Amr Sakr
Cellular +201068373532 5 Sharawy st. Loran
Alexandria, Egypt 21624
amr-sakr@live.com
Career Summary
Maintenance & Electrical Construction
Electromechanical engineering professional offering 6+ years of experience in Maintenance & Electrical
Construction. Managing different types of maintenance strategies in addition to strong experience in designing,
testing, provisioning, deploying and supporting MEP tasks. Extensive background and interpretation in low voltage
and light current systems installation. Highly skilled in planning and analysis with strengths in project management.
Strong technical and methodical aptitude with an innate ability to analyze, coordinate and synthesize data.
Personal Information
- Date of Birth: January, 2nd
, 1988
- Marital Status: Married
- Nationality: Egyptian
- Military Status: Exempted
Areas of Expertise
• Managing MEP design projects including HVAC, Pumping, Fire Fighting, & piping systems from initiation
through successful completion.
• Corrective, preventive, and predictive maintenance.
• Low voltage systems installation including LV panels, MDB, EMBD, & DB.
• Light current systems including Fire alarm, telephones, Data, & CCTV systems.
• Project Management.
Experience
Designia Mall Maintenance & Duty Manager May 2015 to Present
Nile Projects & Trading Co. Alexandria, Egypt
• Coordinate with office and mall staff , consultants, & contractors including restaurants, health clubs, and multi-
national corporates as Tommy Hilfiger, Ralph Lauren, Burberry, Armani Jeans, ....etc.
• Managing maintenance schedules and budgets.
• Analysis of repetitive equipment failures.
• Forecasting of spare parts.
• Managing a team of multi-disciplined maintenance technicians.
• Ensuring that all certificates of compliance are maintained and up to date in accordance with relevant
legislation.
• Ensuring that all building systems is in safe working order in line with current regulations.
Project Manager Sep 2012 to May 2015
Electrotech Egypt
Projects Involved:
Deebtex Factory – Designia Mall – El-Tarek Show Room – Pharma Overseas Store.
• Manage all phases of customer's design and deployment of cabling infrastructure and / or electrical projects.
• Value-engineer projects to remove cost and drive savings to our customer.
• Manage, coach and develop assigned staff.
• Schedule, conduct and document all job meetings.
• Ordering all equipment & materials for the project.
• Tracking of project RFI's, change orders and other pertinent documentation.
• Manage project close out, including securing warranties, guarantees, and acceptance of work, sub-contractor
and vendor close, final payment and records retention.
Project Engineer Aug 2010 to Sep 2012
Electrotech Egypt
Projects Involved:
Arab Academy for Science & Technology Great hall- Al-Ahly National Bank – Kamaraya Roushdy Mall – AWA
Food Factory.
• Installation of low voltage systems which includes: lighting circuits & power sockets outlet, isolator's outlet,
and three phase power socket.
• Installation of LV panels, MDB, EMBD &DB for the power supply to the power sockets, lighting loads, &
A/C.
• Installation of control circuit, lying & connection of LV cables to the different pump motors.
• Installation of low current earthling system.
• Installation of bus-bar riser.
• Installation of light current systems which includes: fire alarm systems, telephone systems, Data systems,
CCTV systems, TV systems, Accesses control system and light current earthing system.
• Testing and commissioning of MDB, SMDB, DB, bus-bar and pump motor, etc.…..
Education
Bachelor of Science, Mechatronics Engineering 2010
Arab Academy for Science, Technology, and Maritime Transportation Alexandria, Egypt
Elementary, preparatory, High school. 2005
Janakless Language School Alexandria, Egypt
Additional Skills
• AutoCAD
• Matlab
• MS Office
• MS Project
Languages
• Arabic: Mother Tongue
• English: Fluent

MEP Engineer Amr Sakr Resume

  • 1.
    Amr Sakr Cellular +2010683735325 Sharawy st. Loran Alexandria, Egypt 21624 amr-sakr@live.com Career Summary Maintenance & Electrical Construction Electromechanical engineering professional offering 6+ years of experience in Maintenance & Electrical Construction. Managing different types of maintenance strategies in addition to strong experience in designing, testing, provisioning, deploying and supporting MEP tasks. Extensive background and interpretation in low voltage and light current systems installation. Highly skilled in planning and analysis with strengths in project management. Strong technical and methodical aptitude with an innate ability to analyze, coordinate and synthesize data. Personal Information - Date of Birth: January, 2nd , 1988 - Marital Status: Married - Nationality: Egyptian - Military Status: Exempted Areas of Expertise • Managing MEP design projects including HVAC, Pumping, Fire Fighting, & piping systems from initiation through successful completion. • Corrective, preventive, and predictive maintenance. • Low voltage systems installation including LV panels, MDB, EMBD, & DB. • Light current systems including Fire alarm, telephones, Data, & CCTV systems. • Project Management. Experience Designia Mall Maintenance & Duty Manager May 2015 to Present Nile Projects & Trading Co. Alexandria, Egypt • Coordinate with office and mall staff , consultants, & contractors including restaurants, health clubs, and multi- national corporates as Tommy Hilfiger, Ralph Lauren, Burberry, Armani Jeans, ....etc. • Managing maintenance schedules and budgets. • Analysis of repetitive equipment failures. • Forecasting of spare parts. • Managing a team of multi-disciplined maintenance technicians. • Ensuring that all certificates of compliance are maintained and up to date in accordance with relevant legislation. • Ensuring that all building systems is in safe working order in line with current regulations. Project Manager Sep 2012 to May 2015 Electrotech Egypt Projects Involved: Deebtex Factory – Designia Mall – El-Tarek Show Room – Pharma Overseas Store. • Manage all phases of customer's design and deployment of cabling infrastructure and / or electrical projects. • Value-engineer projects to remove cost and drive savings to our customer. • Manage, coach and develop assigned staff. • Schedule, conduct and document all job meetings. • Ordering all equipment & materials for the project. • Tracking of project RFI's, change orders and other pertinent documentation. • Manage project close out, including securing warranties, guarantees, and acceptance of work, sub-contractor and vendor close, final payment and records retention.
  • 2.
    Project Engineer Aug2010 to Sep 2012 Electrotech Egypt Projects Involved: Arab Academy for Science & Technology Great hall- Al-Ahly National Bank – Kamaraya Roushdy Mall – AWA Food Factory. • Installation of low voltage systems which includes: lighting circuits & power sockets outlet, isolator's outlet, and three phase power socket. • Installation of LV panels, MDB, EMBD &DB for the power supply to the power sockets, lighting loads, & A/C. • Installation of control circuit, lying & connection of LV cables to the different pump motors. • Installation of low current earthling system. • Installation of bus-bar riser. • Installation of light current systems which includes: fire alarm systems, telephone systems, Data systems, CCTV systems, TV systems, Accesses control system and light current earthing system. • Testing and commissioning of MDB, SMDB, DB, bus-bar and pump motor, etc.….. Education Bachelor of Science, Mechatronics Engineering 2010 Arab Academy for Science, Technology, and Maritime Transportation Alexandria, Egypt Elementary, preparatory, High school. 2005 Janakless Language School Alexandria, Egypt Additional Skills • AutoCAD • Matlab • MS Office • MS Project Languages • Arabic: Mother Tongue • English: Fluent