The Plains All American Pipeline needed to improve the foundation for a new 205-foot diameter fuel storage tank due to soft soils and groundwater at the site. An MSE raft foundation using Tensar BX Geogrid was selected as it would be more affordable and reduce differential settlement compared to deep foundations. Crews installed the 265-foot diameter MSE raft by excavating 10 feet, placing layers of geotextile and geogrid, and compacting aggregate between the layers. The MSE raft foundation satisfied the project needs of supporting the tank weight while minimizing settlement risks from subsurface conditions.