Thanks to 55,500 square feet of Mesa product, a nine-man installation crew, and meticulous attention to challenging soil conditions, a project in Oregon was completed in a rigorous 4 month period.
Thanks to Tensar's SierraScape System, the owners of a Canadian Tire store in Ontario were able to build the new store they wanted – where they wanted – and still save more than $1 million (CDN).
When a foundation improvement solution was needed at the West Hynes Tank Farm in Long Beach, California, Tensar came through with a cost effective, effective and timely solution.
Application: Plains All American Pipeline needed
a foundation improvement solution for a new 205-
foot diameter, fuel-storage tank. GeoPentech, the
project engineers, suggested using a mechanically
stabilized earth (MSE) raft as an affordable solution.
In Florida, Tensar completed the installation of two retaining walls for a luxury timeshare villa, totalling approximately 15,000 square feet of installed block.
The Arizona Department of Transportation (ADOT) used the Spectra® Roadway Improvement System, a mechanically stabilized layer incorporating Tensar® TriAxTM Geogrid, to create an unyielding and stable test construction platform.
When an existing highway ramp in Puerto Rico had to be relocated, two Tensar products were used to create an embankment to support the highway ramp. Learn more:
Thanks to Tensar's SierraScape System, the owners of a Canadian Tire store in Ontario were able to build the new store they wanted – where they wanted – and still save more than $1 million (CDN).
When a foundation improvement solution was needed at the West Hynes Tank Farm in Long Beach, California, Tensar came through with a cost effective, effective and timely solution.
Application: Plains All American Pipeline needed
a foundation improvement solution for a new 205-
foot diameter, fuel-storage tank. GeoPentech, the
project engineers, suggested using a mechanically
stabilized earth (MSE) raft as an affordable solution.
In Florida, Tensar completed the installation of two retaining walls for a luxury timeshare villa, totalling approximately 15,000 square feet of installed block.
The Arizona Department of Transportation (ADOT) used the Spectra® Roadway Improvement System, a mechanically stabilized layer incorporating Tensar® TriAxTM Geogrid, to create an unyielding and stable test construction platform.
When an existing highway ramp in Puerto Rico had to be relocated, two Tensar products were used to create an embankment to support the highway ramp. Learn more:
The North Bennington Highway Department, in conjunction with Tensar International and Vermont Local Roads, conducted a new product demonstration featuring the use of Glasspave. Learn all about this product including how it's implemented.
“Minimizing time-consuming excavation requirements is a key advantage of the Spectra System with TriAx Geogrid,” says TIC regional manager Lars Nelson.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
1. Spring 2002
The Mesa Connection™
Klamath Falls Amphitheater — Another Star is Born
Terraced Mesa® Walls Support Spectacular Outdoor Venue
Klamath Falls is getting ready to rock.
The Oregon town (pop. 21,000), located in the eastern foothills of the Cascade Mountains near the California border, is counting down to
the opening of the privately developed Klamath Falls Amphitheater, centerpiece of a new mixed-use development. And the venue is as
dazzling as the stars who will perform there.
Built into the hillside, and with views of snow-capped Mt. Shasta some 70 miles away, the amphitheater features a design of terraced
segmental retaining walls (SRWs), some exceeding 40 feet, constructed by the Mesa Retaining Wall Systems. The project required more
than 55,500 square feet of Mesa product, a nine-man installation crew, a rigorous, four-month production schedule, and meticulous
attention to challenging soil conditions.
Developer Launches Search for MSE Solution
The project was initiated early last year when developer Greg Bessert of KCS Holdings contacted Klamath Falls-based Zbinden-Carter
Engineering. “We were asked to explore mechanically stabilized earth (MSE) systems for the amphitheater’s walls and actually developed
a working design based on another product,” commented Eric Souders, Project Manager. When that system proved to be cost-prohibitive,
the engineers contacted Key West Retaining Systems to source an alternative.
Key West, the first company to install Mesa Systems in the region, knew what to do. “We contacted Mutual Materials to price out a Mesa
Wall,” said Tim Mann, Key West Sales Manager. Mutual Materials, the Oregon-Washington Mesa Licensee since 1997, took a number of
innovative steps to cut costs; among them, they specified natural color, standard straight-face block below grade (above grade block is
standard, radius face and khaki in color). An estimate was developed with additional help from Bob Barry, Tensar Earth Technologies’ SRW
Manager/Western Region, and Scott Ward of SRW Engineering, the design engineering firm contracted by Zbinden-Carter. The bid was
approved (just as you might expect in the Pacific Northwest) over coffee.
2. Native Soils a Dramatic Challenge
Zbinden-Carter, SRW Engineering, and Key West faced a particularly tough design and
installation challenge - sandy silt over diatomaceous soil, a powdery and highly sensitive
limestone-like material left behind from a prehistoric lake. “Under a strict Quality Assurance
program, we continuously tested conditions and were able to use native soils for
reinforcement and retained backfill,” added Zbinden-Carter’s Russ Carter, P.E. Gravel fill
was imported for the walls’ foundations.
But the challenge didn’t end there. “We were on a high production, high installation
schedule,” commented Key West President Marv Wyatt. “We were averaging 700 square feet
of installation per day. On some days we installed as much as 2,000 square feet. We dealt with
tight, four-foot radius turns. And with so many terraces, we had to hand-set 5,000 blocks on
the gravel leveling pads.” Despite those challenges, the company completed the walls within
.05-inch of elevation. Both Wyatt and developer Bessert added that Mutual Materials’
Bridgeport (WA) plant, which manufactured the Mesa block, did an “excellent” job meeting
production schedules, including the coordination of time-critical deliveries.
Performance Gets ##### Reviews
“With the soil values, wall loads, and wall heights involved, the Mesa Systems were pushed to the limits,” said Key West’s Mann. “This was
our firm’s first experience with Mesa, and it’s a great product,” commented Russ Carter from Zbinden-Carter. And KCS’s Greg Bessert added
that the Mesa Systems’ mechanical connection provided a “tighter installation... with more assurances for long-term integrity.”
All five-star reviews for the Mesa Systems — before the real crowds start rocking at this spectacular performance venue.