable SRS design [18]. However, An RDS study of sex workers in Brazil reported cDE = 2.63 [19]. Another RDS study of under- graduate students found an average cDE of 3.14 [13]. Fur- thermore, using simulated data, Goel and Salganik [20] find RDS cDEs may reach above 20, suggestingRDS analysis may produce highly unstable samples. While empirical evidence suggests RDS estimates are too accurate to support such large cDEs [21], further research is needed to determine if a generalized cDE can be applied to RDS studies of certain populations or if the commonly applied recommendation of cDE = 2 should be adjusted. If, for example, a review of many RDS studies found relatively consistent cDEs across variables and samples, then this cDE could be applied to calculate sample size in future RDS studies. Methods and Data Methods for NHBS among IDU (NHBS-IDU) are described in detail elsewhere [10] and briefly reported here. NHBS is a community-based survey that conducts interviews and HIV testing among 3 high risk populations: IDU, men who have sex with men, and heterosexuals at increased risk for HIV infection [22]. Data used in this paper were collected during the first two cycles of NHBS-IDU (NHBS-IDU1 from 2005 to 2006 and NHBS-IDU2 in 2009). NHBS-IDU is con- ducted by the Centers for Disease Control and Prevention (CDC) in collaboration with state and local health depart- ments in over 20 of 96 large metropolitan statistical areas (those with population greater than 500,000) within the United States (termed ‘‘cities’’ throughout), where approx- imately 60% of the nation’s AIDS cases had been reported [23]. Health departments in each city received local IRB approval for study activities. CDC reviewed the protocol and determined CDC staff was not-engaged; therefore CDC IRB approval was not required. Each city operated at least one interview field site that was chosen to be accessible to drug-use networks identified during formative research. Following standard RDS pro- cedures [12, 24], each city began RDS with a limited number of diverse initial recruits, or ‘‘seeds’’ (n = 3–35). Respondents were provided number-coded coupons with which to recruit other IDU they knew personally. The number of coupons given to each respondent varied by city and ranged from three to six. Within some cities, the number of coupons given varied throughout sampling to regulate the flow of individuals seeking interviews and to reduce the number of coupons in the community as the sample size was approached. Respondents were compen- sated both for their participation and for each eligible recruit who completed the survey. NHBS-IDU procedures included eligibility screening, informed consent from participants, and an interviewer- administered survey. Eligibility for NHBS-IDU included being age 18 or older, a resident of the city, not having previously participated in the current NHBS data collection cycle, being able to complete the survey in English or Spanish, and having injected drugs within 12 months pre- ceding the interview date as measured by self-report and either evidence of recent injection or adequate description of injection practices [10]. The survey measured charac- teristics of participants’ IDU networks, demographics, drug use and injection practices, sexual behaviors, HIV testing history, and use of HIV prevention services. Participants in NHBS-IDU2 were also offered an HIV test in conjunction with the survey. NHBS-IDU1 was conducted from May 2005 through February 2006 in 23 cities. NHBS-IDU2 was conducted from June 2009 through December 2009 in 20 cities, 18 of which were included in NHBS-IDU1. Our results are based on two cycles of data collection from 18 cities and 1 cycle of data collection from seven cities, five from NHBS-IDU1 and two from NHBS-IDU2 (Fig. 1). For this analysis, RDS data from each city are treated as independent samples. Data from each city were analyzed separately. Results from city level analysis are pooled and presented here by cycle. In total 43 samples (23 samples from NHBS-IDU1 and 20 from NHS-IDU2) were included. Data collection time varied across cities, due to differences in timing for human subjects approvals, logistics, and speed of sampling. All cities implemented a single protocol during each cycle. Field operations across all cities were standardized and followed common RDS procedures [24], however, individual cities were provided flexibility, such as deter- mining the number of coupons given or interview locations used, to meet local challenges. While not its primary pur- pose, the presence of multiple simultaneous samples in the NHBS-IDU research design provides a means for evalu- ating RDS methodology when used to study populations at increased risk for HIV. To meet public health goals, NHBS focused on those cites with the largest burden of AIDS disease based on most recent available data at the time cites were being AIDS Behav (2012) 16:797–806 799 123
  • 4.
    chosen: NHBS-IDU1 citieswere chosen based on AIDS data available from 2000; NHBS-IDU2 cities were chosen based on AIDS data available from 2004 [23]. As such, the cities are not necessarily representative of all U.S. cities or IDU populations. However, NHBS cities are chosen to ensure coverage of diverse geographic areas in the United States and likely represent typical U.S. cities in which RDS studies of IDU or other hard-to-reach populations would be conducted. Measures Efficiency of network-based samples, such as RDS, is correlated with homophily in the social network [4]. Homophily is the network principal that similar individuals are more likely to form social connections than dissimilar ones. In networks where members are defined by a specific stigmatized activity—such as injection drug use—the highest homophily variables tend to be basic demographic characteristics [25]. Based on formative research, we identified three key NHBS-IDU variables likely to have high homophily and, consequently, the largest cDEs: race/ ethnicity, gender, and age. Race and Hispanic ethnicity were asked separately, then coded into one variable with mutually exclusive categories: white, black, Hispanic (regardless of race), and other (including American Indian or Alaska Natives, Asian, Native Hawaiian and Pacific Islander, and multiracial). Gender was coded as male or female. Age was grouped into five categories: 18–24, 25–29, 30–39, 40–49, 50 years and over. In addition, we analyze cDE for two variables related to HIV risk: sharing syringes and self-reported HIV status. Sharing syringes was defined as having shared any syringes or needles in the past 12 months. Self-reported HIV status was coded as HIV- positive or not (HIV-negative, indeterminate results or status, never received the result, never tested). Data As shown in Fig. 2, during the NHBS-IDU1 and NHBS- IDU2 a total of 26,705 persons were recruited to participate (13,519 in NHBS-IDU1; 13,186 in NHBS-IDU2), 524 of whom were seeds (384 in NHBS-IDU1; 140 in NHBS- IDU2). The target sample size for each city in each cycle was 500 IDU (range: 186–631 IDU). In NHBS-IDU1, a total of 1,563 (12%) persons did not meet NHBS-IDU eligibility criteria and were excluded from analysis. An additional 46 persons had no recruitment information and their records were also excluded. Among the 11,910 eligible persons, we retained only recruitment data for 439 (3.2%) persons whose survey data were either lost during data transfer (334), who were not identified as male or female (67) or whose responses to survey questions were invalid (38). The purpose of this analysis procedure is Fig. 1 Map of NHBS-IDU1 and NHBS-IDU2 sampling sites by participating cycle. Cycle for which data are available is shown in parenthesis next to city names. If no cycle is shown, data are available for both NHBS-IDU1 and NHBS-IDU2 800 AIDS Behav (2012) 16:797–806 123
  • 5.
    to maintain recruitmentchains. Their survey data were coded as missing thus excluded from analysis. In NHBS-IDU2 a total of 2,692 (20.4%) persons were screened ineligible. These included 2,687 persons who did not meet NHBS-IDU eligibility criteria and 5 persons without recruitment information. Among the 10,494 persons included in the analysis, 279 persons (2.7%) were included with only recruitmentdatainordertomaintainrecruitmentchains.These include 142 lost records, 55 persons who were not identified as male or female, 64 persons with incomplete survey, and 18 persons forother reasons(repeated participants, invalid survey response or invalid participation coupons). The final analysis sample included 21,686 persons (11,471 for NHBS-IDU1 and 10,215 for NHBS-IDU2), including seeds. As this analysis does not present test results, participants with missing or indeterminate HIV test results were not excluded from the analysis. Raw sample proportions (unweighted), aggregated national estimates (weighted), and median homophily for all five analysis variables are presented in Table 1. Analysis Techniques As discussed above, measurement of cDE requires a means of calculating variance. Several methods of estimating RDS variance have been presented [5, 18, 19, 26]. A detailed dis- cussion of these estimates is beyond the scope of this paper. For this analysis, Salganik’s [18] bootstrap variance estimate procedure was used for two reasons. First, this paper revisits Salganik’s [18] recommendation that cDE = 2 should be used in calculation of RDS sample size. Our use of the same vari- ance estimation provides a consistent comparison. Second, this is the variance estimate employed by RDS Analysis Tool (RDSAT). To date, RDSAT is the only RDS analysis software publically available. While multiple RDS variance estimators have been proposed, RDSAT remains the primary RDS analysis option for most researchers not involved in the development of new estimators. RDS analysis was conducted using RDSAT 8.0.8 with a = 0.025 and 10,000 resamples for bootstrapping to cal- culate estimates and estimate standard errors [27]. cDEs were calculated as the ratio of RDS variance to variance expected under SRS, as defined above. cDEs were calculated independently for each variable within each city. Observed cDEs for each variable across all cities within a given cycle are presented in each box plot. A tall box plot represents large variation in cDE across cities. Homophily was calcu- lated in RDSAT using Heckathorn’s formula [4, 24]: Ha ¼ Saa À cPa 1 À cPa if Saa ! cPa Ha ¼ Saa À cPa cPa if SaacPa ð3Þ where Ha is homophily of subgroup a, Saa is the proportion of in-group recruitments of individuals in subgroup a, and cPa is the estimated proportions of a individuals in the population. As defined, homophily ranges from -1 to 1 Fig. 2 NHBS-IDU1 and NHBS-IDU2 analysis data AIDS Behav (2012) 16:797–806 801 123
  • 6.
    and provides ofan estimate of the proportion of in-group ties after accounting for group size. We utilized NHBS-IDU’s extensive data to determine whether and to what extent cDEs vary in RDS studies of U.S. IDU and to test the current recommendation that a cDE of at least two should be used when calculating sample size requirements for RDS studies. A finding that cDEs remain consistent across variables and cities would suggest a sin- gle cDE can be applied to studies of U.S. IDU using RDS to conduct a priori sample size estimation. If cDEs vary within an identifiable range, then the upper bound of that range can be used as a conservative estimate in the calculation of sample size for future RDS studies of U.S. IDU. Results Figures 3, 4, 5, and 6 show box plots of cDE for five analysis variables across two cycles of NHBS-IDU. Figure 3 shows cDEs for estimates by gender, self-reported HIV status, and syringe sharing behavior. In all cases, the 25th percentile occurs above cDE = 2 and the 75th per- centile occurs below cDE = 4. The distribution of cDEs differs between variables, but appears consistent across cycles. Figure 4 shows cDEs for age estimates by cycle. DEs for younger age categories are more variant than those for older age categories. Overall, Fig. 4 displays a similar pattern to Fig. 3. The majority of DEs fall above cDE = 2 and below cDE = 4. Figure 5 shows DEs for race estimates by cycle. Again the majority of cDEs fall above cDE = 2, however, there is more variation in cDE across racial categories and across NHBS cycles by race than by other variables. The association between homophily and cDE is shown in Fig. 6. For both NHBS-IDU1 and NHBS-IDU2 data, a non-linear model fits the data well, with approximately Table 1 Demographic characteristics of participants: National HIV Behavioral Surveillance System—Injecting Drug Users, United States, 2005–2006 and 2009 NHBS-IDU1, 2005–2006 NHBS-IDU2, 2009 Unweighted Weighted Unweighted Weighted N Sample (%) Proportion (95% CI) Median homophily N Sample (%) Proportion (95% CI) Median homophily Gender Male 8,158 71.1 68.0 (66.1–70) 0.27 7,389 72.3 70.9 (69–72.7) 0.19 Female 3,313 28.9 32.0 (30–33.9) 0.11 2,825 27.7 29.1 (27.3–31) 0.15 Race/ethnicity Hispanic 2,429 21.2 23.1 (21.1–25.2) 0.35 2,199 21.5 23.1 (21–25.2) 0.37 Black 5,630 49.1 47.7 (45.3–50.1) 0.47 4,756 46.6 40.5 (38.2–42.9) 0.57 White 2,921 25.5 24.8 (22.9–26.7) 0.37 2,786 27.3 31.8 (29.3–34.3) 0.37 Multiple/other 482 4.2 4.3 (3.5–5.1) 0.07 458 4.5 4.6 (3.8–5.4) 0.04 Age (years) 18–24 443 3.9 4.5 (3.6–5.4) 0.14 349 3.4 4.4 (3.5–5.3) 0.24 25–29 793 6.9 7.2 (6.3–8.1) 0.09 669 6.5 7.1 (6–8.1) 0.12 30–39 2,527 22.0 21.4 (19.9–22.9) 0.07 1,838 18.0 19.9 (18.3–21.6) 0.12 40–49 4,314 37.6 39.1 (37.2–41) 0.06 3,176 31.1 32.1 (30.2–34) 0.08 C50 3,394 29.6 27.8 (26–29.6) 0.18 4,183 40.9 36.5 (34.5–38.5) 0.23 Self-reported HIV status HIV positive 882 7.7 7.8 (6.6–9) 0.18 549 5.4 5.8 (4.9–6.7) 0.10 HIV negativea 10,535 91.8 92.9 (91–93.4) 0.25 9,596 93.9 94.2 (93.3–95.1) 0.21 Share syringesb Yes 4,133 36.0 33.0 (31.2–34.7) 0.16 3,575 35.0 33.3 (31.4–35.1) 0.17 No 7,322 63.8 67.0 (65.3–68.8) 0.01 6,495 63.6 66.7 (64.9–68.6) -0.01 Total 11,471 10,215 a Includes participants who reported negative or unknown status b Sharing syringes or needles in the 12 months prior to interview 802 AIDS Behav (2012) 16:797–806 123
  • 7.
    50% of thevariation in cDE attributable to differences in homophily. The intercept in both models, 2.55 in IDU1 and 2.73 in IDU2, is above 2. Thus, even when there is no homophily, the expected cDE is greater than the current recommendation. A linear fit was tested but ruled out when the residuals plots showed non-random clear patterns suggesting a non-linear fit. A non-linear association is consistent with Heckathorn [4] who hypothesizes a non- linear association between homophily and standard error in RDS studies. Discussion Our results show that while RDS cDEs tend to vary by city and analysis variable, the majority of cDEs fall between cDE = 2 and cDE = 4 with the exception of several race categories. As mentioned above, the NHBS populations Fig. 3 cDE by gender, self-reported HIV status, and syringe sharing behavior for two cycles of NHBS-IDU. cDEs of dichotomous variables are equivalent across category (i.e. cDE of males = cDE of females) Fig. 4 cDE of estimates for age of IDU in NHBS-IDU1 and NHBS- IDU2 Fig. 5 cDE of estimates of race of IDU in NHBS-IDU1 and NHBS- IDU2 Fig. 6 Association between cDE and homophily by gender, race, age, HIV positive status and sharing syringes among IDU in 43 RDS samples in NHBS-IDU1 and NHBS-IDU2. Poly (IDU1) and Poly (IDU2) are the non-linear best fit lines for NHBS-IDU1 and NHBS- IDU2, respectively. Linear fit lines were tested and ruled out when residual plots showed clear nonrandom patterns AIDS Behav (2012) 16:797–806 803 123
  • 8.
    tended toward insularityby race. Consistent with other work [4], we found high cDEs were associated with high homophily. High cDEs for blacks, Hispanics, and whites are likely due to the high homophily we observed for these groups. Our results support two conclusions. First, the original cDE recommended by Salganik [18] for use in sample size calculations of RDS studies ( cDE = 2), is unlikely to pro- vide adequate statistical power in RDS studies of IDU in the U.S. While some cDEs at or below two were observed, the vast majority fell above cDE = 2. Second, with the excep- tion of estimates of race, cDEs tended to fall below cDE = 4. Coupled with our previous assessment that these data can be viewed as representative of typical RDS studies of IDU in the U.S., the results suggest that cDEs for successful RDS studies focusing on this population will generally fall in the range of two to four. Consequently, we recommend cDE = 4 as a more appropriate, realistic estimate of cDE to use when calculating sample size requirements for RDS studies of IDU in the U.S. In multi-racial studies, formative research should be conducted to determine the level of racial homophily within the population. If race homophily is too high, separate studies maybe necessary. Calculating Sample Size Based on our finding that cDE = 4 is a more realistic estimate for the cDE of RDS studies of U.S. IDU popula- tions, we can now calculate sample size estimates for future research using Eq. 1 For example, if based on pre- existing knowledge we suspect approximately 30% of IDU engage in a high-risk behavior and we want to estimate this prevalence with a standard error no greater than 0.03, the required sample size is calculated as follows: n ¼ 4 Á ð0:3Þ 1 À 0:3ð Þ 0:03ð Þ2 ¼ 933 ð4Þ Thus, we would need a sample of 933 IDU in our study. Note that while the relationship between sample size and DE is linear, the relationship between sample size and standard error is exponential. Therefore, while achieving the same statistical power requires a sample size four times larger than SRS, an RDS study with sample size similar to SRS will reduce statistical power by less than four times. For example, if we make the above estimate with a desired maximum standard error of 0.04 instead of 0.03 the new sample size requirement is: n ¼ 4 Á ð0:3Þ 1 À 0:3ð Þ 0:04ð Þ2 ¼ 525 ð5Þ By slightly reducing statistical power (i.e., increasing maximum standard error), we reduce the required sample size by about 50% to 525 IDU. Figure 7 shows the relationship between sample size and standard error of estimates for RDS studies with cDE = 4 for Pa = 0.3 and Pa = 0.5. The relationship is exponential, so a reduction in standard error from 0.03 to 0.04 provides a greater reduction in absolute sample size than reducing standard error from 0.04 to 0.05. A population proportion estimate of 0.5 (Pa = 0.5) provides the most conservative estimates and should be used in the absence of outside information. Researchers faced with limited resources may be willing to accept higher standard errors to keep sample size requirements low. Additionally, because cDE = 4 is a conservative estimate, studies planning for higher standard errors may find observed standard errors are lower than initially expected for many variables. Conclusion Our analyses suggest that a cDE of four ( cDE = 4) is pre- ferred for applying to calculations of sample size for future RDS studies of IDU in the U.S. This cDE is higher than Salganik’s [18] estimate, but lower than some recent the- oretical estimates suggested by Goel and Salganik [20]. The advantage of our recommendation is its empirical basis and practical emphasis. Our results are likely generalizable to RDS studies of IDU populations in the U.S. Studies of non-IDU or popu- lations outside the U.S. should apply our results with caution. Second, our data originate from larger urban populations. Studies of rural IDU may find different cDE outcomes. Third, while the large number of cities included in NHBS covers a wide range of IDU populations, city selection favored those cities with the highest overall HIV 100 300 500 700 900 1100 1300 0.03 0.035 0.04 0.045 0.05 0.055 0.06 RequiredSampleSize Maximum Standard Error Pa=.5, DE=4 Pa=.3, DE=4 Fig. 7 Required sample size decreases sharply as the maximum allowable standard error of estimates is relaxed for samples with cDE of four based on Eq. 1 Pa is the population proportion of individuals with characteristic ‘a’ 804 AIDS Behav (2012) 16:797–806 123
  • 9.
    burden. Thus, resultsfrom studies conducted in cities with lower HIV burdens may differ from our own. Beyond generalizability, our results have several limi- tations. First, our recommendation that cDE = 4 should be used in estimating sample size requirements may underes- timate cDE with respect to race. The large cDEs we observed are likely due to higher homophily by race than other variables, a common finding in U.S. populations. Fortu- nately, racial homophily is relatively easy to monitor during sampling and to address in formative research. If racial homophily is too high, stratified results can be reported by race. If racial homophily is excessive, such that almost no cross-race recruitment is observed, samples can be sepa- rated by race and analyzed separately. If external informa- tion on the relative size of the different racial groups is available, the results can be aggregated. Second, our anal- ysis relies on confidence interval bounds generated using the RDSAT bootstrapping algorithm [18, 27]. The algo- rithm is not the only method of calculating RDS variances [5, 19, 26] and has been shown to underestimate variance under certain conditions [20, 21]. If this variance estimation procedure is not correct the true DE could be higher, pos- sibly much higher, than cDE. Similarly, as new, more effi- cient estimation procedures are developed a lower cDE may become more appropriate for estimating sample size. Unfortunately, there is often a significant delay between when new methods are developed and when they are accessible for use by the scientific community. For practi- cality, we chose a variance estimate that is most accessible to researchers utilizing RDS today. Third, differences in implementation within city across time, such as the number of coupons given to each respondent, negate our ability to explore the effect of some implementation differences on cDE. Fourth, our analysis focused on the relationship between cDE and homophily, a trait level measure of clus- tering. Recent work suggests bottlenecks may be a more appropriate level of analysis than homophily [20]. Bottle- necks are a function of the entire network structure and how traits are distributed across that network structure. Unfor- tunately, our RDS data do not provide sufficient information to analyze the global network structure. Based on the lit- erature, we expect the association between cDE and bottle- necks to be stronger than the association between homophily and cDE. Finally, this analysis analyzed data from 43 RDS samples implementing a standard NHBS protocol. While the NHBS protocol follows standard RDS procedures and allowed flexibility meet the unique condi- tions of each city, it is possible that different studies could yield different results. This is especially true of studies that use modified RDS procedures. Further research is needed to explore the effect of differences in implementation on cDE. Despite these limitations, we argue that these results provide an alternative to earlier recommendations for cal- culating RDS sample size in studies of U.S. IDU and serve as a guide to researchers planning future RDS studies. Previous research presenting weighted RDS estimates and confidence intervals is not impacted by our results, as confidence intervals from RDS analysis account for DE. However, our results further highlight the need for con- ducting RDS analysis on RDS data. Unweighted analyses of RDS data, which treat the sample as an SRS, not only risk presenting biased estimates, but also risk underesti- mating the variance of those estimates by as much a factor of four. Public health researchers working with RDS data will benefit from our results by ensuring they have adequate power for identifying health outcomes such as HIV prev- alence and/or risk behaviors. Data collections, including NHBS-IDU, must balance the need for precise estimates with the need to limit burden on the public and to ensure the best use of limited resources. The current target sample size for NHBS-IDU is 500 per city and 10,000 nationally. This sample size is adequate for national estimates, but may have limited power locally for some variables of interest. Given the exponential relationship between stan- dard error and sample size, researchers may be willing to accept and plan for higher standard errors to keep sample size requirements low. Acknowledgments This paper is based, in part, on contributions by National HIV Behavioral Surveillance System staff members, including J. Taussig, R. Gern, T. Hoyte, L. Salazar, B. Hadsock, Atlanta, Georgia; C. Flynn, F. Sifakis, Baltimore, Maryland; D. Isenberg, M. Driscoll, E. Hurwitz, Boston, Massachusetts; N. Prac- hand, N. Benbow, Chicago, Illinois; S. Melville, R. Yeager, A. Sayegh, J. Dyer, A. Novoa, Dallas, Texas; M. Thrun, A. Al-Tayyib, R. Wilmoth, Denver, Colorado; E. Higgins, V. Griffin, E. Mokotoff, Detroit, Michigan; M. Wolverton, J. Risser, H. Rehman, Houston, Texas; T. Bingham, E. Sey, Los Angeles, California; M. LaLota, L. Metsch, D. Beck, D. Forrest, G. Cardenas, Miami, Florida; C. Ne- meth, C.-A. Watson, Nassau-Suffolk, New York; W. T. Robinson, D. Gruber, New Orleans, Louisiana; C. Murrill, A. Neaigus, S. Jenness, H. Hagan, T. Wendel, New York, New York; H. Cross, B. Bolden, S. D’Errico, Newark, New Jersey; K. Brady, A. Kirkland, Philadelphia, Pennsylvania; V. Miguelino, A. Velasco, San Diego, California; H. Raymond, W. McFarland, San Francisco, California; S. M. De Leo´n, Y. Rolo´n-Colo´n, San Juan, Puerto Rico; M. Courogen, H. Thiede, N. Snyder, R. Burt, Seattle, Washington; M. Herbert, Y. Friedberg, D. Wrigley, J. Fisher, St. Louis, Missouri; and P. Cunningham, M. Sansone, T. West-Ojo, M. Magnus, I. Kuo, District of Columbia. References 1. CDC. HIV Surveillance Report, 20092011, vol. 21. Available from www.cdc.gov/hiv/surveillance/resources/reports. 2. CDC. HIV-associated behaviors among injecting-drug users—23 Cities, United States, May 2005–February 2006. Morb Mortal Wkly Rep. 2009;58(13):329–32. AIDS Behav (2012) 16:797–806 805 123
  • 10.
    3. White HouseOffice of National AIDS Policy. National HIV/ AIDS Strategy for the United States. Washington: The White House Office of National AIDS Policy; 2010. 4. Heckathorn DD. Respondent-driven sampling. II. Deriving valid population estimates from chain-referral samples of hidden populations. Soc Probl. 2002;49(1):11–34. 5. Volz E, Heckathorn DD. Probability based estimation theory for respondent driven sampling. J Off Stat. 2008;24(1):79–97. 6. Salganik MJ, Heckathorn DD. Sampling and estimation in hidden populations using respondent-driven sampling. Sociol Methodol. 2004;34:193–239. 7. Malekinejad M, Johnston LG, Kendall C, Kerr LR, Rifkin MR, Rutherford GW. Using respondent-driven sampling methodology for HIV biological and behavioral surveillance in international set- tings:asystematicreview.AIDSBehav.2008;12(4Suppl):S105–30. 8. Broadhead RS, Heckathorn DD. Aids-prevention outreach among injection-drug users—agency problems and new approaches. Soc Probl. 1994;41(3):473–95. 9. Platt L, Wall M, Rhodes T, Judd A, Hickman M, Johnston LG, et al. Methods to recruit hard-to-reach groups: comparing two chain referral sampling methods of recruiting injecting drug users across nine studies in Russia and Estonia. J Urban Health. 2006;83(6 Suppl):i39–53. 10. Lansky A, Abdul-Quader AS, Cribbin M, Hall T, Finlayson TJ, Garfein RS, et al. Developing an HIV behavioral surveillance system for injecting drug users: the National HIV Behavioral Surveillance System. Public Health Rep. 2007;122(Suppl 1): 48–55. 11. Des Jarlais DC, Arasteh K, Perlis T, Hagan H, Abdul-Quader A, Heckathorn DD, et al. Convergence of HIV seroprevalence among injecting and non-injecting drug users in New York City. AIDS. 2007;21(2):231–5. 12. Heckathorn DD. Respondent-driven sampling: a new approach to the study of hidden populations. Soc Probl. 1997;44(2):174–99. 13. Wejnert C, Heckathorn DD. Web-based network sampling— efficiency and efficacy of respondent-driven sampling for online research. Sociol Method Res. 2008;37(1):105–34. 14. Cornfield J. The determination of sample size. Am J Public Health Nations Health. 1951;41(6):654–61. 15. Kish L. Survey sampling. New York: Wiley; 1965. 16. Lohr S. Sampling: design and analysis. Pacific Grove: Brooks/ Cole Publishing Company; 1999. 17. Karon JM. The analysis of time-location sampling study data. In: Proceeding of the joint statistical meeting, section on survey research methods. Minneapolis, MN: American Statistical Asso- ciation; 2005. p. 3180–6. 18. Salganik MJ. Variance estimation, design effects, and sample size calculations for respondent-driven sampling. J Urban Health. 2006;83(6 Suppl):i98–112. 19. Szwarcwald CL, de Souza Junior PR, Damacena GN, Junior AB, Kendall C. Analysis of data collected by RDS among sex workers in 10 Brazilian cities, 2009: estimation of the prevalence of HIV, variance, and design effect. J Acquir Immune Defic Syndr. 2011;57(Suppl 3):S129–35. 20. Goel S, Salganik MJ. Assessing respondent-driven sampling. Proc Natl Acad Sci USA. 2010;107(15):6743–7. 21. Wejnert C. An empirical test of respondent-driven sampling: point estimates, variance, degree measures, and out-of-equilib- rium data. Sociol Methodol. 2009;39(1):73–116. 22. Lansky A, Brooks JT, Dinenno E, Heffelfinger J, Hall HI, Mer- min J. Epidemiology of HIV in the United States. J Acquir Immune Defic Syndr. 2010;55(Suppl 2):S64–8. 23. Gallagher KM, Sullivan PS, Lansky A, Onorato IM. Behavioral surveillance among people at risk for HIV infection in the U.S.: the National HIV Behavioral Surveillance System. Public Health Rep. 2007;122(Suppl 1):32–8. 24. Wejnert C, Heckathorn D. Respondent-driven sampling: opera- tional procedures, evolution of estimators, and topics for future research. In: Williams M, Vogt P, editors. The SAGE handbook of innovation in social research methods. London: SAGE Publi- cations, Ltd.; 2011. p. 473–97. 25. McPherson M, Smith-Lovin L, Cook JM. Birds of a feather: homophily in social networks. Annu Rev Sociol. 2001;27: 415–44. 26. Gile KJ. Improved inference for respondent-driven sampling data with application to HIV prevalence estimation. J Am Stat Assoc. 2011;106(493):135–46. 27. Volz E, Wejnert C, Degani I, Heckathorn D. Respondent-driven sampling analysis tool (RDSAT). 8th ed. Ithaca: Cornell Uni- versity; 2010. 806 AIDS Behav (2012) 16:797–806 123