SlideShare a Scribd company logo
Lockout/Tagout Safety
Procedures for FEMC
Document Number EN-MPS-717
Revision 4
Approved by Ric Morris
Stations
09/14/05
Active Divisions/Departments
FEMC
Raytheon Polar Services Company
Facilities, Engineering, Maintenance, and Construction (FEMC)
Contract No. OPP 0000373
HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE ONLINE
Raytheon Polar Services Company EN-MPS-717
Lockout/Tagout Safety Procedures for FEMC Revision 4
Stations
Table of Contents
Table of Contents ................................................................................................................. i
Purpose................................................................................................................................ 1
Responsibilities................................................................................................................... 1
All Supervisors and Foremen, FEMC............................................................................. 1
Terms and Definitions......................................................................................................... 1
Lockout............................................................................................................................ 1
Tagout.............................................................................................................................. 1
Discussion........................................................................................................................... 2
Requirements ...................................................................................................................... 2
Equipment ....................................................................................................................... 2
Locking and Tagging Out Electrical Devices ..................................................................... 2
Equipment ....................................................................................................................... 2
References........................................................................................................................... 4
Records ............................................................................................................................... 4
Facilities, Engineering, Maintenance, and Construction (FEMC) i
Contract No. OPP 0000373
Raytheon Polar Services Company EN-MPS-717
Lockout/Tagout Safety Procedures for FEMC Revision 4
Stations
Purpose
This procedure outlines the proper safety measures necessary to prevent injury
while conducting any maintenance, repairs, construction, and/or service on
pneumatic, hydraulic, and electric equipment and all associated parts.
Responsibilities
All Supervisors and Foremen, FEMC
On Project (Fill in Project Name & WBS #) the responsible party is
SIGNATURE REQUIRED
Terms and Definitions
Lockout
An energy lockout involves the use of a locking device to remove any switch,
valve, raised load, or any other such device from operation. This protects the
worker by preventing the use of devices that energize equipment, parts, or
machines.
Tagout
This provides a visible warning to all personnel that a particular switch, valve,
or energy source is under a lockout procedure. The tag displays the name of
the worker conducting the lockout/tagout procedure and the date work began.
Facilities, Engineering, Maintenance, and Construction (FEMC) Page 1 of 4 pages
Contract No. OPP 0000373
Raytheon Polar Services Company EN-MPS-717
Lockout/Tagout Safety Procedures for FEMC Revision 4
Stations
Discussion
The Lockout/Tagout Safety Procedure for FEMC supplements the
Environmental Health, and Safety (EH&S) Lockout/Tagout Program (EH-
LMNPS-204). The FEMC procedure incorporates the same basic procedures
as the EH&S document, and it provides specific information for construction
and maintenance personnel working under the Engineering Division and
FEMC.
Requirements
Equipment
Locks, tags, and associated equipment
Locking and Tagging Out Electrical Devices
To ensure the safety of all personnel, use the following steps prior to
conducting work on electrical devices.
Equipment
All locks, keys, tags, and associated lockout/tagout equipment are located in
Building 136 by the Foreman’s office. FEMC maintains a check out procedure
for locks and issues the number of locks required for each application.
1. Personnel from the Electrical Work Center and the PM Work Center use
these locks on a regular basis. Other personnel can obtain locks on an as
needed basis.
2. Obtain the proper lockout device from the lockout/tagout station located
in Building 136. Check out the lock and key and record your name, the
date, and the lock number.
Facilities, Engineering, Maintenance, and Construction (FEMC) Page 2 of 4 pages
Contract No. OPP 0000373
Raytheon Polar Services Company EN-MPS-717
Lockout/Tagout Safety Procedures for FEMC Revision 4
Stations
Note The worker determines the appropriate lockout device by the type
of equipment receiving service and/or maintenance. Review the
task to determine the proper number and type of locks and tags
required to ensure that equipment cannot be energized while
personnel work. Please ensure that all energy sources are located
and locked out. Some jobs require more than one lock and tag.
3. Place locks and/or tags on any circuits, equipment, valves, and other
devices that personnel will be working on to prevent start-up during
service or maintenance.
The placement and removal of locks and tags must be completed by the
worker who will conduct the service or maintenance.
Note According to the EH&S Lockout/Tagout Program (EH-LMNPS-
204), personnel should place hasps and locks on main breakers,
electrical panel doors, valve handles, and other devices with
lockable points. If it is impossible to lock a device or equipment, a
tag must be used to alert others that the equipment is under
service. These measures prevent the accidental activation of
energy sources that could result in injury or death to anyone
exposed to them.
4. After placing a lock on the proper location, attach a tag with the lock.
♦ Tags must accompany all locks.
♦ Tags should include the date of lockout and worker’s name.
5. If it is impossible to attach any type of lock on the required equipment,
maintenance personnel must attach tags in all locations where switches
can be thrown, valves opened, or any other device activated to energize
equipment or release stored energy.
6. Ensure that all energy sources are blocked and/or tagged and that all
stored energy is safely released or blocked. Do this before work
proceeds.
Use of a multi-meter is one means to confirm that energy is successfully
blocked or released.
Facilities, Engineering, Maintenance, and Construction (FEMC) Page 3 of 4 pages
Contract No. OPP 0000373
Raytheon Polar Services Company EN-MPS-717
Lockout/Tagout Safety Procedures for FEMC Revision 4
Stations
7. Remove the locks and tags once all work is complete. The locks and
tags are to be removed by the worker who attached them.
Result After successfully completing these tasks, FEMC and Engineering
personnel have accomplished approved RPSC EH&S safety practices.
References
EH&S Lockout/Tagout Program (EH-LMNPS-204)
Records
This procedure generates no records.
Facilities, Engineering, Maintenance, and Construction (FEMC) Page 4 of 4 pages
Contract No. OPP 0000373

More Related Content

What's hot

Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
KJP Consulting
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
Mary Helen
 
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) PresentationAn OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
Jacqueline Chau
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
Panduit Safety
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
jasonmorgan
 
Loto training
Loto trainingLoto training
Loto training
Noel Regalado
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
Noel Regalado
 
Lock out tag out procedures
Lock out  tag out proceduresLock out  tag out procedures
Lock out tag out procedures
YAWAR HASSAN KHAN
 
ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag Out
WRDSB
 
The Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIThe Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPI
Atlantic Training, LLC.
 
Loto online slides
Loto online slidesLoto online slides
Loto online slides
Tabatha Dorman
 
Control of hazardous energy
Control of hazardous energyControl of hazardous energy
Control of hazardous energy
Marlowe Chica
 
Energy Control Program by MCIEAST
Energy Control Program by MCIEASTEnergy Control Program by MCIEAST
Energy Control Program by MCIEAST
Atlantic Training, LLC.
 
LOTO
LOTO LOTO
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
sspuent
 
Control of Hazardous Energy
Control of Hazardous EnergyControl of Hazardous Energy
Control of Hazardous Energy
Andy Mihans
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
Noel Regalado
 
Uno dm-installation-manual
Uno dm-installation-manualUno dm-installation-manual
Uno dm-installation-manual
Optimus Energy Philippines
 
Resistance Welding
Resistance WeldingResistance Welding
Resistance Welding
vtsiri
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
Atlantic Training, LLC.
 

What's hot (20)

Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) PresentationAn OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Loto training
Loto trainingLoto training
Loto training
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
Lock out tag out procedures
Lock out  tag out proceduresLock out  tag out procedures
Lock out tag out procedures
 
ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag Out
 
The Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIThe Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPI
 
Loto online slides
Loto online slidesLoto online slides
Loto online slides
 
Control of hazardous energy
Control of hazardous energyControl of hazardous energy
Control of hazardous energy
 
Energy Control Program by MCIEAST
Energy Control Program by MCIEASTEnergy Control Program by MCIEAST
Energy Control Program by MCIEAST
 
LOTO
LOTO LOTO
LOTO
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
 
Control of Hazardous Energy
Control of Hazardous EnergyControl of Hazardous Energy
Control of Hazardous Energy
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Uno dm-installation-manual
Uno dm-installation-manualUno dm-installation-manual
Uno dm-installation-manual
 
Resistance Welding
Resistance WeldingResistance Welding
Resistance Welding
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 

Viewers also liked

Herbalife Business Opportunity In India
Herbalife Business Opportunity In IndiaHerbalife Business Opportunity In India
Herbalife Business Opportunity In India
Mark Lancaster
 
Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01
062270
 
Tutorial quizcreator
Tutorial quizcreatorTutorial quizcreator
Tutorial quizcreatorNetiply Best
 
Como hacer un blog
Como hacer un blogComo hacer un blog
Como hacer un blog
cnsg1917
 
Madrid Antiguo, clásico, bohemio
Madrid Antiguo, clásico, bohemioMadrid Antiguo, clásico, bohemio
Madrid Antiguo, clásico, bohemio
madridantiguo
 
ikastetxeek betetzeko aurkezpena
ikastetxeek betetzeko aurkezpenaikastetxeek betetzeko aurkezpena
ikastetxeek betetzeko aurkezpena
Trinitarias Algorta
 
Agenda 21
Agenda 21Agenda 21
The salvation army red kettle run
The salvation army red kettle runThe salvation army red kettle run
The salvation army red kettle run
william timperley
 

Viewers also liked (10)

Herbalife Business Opportunity In India
Herbalife Business Opportunity In IndiaHerbalife Business Opportunity In India
Herbalife Business Opportunity In India
 
Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01Dlmeng1q4t2f 130108134044-phpapp01
Dlmeng1q4t2f 130108134044-phpapp01
 
Tutorial quizcreator
Tutorial quizcreatorTutorial quizcreator
Tutorial quizcreator
 
Como hacer un blog
Como hacer un blogComo hacer un blog
Como hacer un blog
 
Presentation
PresentationPresentation
Presentation
 
Eskolako Agenda 21
Eskolako Agenda 21Eskolako Agenda 21
Eskolako Agenda 21
 
Madrid Antiguo, clásico, bohemio
Madrid Antiguo, clásico, bohemioMadrid Antiguo, clásico, bohemio
Madrid Antiguo, clásico, bohemio
 
ikastetxeek betetzeko aurkezpena
ikastetxeek betetzeko aurkezpenaikastetxeek betetzeko aurkezpena
ikastetxeek betetzeko aurkezpena
 
Agenda 21
Agenda 21Agenda 21
Agenda 21
 
The salvation army red kettle run
The salvation army red kettle runThe salvation army red kettle run
The salvation army red kettle run
 

Similar to Electricallockoutsop 717

Gen_prot_p345_manual.pdf
Gen_prot_p345_manual.pdfGen_prot_p345_manual.pdf
Gen_prot_p345_manual.pdf
SatyajitRai4
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
Atif767782
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
chopriroti
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptx
naeem41394
 
P44x_EN_M_Ka7__E0__M.pdf
P44x_EN_M_Ka7__E0__M.pdfP44x_EN_M_Ka7__E0__M.pdf
P44x_EN_M_Ka7__E0__M.pdf
BachirBachirAlMounta
 
Marcus Punch - When SIL2 will just not do!
Marcus Punch - When SIL2 will just not do!Marcus Punch - When SIL2 will just not do!
Marcus Punch - When SIL2 will just not do!
NSW Environment and Planning
 
Permit Issue consideration#1
Permit Issue consideration#1Permit Issue consideration#1
Permit Issue consideration#1
Stephen John Wilson
 
130935887 areva-kvfg-r8559 c
130935887 areva-kvfg-r8559 c130935887 areva-kvfg-r8559 c
130935887 areva-kvfg-r8559 c
Juan Carlos Valderrama
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
Invest Northern Ireland
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
Marty Stevenson
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015
Mark Barbour
 
Steps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdfSteps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdf
ASK EHS Engineering & Consultants
 
Unlocking Safety The Importance of a Lockout Station
Unlocking Safety The Importance of a Lockout StationUnlocking Safety The Importance of a Lockout Station
Unlocking Safety The Importance of a Lockout Station
Lockout India
 
Summary_of_Safety_and_Transport_Instructions_EN.pdf
Summary_of_Safety_and_Transport_Instructions_EN.pdfSummary_of_Safety_and_Transport_Instructions_EN.pdf
Summary_of_Safety_and_Transport_Instructions_EN.pdf
MarioUrbanoRamirezHu
 
Atlas-Copco-QAS-100. intruction manual.pdf
Atlas-Copco-QAS-100. intruction manual.pdfAtlas-Copco-QAS-100. intruction manual.pdf
Atlas-Copco-QAS-100. intruction manual.pdf
Luis64166
 
26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx
safetygoodwe
 

Similar to Electricallockoutsop 717 (20)

Gen_prot_p345_manual.pdf
Gen_prot_p345_manual.pdfGen_prot_p345_manual.pdf
Gen_prot_p345_manual.pdf
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptx
 
P44x_EN_M_Ka7__E0__M.pdf
P44x_EN_M_Ka7__E0__M.pdfP44x_EN_M_Ka7__E0__M.pdf
P44x_EN_M_Ka7__E0__M.pdf
 
Marcus Punch - When SIL2 will just not do!
Marcus Punch - When SIL2 will just not do!Marcus Punch - When SIL2 will just not do!
Marcus Punch - When SIL2 will just not do!
 
Permit Issue consideration#1
Permit Issue consideration#1Permit Issue consideration#1
Permit Issue consideration#1
 
130935887 areva-kvfg-r8559 c
130935887 areva-kvfg-r8559 c130935887 areva-kvfg-r8559 c
130935887 areva-kvfg-r8559 c
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015
 
Steps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdfSteps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdf
 
Unlocking Safety The Importance of a Lockout Station
Unlocking Safety The Importance of a Lockout StationUnlocking Safety The Importance of a Lockout Station
Unlocking Safety The Importance of a Lockout Station
 
Summary_of_Safety_and_Transport_Instructions_EN.pdf
Summary_of_Safety_and_Transport_Instructions_EN.pdfSummary_of_Safety_and_Transport_Instructions_EN.pdf
Summary_of_Safety_and_Transport_Instructions_EN.pdf
 
Atlas-Copco-QAS-100. intruction manual.pdf
Atlas-Copco-QAS-100. intruction manual.pdfAtlas-Copco-QAS-100. intruction manual.pdf
Atlas-Copco-QAS-100. intruction manual.pdf
 
26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx26_SGW-_Permit_To_Work- At Job Site.pptx
26_SGW-_Permit_To_Work- At Job Site.pptx
 

Recently uploaded

Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
my Pandit
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 

Recently uploaded (20)

Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 

Electricallockoutsop 717

  • 1. Lockout/Tagout Safety Procedures for FEMC Document Number EN-MPS-717 Revision 4 Approved by Ric Morris Stations 09/14/05 Active Divisions/Departments FEMC Raytheon Polar Services Company Facilities, Engineering, Maintenance, and Construction (FEMC) Contract No. OPP 0000373 HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE ONLINE
  • 2. Raytheon Polar Services Company EN-MPS-717 Lockout/Tagout Safety Procedures for FEMC Revision 4 Stations Table of Contents Table of Contents ................................................................................................................. i Purpose................................................................................................................................ 1 Responsibilities................................................................................................................... 1 All Supervisors and Foremen, FEMC............................................................................. 1 Terms and Definitions......................................................................................................... 1 Lockout............................................................................................................................ 1 Tagout.............................................................................................................................. 1 Discussion........................................................................................................................... 2 Requirements ...................................................................................................................... 2 Equipment ....................................................................................................................... 2 Locking and Tagging Out Electrical Devices ..................................................................... 2 Equipment ....................................................................................................................... 2 References........................................................................................................................... 4 Records ............................................................................................................................... 4 Facilities, Engineering, Maintenance, and Construction (FEMC) i Contract No. OPP 0000373
  • 3. Raytheon Polar Services Company EN-MPS-717 Lockout/Tagout Safety Procedures for FEMC Revision 4 Stations Purpose This procedure outlines the proper safety measures necessary to prevent injury while conducting any maintenance, repairs, construction, and/or service on pneumatic, hydraulic, and electric equipment and all associated parts. Responsibilities All Supervisors and Foremen, FEMC On Project (Fill in Project Name & WBS #) the responsible party is SIGNATURE REQUIRED Terms and Definitions Lockout An energy lockout involves the use of a locking device to remove any switch, valve, raised load, or any other such device from operation. This protects the worker by preventing the use of devices that energize equipment, parts, or machines. Tagout This provides a visible warning to all personnel that a particular switch, valve, or energy source is under a lockout procedure. The tag displays the name of the worker conducting the lockout/tagout procedure and the date work began. Facilities, Engineering, Maintenance, and Construction (FEMC) Page 1 of 4 pages Contract No. OPP 0000373
  • 4. Raytheon Polar Services Company EN-MPS-717 Lockout/Tagout Safety Procedures for FEMC Revision 4 Stations Discussion The Lockout/Tagout Safety Procedure for FEMC supplements the Environmental Health, and Safety (EH&S) Lockout/Tagout Program (EH- LMNPS-204). The FEMC procedure incorporates the same basic procedures as the EH&S document, and it provides specific information for construction and maintenance personnel working under the Engineering Division and FEMC. Requirements Equipment Locks, tags, and associated equipment Locking and Tagging Out Electrical Devices To ensure the safety of all personnel, use the following steps prior to conducting work on electrical devices. Equipment All locks, keys, tags, and associated lockout/tagout equipment are located in Building 136 by the Foreman’s office. FEMC maintains a check out procedure for locks and issues the number of locks required for each application. 1. Personnel from the Electrical Work Center and the PM Work Center use these locks on a regular basis. Other personnel can obtain locks on an as needed basis. 2. Obtain the proper lockout device from the lockout/tagout station located in Building 136. Check out the lock and key and record your name, the date, and the lock number. Facilities, Engineering, Maintenance, and Construction (FEMC) Page 2 of 4 pages Contract No. OPP 0000373
  • 5. Raytheon Polar Services Company EN-MPS-717 Lockout/Tagout Safety Procedures for FEMC Revision 4 Stations Note The worker determines the appropriate lockout device by the type of equipment receiving service and/or maintenance. Review the task to determine the proper number and type of locks and tags required to ensure that equipment cannot be energized while personnel work. Please ensure that all energy sources are located and locked out. Some jobs require more than one lock and tag. 3. Place locks and/or tags on any circuits, equipment, valves, and other devices that personnel will be working on to prevent start-up during service or maintenance. The placement and removal of locks and tags must be completed by the worker who will conduct the service or maintenance. Note According to the EH&S Lockout/Tagout Program (EH-LMNPS- 204), personnel should place hasps and locks on main breakers, electrical panel doors, valve handles, and other devices with lockable points. If it is impossible to lock a device or equipment, a tag must be used to alert others that the equipment is under service. These measures prevent the accidental activation of energy sources that could result in injury or death to anyone exposed to them. 4. After placing a lock on the proper location, attach a tag with the lock. ♦ Tags must accompany all locks. ♦ Tags should include the date of lockout and worker’s name. 5. If it is impossible to attach any type of lock on the required equipment, maintenance personnel must attach tags in all locations where switches can be thrown, valves opened, or any other device activated to energize equipment or release stored energy. 6. Ensure that all energy sources are blocked and/or tagged and that all stored energy is safely released or blocked. Do this before work proceeds. Use of a multi-meter is one means to confirm that energy is successfully blocked or released. Facilities, Engineering, Maintenance, and Construction (FEMC) Page 3 of 4 pages Contract No. OPP 0000373
  • 6. Raytheon Polar Services Company EN-MPS-717 Lockout/Tagout Safety Procedures for FEMC Revision 4 Stations 7. Remove the locks and tags once all work is complete. The locks and tags are to be removed by the worker who attached them. Result After successfully completing these tasks, FEMC and Engineering personnel have accomplished approved RPSC EH&S safety practices. References EH&S Lockout/Tagout Program (EH-LMNPS-204) Records This procedure generates no records. Facilities, Engineering, Maintenance, and Construction (FEMC) Page 4 of 4 pages Contract No. OPP 0000373