Makkah Public Transport Program (MPTP)
MPTP Metro Phase 1 – Overview
October 2015
Contents
2 RSK Localisation Plan
1. Makkah Position in the Islamic World
2. Makkah Vision
3. Makkah Population , Hajj and Umrah Pilgrims
4. Public Transportation Issues in Makkah
5. KSA Government Investments in Makkah
6. Political – Social & Economic Impact
7. Benefit of the Project
8. Royal Decree
9. Design Criteria
10. MPTP Phasing Strategy – phase -1 Lines B & C
11. Interface and Utilities
12. Overview of Makkah Metro Phase 1 & Procurement strategy
13. MPTP Challenges
14. Questions and Answers
Haram view –
How to get In & Out ?
Makkah Vision
4 RSK Localisation Plan
Makkah is a truly unique city with global significance to over one fifth of
the world's population. The Makkah Vision, as articulated by HRH Prince
Khaled AI Faisal (Governor of Makkah Region), aims to transform Makkah
into a uniquely modern, beautiful and vibrant city that is deeply rooted in
its cultural and religious heritage and that befits its historical and spiritual
universal importance. A city that “celebrates” Islam and upholds its
values, with reflection on its rich past and a keen eye to a promising
future. By virtue of its historical importance and religious significance,
Makkah is to serve as an honorable and inspiring example of which its
residents, visitors and all Muslims can be proud.
Makkah Vision
An Overview - RSK 5
• Makkah Vision aims to transform Makkah to a uniquely modern,
beautiful and vibrant city deeply rooted in its cultural and religious
heritage that befits its historical and spiritual universal importance.
• The Makkah Vision recognizes four focal points:
– The human being
– The place
– The government
– The public & private sectors & projects
• Through this Vision, the MMRTC was created to improve the lives and
mobility of Makkah’s residents and visitors.
Makkah Vision
Hierarchy of Transit Modes
An Overview - RSK
Proposed Makkah Movement Hierarchy
Population Distribution &
Forecast - Makkah
7 RSK Localisation Plan
An Overview - RSK 8
1430 H -
2009
1435 H -
2014
1437 H -
2016
1450 H -
2030
Umrah(M) 4.6 6.024 11.8 17.2
Hajj (M) 3.1 2.9 3.8 8
0
5
10
15
20
25
30
PeopleinMillion Hajj and Umrah Pilgrims
Hajj and Umrah Pilgrims Trend
Public Transportation issues
in Makkah
9 RSK Localisation Plan
1. There isn’t any Public Transit network in the city.
2. In 1435H ( 2014) about 12 million pilgrims visit Makkah. This expected to
increase to 26 million pilgrims by 1450H (2030 ).
3. Umrah only will be doubled next year 1437 (2016) to around 12 million.
4. Umarah visa is open all around the year.
5. Umrah & Hajj annual rate +12 %, +6% respectively .
6. The roads infrastructure available and under construction are not able to meet
the current and future traffic demand
7. There are limited parking space available for cars.
8. Mix of use between Cars and Pedestrians is a safety hazard.
9. Current use of Private vehicle cause environmental pollution.
10. Lack of alternative Public Transportation means.
11. Inability to meet the requirements of disable people.
An Overview - RSK 10
Traffic issues – current status
Traffic issues – current status
Traffic issues – current status
Current Day to Day Demand Haram-
Main corridors
Day to Day Demand City-
Distribution traffic & demand
An Overview - RSK 15
KSA Government
Investment in Makkah
• The King launched third phase of Al Haram expansion on 11 July 2015,
consisting of five projects.
• Land Acquired area 2.2 M (sq.m) – Cost 100 B-SAR
• Cost of Haram extension more than 100 to 110 B-SAR
• Attracting more than 100 B-SAR in investment from public & private
sectors.
• Improving and facilitate Mashaer areas – cost more than 20 B-SAR
• Improving & Developing Jamarat – Cost 6 B-SAR
• King Abdulla project (EMMAR-Makkah )- cost more than 23 B-SAR
• Annual cost to manage Hajj more than 800 M-SAR
• To protect and augment the current investment,
Makkah needs a modern Transportation System.
Benefits From The
Project on :
16 RSK Localisation Plan
• Society
o Provide a Public Transportation System that is convenient, fast and
affordable
o Reduce traffic congestions
o Significant reduction in journey times
o Improvements in traffic safety level
o Increase the safety of pedestrians.
• Economy
o The development of urban areas
o Increase the economic efficiency and create jobs
o Easy access to business centers
Benefits From The
Project on:
17 RSK Localisation Plan
• Environment
o Reduction of carbon dioxide emissions and other pollutants
o Reduction in noise
o Improvements in the environmental conditions of the roads network
• The City
o It will contribute to the emergence of the City of Makkah as a “Smart
City” to join the developed Cities .
o Develop Makkah as the City of the 21st Century and beyond
o Position the City as attractive to investors
An Overview - CW1 & CW2 18
MPTP Impact
Environment &
Safety
• Reduction of
accidents and
associated
damages
• Reduce pollutions
in Makkah
GDP
• Expected increase
in annual growth
rate
Real Estate
• Increase in
property value
• Reduction in land
utilization for road
Workforce
• Provide
employment
opportunities for
Makkah region
and KSA people.
• Sustainable jobs
Economy
• Based on 2012
data, for every
100,000 pilgrims,
an estimated
SAR 520 Million
is spent on the
economy.
Time Cost
• Reduction in
traffic congestion
costs
Economic Impact of MPTP Phase 1
Economics Feasibility
Study
Benefits
Net Present Value
(SAR Billion)
Minimize travelling time for passengers 56.3
Reduction in Carbon Dioxide, Air Pollution, Noise and Accidents 21.6
Save the costs of operating automotive (fuel, maintenance, etc.) 21.9
Increase economic activities in the construction and service
sectors
186.7
Increase in real estate values 7.1
Total Revenue – Net Present Value 294.0
Total Cost (Construction and Operations) – Net Present
Value
145.5
Benefits / Cost Ratio (B/C Ratio) 2.02
Feasible Financial Study-
Break-even year 2022
-
0
2,000
4,000
6,000
8,000
10,000
12,000
Annual O&M Cost Annual Fare Revenue
Millions of Inflated SAR
Main Conclusions of the
Feasibility Studies
21 RSK Localisation Plan
1. The Public Transportation Network is technically feasible & essential
2. The Network meets the current and future transportation requirements
of residents and visitors
3. Public Transportation will improve the environmental conditions
4. Public Transportation will support the growth of the City and its
economy
Therefore there is an urgent need to implement this Project.
Royal Decree
22 RSK Localisation Plan
The Development Commission of Makkah and Mashaaer (DCOMM) appointed
the Makkah Mass Rail Transit Company (MMRTC) to run the Program
Management Office (PMO) for the Makkah Public transport Program (MPTP).
MPTP was approved by the government of the Kingdom of Saudi Arabia by the
Royal Decree (Number 45268 dated 07/10/1433H) to be financed entirely with
public funding.
An Overview - RSK 23
Design Criteria – General
Technical Categories Technical Criteria
Meeting Demand  Direct service on main radials to Holy Haram.
 Link HHR – Holy Haram – MMMP.
 Meet future normal day demand (Holy Haram), Friday, Ramadan and
Hajj
 Provide a comprehensive and complete Public Transportation System
Accessibility  Population with 400m of MRT Station ( catchment area ).
 Provide a suitable service to Holy Haram.
 Potential for safe walk routes between Holy Haram and stations.
 Address conflicts between pedestrian walk-ways and Public
Transportation routes
Environmental Impact  Reduce traffic congestion.
 Noise in MCA.
 Emissions in MCA and City.
 Visual Impact (City).
 Impact on religious sites.
Deliverability  Stakeholder acceptability.
 Potential for staged implementation.
 Land acquisition requirement (private land).
 Construction disruption
 Level of risk.
Design Criteria
– Study Process
24 RSK Localisation Plan
Develop Long List of Options
Dynamics of the City Objectives of the MRT System Constraints
Initial 26
Options
Appraisal
Short listed 5 Options
Final Option
Appraisal
Preferred Option(s)
Feasibility & CostsDemand Forecasting
Multi Criteria Assessment
Framework
MPTP Network –
All Phases
25 RSK Localisation Plan
C10-N
C9-N
C8-N
C7-N
C6-N
C5-N
C4-N
C3-N
C2-N
C1-N
C1-S C2-S
C3-S
C3b-S
C4-S
C5-S
C6-S
C7-S
C8-S
D10-W D9-W D8-W D7-W D6-W D5-W D4-W D3-W D2-W D1b-W
D1-W
D1-S
D2-S
D3-S
D4-S
D5-S
D6-S
D7-S
D8-S
D9-S
D10-S
D11-S
D12-S
D13-S
D14-S
B10-W
B9-W
B8-W
B7-W
B6-W
B5-W
B4-W B3-W B2-W
B11-W
B12-W
B13-W
B14-W
A3-W
A4-W
A5-W
A6-W
A7-W
A8-W
A2b-W
A2-W
A9-W
A10-W
A11-W
A12-W
A13-W
A1-W
A1-E A2-E A2b-E
A3-E A4-E A5-E A6-E A7-E A8-E A9-E A10-E
A11-E
A12-E
B2-E
B3-E-B
B1-EB1-W
C
D
A
B
A
D
B
C
C11-N
C12-N
D11-W
Construction Phase 1
Construction Phase 2
Construction Phase 3
Construction Phase 4
Construction Phase 5
Construction Phase 6
B4-E
B5-E
B6-E
B7-E
B8-E
B9-E
B10-E
B11-E
B3-E-M
Holy Haram
• Length = 182 km
• 88 Stations
• 20 years
• 6 Phases
An Overview - RSK 26
MMMP (Existing)
‫الخط‬(‫أ‬)
‫الخط‬(‫ج‬)
‫الخط‬(‫د‬)
‫الخط‬(‫ب‬)
‫الخط‬(‫أ‬)
‫الخط‬(‫ب‬)
‫الخط‬(‫ج‬)
‫الخط‬(‫د‬)
MPTP Network –
All Phases
MPTP Phasing Strategy –
Lines B & C together
• Sustainability :
– To provide comprehensive service for :
• Residents ( schools, hospital, universities, major Development, works etc )
• Umrah ( Haram & Taneem, Accommodations outside MCA )
• Hajj – Pilgrims .
• Technical – Aspects & Design:
- One OCC – End of Line C
- One Depot – End of Line C
- One integrated System ( signaling)
- Power ( electrical redundancy & traction )
- DB3 & RSK based on two lines
MPTP Phasing Strategy –
Lines B & C . Cont. 1
• Operation :
– Crowd distribution at Mina Plaza ( Jamarat ) & Haram
– Integration with bus system
– Interchange station is mandatory
– provide high level of flexibility to meet the transportation needs
– The network is designed to start with two connected lines B & C.
An Overview - CW1 & CW2 29
Interface & Utility Relocation
 MMRTC conducted coordination meetings with SEC, STC, Water
National Company, AMANAT and DCOMM regarding utility
relocation. These information and drawings were collected in the
Preliminary Design and later provided in the RFP.
 Detailed Utility Relocation plan and methodology will be developed
by the Design and Build Civil Contractors according to their design,
schedule and the RFP requirements.
Overview of Makkah Metro
Phase1 - MPTP System
• CBTC Moving block - the MMRT system allowing to operate either
• The system design shall be operational in any of the GoA2, GoA3,
and GoA4 modes depending on the operational requirements
envisioned and experienced throughout the year.
Station & System Integration
• Station Design & Types
– 200m platform
– Central platform , lateral platform, Three platforms
• To avoid disruption and delays, to ensure a good level of service for MPTP
users
• To allow more flexible movements for users
• To facilitate crowd management
• PSD & Segregation doors
Procurement strategy
Phase- 1 Process
• General Facts is :
– There is no a signal optimized procurement approach for every project
– The right optimized procurement for a project lead to success execution
• Contract Perimeter
– Technical interface
– Legal interface
• Criteria specifically influence the allotment
– Risk ( for client , for contractors )
– Time frame - control design and technical feature
– Competition and attractiveness
– Optimized cost
– Complexity ( technical and management interface ; contractual – many contracts/ layers )
– Owner organization and experience
Procurement strategy
Phase- 1 Process
• Kind of activities we need from the contractors
– FIDIC different books ( Red, Yellow , Silver )
• 5 Approaches we have conducted from more than 20 form of
allotments
– Underground , Above ground, stations , Trak work , Depot and etc
– System , PSD, AFC, Operation & Control , Fire Fighting and etc
– RSK
• SOWT Analysis
– Internal Factors ( strength & weakness ) – For the client
– External Factors ( Opportunity & Threat ) – For the program
An Overview - RSK 34
Procurement Strategy-
Phase -1
1. Lump Sum Design & Build
2. Mandate use of FIDIC Yellow Book
3. Contracts for Metro Phase 1:
 Two Civil Works Contracts (CW1 and CW2)
 SYSTEMS with MEP and Finishes Contract
 Rolling Stock Contract
An Overview - RSK 35
Program Process
Preliminary Design
Pre-Qualification
Tender
Clarifications
Technical Evaluations
Financial Evaluation
Negotiations
Contract Award
Mobilisation
Mobilisation
60% Design
Detail Design
Design Approval
Material Procurement
Construction
Integrated Testing
Operation Readiness
An Overview - RSK 36
Overview of Makkah
Metro Phase 1– Civil Work
Metro Network
Summary
Phase 1
Underground (km) 23
At Grade/ Elevated
(km)
21
Total Length (km) 45
Total Number of
Stations
22
Overview of Makkah Metro Phase 1
– Typical Elevated Station
Overview of Makkah Metro Phase 1
– Typical Underground Station
MPTP ChallengesNo.
Challenge Description Challenge Cause
1 Final award process for Civil Works Contracts
takes longer than estimated.
 Delays in land acquisition
 Approval process
2 Zam Zam aquifer  The construction of underground stations planned to be located within
area of the aquifer location.
3 Shortage of human resources required for the
Program
 Skills required not widely available in the region, specifically access to
Makkah
 Difficulty in attracting required skills to KSA
4 Significant traffic disruption and congestion
impacting the Makkah economy and the success
of the project
 Poorly planned and/or managed traffic diversions during construction
 Influx of pilgrims during Hajj or Ramadan
5 Other difficulties / Challenges  Coordination
 Technical
 Managerial
THANK YOU ‫لكم‬ ً‫ا‬‫شكر‬

More Related Content

What's hot

London bus public transportation
London bus public transportationLondon bus public transportation
London bus public transportation
Neeraj Mandloi IAS
 
Nsrcf vision 2020
Nsrcf vision 2020Nsrcf vision 2020
Nsrcf vision 2020
Kadris
 
Gang Strenght Formula.ppt
Gang Strenght Formula.pptGang Strenght Formula.ppt
Gang Strenght Formula.ppt
ssuser9cea3f
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
Avtansh Ghai
 
Riyadh metro project presentation 06052015 Final
Riyadh metro project presentation 06052015 FinalRiyadh metro project presentation 06052015 Final
Riyadh metro project presentation 06052015 Final
Clemens Tierie
 

What's hot (20)

Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
London bus public transportation
London bus public transportationLondon bus public transportation
London bus public transportation
 
Metro Jeddah - Public Transportation Plan EN
Metro Jeddah - Public Transportation Plan ENMetro Jeddah - Public Transportation Plan EN
Metro Jeddah - Public Transportation Plan EN
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Nsrcf vision 2020
Nsrcf vision 2020Nsrcf vision 2020
Nsrcf vision 2020
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in Delhi
 
Gang Strenght Formula.ppt
Gang Strenght Formula.pptGang Strenght Formula.ppt
Gang Strenght Formula.ppt
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
 
TfL's Approach to Developing a Sustainable Transport System
TfL's Approach to Developing a Sustainable Transport SystemTfL's Approach to Developing a Sustainable Transport System
TfL's Approach to Developing a Sustainable Transport System
 
Introduction to urban transportation
Introduction to urban transportationIntroduction to urban transportation
Introduction to urban transportation
 
Case study of feasibility study of mrts
Case study of feasibility study of mrtsCase study of feasibility study of mrts
Case study of feasibility study of mrts
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhi
 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planning
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit System
 
Public-Private Partnership in Urban Transport
Public-Private Partnership in Urban TransportPublic-Private Partnership in Urban Transport
Public-Private Partnership in Urban Transport
 
AN M.ENG PRESENTATION ON ROAD NETWORK
AN M.ENG PRESENTATION ON ROAD NETWORKAN M.ENG PRESENTATION ON ROAD NETWORK
AN M.ENG PRESENTATION ON ROAD NETWORK
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
Riyadh metro project presentation 06052015 Final
Riyadh metro project presentation 06052015 FinalRiyadh metro project presentation 06052015 Final
Riyadh metro project presentation 06052015 Final
 
IMPORTANCE OF SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDY
IMPORTANCE OF  SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDYIMPORTANCE OF  SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDY
IMPORTANCE OF SMART CITY PROJECT AND ITS POLICIES AT VELLORE – A CASE STUDY
 

Viewers also liked

King abdul aziz road makkah 2
King abdul aziz road   makkah 2King abdul aziz road   makkah 2
King abdul aziz road makkah 2
Faris Jeddawi
 
Dr. mansour el bardisi -noise impact assessment for metro and railway
Dr. mansour el  bardisi -noise impact assessment for metro and railwayDr. mansour el  bardisi -noise impact assessment for metro and railway
Dr. mansour el bardisi -noise impact assessment for metro and railway
imadhammoud
 
Final petro rabigh presentation
Final petro rabigh presentationFinal petro rabigh presentation
Final petro rabigh presentation
Faris Jeddawi
 
Kaaba Pics Old
Kaaba Pics OldKaaba Pics Old
Kaaba Pics Old
ihusain
 
Khutbah keagungan kota makkah
Khutbah keagungan kota makkahKhutbah keagungan kota makkah
Khutbah keagungan kota makkah
Khutbah
 

Viewers also liked (20)

Kwality
KwalityKwality
Kwality
 
[e-Government Program Action Plan : Holy Makkah City]
[e-Government Program Action Plan : Holy Makkah City][e-Government Program Action Plan : Holy Makkah City]
[e-Government Program Action Plan : Holy Makkah City]
 
Teen ads analysis
Teen ads analysisTeen ads analysis
Teen ads analysis
 
King abdul aziz road makkah 2
King abdul aziz road   makkah 2King abdul aziz road   makkah 2
King abdul aziz road makkah 2
 
Dr. mansour el bardisi -noise impact assessment for metro and railway
Dr. mansour el  bardisi -noise impact assessment for metro and railwayDr. mansour el  bardisi -noise impact assessment for metro and railway
Dr. mansour el bardisi -noise impact assessment for metro and railway
 
Final petro rabigh presentation
Final petro rabigh presentationFinal petro rabigh presentation
Final petro rabigh presentation
 
Cheetosfinal
CheetosfinalCheetosfinal
Cheetosfinal
 
Kaaba Pics Old
Kaaba Pics OldKaaba Pics Old
Kaaba Pics Old
 
Bk
BkBk
Bk
 
Makkah Rare Photos
Makkah Rare PhotosMakkah Rare Photos
Makkah Rare Photos
 
Islam - the Kabaah from the time of prophet Ibrahim till now
Islam - the Kabaah from the time of prophet Ibrahim till nowIslam - the Kabaah from the time of prophet Ibrahim till now
Islam - the Kabaah from the time of prophet Ibrahim till now
 
Last sermon of the holy prophet pbuh
Last sermon of the holy prophet pbuhLast sermon of the holy prophet pbuh
Last sermon of the holy prophet pbuh
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
 
Integrated project-delivery
Integrated project-deliveryIntegrated project-delivery
Integrated project-delivery
 
MedaLogistics16 | Hussein Balaghi
MedaLogistics16 | Hussein BalaghiMedaLogistics16 | Hussein Balaghi
MedaLogistics16 | Hussein Balaghi
 
Makkaj ppt final
Makkaj ppt  finalMakkaj ppt  final
Makkaj ppt final
 
Khutbah keagungan kota makkah
Khutbah keagungan kota makkahKhutbah keagungan kota makkah
Khutbah keagungan kota makkah
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
 

Similar to Makkah Metro - Makkah Mass Rail Project (MMRP)

Defining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoDefining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwango
ReaVaya_KM
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
BRTCoE
 
Middle East Rail 2016 Sneak Preview Brochure
Middle East Rail 2016 Sneak Preview BrochureMiddle East Rail 2016 Sneak Preview Brochure
Middle East Rail 2016 Sneak Preview Brochure
Alex Augusti
 
South East Europe Rail conference - Jean Patrick Marquet
South East Europe Rail conference -  Jean Patrick MarquetSouth East Europe Rail conference -  Jean Patrick Marquet
South East Europe Rail conference - Jean Patrick Marquet
Russell Publishing
 
Department of Works NIP - NIPA
Department of Works NIP - NIPADepartment of Works NIP - NIPA
Department of Works NIP - NIPA
Gibson Ali Holemba
 
Pgtu rev for Municipio 14
Pgtu rev for Municipio 14Pgtu rev for Municipio 14
Pgtu rev for Municipio 14
Damiano Morosi
 
JKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPADJKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPAD
Norma Nun
 
Railway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentRailway Stations&Nbrhd Development
Railway Stations&Nbrhd Development
Azher Malik
 
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness BrochureRampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Pratish Halady
 

Similar to Makkah Metro - Makkah Mass Rail Project (MMRP) (20)

What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
 
Defining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoDefining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwango
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
Experience Record
Experience RecordExperience Record
Experience Record
 
Department of Transport update on transport corridors
Department of Transport update on transport corridorsDepartment of Transport update on transport corridors
Department of Transport update on transport corridors
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
 
Dr. amjad bangash bechtel
Dr. amjad bangash   bechtelDr. amjad bangash   bechtel
Dr. amjad bangash bechtel
 
Middle East Rail 2016 Sneak Preview Brochure
Middle East Rail 2016 Sneak Preview BrochureMiddle East Rail 2016 Sneak Preview Brochure
Middle East Rail 2016 Sneak Preview Brochure
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentation
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in Karachi
 
Brett herron
Brett herronBrett herron
Brett herron
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
RDP Chapter 19
 
Mena Infrastructure Growing Sectors - 2013
Mena Infrastructure Growing Sectors - 2013Mena Infrastructure Growing Sectors - 2013
Mena Infrastructure Growing Sectors - 2013
 
Transport and communications
Transport and communicationsTransport and communications
Transport and communications
 
South East Europe Rail conference - Jean Patrick Marquet
South East Europe Rail conference -  Jean Patrick MarquetSouth East Europe Rail conference -  Jean Patrick Marquet
South East Europe Rail conference - Jean Patrick Marquet
 
Department of Works NIP - NIPA
Department of Works NIP - NIPADepartment of Works NIP - NIPA
Department of Works NIP - NIPA
 
Pgtu rev for Municipio 14
Pgtu rev for Municipio 14Pgtu rev for Municipio 14
Pgtu rev for Municipio 14
 
JKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPADJKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPAD
 
Railway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentRailway Stations&Nbrhd Development
Railway Stations&Nbrhd Development
 
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness BrochureRampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
 

More from Ibrahim Al-Hudhaif

More from Ibrahim Al-Hudhaif (20)

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
meed projects - gcc mainline network projects
meed projects - gcc mainline network projectsmeed projects - gcc mainline network projects
meed projects - gcc mainline network projects
 
cit- cross-border passenger and freight traffic legal interoperability - Cesa...
cit- cross-border passenger and freight traffic legal interoperability - Cesa...cit- cross-border passenger and freight traffic legal interoperability - Cesa...
cit- cross-border passenger and freight traffic legal interoperability - Cesa...
 
URBAN TRANSPORT, SUSTAINABILITY AND THE ECONOMY
URBAN TRANSPORT,  SUSTAINABILITY AND THE ECONOMY URBAN TRANSPORT,  SUSTAINABILITY AND THE ECONOMY
URBAN TRANSPORT, SUSTAINABILITY AND THE ECONOMY
 
Hitachi Rail - Alistair Dormer
Hitachi Rail - Alistair DormerHitachi Rail - Alistair Dormer
Hitachi Rail - Alistair Dormer
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

Makkah Metro - Makkah Mass Rail Project (MMRP)

  • 1. Makkah Public Transport Program (MPTP) MPTP Metro Phase 1 – Overview October 2015
  • 2. Contents 2 RSK Localisation Plan 1. Makkah Position in the Islamic World 2. Makkah Vision 3. Makkah Population , Hajj and Umrah Pilgrims 4. Public Transportation Issues in Makkah 5. KSA Government Investments in Makkah 6. Political – Social & Economic Impact 7. Benefit of the Project 8. Royal Decree 9. Design Criteria 10. MPTP Phasing Strategy – phase -1 Lines B & C 11. Interface and Utilities 12. Overview of Makkah Metro Phase 1 & Procurement strategy 13. MPTP Challenges 14. Questions and Answers
  • 3. Haram view – How to get In & Out ?
  • 4. Makkah Vision 4 RSK Localisation Plan Makkah is a truly unique city with global significance to over one fifth of the world's population. The Makkah Vision, as articulated by HRH Prince Khaled AI Faisal (Governor of Makkah Region), aims to transform Makkah into a uniquely modern, beautiful and vibrant city that is deeply rooted in its cultural and religious heritage and that befits its historical and spiritual universal importance. A city that “celebrates” Islam and upholds its values, with reflection on its rich past and a keen eye to a promising future. By virtue of its historical importance and religious significance, Makkah is to serve as an honorable and inspiring example of which its residents, visitors and all Muslims can be proud.
  • 5. Makkah Vision An Overview - RSK 5 • Makkah Vision aims to transform Makkah to a uniquely modern, beautiful and vibrant city deeply rooted in its cultural and religious heritage that befits its historical and spiritual universal importance. • The Makkah Vision recognizes four focal points: – The human being – The place – The government – The public & private sectors & projects • Through this Vision, the MMRTC was created to improve the lives and mobility of Makkah’s residents and visitors.
  • 6. Makkah Vision Hierarchy of Transit Modes An Overview - RSK Proposed Makkah Movement Hierarchy
  • 7. Population Distribution & Forecast - Makkah 7 RSK Localisation Plan
  • 8. An Overview - RSK 8 1430 H - 2009 1435 H - 2014 1437 H - 2016 1450 H - 2030 Umrah(M) 4.6 6.024 11.8 17.2 Hajj (M) 3.1 2.9 3.8 8 0 5 10 15 20 25 30 PeopleinMillion Hajj and Umrah Pilgrims Hajj and Umrah Pilgrims Trend
  • 9. Public Transportation issues in Makkah 9 RSK Localisation Plan 1. There isn’t any Public Transit network in the city. 2. In 1435H ( 2014) about 12 million pilgrims visit Makkah. This expected to increase to 26 million pilgrims by 1450H (2030 ). 3. Umrah only will be doubled next year 1437 (2016) to around 12 million. 4. Umarah visa is open all around the year. 5. Umrah & Hajj annual rate +12 %, +6% respectively . 6. The roads infrastructure available and under construction are not able to meet the current and future traffic demand 7. There are limited parking space available for cars. 8. Mix of use between Cars and Pedestrians is a safety hazard. 9. Current use of Private vehicle cause environmental pollution. 10. Lack of alternative Public Transportation means. 11. Inability to meet the requirements of disable people.
  • 10. An Overview - RSK 10 Traffic issues – current status
  • 11. Traffic issues – current status
  • 12. Traffic issues – current status
  • 13. Current Day to Day Demand Haram- Main corridors
  • 14. Day to Day Demand City- Distribution traffic & demand
  • 15. An Overview - RSK 15 KSA Government Investment in Makkah • The King launched third phase of Al Haram expansion on 11 July 2015, consisting of five projects. • Land Acquired area 2.2 M (sq.m) – Cost 100 B-SAR • Cost of Haram extension more than 100 to 110 B-SAR • Attracting more than 100 B-SAR in investment from public & private sectors. • Improving and facilitate Mashaer areas – cost more than 20 B-SAR • Improving & Developing Jamarat – Cost 6 B-SAR • King Abdulla project (EMMAR-Makkah )- cost more than 23 B-SAR • Annual cost to manage Hajj more than 800 M-SAR • To protect and augment the current investment, Makkah needs a modern Transportation System.
  • 16. Benefits From The Project on : 16 RSK Localisation Plan • Society o Provide a Public Transportation System that is convenient, fast and affordable o Reduce traffic congestions o Significant reduction in journey times o Improvements in traffic safety level o Increase the safety of pedestrians. • Economy o The development of urban areas o Increase the economic efficiency and create jobs o Easy access to business centers
  • 17. Benefits From The Project on: 17 RSK Localisation Plan • Environment o Reduction of carbon dioxide emissions and other pollutants o Reduction in noise o Improvements in the environmental conditions of the roads network • The City o It will contribute to the emergence of the City of Makkah as a “Smart City” to join the developed Cities . o Develop Makkah as the City of the 21st Century and beyond o Position the City as attractive to investors
  • 18. An Overview - CW1 & CW2 18 MPTP Impact Environment & Safety • Reduction of accidents and associated damages • Reduce pollutions in Makkah GDP • Expected increase in annual growth rate Real Estate • Increase in property value • Reduction in land utilization for road Workforce • Provide employment opportunities for Makkah region and KSA people. • Sustainable jobs Economy • Based on 2012 data, for every 100,000 pilgrims, an estimated SAR 520 Million is spent on the economy. Time Cost • Reduction in traffic congestion costs Economic Impact of MPTP Phase 1
  • 19. Economics Feasibility Study Benefits Net Present Value (SAR Billion) Minimize travelling time for passengers 56.3 Reduction in Carbon Dioxide, Air Pollution, Noise and Accidents 21.6 Save the costs of operating automotive (fuel, maintenance, etc.) 21.9 Increase economic activities in the construction and service sectors 186.7 Increase in real estate values 7.1 Total Revenue – Net Present Value 294.0 Total Cost (Construction and Operations) – Net Present Value 145.5 Benefits / Cost Ratio (B/C Ratio) 2.02
  • 20. Feasible Financial Study- Break-even year 2022 - 0 2,000 4,000 6,000 8,000 10,000 12,000 Annual O&M Cost Annual Fare Revenue Millions of Inflated SAR
  • 21. Main Conclusions of the Feasibility Studies 21 RSK Localisation Plan 1. The Public Transportation Network is technically feasible & essential 2. The Network meets the current and future transportation requirements of residents and visitors 3. Public Transportation will improve the environmental conditions 4. Public Transportation will support the growth of the City and its economy Therefore there is an urgent need to implement this Project.
  • 22. Royal Decree 22 RSK Localisation Plan The Development Commission of Makkah and Mashaaer (DCOMM) appointed the Makkah Mass Rail Transit Company (MMRTC) to run the Program Management Office (PMO) for the Makkah Public transport Program (MPTP). MPTP was approved by the government of the Kingdom of Saudi Arabia by the Royal Decree (Number 45268 dated 07/10/1433H) to be financed entirely with public funding.
  • 23. An Overview - RSK 23 Design Criteria – General Technical Categories Technical Criteria Meeting Demand  Direct service on main radials to Holy Haram.  Link HHR – Holy Haram – MMMP.  Meet future normal day demand (Holy Haram), Friday, Ramadan and Hajj  Provide a comprehensive and complete Public Transportation System Accessibility  Population with 400m of MRT Station ( catchment area ).  Provide a suitable service to Holy Haram.  Potential for safe walk routes between Holy Haram and stations.  Address conflicts between pedestrian walk-ways and Public Transportation routes Environmental Impact  Reduce traffic congestion.  Noise in MCA.  Emissions in MCA and City.  Visual Impact (City).  Impact on religious sites. Deliverability  Stakeholder acceptability.  Potential for staged implementation.  Land acquisition requirement (private land).  Construction disruption  Level of risk.
  • 24. Design Criteria – Study Process 24 RSK Localisation Plan Develop Long List of Options Dynamics of the City Objectives of the MRT System Constraints Initial 26 Options Appraisal Short listed 5 Options Final Option Appraisal Preferred Option(s) Feasibility & CostsDemand Forecasting Multi Criteria Assessment Framework
  • 25. MPTP Network – All Phases 25 RSK Localisation Plan C10-N C9-N C8-N C7-N C6-N C5-N C4-N C3-N C2-N C1-N C1-S C2-S C3-S C3b-S C4-S C5-S C6-S C7-S C8-S D10-W D9-W D8-W D7-W D6-W D5-W D4-W D3-W D2-W D1b-W D1-W D1-S D2-S D3-S D4-S D5-S D6-S D7-S D8-S D9-S D10-S D11-S D12-S D13-S D14-S B10-W B9-W B8-W B7-W B6-W B5-W B4-W B3-W B2-W B11-W B12-W B13-W B14-W A3-W A4-W A5-W A6-W A7-W A8-W A2b-W A2-W A9-W A10-W A11-W A12-W A13-W A1-W A1-E A2-E A2b-E A3-E A4-E A5-E A6-E A7-E A8-E A9-E A10-E A11-E A12-E B2-E B3-E-B B1-EB1-W C D A B A D B C C11-N C12-N D11-W Construction Phase 1 Construction Phase 2 Construction Phase 3 Construction Phase 4 Construction Phase 5 Construction Phase 6 B4-E B5-E B6-E B7-E B8-E B9-E B10-E B11-E B3-E-M Holy Haram • Length = 182 km • 88 Stations • 20 years • 6 Phases
  • 26. An Overview - RSK 26 MMMP (Existing) ‫الخط‬(‫أ‬) ‫الخط‬(‫ج‬) ‫الخط‬(‫د‬) ‫الخط‬(‫ب‬) ‫الخط‬(‫أ‬) ‫الخط‬(‫ب‬) ‫الخط‬(‫ج‬) ‫الخط‬(‫د‬) MPTP Network – All Phases
  • 27. MPTP Phasing Strategy – Lines B & C together • Sustainability : – To provide comprehensive service for : • Residents ( schools, hospital, universities, major Development, works etc ) • Umrah ( Haram & Taneem, Accommodations outside MCA ) • Hajj – Pilgrims . • Technical – Aspects & Design: - One OCC – End of Line C - One Depot – End of Line C - One integrated System ( signaling) - Power ( electrical redundancy & traction ) - DB3 & RSK based on two lines
  • 28. MPTP Phasing Strategy – Lines B & C . Cont. 1 • Operation : – Crowd distribution at Mina Plaza ( Jamarat ) & Haram – Integration with bus system – Interchange station is mandatory – provide high level of flexibility to meet the transportation needs – The network is designed to start with two connected lines B & C.
  • 29. An Overview - CW1 & CW2 29 Interface & Utility Relocation  MMRTC conducted coordination meetings with SEC, STC, Water National Company, AMANAT and DCOMM regarding utility relocation. These information and drawings were collected in the Preliminary Design and later provided in the RFP.  Detailed Utility Relocation plan and methodology will be developed by the Design and Build Civil Contractors according to their design, schedule and the RFP requirements.
  • 30. Overview of Makkah Metro Phase1 - MPTP System • CBTC Moving block - the MMRT system allowing to operate either • The system design shall be operational in any of the GoA2, GoA3, and GoA4 modes depending on the operational requirements envisioned and experienced throughout the year.
  • 31. Station & System Integration • Station Design & Types – 200m platform – Central platform , lateral platform, Three platforms • To avoid disruption and delays, to ensure a good level of service for MPTP users • To allow more flexible movements for users • To facilitate crowd management • PSD & Segregation doors
  • 32. Procurement strategy Phase- 1 Process • General Facts is : – There is no a signal optimized procurement approach for every project – The right optimized procurement for a project lead to success execution • Contract Perimeter – Technical interface – Legal interface • Criteria specifically influence the allotment – Risk ( for client , for contractors ) – Time frame - control design and technical feature – Competition and attractiveness – Optimized cost – Complexity ( technical and management interface ; contractual – many contracts/ layers ) – Owner organization and experience
  • 33. Procurement strategy Phase- 1 Process • Kind of activities we need from the contractors – FIDIC different books ( Red, Yellow , Silver ) • 5 Approaches we have conducted from more than 20 form of allotments – Underground , Above ground, stations , Trak work , Depot and etc – System , PSD, AFC, Operation & Control , Fire Fighting and etc – RSK • SOWT Analysis – Internal Factors ( strength & weakness ) – For the client – External Factors ( Opportunity & Threat ) – For the program
  • 34. An Overview - RSK 34 Procurement Strategy- Phase -1 1. Lump Sum Design & Build 2. Mandate use of FIDIC Yellow Book 3. Contracts for Metro Phase 1:  Two Civil Works Contracts (CW1 and CW2)  SYSTEMS with MEP and Finishes Contract  Rolling Stock Contract
  • 35. An Overview - RSK 35 Program Process Preliminary Design Pre-Qualification Tender Clarifications Technical Evaluations Financial Evaluation Negotiations Contract Award Mobilisation Mobilisation 60% Design Detail Design Design Approval Material Procurement Construction Integrated Testing Operation Readiness
  • 36. An Overview - RSK 36 Overview of Makkah Metro Phase 1– Civil Work Metro Network Summary Phase 1 Underground (km) 23 At Grade/ Elevated (km) 21 Total Length (km) 45 Total Number of Stations 22
  • 37. Overview of Makkah Metro Phase 1 – Typical Elevated Station
  • 38. Overview of Makkah Metro Phase 1 – Typical Underground Station
  • 39. MPTP ChallengesNo. Challenge Description Challenge Cause 1 Final award process for Civil Works Contracts takes longer than estimated.  Delays in land acquisition  Approval process 2 Zam Zam aquifer  The construction of underground stations planned to be located within area of the aquifer location. 3 Shortage of human resources required for the Program  Skills required not widely available in the region, specifically access to Makkah  Difficulty in attracting required skills to KSA 4 Significant traffic disruption and congestion impacting the Makkah economy and the success of the project  Poorly planned and/or managed traffic diversions during construction  Influx of pilgrims during Hajj or Ramadan 5 Other difficulties / Challenges  Coordination  Technical  Managerial
  • 40. THANK YOU ‫لكم‬ ً‫ا‬‫شكر‬