Smart Grid Solutions


DONG Energy
Improving the bottom line and getting better data quality




 PROJECT AT A GLANCE
 Project Type
 Operational utility solutions

 Location
 Denmark

 Number of Sites
 More than 6,000

 Applications
 An intelligent, easy-to-use drawing tool in
 which all the features selected in the design
 phase are automatically saved in the GIS
 immediately
                                                 DONG Energy—a large energy company headquartered in Denmark—
 Software Implemented                            obtains, produces, distributes, deals and sells energy and associated
 Designer Express                                products in northern Europe.

 CUSTOMER BENEFITS                               DONG Energy specializes in the design and documentation of new electrical
                                                 facilities, developing more than 6,000 sites annually. Clients include entities
 • Improved bottom line
                                                 with new buildings in a new location that previously did not have access to
 • Better data quality                           electricity, factories in need of more power, maintenance on old projects or in
 • Better customer service                       the case where existing wiring is exchanged with cables.
 • Greater organisational knowledge about the
  projects                                       Throughout its projects, the project manager must first draw the first sketch
                                                 of cabling, electrical substations and transformer station when a plant is
 • Minimize the risks of errors
                                                 projected.

                                                 Challenges
                                                 Redrawing entries and a lack of overview
                                                 The time spent on making the sketch was one of DONG Energy’s
                                                 challenges. Since a sketch can be changed during the construction
                                                 process—and sometimes discarded because a project is cancelled—it is a
                                                 waste of resources if too much time is devoted to the sketch.




Make the most of your energy                                 SM
Smart Grid Solutions             DONG Energy




    “...now all projects are available to everyone in the organization because
    they are in the GIS database from the beginning — and that is a great
    advantage.”
    Max Knudsen, GIS specialist




DONG Energy used a tool developed in ArcView           In addition, the sketch is visible to everyone
which made it possible to draw cables and              in the organization throughout the process—
substations. However, it was not an intelligent        giving everyone an excellent overview of what
tool; when the sketch was entered into the             is happening and an up-to-date status of the
Geographic Information System (GIS) to give            project.
all the elements a correct geographic location,
everything had to be redrawn from scratch.             After discovering Designer Express at the Esri
Nor was it possible — in a simple way — to             International User Conference, Max Knudsen he
get a good overview of the materials used in           started building a business case to determine
connection with the project.                           the potential savings by implementing Designer
                                                       Express. A pilot study was conducted on a full
Another challenge was the length of time from          project and timing was tracked for all of the work
when a plant was built until it appeared in DONG       processes.
Energy’s GIS. Once the sketch is approved, the
plant is established and clients can begin to get      Knudsen explained: “I have examined how long
connected. But at this point, it is still only the     it takes the different employees to do each work
project manager that knows what is established.        task in a project process. How much of the day
Until the drawings from surveyors that measures        do they use to draw? How much time is spent on
the cables and the documentation department            entering data? It was a very detailed mapping of
has finished drawing the project into the GIS, it      all the work flows where I measured it minute by
is not visible to others in the organization. This     minute. First, we did it the old way. Then we did
timeline usually takes 5-6 weeks.                      exactly the same thing, this time using Designer
                                                       Express — and then we compared the numbers.”
”We have an SAP system where we register the
customer connections. But a new electrical plan        Yearly savings of 2 million DKK
doesn’t exist in the SAP before it is registered       The analysis showed that by using Designer
in the GIS because the GIS feeds the SAP,”             Express in the design phase there was a yearly
explained GIS specialist Max Knudsen. “When            savings of 60 percent in the time it takes to draw
a customer is connected to a newly established         in a project — that equals almost two million DKK
substation, a paper note about it is placed in the     a year (more than $350,000 USD). DONG energy
drawer and a couple of weeks later we go into the      expects these savings to be consistent going
system to see if the substation has been entered.      forward.
If it has, we pull out all the paper notes and enter
them in and thereby the SAP system is up to date.      The Bottom Line
That didn’t work in a satisfactory way.”               Improved bottom line and better data quality
                                                       With Designer Express technology, data is saved
Solution                                               in the GIS as the project manager draws the
Schneider Electric’s Designer Express is an            first sketch. Furthermore, the day the plan is
intelligent, easy-to-use drawing tool in which         approved, established and ready to be put into
all the features selected in the design phase          operation, the project manager can transfer all
are automatically saved in the GIS immediately.        features directly to the GIS with one click.
Smart Grid Solutions            DONG Energy




”All features are transferred directly and
automatically. What’s more, if I have drawn in a       “The biggest benefit from Designer
cable, the system knows that there should be an        Express is that we can re-use what
electrical splice closure in each end of the cable     we have drawn and entered in the
in order for it to be connected — so it finalizes it   design phase.”
for me,” Knudsen said.                                 Max Knudsen, GIS specialist

The greatest savings are in the drawing phase.
With other technologies, the process would have
to start from scratch and take about a week to
draw in a whole project. The time studies show
that a project now can be drawn in using 40
percent of the time it took before if the project
manager uses Designer Express. Typing in data
is another place where great savings can be
made. It takes half the time it did before — saving
DONG Energy 50 percent.

Other benefits include better data quality, better
customer service and greater organisational
knowledge about the projects. ”If anyone is
digging in the ground, they contact us to hear
if we have cables there. Before, we could only
show them the cables that were already in
operation – now all projects are available to
everyone in the organization because they are in
the GIS database from the beginning — and that
is a great advantage,” said Knudsen.

Lower risk of data entry errors
Another benefit is minimizing the risks of errors
and misunderstandings when data is being
handed over from one person to another.
Before Designer Express, all the data about a
project was entered into an Access database and
from there it was printed out and entered into the
GIS database when the project was finalized. But
errors and mistakes were commonplace – now,
DONG Energy expects that data quality
will improve.

”The biggest benefit from Designer Express is
that we can re-use what we have drawn and
entered in the design phase. This is where we
save the most time and will get the biggest win
financially,” Knudsen concluded.
©2012 Schneider Electric. All rights reserved.




Schneider Electric Industries SAS Energía solar, 1 (Palmas Altas), 41014 Seville (Spain) Telephone: 34-91-714-70-02   Fax: 34-954-926-424
www.schneider-electric.com
                                                                                                                                            June 2012

More Related Content

What's hot

[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...Schneider Electric
 
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...Schneider Electric
 
Underground Self-Healing Solution
Underground Self-Healing Solution Underground Self-Healing Solution
Underground Self-Healing Solution Schneider Electric
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersSchneider Electric
 
Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSchneider Electric
 
GIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion ProjectGIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion ProjectSchneider Electric
 
The Intelligent and Connected Data Center
The Intelligent and Connected Data CenterThe Intelligent and Connected Data Center
The Intelligent and Connected Data CenterSchneider Electric
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingSchneider Electric
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT ConvergenceSchneider Electric
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overviewSchneider Electric
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesSchneider Electric
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersSchneider Electric India
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...Schneider Electric
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centersSchneider Electric India
 
Four practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costsFour practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costsSchneider Electric India
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit
 
The Future of Machine Building is NOW!
The Future of Machine Building is NOW!The Future of Machine Building is NOW!
The Future of Machine Building is NOW!Schneider Electric
 
Getting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsGetting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsSchneider Electric
 
A framework for converting hotel guestroom energy management into ROI
A framework for converting hotel guestroom energy management into ROIA framework for converting hotel guestroom energy management into ROI
A framework for converting hotel guestroom energy management into ROISchneider Electric
 

What's hot (20)

[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
 
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
 
Underground Self-Healing Solution
Underground Self-Healing Solution Underground Self-Healing Solution
Underground Self-Healing Solution
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control Centers
 
Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ Build
 
GIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion ProjectGIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion Project
 
The Intelligent and Connected Data Center
The Intelligent and Connected Data CenterThe Intelligent and Connected Data Center
The Intelligent and Connected Data Center
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handling
 
[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overview
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
 
An improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centersAn improved architecture for high efficiency, high-density data centers
An improved architecture for high efficiency, high-density data centers
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centers
 
Four practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costsFour practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costs
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution Details
 
The Future of Machine Building is NOW!
The Future of Machine Building is NOW!The Future of Machine Building is NOW!
The Future of Machine Building is NOW!
 
Getting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsGetting Started with Advanced Network Operations
Getting Started with Advanced Network Operations
 
A framework for converting hotel guestroom energy management into ROI
A framework for converting hotel guestroom energy management into ROIA framework for converting hotel guestroom energy management into ROI
A framework for converting hotel guestroom energy management into ROI
 
AspectCTRM For Fuel Marketers
AspectCTRM For Fuel MarketersAspectCTRM For Fuel Marketers
AspectCTRM For Fuel Marketers
 

Viewers also liked

Smarter Buildings and Sustainability - IBM Smarter Business 2011
Smarter Buildings and Sustainability - IBM Smarter Business 2011Smarter Buildings and Sustainability - IBM Smarter Business 2011
Smarter Buildings and Sustainability - IBM Smarter Business 2011IBM Sverige
 
Why Team work is important?
Why Team work is important?Why Team work is important?
Why Team work is important?Grape5
 
Personality development- A PATH TO SUCCESS
Personality development- A PATH TO SUCCESSPersonality development- A PATH TO SUCCESS
Personality development- A PATH TO SUCCESSsree navya
 
Team Building: Creating Effective Teams
Team Building:  Creating Effective Teams Team Building:  Creating Effective Teams
Team Building: Creating Effective Teams Dr. John Persico
 
Team work presentation
Team work presentationTeam work presentation
Team work presentationNasrin Tayyab
 
Teamwork Presentation
Teamwork PresentationTeamwork Presentation
Teamwork PresentationJo Woolery
 
Team work ppt(all in 1)
Team work ppt(all in 1)Team work ppt(all in 1)
Team work ppt(all in 1)raganuu
 
Teamwork presentation
Teamwork presentation Teamwork presentation
Teamwork presentation ct231
 
Team Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern SampleTeam Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern SampleAndrew Schwartz
 
Time management ppt
Time management pptTime management ppt
Time management pptUzma Batool
 
TIME MANAGEMENT POWERPOINT
TIME MANAGEMENT POWERPOINTTIME MANAGEMENT POWERPOINT
TIME MANAGEMENT POWERPOINTAndrew Schwartz
 
TEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINTTEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINTAndrew Schwartz
 

Viewers also liked (20)

Smarter Buildings and Sustainability - IBM Smarter Business 2011
Smarter Buildings and Sustainability - IBM Smarter Business 2011Smarter Buildings and Sustainability - IBM Smarter Business 2011
Smarter Buildings and Sustainability - IBM Smarter Business 2011
 
Why Team work is important?
Why Team work is important?Why Team work is important?
Why Team work is important?
 
Personality development- A PATH TO SUCCESS
Personality development- A PATH TO SUCCESSPersonality development- A PATH TO SUCCESS
Personality development- A PATH TO SUCCESS
 
Leadership Ppt
Leadership PptLeadership Ppt
Leadership Ppt
 
Team Building: Creating Effective Teams
Team Building:  Creating Effective Teams Team Building:  Creating Effective Teams
Team Building: Creating Effective Teams
 
Team work presentation
Team work presentationTeam work presentation
Team work presentation
 
Team Building
Team BuildingTeam Building
Team Building
 
Time Management
Time ManagementTime Management
Time Management
 
PERSONALITY DEVELOPMENT
PERSONALITY DEVELOPMENTPERSONALITY DEVELOPMENT
PERSONALITY DEVELOPMENT
 
Teamwork Presentation
Teamwork PresentationTeamwork Presentation
Teamwork Presentation
 
Motivation ppt
Motivation pptMotivation ppt
Motivation ppt
 
Team work ppt(all in 1)
Team work ppt(all in 1)Team work ppt(all in 1)
Team work ppt(all in 1)
 
Personality Development
Personality DevelopmentPersonality Development
Personality Development
 
Teamwork presentation
Teamwork presentation Teamwork presentation
Teamwork presentation
 
Team Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern SampleTeam Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern Sample
 
Personality ppt
Personality pptPersonality ppt
Personality ppt
 
Time management ppt
Time management pptTime management ppt
Time management ppt
 
TIME MANAGEMENT POWERPOINT
TIME MANAGEMENT POWERPOINTTIME MANAGEMENT POWERPOINT
TIME MANAGEMENT POWERPOINT
 
TEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINTTEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINT
 
8 Tips for an Awesome Powerpoint Presentation
8 Tips for an Awesome Powerpoint Presentation8 Tips for an Awesome Powerpoint Presentation
8 Tips for an Awesome Powerpoint Presentation
 

Similar to [Case study] DONG Energy: Improving the bottom line and getting better data quality

Success Stories In MEP Engineering Project Delivery
Success Stories In MEP Engineering Project DeliverySuccess Stories In MEP Engineering Project Delivery
Success Stories In MEP Engineering Project DeliveryNewforma
 
design of rectangular indeterminate beams using python
design of rectangular indeterminate beams using pythondesign of rectangular indeterminate beams using python
design of rectangular indeterminate beams using pythonsuneelabbireddy1
 
CAD GIS Integration Workshop
CAD GIS Integration WorkshopCAD GIS Integration Workshop
CAD GIS Integration WorkshopAndrew Bashfield
 
Software team linkedin
Software team linkedinSoftware team linkedin
Software team linkedinPrysmian Group
 
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...Schneider Electric
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Project Engineer
Project EngineerProject Engineer
Project EngineerCADISON
 
Improve Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationImprove Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationSafe Software
 
Sridhar S - Resume - Mar-2016
Sridhar S - Resume - Mar-2016Sridhar S - Resume - Mar-2016
Sridhar S - Resume - Mar-2016Sridhar S
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solutionVishakhaBhagia1
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solutionMaitrikpaida
 
Elecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECADElecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECADGuillem Fiter
 
Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...
Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...
Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...Collaborative Consulting
 
Transforming Point Cloud Data into As-Built Drawings.pdf
Transforming Point Cloud Data into As-Built Drawings.pdfTransforming Point Cloud Data into As-Built Drawings.pdf
Transforming Point Cloud Data into As-Built Drawings.pdfRvtcad
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10CADISON
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10CADISON
 

Similar to [Case study] DONG Energy: Improving the bottom line and getting better data quality (20)

Success Stories In MEP Engineering Project Delivery
Success Stories In MEP Engineering Project DeliverySuccess Stories In MEP Engineering Project Delivery
Success Stories In MEP Engineering Project Delivery
 
Vopak 3D Mapping
Vopak 3D MappingVopak 3D Mapping
Vopak 3D Mapping
 
design of rectangular indeterminate beams using python
design of rectangular indeterminate beams using pythondesign of rectangular indeterminate beams using python
design of rectangular indeterminate beams using python
 
CAD GIS Integration Workshop
CAD GIS Integration WorkshopCAD GIS Integration Workshop
CAD GIS Integration Workshop
 
Software team linkedin
Software team linkedinSoftware team linkedin
Software team linkedin
 
Building Technology
Building TechnologyBuilding Technology
Building Technology
 
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
[Case study] Jacksonville Electric Authority: Implementing a complete enterpr...
 
Vikas_Resume
Vikas_ResumeVikas_Resume
Vikas_Resume
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Improve Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationImprove Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data Integration
 
Sridhar S - Resume - Mar-2016
Sridhar S - Resume - Mar-2016Sridhar S - Resume - Mar-2016
Sridhar S - Resume - Mar-2016
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Elecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECADElecworks - electrical and automation CAD software - ECAD
Elecworks - electrical and automation CAD software - ECAD
 
Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...
Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...
Infographic: Mission Impossible – Concept on a Napkin to Award-Winning Innova...
 
Transforming Point Cloud Data into As-Built Drawings.pdf
Transforming Point Cloud Data into As-Built Drawings.pdfTransforming Point Cloud Data into As-Built Drawings.pdf
Transforming Point Cloud Data into As-Built Drawings.pdf
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10
 

More from Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

More from Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Recently uploaded

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 

Recently uploaded (20)

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 

[Case study] DONG Energy: Improving the bottom line and getting better data quality

  • 1. Smart Grid Solutions DONG Energy Improving the bottom line and getting better data quality PROJECT AT A GLANCE Project Type Operational utility solutions Location Denmark Number of Sites More than 6,000 Applications An intelligent, easy-to-use drawing tool in which all the features selected in the design phase are automatically saved in the GIS immediately DONG Energy—a large energy company headquartered in Denmark— Software Implemented obtains, produces, distributes, deals and sells energy and associated Designer Express products in northern Europe. CUSTOMER BENEFITS DONG Energy specializes in the design and documentation of new electrical facilities, developing more than 6,000 sites annually. Clients include entities • Improved bottom line with new buildings in a new location that previously did not have access to • Better data quality electricity, factories in need of more power, maintenance on old projects or in • Better customer service the case where existing wiring is exchanged with cables. • Greater organisational knowledge about the projects Throughout its projects, the project manager must first draw the first sketch of cabling, electrical substations and transformer station when a plant is • Minimize the risks of errors projected. Challenges Redrawing entries and a lack of overview The time spent on making the sketch was one of DONG Energy’s challenges. Since a sketch can be changed during the construction process—and sometimes discarded because a project is cancelled—it is a waste of resources if too much time is devoted to the sketch. Make the most of your energy SM
  • 2. Smart Grid Solutions DONG Energy “...now all projects are available to everyone in the organization because they are in the GIS database from the beginning — and that is a great advantage.” Max Knudsen, GIS specialist DONG Energy used a tool developed in ArcView In addition, the sketch is visible to everyone which made it possible to draw cables and in the organization throughout the process— substations. However, it was not an intelligent giving everyone an excellent overview of what tool; when the sketch was entered into the is happening and an up-to-date status of the Geographic Information System (GIS) to give project. all the elements a correct geographic location, everything had to be redrawn from scratch. After discovering Designer Express at the Esri Nor was it possible — in a simple way — to International User Conference, Max Knudsen he get a good overview of the materials used in started building a business case to determine connection with the project. the potential savings by implementing Designer Express. A pilot study was conducted on a full Another challenge was the length of time from project and timing was tracked for all of the work when a plant was built until it appeared in DONG processes. Energy’s GIS. Once the sketch is approved, the plant is established and clients can begin to get Knudsen explained: “I have examined how long connected. But at this point, it is still only the it takes the different employees to do each work project manager that knows what is established. task in a project process. How much of the day Until the drawings from surveyors that measures do they use to draw? How much time is spent on the cables and the documentation department entering data? It was a very detailed mapping of has finished drawing the project into the GIS, it all the work flows where I measured it minute by is not visible to others in the organization. This minute. First, we did it the old way. Then we did timeline usually takes 5-6 weeks. exactly the same thing, this time using Designer Express — and then we compared the numbers.” ”We have an SAP system where we register the customer connections. But a new electrical plan Yearly savings of 2 million DKK doesn’t exist in the SAP before it is registered The analysis showed that by using Designer in the GIS because the GIS feeds the SAP,” Express in the design phase there was a yearly explained GIS specialist Max Knudsen. “When savings of 60 percent in the time it takes to draw a customer is connected to a newly established in a project — that equals almost two million DKK substation, a paper note about it is placed in the a year (more than $350,000 USD). DONG energy drawer and a couple of weeks later we go into the expects these savings to be consistent going system to see if the substation has been entered. forward. If it has, we pull out all the paper notes and enter them in and thereby the SAP system is up to date. The Bottom Line That didn’t work in a satisfactory way.” Improved bottom line and better data quality With Designer Express technology, data is saved Solution in the GIS as the project manager draws the Schneider Electric’s Designer Express is an first sketch. Furthermore, the day the plan is intelligent, easy-to-use drawing tool in which approved, established and ready to be put into all the features selected in the design phase operation, the project manager can transfer all are automatically saved in the GIS immediately. features directly to the GIS with one click.
  • 3. Smart Grid Solutions DONG Energy ”All features are transferred directly and automatically. What’s more, if I have drawn in a “The biggest benefit from Designer cable, the system knows that there should be an Express is that we can re-use what electrical splice closure in each end of the cable we have drawn and entered in the in order for it to be connected — so it finalizes it design phase.” for me,” Knudsen said. Max Knudsen, GIS specialist The greatest savings are in the drawing phase. With other technologies, the process would have to start from scratch and take about a week to draw in a whole project. The time studies show that a project now can be drawn in using 40 percent of the time it took before if the project manager uses Designer Express. Typing in data is another place where great savings can be made. It takes half the time it did before — saving DONG Energy 50 percent. Other benefits include better data quality, better customer service and greater organisational knowledge about the projects. ”If anyone is digging in the ground, they contact us to hear if we have cables there. Before, we could only show them the cables that were already in operation – now all projects are available to everyone in the organization because they are in the GIS database from the beginning — and that is a great advantage,” said Knudsen. Lower risk of data entry errors Another benefit is minimizing the risks of errors and misunderstandings when data is being handed over from one person to another. Before Designer Express, all the data about a project was entered into an Access database and from there it was printed out and entered into the GIS database when the project was finalized. But errors and mistakes were commonplace – now, DONG Energy expects that data quality will improve. ”The biggest benefit from Designer Express is that we can re-use what we have drawn and entered in the design phase. This is where we save the most time and will get the biggest win financially,” Knudsen concluded.
  • 4. ©2012 Schneider Electric. All rights reserved. Schneider Electric Industries SAS Energía solar, 1 (Palmas Altas), 41014 Seville (Spain) Telephone: 34-91-714-70-02 Fax: 34-954-926-424 www.schneider-electric.com June 2012