Introduction
eFACiLiTY
 is a modular facilities management system
 allows day-to-day management of the processes
 automates operations
 provides a management dashboard for critical analysis
 enables enterprise wide control in the most intelligent and efficient way
Modules
Multi Site Multi Organization Concept
 Site wise concept for multiple sites implementation using a central server
 Facility managers being able to view any location data quickly by selecting
the location/Site on top
 User privileges can be set defining the sites to be viewed and restricted to
each every user and in each and every site.
Time and Attendance
 The Time and attendance system of eFACiLiTY provides improved efficiency,
accuracy and productivity to the resource management and pay-roll process of
organizations.
 This system has the roster management module inbuilt and integrates with the
time & attendance and access control hardware systems to provide attendance,
late clocking exceptions, overtime information of employees to the HR, Payroll
and their respective departments.
Time and Attendance – Features
 Employee profile
 Shift management and Roster generation
 Roster approval and re-assignment
 Employee / Department shift calendar
 Track time-in and time-out of every personnel
 Late clock-in, early clock-out and other exceptions list
 Overtime calculation and reporting
 Leaves requests, approvals workflow
 Permissions / on-duty requests, approvals workflow
 Integration with multiple access control systems
 Integration with other HR / Payroll Systems
 Mobile SMS based clock-in/out and leave requests
 Employee Tracking within the facility
Time and Attendance – Features
 SMS Attendance System with provision for
• In/Out Time Clocking
• Leave/Permission Requests
• Interactive & Automated “Help” replies to users
• SMS Attendance Clocking Report
 Expiry Period Configuration for Compensatory Off leaves
 Include/Exclude Weekends and Holidays for Compensatory Off leaves
 Real time “Footer Alerts” for supervisors and administrators to quick check
requests pending for their approval
 Enhanced Remainder Email Configuration for Exceptions and Approvals
 Control advance leave application
 Bulk approval of employee exceptions and leave/permission requests
 Improved report filters & optimized data binding methods for faster reporting
 Interactive & Automated “Help” replies to users via SMS
Roster
 Assign/un assign shifts to an employee or a group of employees
 Acceptance or rejection of Shifts based on the requirement
 Change of allocated dates for weekly holiday.
 View the applied and changed leaves.
Assign/un Assign Shifts
 Assign/un assign Shifts to an employee or a group of employees
 Change in shift’s date and time, Accept/Reject shifts
 Employees will be allocated shifts against their Employee Codes.
Click Staff Name to open Staff Profile
When any holiday is clicked, the option
“Assign for Holidays” will be set to “Yes”
Admin approval/Rejection
 Approval of Shifts by the Users/supervisor
 Reallocation or Rejection of Assigned shifts
 Shift Approval/rejection for either an individual or a group
Form 3
Form 1
Form 2
Holiday Change
 Provision to change or cancel pre-defined holidays
 Holiday changes are recorded and shifts are assigned accordingly
Leave Application
 Provision to apply leaves of different types
 Leaves are recorded and shifts are assigned accordingly
 Eligible and Carried Forward leaves are displayed based on selected
leave type
Leave Application (Comp-Off)
 Provision to apply comp-off
 Available comp-off leaves are automatically calculated based on staff
attendance
Leave Approval/Rejection
 Provision for managers to approve/reject leaves
 Approval/Rejection remarks can be captured and stored
Permission Application
 Provision to apply permission
 Permission can be applied by staff with shift assigned
Permission Approval/Rejection
 Provision for managers to approve/reject permission
 Approval/Rejection remarks can be captured and stored
Leave Eligibility (Next Year)
 The consecutive year leave eligibility of employees for different leave types to
be available
 Provision to allow override and carry forward of leaves
 Provision to define override limit and carry forward limit for leaves
Leave Status Summary
 The status summary of different leave types for each employee can be viewed
 Leave status for employees can also be viewed for different years
Leave Change
 Cancellation of Leave availed by the staff
View In/Out Details
 The In and Out time of staff is fetched from the access control system
 These details can be viewed by managers and staff
Missed Punch Entry
 Managers have the provision to enter missed punch entries for staff
 Staff can view their respective missed punch entries
Attendance Exception
 Various types of attendance exceptions are raised based on the In/Out
details of staff
 Staff can view and enter reason against the exceptions for approval
View Time Exception
 The time exception details are displayed to the staff
 Status of the exception is displayed
Apply Exception Reason
 Provision for staff to enter exception reason and remarks
 Reason and remarks entered by staff is sent for approval
Exception Approval/Rejection
 Provision for managers to approve/reject exception reason entered by staff
 Approval/Rejection remarks can be captured and stored
View My Calendar
 View shift details from View My Calendar section
 Shift assignments done are highlighted
 Shift timings are shown when mouse is moved over
 Raised and Cleared exceptions are shown
 Provision for staff to apply reason for exceptions
Track Staffs
 Locates the existence of the staff in the company
 Tracks the existence of the staff for the current time or for a specified range of
date / time
 Monitors Staff entry or exit
 Reports Staff movement
Holidays
 Provision for defining the holidays
 Different Color Indication for various types of holidays
Email Alerts
 Mail is triggered to the employees who check in late / check out early.
 Subject phrases are maintained in a separate master “Mail Contents”.
 When the system triggers a mail to the Employees, it takes and applies the
appropriate subject from this master to the mail.
Integration
 Integration with 3rd party application ( like SAP,SIEBEL, JDEdwards,
Baan,etc)
 Integration with Access Control Devices
 Integration with Active Directory
Reports Features
 Generation of the MIS Reports like
• Staff Directory
• Shift assignment-staff wise
• Shift Assignment – Date wise
• Staff unassigned days
• Shift Summary
• Time and Attendance – Exception Report
• Unprocessed Click-in and Click-out
• Staff Overtime Report
• Approval / Rejection Report
• Attendance Report
• Staff Movement
 These reports can be printed in HTML, Excel and PDF formats
Software Specifications
 Microsoft’s .NET Framework
 Browser based thin-client interface
 Supports Oracle/MSSQL/MSSQL Express
 Email, SMS, MMS Messaging
 Cross browser compatible
 Language of your choice
 Supports MS Exchange, LDAP
 Building Management Systems (BMS) Integration
 Ready for integration with Microsoft Active Directory, Oracle Single Sign-on
 PDA extension with Microsoft Pocket PC
 Table, Field, Activity wise Audit Trail
 Security Policy Management
Synergetic Partners
Microsoft Gold Certified Partner (ISV)–Product Development
Tridium Asia Pacific, Singapore
Metronic Global Berhad, Malaysia & China
Pinnacle Computer Systems Dubai, U.A.E.Wave Front, Japan
Infocon Technology, Malaysia
Global Trade S.A.R.L., Saudi Arabia Sequential IDS, Nigeria
eFACiLiTY End Users
Intelligent Building Management System
– Federal Government Buildings, Putrajaya, Malaysia
Enterprise Facilities Management System Implementation
– Ministry of Health, Kuwait
Enterprise Facilities Management System Implementation
– Tidel Park, Coimbatore, India
Government
eFACiLiTY - Enterprise Facility Booking System
– Malaysian Communications And Multimedia Commission (MCMC), Malaysia
Enterprise Facilities Management System Implementation
– Ministry of Health, Bahrain
Enterprise Facilities Management System Implementation
– Saudi Arabia National Guard, Saudi Arabia
eFACiLiTY End Users
Corporates
Enterprise Visitor Management System
– Japan Tobacco International, Malaysia
Enterprise Facility Management System
– British Aero Space, Saudi Arabia
Enterprise Facility Management System
– Saudi Catering and Contracting, Saudi Arabia
Enterprise Facilities Management System
– Qatar Petroleum, Qatar
Enterprise Facilities Management System
– Sodexo, India
Enterprise Facilities Management System
– For Vodafone through Honeywell
eFACiLiTY End UserseFACiLiTY End Users
Corporates
Enterprise Facilities Management System
– Trade Coast, Australia
Enterprise Facility Management System
– Alghanim Industries, Kuwait
Enterprise Facilities Management System
– Embassy Services Private Limited, India
Enterprise Facilities Management System
– Airmaster, Australia
Enterprise Facilities Management System
– Millennium Hilton, Bangkok
eFACiLiTY End Users
Corporates
eFACiLiTY Module Implementation
– Prestige IT Park, India
eFACiLiTY - Enterprise Facility Management System
– CoreLogic, India
eFACiLiTY – Enterprise Facility Management System
– Wadhwa Group, India
eFACiLiTY – Enterprise Facility Management System
– Egypt, UAE, Saudi Arabia, India
eFACiLiTY – Enterprise Facility Management System
– Pacific Controls, UAE
Corporates
eFACiLiTY – Enterprise Facility Management System
– Albhukary, Malayasia
Tenant Billing System
– GVK Mall, India
Tenant Billing System
– Value Mall, India
Enterprise Facilities Management System Implementation
– Sheraton Darling Harbor, Sydney, Australia
Facility Booking System
– DiGi, Malaysia
eFACiLiTY End Users
eFACiLiTY End Users
Corporates
eFACiLiTY – Enterprise Facilities Management System
– Saudi Arabian Trading & Construction Co. (SATCO), Saudi Arabia
eFACiLiTY – Enterprise Facilities Management System
– Godrej Properties, India
eFACiLiTY – Enterprise Facilities Management System
– CRISIL Limited, India
eFACiLiTY – Enterprise Visitor Management System
– Electronic Card Services Ltd, Kenya
eFACiLiTY – Enterprise Facilities Management System
– For Societe Generale via CBRE South Asia Pvt. Ltd
eFACiLiTY – Enterprise Facilities Management System
–GPX (India) Private Limited, India
SIERRA ODC Private Limited
 Founded in 1998
 Based in Coimbatore, INDIA
 Providing Software Development & Support Services
 150+ Strong workforce
 Clients and Outsourcing in Malaysia, USA, UK, Middle East and Africa
 Satisfied Multinational Clients
 Microsoft Gold Certified Partner
Customs, Ports, Free Trade Zone Affairs Automation Project
– Kingdom of Bahrain
Key Projects – Government
Airport Automation, Cargo Management, Point of Sales Systems
– Civil Aviation Authority, Uganda
Farm Production System
– Malaysian Agri Food Corporation, Malaysia
Enterprise Facilities Management System Implementation
– Ministry of Health, Bahrain
Enterprise Facilities Management System Implementation
– Saudi Arabia National Guard, Saudi Arabia
Enterprise Resource Planning
Materials Management System
Sales and Distribute Management
Supply Chain Management
Materials Management System
Sales and Distribute Management Supply Chain Management
Supply Chain Management CRM & Sales Force Automation System
– South Asia
SAP Integration & Online Reporting Application
Key Projects – Fortune 500
Tobacco Leaf Information System
– Malaysia
Non Tobacco Material Warehouse Management
– Korea, Malaysia
Asia Sales Information System
– Singapore
Global Labelling Application
– Global
Incident Report Tools
– Global
Fleet Management System
– Malaysia
Virtual Application Portal
– Global
Account Database Manager
– Vietnam
Know Your Customer
– Global
Global Regulatory Overview
– Global
Account Database Manager
– Philippines
Test Tracking Tool
– Global
Global Freight Tool
– Global
Routing Engine
– Global
Scoring Engine
– Global
Production Tracking & Performance System
– Global
GSA Stop Card Reports Development
– Global
Global Freight Tool - PPO Integration
– Global
Competitive Intelligence Portal
– Italy, Spain, France, Benelux
Key Projects – Fortune 500
Secure FTP Application
– India
B2B Integration
– India
Warehouse Occupancy Analysis System
– India
Enterprise Facilities Management System
– Malaysia
Energy Dashboard Development
– India
Energy Visualization and Analysis
Product Development and Continuance
– Australia
Key Projects – Fortune 500
Lenova India Reporting Solution
– Singapore
Service Parts Management System
- India
Management of Change (MOC)
- Malaysia
Enterprise Maintenance Management System
– YUM Group, India
Key Projects – Other Corporates
B2C Shopping Mall with Order Processing
– Canada
Jobs / Recruitment Portal
– Utusan Group, Malaysia
SMS News Portal
– Utusan, Malaysia
Contracts Closeout Data Administration System
– USA
Enterprise Resource Planning
– VIP Group, India
Key Projects – Other Corporates
Silver light based Simple Business Accounting System
– Osborne Charles Group, USA
Warehouse Management for Automated Storage and Retrieval System (ASRS)
– ER Mekatron Sdn. Bhd., Malaysia
Aircraft and Ground Support Equipment Maintenance Management
– IndiGO Airlines, India
Enterprise Facility Management System
– For Nitesh Residency via Carrier Race Technologies Pvt Ltd, India
Key Clients & End Users
Key Clients & End Users
w w w . s i e r r a t e c . c o m
SIERRA ODC Private Limited
Thank You!
For more information please contact us at
info@sierratec.com
INDIA
SIERRA ODC Private Limited
188/1,Varadharaja Layout-1
PN Palayam Road, Ganapathy,
Coimbatore - 641 006.
Tel: +91-422-2567596 / 7
Fax: +91-422-2567445
USA/Canada +1 408 239 4819
USA
SIERRA Infosys Inc.
6001 Savoy Dr, Suite 210,
Houston TX 77036,
Tel: +1-713-747-9693
Fax: +1-509-351-6682
MALAYSIA
SIERRA ODC (M) SDN. BHD.
96-1, Biz Avenue, 2, Neo Cyber
Lingkaran Cyber Point Barat
63000, Cyberjaya,
Selangor, Malaysia
Tel: +603-8320-2080
Fax:+603-8320-2082
SINGAPORE
SIERRA ODC (S) Pte. Ltd.
#20, Cecil Street,
#14-01, Equity Plaza
Singapore 049705
Tel: +65 97334623

eFACiLiTY Time and Attendance System

  • 2.
    Introduction eFACiLiTY  is amodular facilities management system  allows day-to-day management of the processes  automates operations  provides a management dashboard for critical analysis  enables enterprise wide control in the most intelligent and efficient way
  • 3.
  • 4.
    Multi Site MultiOrganization Concept  Site wise concept for multiple sites implementation using a central server  Facility managers being able to view any location data quickly by selecting the location/Site on top  User privileges can be set defining the sites to be viewed and restricted to each every user and in each and every site.
  • 5.
    Time and Attendance The Time and attendance system of eFACiLiTY provides improved efficiency, accuracy and productivity to the resource management and pay-roll process of organizations.  This system has the roster management module inbuilt and integrates with the time & attendance and access control hardware systems to provide attendance, late clocking exceptions, overtime information of employees to the HR, Payroll and their respective departments.
  • 6.
    Time and Attendance– Features  Employee profile  Shift management and Roster generation  Roster approval and re-assignment  Employee / Department shift calendar  Track time-in and time-out of every personnel  Late clock-in, early clock-out and other exceptions list  Overtime calculation and reporting  Leaves requests, approvals workflow  Permissions / on-duty requests, approvals workflow  Integration with multiple access control systems  Integration with other HR / Payroll Systems  Mobile SMS based clock-in/out and leave requests  Employee Tracking within the facility
  • 7.
    Time and Attendance– Features  SMS Attendance System with provision for • In/Out Time Clocking • Leave/Permission Requests • Interactive & Automated “Help” replies to users • SMS Attendance Clocking Report  Expiry Period Configuration for Compensatory Off leaves  Include/Exclude Weekends and Holidays for Compensatory Off leaves  Real time “Footer Alerts” for supervisors and administrators to quick check requests pending for their approval  Enhanced Remainder Email Configuration for Exceptions and Approvals  Control advance leave application  Bulk approval of employee exceptions and leave/permission requests  Improved report filters & optimized data binding methods for faster reporting  Interactive & Automated “Help” replies to users via SMS
  • 8.
    Roster  Assign/un assignshifts to an employee or a group of employees  Acceptance or rejection of Shifts based on the requirement  Change of allocated dates for weekly holiday.  View the applied and changed leaves.
  • 9.
    Assign/un Assign Shifts Assign/un assign Shifts to an employee or a group of employees  Change in shift’s date and time, Accept/Reject shifts  Employees will be allocated shifts against their Employee Codes. Click Staff Name to open Staff Profile When any holiday is clicked, the option “Assign for Holidays” will be set to “Yes”
  • 10.
    Admin approval/Rejection  Approvalof Shifts by the Users/supervisor  Reallocation or Rejection of Assigned shifts  Shift Approval/rejection for either an individual or a group Form 3 Form 1 Form 2
  • 11.
    Holiday Change  Provisionto change or cancel pre-defined holidays  Holiday changes are recorded and shifts are assigned accordingly
  • 12.
    Leave Application  Provisionto apply leaves of different types  Leaves are recorded and shifts are assigned accordingly  Eligible and Carried Forward leaves are displayed based on selected leave type
  • 13.
    Leave Application (Comp-Off) Provision to apply comp-off  Available comp-off leaves are automatically calculated based on staff attendance
  • 14.
    Leave Approval/Rejection  Provisionfor managers to approve/reject leaves  Approval/Rejection remarks can be captured and stored
  • 15.
    Permission Application  Provisionto apply permission  Permission can be applied by staff with shift assigned
  • 16.
    Permission Approval/Rejection  Provisionfor managers to approve/reject permission  Approval/Rejection remarks can be captured and stored
  • 17.
    Leave Eligibility (NextYear)  The consecutive year leave eligibility of employees for different leave types to be available  Provision to allow override and carry forward of leaves  Provision to define override limit and carry forward limit for leaves
  • 18.
    Leave Status Summary The status summary of different leave types for each employee can be viewed  Leave status for employees can also be viewed for different years
  • 19.
    Leave Change  Cancellationof Leave availed by the staff
  • 20.
    View In/Out Details The In and Out time of staff is fetched from the access control system  These details can be viewed by managers and staff
  • 21.
    Missed Punch Entry Managers have the provision to enter missed punch entries for staff  Staff can view their respective missed punch entries
  • 22.
    Attendance Exception  Varioustypes of attendance exceptions are raised based on the In/Out details of staff  Staff can view and enter reason against the exceptions for approval
  • 23.
    View Time Exception The time exception details are displayed to the staff  Status of the exception is displayed
  • 24.
    Apply Exception Reason Provision for staff to enter exception reason and remarks  Reason and remarks entered by staff is sent for approval
  • 25.
    Exception Approval/Rejection  Provisionfor managers to approve/reject exception reason entered by staff  Approval/Rejection remarks can be captured and stored
  • 26.
    View My Calendar View shift details from View My Calendar section  Shift assignments done are highlighted  Shift timings are shown when mouse is moved over  Raised and Cleared exceptions are shown  Provision for staff to apply reason for exceptions
  • 27.
    Track Staffs  Locatesthe existence of the staff in the company  Tracks the existence of the staff for the current time or for a specified range of date / time  Monitors Staff entry or exit  Reports Staff movement
  • 28.
    Holidays  Provision fordefining the holidays  Different Color Indication for various types of holidays
  • 29.
    Email Alerts  Mailis triggered to the employees who check in late / check out early.  Subject phrases are maintained in a separate master “Mail Contents”.  When the system triggers a mail to the Employees, it takes and applies the appropriate subject from this master to the mail.
  • 30.
    Integration  Integration with3rd party application ( like SAP,SIEBEL, JDEdwards, Baan,etc)  Integration with Access Control Devices  Integration with Active Directory
  • 31.
    Reports Features  Generationof the MIS Reports like • Staff Directory • Shift assignment-staff wise • Shift Assignment – Date wise • Staff unassigned days • Shift Summary • Time and Attendance – Exception Report • Unprocessed Click-in and Click-out • Staff Overtime Report • Approval / Rejection Report • Attendance Report • Staff Movement  These reports can be printed in HTML, Excel and PDF formats
  • 32.
    Software Specifications  Microsoft’s.NET Framework  Browser based thin-client interface  Supports Oracle/MSSQL/MSSQL Express  Email, SMS, MMS Messaging  Cross browser compatible  Language of your choice  Supports MS Exchange, LDAP  Building Management Systems (BMS) Integration  Ready for integration with Microsoft Active Directory, Oracle Single Sign-on  PDA extension with Microsoft Pocket PC  Table, Field, Activity wise Audit Trail  Security Policy Management
  • 33.
    Synergetic Partners Microsoft GoldCertified Partner (ISV)–Product Development Tridium Asia Pacific, Singapore Metronic Global Berhad, Malaysia & China Pinnacle Computer Systems Dubai, U.A.E.Wave Front, Japan Infocon Technology, Malaysia Global Trade S.A.R.L., Saudi Arabia Sequential IDS, Nigeria
  • 34.
    eFACiLiTY End Users IntelligentBuilding Management System – Federal Government Buildings, Putrajaya, Malaysia Enterprise Facilities Management System Implementation – Ministry of Health, Kuwait Enterprise Facilities Management System Implementation – Tidel Park, Coimbatore, India Government eFACiLiTY - Enterprise Facility Booking System – Malaysian Communications And Multimedia Commission (MCMC), Malaysia Enterprise Facilities Management System Implementation – Ministry of Health, Bahrain Enterprise Facilities Management System Implementation – Saudi Arabia National Guard, Saudi Arabia
  • 35.
    eFACiLiTY End Users Corporates EnterpriseVisitor Management System – Japan Tobacco International, Malaysia Enterprise Facility Management System – British Aero Space, Saudi Arabia Enterprise Facility Management System – Saudi Catering and Contracting, Saudi Arabia Enterprise Facilities Management System – Qatar Petroleum, Qatar Enterprise Facilities Management System – Sodexo, India Enterprise Facilities Management System – For Vodafone through Honeywell
  • 36.
    eFACiLiTY End UserseFACiLiTYEnd Users Corporates Enterprise Facilities Management System – Trade Coast, Australia Enterprise Facility Management System – Alghanim Industries, Kuwait Enterprise Facilities Management System – Embassy Services Private Limited, India Enterprise Facilities Management System – Airmaster, Australia Enterprise Facilities Management System – Millennium Hilton, Bangkok
  • 37.
    eFACiLiTY End Users Corporates eFACiLiTYModule Implementation – Prestige IT Park, India eFACiLiTY - Enterprise Facility Management System – CoreLogic, India eFACiLiTY – Enterprise Facility Management System – Wadhwa Group, India eFACiLiTY – Enterprise Facility Management System – Egypt, UAE, Saudi Arabia, India eFACiLiTY – Enterprise Facility Management System – Pacific Controls, UAE
  • 38.
    Corporates eFACiLiTY – EnterpriseFacility Management System – Albhukary, Malayasia Tenant Billing System – GVK Mall, India Tenant Billing System – Value Mall, India Enterprise Facilities Management System Implementation – Sheraton Darling Harbor, Sydney, Australia Facility Booking System – DiGi, Malaysia eFACiLiTY End Users
  • 39.
    eFACiLiTY End Users Corporates eFACiLiTY– Enterprise Facilities Management System – Saudi Arabian Trading & Construction Co. (SATCO), Saudi Arabia eFACiLiTY – Enterprise Facilities Management System – Godrej Properties, India eFACiLiTY – Enterprise Facilities Management System – CRISIL Limited, India eFACiLiTY – Enterprise Visitor Management System – Electronic Card Services Ltd, Kenya eFACiLiTY – Enterprise Facilities Management System – For Societe Generale via CBRE South Asia Pvt. Ltd eFACiLiTY – Enterprise Facilities Management System –GPX (India) Private Limited, India
  • 40.
    SIERRA ODC PrivateLimited  Founded in 1998  Based in Coimbatore, INDIA  Providing Software Development & Support Services  150+ Strong workforce  Clients and Outsourcing in Malaysia, USA, UK, Middle East and Africa  Satisfied Multinational Clients  Microsoft Gold Certified Partner
  • 41.
    Customs, Ports, FreeTrade Zone Affairs Automation Project – Kingdom of Bahrain Key Projects – Government Airport Automation, Cargo Management, Point of Sales Systems – Civil Aviation Authority, Uganda Farm Production System – Malaysian Agri Food Corporation, Malaysia Enterprise Facilities Management System Implementation – Ministry of Health, Bahrain Enterprise Facilities Management System Implementation – Saudi Arabia National Guard, Saudi Arabia
  • 42.
    Enterprise Resource Planning MaterialsManagement System Sales and Distribute Management Supply Chain Management Materials Management System Sales and Distribute Management Supply Chain Management Supply Chain Management CRM & Sales Force Automation System – South Asia SAP Integration & Online Reporting Application Key Projects – Fortune 500
  • 43.
    Tobacco Leaf InformationSystem – Malaysia Non Tobacco Material Warehouse Management – Korea, Malaysia Asia Sales Information System – Singapore Global Labelling Application – Global Incident Report Tools – Global Fleet Management System – Malaysia Virtual Application Portal – Global Account Database Manager – Vietnam Know Your Customer – Global Global Regulatory Overview – Global Account Database Manager – Philippines Test Tracking Tool – Global Global Freight Tool – Global Routing Engine – Global Scoring Engine – Global Production Tracking & Performance System – Global GSA Stop Card Reports Development – Global Global Freight Tool - PPO Integration – Global Competitive Intelligence Portal – Italy, Spain, France, Benelux Key Projects – Fortune 500
  • 44.
    Secure FTP Application –India B2B Integration – India Warehouse Occupancy Analysis System – India Enterprise Facilities Management System – Malaysia Energy Dashboard Development – India Energy Visualization and Analysis Product Development and Continuance – Australia Key Projects – Fortune 500 Lenova India Reporting Solution – Singapore Service Parts Management System - India Management of Change (MOC) - Malaysia Enterprise Maintenance Management System – YUM Group, India
  • 45.
    Key Projects –Other Corporates B2C Shopping Mall with Order Processing – Canada Jobs / Recruitment Portal – Utusan Group, Malaysia SMS News Portal – Utusan, Malaysia Contracts Closeout Data Administration System – USA
  • 46.
    Enterprise Resource Planning –VIP Group, India Key Projects – Other Corporates Silver light based Simple Business Accounting System – Osborne Charles Group, USA Warehouse Management for Automated Storage and Retrieval System (ASRS) – ER Mekatron Sdn. Bhd., Malaysia Aircraft and Ground Support Equipment Maintenance Management – IndiGO Airlines, India Enterprise Facility Management System – For Nitesh Residency via Carrier Race Technologies Pvt Ltd, India
  • 47.
    Key Clients &End Users
  • 48.
    Key Clients &End Users
  • 49.
    w w w. s i e r r a t e c . c o m SIERRA ODC Private Limited Thank You! For more information please contact us at info@sierratec.com INDIA SIERRA ODC Private Limited 188/1,Varadharaja Layout-1 PN Palayam Road, Ganapathy, Coimbatore - 641 006. Tel: +91-422-2567596 / 7 Fax: +91-422-2567445 USA/Canada +1 408 239 4819 USA SIERRA Infosys Inc. 6001 Savoy Dr, Suite 210, Houston TX 77036, Tel: +1-713-747-9693 Fax: +1-509-351-6682 MALAYSIA SIERRA ODC (M) SDN. BHD. 96-1, Biz Avenue, 2, Neo Cyber Lingkaran Cyber Point Barat 63000, Cyberjaya, Selangor, Malaysia Tel: +603-8320-2080 Fax:+603-8320-2082 SINGAPORE SIERRA ODC (S) Pte. Ltd. #20, Cecil Street, #14-01, Equity Plaza Singapore 049705 Tel: +65 97334623