POSITION: Welding & NDT Inspector (Aramco Approved),(SABIC Approved).
Name : Gurajada Santosh Brahmaji
Nationality : Indian
Languages Known : English, Hindi, Tamil, & Telugu etc.
E-Mail ID : san153santosh@gmail.com , sangurajada@yahoo.co.in
Mobile No : , 0048 739672061 , 0048 731388626 , 0091 7416256624.
 Diploma in Mechanical Engineering.
 State Board of Technical Education (SBTET), Visakhapatnam, A.P (INDIA).
 State Board of Technical Education & Training- (Visakhapatnam)
 Computer Den Training & Software Development Centre (MS-OFFICE)
TECHNICAL CERTIFICATIONS:
 CertifiedWeldingInspectorCSWIP3.1( TWI-CERTIFICATION LTD- ENGLAND)
Certificate No - 46061/2
Date of Expiry - 14 March 2020.
 ( SNT-TC- 1A-2006 of ASNT).
 ASNT - NDT Level II –Radiographic test film Interpretation (NO:NDT-120702/RTFI)
 ASNT - NDT Level II - Penetrant testing (CERTIFICATE NO:NDT-TCS/2028/PT)
 ASNT - NDT Level II - Magnetic particle testing (CERTIFICATE NO:NDT-TCS/2028/MT)
 ASNT - NDT Level II - Ultrasonic testing (CERTIFICATE NO:NDT-TCS/2028/UT)
 ASNT - NDT Level II - Radiography Testing (CERTIFICATE NO:ASNT-SNT-1A/2001/RT)
 Attended 10 days training on Welding inspection Training of various welding
Methods conducted by NDT & Welding Institute. Visakhapatnam.
 Attended 25 days training on over view of various NDT Methods conducted by
NDT Training & Consulting Services, VISAKHAPATNAM, AP, INDIA.
 Safety Training: Taken for H2S, Confined Space In Gas & Petrochemicals fields.
( NIOSH SAFETY PASSPORT ) MALAYSIA.
 HSE PDO (SAFETY PASSPORT) OMAN.
Page 2 of 7
WORK EXPERIENCE TOTAL : 12 YEARS.
Company : M/S.energoPLsp.z o.o
ul.Laczna 39, 41-303 Dabrowa Gornicza,
office:ul.mickiewicza 15 , 40-951 Katowice.
POLAND.
Project : Demontaż Elektrofiltrai montaż filtra workowegoPGNIGECŻerań
Name ofClient : Bilfinger ELWOS.A.
PositionHeld : QC Welding & NDT Inspector
Duration : February 2015 to Till Date.
Duties And Responsibilities :
 Conducting and Participation in Pre-InspectionMeeting with Client and formulating the waysof
Inspection as per the Approved Inspection Test Plan.
 Review of Inspection and Test Plan & Inspecting Material forverificationat all stages of inspection as per
the approved inspection test plane.
 Organize and conductwelder’s qualification test as per EN287-1 and client specification.
 Inspection of Electrodes, filler wires and gas used for welding.
 Control welding consumables & documents.
 Coordinate forNon DestructiveExamination of Welds (RT/UT/MT/PT),inaccordancewith approved
procedures and QC Plans.
 Preparation of QC Documentation, Inspection Checklist, Preparation of Final Dossier for Projectas
required by the Client such as NDT Reports, Final Inspection Reports, Calibration Records& Welder
PerformanceCertificates Etc.,(MTC, Visual/Dimensional Inspection Reports, Weld Map,
WPS/PQR/WQRT,NDTREPORTS) Review of Final Dossier Priorto Acceptance.
Company : AlaaInternational contractingCo. (AFI)
P.O.Box-9998, Dammam-31423(Yanbu),
Kingdom Of Saudi Arabia.
Tel: +966 3 8470033, Fax: +966 3 8473994.
Project : REPLACE OF AUXILARY CONTROLSYSTEM@ YRD.
Name ofClient : SAUDIARAMCO( YANBU REFINERY DEPARTMENT)
PositionHeld : QC Welding & NDT Inspector
Duration : February 2013 to August 2014
Duties And Responsibilities :
 Conducting and Participation in Pre-InspectionMeeting with Client and formulating the waysof
Inspection as per the Approved Inspection Test Plan.
Page 3 of 7
 Review of Inspection and Test Plan & Inspecting Material forverificationat all stages of inspection as per
the approved inspection test plane.
 Organize and conductwelder’s qualification test as per ASME Section IX and client specification.
 Inspection of Electrodes, filler wires and gas used for welding.
 Control welding consumables & documents.
 Visual Inspection of pipe fit up and welds joints and reject/acceptas per acceptance criteria of ASME B
31.3
 Visual Inspection of Structural members fit up and weld joints as per acceptance criteria of AWS D1.1.
 Monitor preheating prior commencement of welding and inter pass temperatures during the welding.
 Monitor performance of the welders on the basis of radiographic inspection and promote corrective
action where necessary.
 Check final dimension, material traceability, orientation and cleanliness after completion of pipe spool
fabrication / structural members.
 Coordinate forPost Weld Heat Treatment of welds, monitor the heating rate, soaking time and cooling
rate during heat treatment.
 Liaise with Client, Authorized Inspector & Third Party.
 Coordinate Technical Queries with project management team on daily basis.
 Coordinate with client inspection department / third party inspection department for quality issues.
Documentation
 Preparation of QC Documentation, Inspection Checklist, Preparation of Final Dossier for Projectas
required by the Client such as NDT Reports, Final Inspection Reports, Calibration Records& Welder
PerformanceCertificates Etc.,(MTC, Visual/Dimensional Inspection Reports, Weld Map,
WPS/PQR/WQRT,NDTREPORTS) Review of Final Dossier Priorto Acceptance.
Company : AlaaInternational contractingCo. (AFI)
Project : IBN-RUSHD –II, U&O-DBN (PROJECT)
Name ofClient : SAUDI ARABIA-SABIC
Name ofContractor : CTCI CORPORATION ARABIA
PositionHeld : QC-Welding & NDT Inspector
Duration : 29th January 2012 to 10th January 2013.
Duties And Responsibilities :
Page 4 of 7
 Duties Include Surveillance and Checking of Piping Fabrication and Installation Procedure and welding
requirements, receiving materials to the Project quality procedure and clients project specific.
 Inspection and monitoring on fabrication and installation of pipe supports and various structures.
 Conducting Welder’s Qualification Test as per ASME Sec IX.
 Responsibilities include in monitoring and inspection of delivered and installed material as IS, BS ANSI
& ASTM code and standards.
 Liaise with QC Engineer and client representative for day-to-day quality related activities of the
project/contract.
 Inspection and acceptance of materials as per Specification and Project requirement.
 Visual Inspection of weldsand acceptingas per Projectspecificationsand preparing reports making QCW
clearance for further activities.
 Monitoring and Inspection of fit-up for pipe joints with dimensional and orientation, welding activities
in all area of the project as per welding.
 Monitoring welding consumable control, welder qualification and welding activities at fabrication shop
and field as per the (QCP).
 Preparing various documents such as welding inspection report prior to endorsement to the client and
Project Management Team (PMT) to raise Request for Inspection (RFI) for final acceptance.
 Monitoring positive material identification (PMI) for stainless steel, Alloy steel and copper Nickel
associating with other tests like bend tests, hardness tests, Macro examinations.
 Witnessing Non-Destructive Testing for welds which involve R.T, P.T., M.T and U.T & PWHT.
Familiar With Codes :
ASME Sec V, ASME Sec VIII, ASME Sec IX & Saudi Aramco Engineering Standards &
Procedures
Company : M/S. Denholm Yam Contracting Company.
Abu Dhabi, PO Box- 94243. (U.A.E).
Tel: 971 2 659 3333, Fax: 971 2 659 3334.
Clients
 DOLPHIN ENERGY( Taweelah Fujairah-Gas Power Pipeline Project)
 PETROFAC INTERNATIONAL LTD ( Fabrication of Pipe Spools For ASAB Full Field
Development Project)
 SBM (Deep Panuke Project Offshore Nova Scotia)
Designation : QC WeldingInspector
Period : May-25-2010 to April-9-2011
Duties and Responsibilities:
Page 5 of 7
 Inspections of all activities from Shop Fabrication to Site Erection – Dimensional, Welding & NDT.
 Carry out the Inspection as per the Approved Project Quality Plan. (PQP).
 Responsible forRaising RFI & Co-ordination with ProjectInspector for All “Hold Points” activities.
 To checkthe Fit / Up as per the ProjectSpecificationand Monitoring Welding activities as per Project
Specification & Procedureand ensure Welding Parameter started in WPShas been followed.
 To Check the Pipe Size, Thickness and Surface Condition prior to Fit/Up.
 Ensuring Fit Up Clearance for the Welding.
 Conduct Inspection of all materials being used for Welding Activities.
 Confirm the Material against the Material Certificate.
 Check Calibration Welding Equipment’s.
 Preparation of Weld Map and Maintaining Traceability of Weld Joints withProper Inspection Reports.
 Co-ordinate with the Sub Contractor to fulfill the NDE Requirement.
 Witnessing the Inspection of Magnetic Particle and Penetrate Testing Methods According to Client
Requirements.
COMPANY : M/S FPUH AB-PEMONT.
Ul.Okrzei 10;42-450 Lazy ,
POLAND.(EUROPE )
CLIENTS:
 GJOA SEMI for AKKER KVAERNER,
 YIT SEVERN ,the UK,
 LOTOS for POLIMEX-SICES,
PTA WLOCLAWEK, POLAND
Designation : Welder & Supervisor
Period : 01-March-2009 to 30-November 2009
Roles and Responsibilities:
 To Check the Fit-Up as per the Project Specification & Monitoring Welding Activities as per Project
Specification & Procedure and ensure Welding Parameter started in WPS has been followed.
 To check the Pipe Size, Thickness and Surface Condition prior to Fit/Up.
 Ensuring Fit Up clearance for the Welding.
 Check Calibration Welding Equipment’s.
Page 6 of 7
COMPANEY : M/S. Syarikat Steelcon SDN.BHD
SUMATEC CORPORATION SDN.BHD.
BATU CAVES. KAULALUMPUR. MALAYSIA.
CLIENTS :
 SGL CARBON SDN BHD SUPPLY AND FABRICATION OF STORAGE TANK AND
DOSAGE TANK.
 INDEPENDENT TECHNOLAGY SDN BHD. FILTER VESSELS FOR WYLOO
COMPRESSOR STATION.
 BORN CANADA. RADIANT COILS AND CONVECTION BOXES OF METALS
LIKE SS, P11, P22.
Designation : Jr. Welding Supervisor.
Period : SEP.2006 TO SEP 2008
KEY ROLES AND EXPERIENCE :
 Witness of Destructive and Non destructive testing and NDT as per approved
procedures.
 Supervision of NDT Technicians, Welders and fitters
Non- Destructive Testing
 Interpret RT Films & Drawings and other Documents.
 Radiography of tanks, Vessels, Pressure parts, prefabricated weld joint of pipes
using gamma ray.
 To carry out the Documentation part for all the Inspection with the Results
COMPANEY : Galfar Al Misnad Engineering&Contracting Wll.
DOHA –QATAR & OMAN.
Designation : Welder
Period : 09-Feb-2004 to 31-July-2005
Familiar with Welding Process :
 SMAW, GTAW, GMAW, FCAW & SAW.
COMPANEY : Grafcon Construction Private Limited.
Visakhapatnam.
CLIENTS : Devy Power Gas India PVT.LTD.
Designation : Welding Supervisor
Period : 30-May-2001 to 08-April-2002.
PERSONAL DETAILS:
Date of Birth : 06/02/1982.
Father’sName : Mr. G.MADHUSUDHANA RAO
Page 7 of 7
Sex : Male.
Marital Status : Married.
Passport No. : H 7985496 (OLD A8997370)
Date of Expiry : 04/02/2020
DECLARATION:
I hereby declare that the above said statement, given by me is true to the
Best of my knowledge, conscious and belief.
Yours faithfully,
G.SANTOSH BRAHMAJI

QA-QC WELDING & NDT Inspector for poland updated

  • 1.
    Page 1 of7 C U R RI C U L U M V I T A E POSITION: Welding & NDT Inspector (Aramco Approved),(SABIC Approved). Name : Gurajada Santosh Brahmaji Nationality : Indian Languages Known : English, Hindi, Tamil, & Telugu etc. E-Mail ID : san153santosh@gmail.com , sangurajada@yahoo.co.in Mobile No : , 0048 739672061 , 0048 731388626 , 0091 7416256624.  Diploma in Mechanical Engineering.  State Board of Technical Education (SBTET), Visakhapatnam, A.P (INDIA).  State Board of Technical Education & Training- (Visakhapatnam)  Computer Den Training & Software Development Centre (MS-OFFICE) TECHNICAL CERTIFICATIONS:  CertifiedWeldingInspectorCSWIP3.1( TWI-CERTIFICATION LTD- ENGLAND) Certificate No - 46061/2 Date of Expiry - 14 March 2020.  ( SNT-TC- 1A-2006 of ASNT).  ASNT - NDT Level II –Radiographic test film Interpretation (NO:NDT-120702/RTFI)  ASNT - NDT Level II - Penetrant testing (CERTIFICATE NO:NDT-TCS/2028/PT)  ASNT - NDT Level II - Magnetic particle testing (CERTIFICATE NO:NDT-TCS/2028/MT)  ASNT - NDT Level II - Ultrasonic testing (CERTIFICATE NO:NDT-TCS/2028/UT)  ASNT - NDT Level II - Radiography Testing (CERTIFICATE NO:ASNT-SNT-1A/2001/RT)  Attended 10 days training on Welding inspection Training of various welding Methods conducted by NDT & Welding Institute. Visakhapatnam.  Attended 25 days training on over view of various NDT Methods conducted by NDT Training & Consulting Services, VISAKHAPATNAM, AP, INDIA.  Safety Training: Taken for H2S, Confined Space In Gas & Petrochemicals fields. ( NIOSH SAFETY PASSPORT ) MALAYSIA.  HSE PDO (SAFETY PASSPORT) OMAN.
  • 2.
    Page 2 of7 WORK EXPERIENCE TOTAL : 12 YEARS. Company : M/S.energoPLsp.z o.o ul.Laczna 39, 41-303 Dabrowa Gornicza, office:ul.mickiewicza 15 , 40-951 Katowice. POLAND. Project : Demontaż Elektrofiltrai montaż filtra workowegoPGNIGECŻerań Name ofClient : Bilfinger ELWOS.A. PositionHeld : QC Welding & NDT Inspector Duration : February 2015 to Till Date. Duties And Responsibilities :  Conducting and Participation in Pre-InspectionMeeting with Client and formulating the waysof Inspection as per the Approved Inspection Test Plan.  Review of Inspection and Test Plan & Inspecting Material forverificationat all stages of inspection as per the approved inspection test plane.  Organize and conductwelder’s qualification test as per EN287-1 and client specification.  Inspection of Electrodes, filler wires and gas used for welding.  Control welding consumables & documents.  Coordinate forNon DestructiveExamination of Welds (RT/UT/MT/PT),inaccordancewith approved procedures and QC Plans.  Preparation of QC Documentation, Inspection Checklist, Preparation of Final Dossier for Projectas required by the Client such as NDT Reports, Final Inspection Reports, Calibration Records& Welder PerformanceCertificates Etc.,(MTC, Visual/Dimensional Inspection Reports, Weld Map, WPS/PQR/WQRT,NDTREPORTS) Review of Final Dossier Priorto Acceptance. Company : AlaaInternational contractingCo. (AFI) P.O.Box-9998, Dammam-31423(Yanbu), Kingdom Of Saudi Arabia. Tel: +966 3 8470033, Fax: +966 3 8473994. Project : REPLACE OF AUXILARY CONTROLSYSTEM@ YRD. Name ofClient : SAUDIARAMCO( YANBU REFINERY DEPARTMENT) PositionHeld : QC Welding & NDT Inspector Duration : February 2013 to August 2014 Duties And Responsibilities :  Conducting and Participation in Pre-InspectionMeeting with Client and formulating the waysof Inspection as per the Approved Inspection Test Plan.
  • 3.
    Page 3 of7  Review of Inspection and Test Plan & Inspecting Material forverificationat all stages of inspection as per the approved inspection test plane.  Organize and conductwelder’s qualification test as per ASME Section IX and client specification.  Inspection of Electrodes, filler wires and gas used for welding.  Control welding consumables & documents.  Visual Inspection of pipe fit up and welds joints and reject/acceptas per acceptance criteria of ASME B 31.3  Visual Inspection of Structural members fit up and weld joints as per acceptance criteria of AWS D1.1.  Monitor preheating prior commencement of welding and inter pass temperatures during the welding.  Monitor performance of the welders on the basis of radiographic inspection and promote corrective action where necessary.  Check final dimension, material traceability, orientation and cleanliness after completion of pipe spool fabrication / structural members.  Coordinate forPost Weld Heat Treatment of welds, monitor the heating rate, soaking time and cooling rate during heat treatment.  Liaise with Client, Authorized Inspector & Third Party.  Coordinate Technical Queries with project management team on daily basis.  Coordinate with client inspection department / third party inspection department for quality issues. Documentation  Preparation of QC Documentation, Inspection Checklist, Preparation of Final Dossier for Projectas required by the Client such as NDT Reports, Final Inspection Reports, Calibration Records& Welder PerformanceCertificates Etc.,(MTC, Visual/Dimensional Inspection Reports, Weld Map, WPS/PQR/WQRT,NDTREPORTS) Review of Final Dossier Priorto Acceptance. Company : AlaaInternational contractingCo. (AFI) Project : IBN-RUSHD –II, U&O-DBN (PROJECT) Name ofClient : SAUDI ARABIA-SABIC Name ofContractor : CTCI CORPORATION ARABIA PositionHeld : QC-Welding & NDT Inspector Duration : 29th January 2012 to 10th January 2013. Duties And Responsibilities :
  • 4.
    Page 4 of7  Duties Include Surveillance and Checking of Piping Fabrication and Installation Procedure and welding requirements, receiving materials to the Project quality procedure and clients project specific.  Inspection and monitoring on fabrication and installation of pipe supports and various structures.  Conducting Welder’s Qualification Test as per ASME Sec IX.  Responsibilities include in monitoring and inspection of delivered and installed material as IS, BS ANSI & ASTM code and standards.  Liaise with QC Engineer and client representative for day-to-day quality related activities of the project/contract.  Inspection and acceptance of materials as per Specification and Project requirement.  Visual Inspection of weldsand acceptingas per Projectspecificationsand preparing reports making QCW clearance for further activities.  Monitoring and Inspection of fit-up for pipe joints with dimensional and orientation, welding activities in all area of the project as per welding.  Monitoring welding consumable control, welder qualification and welding activities at fabrication shop and field as per the (QCP).  Preparing various documents such as welding inspection report prior to endorsement to the client and Project Management Team (PMT) to raise Request for Inspection (RFI) for final acceptance.  Monitoring positive material identification (PMI) for stainless steel, Alloy steel and copper Nickel associating with other tests like bend tests, hardness tests, Macro examinations.  Witnessing Non-Destructive Testing for welds which involve R.T, P.T., M.T and U.T & PWHT. Familiar With Codes : ASME Sec V, ASME Sec VIII, ASME Sec IX & Saudi Aramco Engineering Standards & Procedures Company : M/S. Denholm Yam Contracting Company. Abu Dhabi, PO Box- 94243. (U.A.E). Tel: 971 2 659 3333, Fax: 971 2 659 3334. Clients  DOLPHIN ENERGY( Taweelah Fujairah-Gas Power Pipeline Project)  PETROFAC INTERNATIONAL LTD ( Fabrication of Pipe Spools For ASAB Full Field Development Project)  SBM (Deep Panuke Project Offshore Nova Scotia) Designation : QC WeldingInspector Period : May-25-2010 to April-9-2011 Duties and Responsibilities:
  • 5.
    Page 5 of7  Inspections of all activities from Shop Fabrication to Site Erection – Dimensional, Welding & NDT.  Carry out the Inspection as per the Approved Project Quality Plan. (PQP).  Responsible forRaising RFI & Co-ordination with ProjectInspector for All “Hold Points” activities.  To checkthe Fit / Up as per the ProjectSpecificationand Monitoring Welding activities as per Project Specification & Procedureand ensure Welding Parameter started in WPShas been followed.  To Check the Pipe Size, Thickness and Surface Condition prior to Fit/Up.  Ensuring Fit Up Clearance for the Welding.  Conduct Inspection of all materials being used for Welding Activities.  Confirm the Material against the Material Certificate.  Check Calibration Welding Equipment’s.  Preparation of Weld Map and Maintaining Traceability of Weld Joints withProper Inspection Reports.  Co-ordinate with the Sub Contractor to fulfill the NDE Requirement.  Witnessing the Inspection of Magnetic Particle and Penetrate Testing Methods According to Client Requirements. COMPANY : M/S FPUH AB-PEMONT. Ul.Okrzei 10;42-450 Lazy , POLAND.(EUROPE ) CLIENTS:  GJOA SEMI for AKKER KVAERNER,  YIT SEVERN ,the UK,  LOTOS for POLIMEX-SICES, PTA WLOCLAWEK, POLAND Designation : Welder & Supervisor Period : 01-March-2009 to 30-November 2009 Roles and Responsibilities:  To Check the Fit-Up as per the Project Specification & Monitoring Welding Activities as per Project Specification & Procedure and ensure Welding Parameter started in WPS has been followed.  To check the Pipe Size, Thickness and Surface Condition prior to Fit/Up.  Ensuring Fit Up clearance for the Welding.  Check Calibration Welding Equipment’s.
  • 6.
    Page 6 of7 COMPANEY : M/S. Syarikat Steelcon SDN.BHD SUMATEC CORPORATION SDN.BHD. BATU CAVES. KAULALUMPUR. MALAYSIA. CLIENTS :  SGL CARBON SDN BHD SUPPLY AND FABRICATION OF STORAGE TANK AND DOSAGE TANK.  INDEPENDENT TECHNOLAGY SDN BHD. FILTER VESSELS FOR WYLOO COMPRESSOR STATION.  BORN CANADA. RADIANT COILS AND CONVECTION BOXES OF METALS LIKE SS, P11, P22. Designation : Jr. Welding Supervisor. Period : SEP.2006 TO SEP 2008 KEY ROLES AND EXPERIENCE :  Witness of Destructive and Non destructive testing and NDT as per approved procedures.  Supervision of NDT Technicians, Welders and fitters Non- Destructive Testing  Interpret RT Films & Drawings and other Documents.  Radiography of tanks, Vessels, Pressure parts, prefabricated weld joint of pipes using gamma ray.  To carry out the Documentation part for all the Inspection with the Results COMPANEY : Galfar Al Misnad Engineering&Contracting Wll. DOHA –QATAR & OMAN. Designation : Welder Period : 09-Feb-2004 to 31-July-2005 Familiar with Welding Process :  SMAW, GTAW, GMAW, FCAW & SAW. COMPANEY : Grafcon Construction Private Limited. Visakhapatnam. CLIENTS : Devy Power Gas India PVT.LTD. Designation : Welding Supervisor Period : 30-May-2001 to 08-April-2002. PERSONAL DETAILS: Date of Birth : 06/02/1982. Father’sName : Mr. G.MADHUSUDHANA RAO
  • 7.
    Page 7 of7 Sex : Male. Marital Status : Married. Passport No. : H 7985496 (OLD A8997370) Date of Expiry : 04/02/2020 DECLARATION: I hereby declare that the above said statement, given by me is true to the Best of my knowledge, conscious and belief. Yours faithfully, G.SANTOSH BRAHMAJI