 CULTURAL PROCESSES UNDERLIE MUCH OF WHAT HAPPENS
  IN MODERN ORGANIZATIONS. CULTURE FILTERS THE WAYS
  IN WHICH PEOPLE SEE AND UNDERSTAND THEIR WORLDS.
  CULTURE PRESCRIBES SOME BEHAVIORS AND FORBIDS
  OTHERS. CULTURE COLORS THE EMOTIONAL RESPONSES
  THAT PEOPLE HAVE TO EVENTS.
 FROM THE POINT OF VIEW OF PUBLIC ADMINISTRATION,
  SCHOLARS DEFINE CULTURE AS EXISTING AT THREE DISTINCT
  LEVELS: SOCIETAL, POLITICAL, AND ADMINISTRATIVE.


S3-Unpas_2012         www.ginandjar.com              2
Societal
                               Culture




                               Public
                            Administration
                                                  Adminis-
                Political
                                                   trative
                Culture
                                                   Culture



S3-Unpas_2012                 www.ginandjar.com              3
 AROUND THE GLOBE, THE TYPICAL PUBLIC ORGANIZATION IS
  DEEPLY ENTRENCHED IN THE CLASSICAL WEBERIAN-TYPE
  BUREAUCRATIC MODEL. WITH EMPHASIS ON CONTROL AND
  COMPLIANCE, THE TRADITIONAL PUBLIC ORGANIZATION IS
  A DETERMINISTIC SYSTEM SEEKING EQUILIBRIUM AND
  STABILITY IN WHICH DISORDER AND UNCERTAINTY ARE
  VIEWED AS DYSFUNCTIONAL.




S3-Unpas_2012         www.ginandjar.com             4
 THEREFORE, TRANSFORMATION OF THE STRUCTURES,
  PROCESSES, AND CULTURES WITHIN PUBLIC
  BUREAUCRACIES IS NOT LIKELY TO OCCUR VIA SELF-
  ORGANIZING PROCESSES. TO REALIZE FUNDAMENTAL
  REFORM OF PUBLIC ORGANIZATIONS THUS REQUIRES AN
  ORGANIC PROCESS THAT FITS WITH ADAPTIVE SYSTEMS
  [ARKADY IN BOX, IBID]. NEEDLESS TO SAY AN ORGANIC
  PROCESS IS A CULTURAL PROCESS.




S3-Unpas_2012         www.ginandjar.com               5
 MULTICULTURAL SOCIETY. CULTURAL VARIATION DOES NOT
  ONLY DISTINGUISH ONE SOCIETY AGAINST THE OTHER, BUT
  WITHIN A SOCIETY, ESPECIALLY IN A COUNTRY SUCH AS
  INDONESIA WHICH IS A MULTICUTURAL SOCIETY. VALUES,
  NORMS AND TRADITION IN ACEH IS DIFFERENT THAN IN
  JAVA OR IN BALI OR IN PAPUA.




S3-Unpas_2012         www.ginandjar.com            6
 INDEED MANY NATIONS ARE MULTICULTURAL AND DIVERSE
  IN TERMS OF RACE, ETHNICITY, RELIGION, IDENTITY,
  TRADITION. IN MULTICULTURAL SOCIETY PUBLIC
  ADMINISTRATORS WORK IN DIVERSE ORGANIZATIONS AND
  DEAL WITH A DIVERSE CITIZENRY. MULTICULTURALISM
  IMPACTS PUBLIC ADMINISTRATION IN TWO MAJOR
  DOMAINS: WITHIN PUBLIC ORGANIZATIONS AND IN THE
  GREATER SOCIETY [ARKADY, IBID].




S3-Unpas_2012        www.ginandjar.com           7
 DAHL AND WALDO ALSO POINTED OUT, CULTURAL
  FACTORS COULD MAKE PUBLIC ADMINISTRATIONS ON
  ONE PART OF THE GLOBE QUITE A DIFFERENT ANIMAL
  FROM PUBLIC ADMINISTRATION ON ANOTHER PART.
 THE MOVEMENT GAVE RISE TO A SEMIAUTONOMOUS
  SUBFIELD OF COMPARATIVE PUBLIC ADMINISTRATION
  IN WHICH DEVELOPMENT ADMINISTRATION
  CONCENTRATES ON THE DEVELOPING NATIONS.




S3-Unpas_2012       www.ginandjar.com          8
 THE NATIONAL DEVELOPMENT OF AN EMERGING
  NATION INEVITABLY INCARNATES PARTICULAR NEEDS
  AND DEMANDS THAT REQUIRE SPECIFIC
  ADMINISTRATIVE ABILITIES.
 THIS TYPE OF ADMINISTRATION OR MANAGEMENT,
  ADAPTED FOR THE PARTICULAR NEEDS OF
  DEVELOPING COUNTRIES, HAS BEEN REFERRED TO
  INTERCHANGEABLY AS DEVELOPMENT
  ADMINISTRATION OR DEVELOPMENT
  MANAGEMENT.

S3-Unpas_2012       www.ginandjar.com         9
 BROADLY, DEVELOPMENT ADMINISTRATION IS AN
    INTEGRAL PART OF SOCIETAL DEVELOPMENT AND IS
    PROFOUNDLY INFLUENCED BY THE OVERALL
    POLITICAL, ECONOMIC, AND CULTURAL ATTRIBUTES
    OF THE SOCIETY.
   DEVELOPMENT ADMINISTRATION IS DIFFERENT
    FROM ADMINISTRATIVE DEVELOPMENT, WHICH
    COULD BE ANY ADMINISTRATION IN ANY SETTING
    SEEKING REFORM, CHANGE, OR IMPROVEMENT OF
    ITS CAPACITY.



S3-Unpas_2012        www.ginandjar.com         10
PUBLIC ADMINISTRATION


                            COMPARATIVE
                       PUBLIC ADMINISTRATION


                DEVELOPED                        DEVELOPING
                COUNTRIES                        COUNTRIES

                                                 DEVELOPMENT
                                                ADMINISTRATION

S3-Unpas_2012               www.ginandjar.com                    11
THE OBJECTIVE OF DEVELOPMENT
ADMINISTRATION

 THE CONCERN OF DEVELOPMENT ADMINISTRATION IS
  HOW CAN THE IDEAS AND MECHANISMS OF PUBLIC
  ADMINISTRATION BE USED AS INSTRUMENTS OF
  SOCIAL AND ECONOMIC DEVELOPMENT?




S3-Unpas_2011      www.ginandjar.com        12
PUBLIC ADMINISTRATION




          MAIN IDEAS                                   MECHANISM

                 EFFICIENCY                              ORGANIZATION

                EFFECTIVENESS                            MANAGEMENT

                  ECONOMY




                                DEVELOPMENT
S3-Unpas_2011                      www.ginandjar.com                    13
 “DEVELOPMENT ADMINISTRATION” IS GENERALLY
    SIMILAR TO THE TRADITIONAL “PUBLIC
    ADMINISTRATION” IN ITS CONCERN WITH HOW A
    GOVERNMENT IMPLEMENTS ITS RULES, POLICIES, AND
    NORMS.
   IT DIFFERS, HOWEVER, IN ITS OBJECTIVES, SCOPE, AND
    COMPLEXITY.
   DEVELOPMENT ADMINISTRATION IS MORE INNOVATIVE,
    SINCE IT IS CONCERNED WITH THE SOCIETAL CHANGES
    INVOLVED IN ACHIEVING DEVELPOMENTAL OBJECTIVES.
S3-Unpas_2011          www.ginandjar.com                 14
 DEVELOPMENT ADMINISTRATION IS THE NAME
    OFTEN GIVEN TO THE WAY A COUNTRY’S
    GOVERNMENT ACTS TO FULFILL ITS ROLE IN
    ACHIEVING DEVELOPMENT.


                                        (RIGGS, 1977)




S3-Unpas_2012       www.ginandjar.com               15
THE THREE AREAS OF CONCERN :
    1. HOW PURPOSEFULLY TO GUIDE GOVERNMENT ACTION
       TOWARD DEVELOPMENT OBJECTIVES;
    2. HOW ACTUALLY TO TAKE ACCOUNT OF THE MANY AND
       COMPLEX INTERDEPENDENCIES OF SOCIETAL CHANGE; AND
    3. HOW TO INSURE THAT GOVERNMENTAL ADMINISTRATION
       IS DYNAMIC AND INNOVATIVE.




S3-Unpas_2012           www.ginandjar.com            16
THE FUNCTION OF DEVELOPMENT ADMINISTRATION
 TO ASSURE THAT AN APPROPRIATELY CONGENIAL
 ENVIRONMENT AND EFFECTIVE ADMINISTRATION
 SUPPORT ARE PROVIDED FOR DELIVERY OF CAPITAL,
 MATERIALS, AND SERVICES WHERE NEEDED IN THE
 PRODUCTIVE PROCESS –WHETHER IN PUBLIC, PRIVATE,
 OR MIXED ECONOMIES.
                                        (GANT, 1979)




S3-Unpas_2012       www.ginandjar.com           17
 SIX GROUPS OF NEEDED INPUTS:
           1)   SKILLED MANPOWER,
           2)   FINANCES,
           3)   LOGISTICS (OR FACILITIES FOR THE PHYSICAL FLOW OF
                GOODS AND SERVICES),
           4)   INFORMATION (FACILITIES FOR THE PHYSICAL
                TRANSMISSION OF DATA),
           5)   PARTICIPATION (OF INDIVIDUALS AND GROUPS), AND
           6)   LEGITIMATE POWER (TO ENFORCE DECISIONS).
   THESE SIX INPUTS TOGETHER COMPOSE THE
    CONTENT OF DEVELOPMENT ACTION.


S3-Unpas_2011                    www.ginandjar.com                  18
MODELS OF DEVELOPMENT ADMINISTRATION
 THERE IS A LACK CONSENSUS ON WHAT IS CHARACTERISTIC OF
  THE ADMINISTRATIVE SITUATION IN TRANSITIONAL SOCIETIES,
  ON POSSIBLE STAGES OR SEQUENCES IN THE PROCESS OF
  ADMINISTRATIVE TRANSFORMATION, ON RELATIONSHIPS
  BETWEEN ADMINISTRATIVE CHANGE AND CORRESPONDING
  PROCESSES OF POLITICAL, ECONOMIC, AND CULTURAL
  DEVELOPMENT.
 THERE IS EVEN DISAGREEMENT ON THE RELATION BETWEEN
  ADMINISTRATION AND CULTURE—WHETHER ADMINISTRATIVE
  BEHAVIOR IS UNIQUELY DETERMINED BY PARTICULAR CULTURES
  OR CORRESPONDS TO GENERAL LEVELS OF SOCIO­POLITICAL
  INTEGRATION" (RIGGS).


S3-Unpas_2011          www.ginandjar.com              19
 IN ADMINISTRATION IN DEVELOPING COUNTRIES
    (1964), RIGGS PRESENTED THE CONCEPT OF
    "PRISMATIC SOCIETY" TO EXPLAIN THE UNIQUE
    CONDITIONS AND THE DYNAMICS OF POLITICS
    AND ADMINISTRATION IN DEVELOPING
    COUNTRIES.




S3-Unpas_2012       www.ginandjar.com           20
 AS AN ALTERNATIVE MODEL FOR CONCEPTUALIZING
  DEVELOPING COUNTRIES, RIGGS OFFERED HIS
  "PRISMATIC MODEL“, BASED ON THE METAPHOR OF A
  PRISM. WHEN WHITE LIGHT (THAT IS, LIGHT MADE UP
  OF ALL VISIBLE WAVELENGTHS) PASSES THROUGH A
  PRISM, IT IS DIFFRACTED, BROKEN INTO A VARIETY OF
  COLORS—A RAINBOW.
 SIMILARLY, RIGGS CONTENDED, SOCIETIES IN THE
  PROCESS OF DEVELOPMENT MOVE FROM A FUSED
  MODE, IN WHICH LITTLE OR NO DIFFERENTIATION
  EXISTS, TO A DIFFRACTED CONDITION IN WHICH THERE
  IS A HIGH DEGREE OF FUNCTIONAL SPECIALIZATION.



S3-Unpas_2012         www.ginandjar.com               21
RIGG’S PRISMATIC MODEL




            SOCIETY: FUSED                              PRISMATIC                     DIFFRACTED
      BUREAUCRATIC: CHAMBER                              SALA/BUREAU                     OFFICE
             MODEL

                                ROSTOW FIVE STAGES OF GROWTH
                  NAL SOCIETY




                                    CONDITION
                  TRADITIO-




                                                                          THE DRIVE

                                                                          MATURITY
                                                               THE TAKE
                                    FOR TAKE




                                                                                         CONSUM-
                                    THE PRE-




                                                                                         OF HIGH
                                                                                         THE AGE



                                                                                         PTION
                                                                                         MASS
                                                               OFF
                                    OFF




                                                                          TO
S3-Unpas_2012                                   www.ginandjar.com                                 22
RELATIVELY             FOCUS      RELATIVELY
                 SPECIFIED                        UNSPECIFIED
   RELATIVELY
   SPECIFIED      PHASE III                         PHASE II



   LOCUS



   RELATIVELY
   UNSPECIFIED
                   PHASE I                         PHASE IV


  The four cells of a 2 X 2 matrix relating two combinations of locus
  and focus
S3-Unpas_2012                 www.ginandjar.com                         23
THE RISE AND FALL OF DEVELOPMENT ADMINISTRATION
 WITH THE INVENTION OF DEVELOPMENT BY THE
  WESTERN NATIONS IN THE IMMEDIATE POST-WAR
  PERIOD AND ITS ADOPTION AS STATE IDEOLOGY BY THE
  GOVERNMENTS AND EMERGING ELITES OF THE POORER
  NATIONS, THE QUESTION AROSE AS TO HOW THE
  PROMISED SOCIAL TRANSFORMATION WAS TO BE
  ACHIEVED.
 ‘THE PRIMARY OBSTACLES TO DEVELOPMENT ARE
  ADMINISTRATIVE RATHER THAN ECONOMIC', DECLARED
  DONALD STONE (1965). OTHERS AGREED AND
  DEVELOPMENT ADMINISTRATION WAS CREATED TO PLAY
  A MAJOR ROLE IN FACILITATING DEVELOPMENT.
S3-Unpas_2012        www.ginandjar.com            24
 MANY DEVELOPING COUNTRIES FACE AN
    ONGOING NEED TO BUILD INSTITUTIONS AND
    ORGANIZATIONS ABLE TO OVERCOME
    TRADITIONAL BARRIERS TO THE EFFECTIVE
    IMPLEMENTATION OF DEVELOPMENTAL POLICIES.




S3-Unpas_2012       www.ginandjar.com           25
 DEVELOPMENT ADMINISTRATION REPRESENTED THE
   PRACTICAL APPLICATION OF MODERNIZATION
   THEORY. ITS PROMOTERS SAW IT AS 'A MIDWIFE FOR
   WESTERN DEVELOPMENT-CREATING STABLE AND
   ORDERLY CHANGE' (DWIVEDI AND NEF, 1982).
  IT WAS A FORM OF SOCIAL ENGINEERING IMPORTED
   FROM THE WEST AND EMBODYING FAITH IN THE
   APPLICATION OF RATIONAL SCIENTIFIC PRINCIPLES
   AND THE EFFICACY OF KEYNESIAN WELFARE
   ECONOMICS.


S3-Unpas_2012       www.ginandjar.com          26
 THE CREATION AND USE OF THESE ABILITIES HAVE
  ALWAYS BEEN PRIMARY CHALLENGES OF
  DEVELOPMENT ADMINISTRATION. THE ABSENCE AND
  BREAKDOWN OF THESE ABILITIES HAVE OFTEN BEEN
  MAJOR FACTORS IN DEVELOPMENT
  ADMINISTRATION'S FAILURE TO MEET SATISFACTORY
  LEVELS OF PERFORMANCE.
 AS A RESULT, DEVELOPMENT ADMINISTRATION HAS
  NOT FARED WELL IN SOME CRITICAL AREAS, SUCH AS
  THE CONCEPTION OF AN INSPIRING, COMPATIBLE
  VISION AND MANAGING EFFECTIVELY TO ACHIEVE
  THIS VISION.

S3-Unpas_2012       www.ginandjar.com          27
 IN UTILIZING MODERN TECHNIQUES, DEVELOPMENT
  ADMINISTRATION, FOR EXAMPLE, SEEMS TO LAG
  BEHIND THE PRIVATE SECTOR IN LEVERAGING
  TECHNOLOGY TO IMPROVE INTERNAL OPERATIONS
  AND TO ENHANCE THE OVERALL EFFECTIVENESS OF
  DEVELOPMENT ORGANIZATIONS.




S3-Unpas_2012      www.ginandjar.com        28
 UNABLE TO ATTAIN A TIMELY CORRECTION OF ITS
   DEFICIENCIES OR TO LEARN FROM ITS FAILURES,
   DEVELOPMENT ADMINISTRATION LARGELY
   REMAINS BURDENED BY A COMBINATION OF
   INHERITED STRUCTURES AND BEHAVIORS AND
   DEEPLY INTERNALIZED LOCAL CULTURAL PATTERNS.
  THIS COMBINATION OF LEGACIES HAS HAD THE
   EFFECT OF IMPEDING PERFORMANCE AND
   WASTING BADLY NEEDED INSTITUTIONAL ENERGIES
   ON OTHER THAN PRODUCTIVE ENDEAVORS TO
   ACCOMPLISH DEVELOPMENTAL MANDATES.


S3-Unpas_2012       www.ginandjar.com         29
S3-Unpas_2012   www.ginandjar.com   30
REVIVAL OF DEVELOPMENT ADMINISTRATION

  THE MOST IMPORTANT DIFFERENCE BETWEEN
   ADMINISTRATION IN DEVELOPING COUNTRIES AND IN THE
   WEST WAS BEING INCREASINGLY IDENTIFIED AS THAT
   ENVELOPE OF FACTORS AND FORCES WHICH WE
   COLLECTIVELY CALL THE ORGANIZATIONAL ENVIRONMENT.
  WHETHER IT WAS THE SOCIAL CLASS CONTEXT, THE
   INFLUENCE OF THE WORLD BANK, THE TYPE OF REGIME,
   THE NATURE OF THE POLICY­MAKING PROCESS OR SIMPLY
   THE PREVAILING CULTURE, THE CENTRALITY OF THE
   ENVIRONMENT FOR UNDERSTANDING ADMINISTRATIVE
   ACTION AND PARALYSIS WAS BECOMING FIRMLY
   ESTABLISHED.

S3-Unpas_2012          www.ginandjar.com               31
 THE NEO-CLASSICAL ECONOMISTS HAD MEANWHILE GAINED
    CONSIDERABLE INFLUENCE IN POLICY CIRCLES AND WERE
    ALSO POINTING TO INEFFICIENCY AND INEFFECTIVENESS IN
    THE PUBLIC SECTOR.
   BIG GOVERNMENT HAD NOT BEEN EFFECTIVE GOVERNMENT
    AND IT WAS TIME THE PRINCIPALS OF THE MARKET WERE
    ALLOWED TO OPREATE. REDUCING THE SIZE OF THE STATE
    AND RESTRICTING THE OPERATION OF THE STATE WOULD
    BRING CONSIDERABLE SAVINGS.
   PROGRAMMES TO INCREASE BUREAUCRATIC CAPACITY AND
    EFFICIENCY AND TO ENCOURAGE PRIVATE SECTOR GROWTH
    THROUGH MARKET MECHANISMS WOULD THEN ENSURE
    THAT DEVELOPMENT WOULD TAKE PLACE.


S3-Unpas_2012           www.ginandjar.com             32
 THE OLD DISTINCTION BETWEEN PUBLIC SECTOR AND
  PRIVATE SECTOR MANAGEMENT BECAME BLURRED.
  THE DISSEMINATION OF THIS MODEL TO DEVELOPING
  COUNTRIES WAS UNDERTAKEN BY ENTHUSIASTIC
  WESTERN ADVOCATES AND MULTILATERAL FINANCIAL
  INSTITUTIONS SUCH AS THE WORLD BANK AND IMF.




S3-Unpas_2012      www.ginandjar.com         33
ANOTHER APPROACH
 FORCEFULLY ADVOCATED BY DWIVEDI AND, NEF (1982)
  WAS THE SEARCH FOR ALTERNATIVE FORMS OF
  ORGANIZATIONAL APPROACH TO DEVELOPMENT. INSTEAD
  OF SIMPLY CRITICISING THE FAILURES, PEOPLE BEGAN TO
  LOOK AT THE SUCCESSES AND INNOVATIONS.
 RONDINELLI (1983) WAS KEEN TO IDENTIFY LESSONS FROM
  PAST EXPERIENCE THAT COULD ENHANCE DEVELOPMENT
  ADMINISTRATION IN THE FUTURE. HIS ANALYSIS INDICATED
  THAT THE MAIN REASON FOR POOR PAST PERFORMANCE
  IN THE PUBLIC SECTOR WAS THE FAILURE TO COPE WITH
  THE COMPLEXITY AND UNCERTAINTY OF ORGANIZATIONAL
  ENVIRONMENTS IN DEVELOPING COUNTRIES.

S3-Unpas_2012          www.ginandjar.com            34
 THE REMEDY LAY IN CHANGING STRUCTURES AND
  PROCEDURES SO THAT EXPERIMENTATION AND
  LEARNING OCCURRED. THIS CREATIVE HYBRID
  COMPRISES A HUMAN-RELATIONS TYPE OF
  MANAGEMENT THEORY COUPLED WITH A
  CONTINGENCY-STYLE ACKNOWLEDGEMENT OF HIGHLY
  VARIABLE ENVIRONMENTAL CONDITIONS, INCLUDING
  THE POLITICAL ENVIRONMENT.




S3-Unpas_2012       www.ginandjar.com            35
 IN THE LATE 1980s DEVELOPMENT ADMINISTRATION WAS
  EMERGING FROM SELF-CRITICISM AND DOUBT AND WAS
  ACQUIRING A NEW LEASE OF LIFE.
 MILTON ESMAN (1988) DECLARED THAT DEVELOPMENT
  ADMINISTRATION HAS NOT ONLY SURVIVED THE
  LIMITATIONS OF ITS FOUNDERS, BUT IT HAS SUCCESSFULLY
  ADAPTED TO A MUCH MORE REALISTIC SET OF
  EXPECTATIONS ABOUT THE PROCESS OF DEVELOPMENT
  AND THE POTENTIALITIES OF THE PUBLIC SECTOR.
 DEVELOPMENT ADMINISTRATION, ACCORDING TO SUCH
  WRITERS, HAD MATURED BUT IT WAS STILL DYNAMIC.

S3-Unpas_2012         www.ginandjar.com            36
 SO HOW DO WE CHARACTERIZE THE CONTEMPORARY
  PRACTICE OF DEVELOPMENT ADMINISTRATION?
 DEVELOPMENT ADMINISTRATION REMAINS HEAVILY BUT
  NOT EXCLUSIVELY FOCUSED ON PUBLIC ADMINISTRATION.
  IT IS NO LONGER PREMISED ON THE NOTION OF BIG
  GOVERNMENT; THIS IS IN PART DUE TO DISAPPOINTING
  RESULTS OF OFFICIAL DEVELOPMENT INTERVENTIONS AND
  TO THE SHORTAGE OF FINANCIAL RESOURCES.




S3-Unpas_2012        www.ginandjar.com          37
 SUSTAINED INSTITUTIONAL DEVELOPMENT REQUIRES
  CERTAIN CONDITIONS. THESE REQUISITES HAVE
  INCREASINGLY BECOME MORE SPECIFIC:
      1)    TAPPING STAKEHOLDERS' SUPPORT,
      2)    PROMOTING ONGOING STRATEGIC PLANNING,
      3)    ENGAGING IN MARKETING, AND
      4)    REDUCING DEPENDENCY THROUGH THE USE OF LOCAL
            RESOURCES.
                                               (GOLDSMITH 1992, 586)




S3-Unpas_2012              www.ginandjar.com                   38
BOTH MACRO AND MICRO POLITICAL PROCESSES ARE
    CENTRAL CONCERNS IN THE PRACTICE AND ANALYSIS OF
    DEVELOPMENT ADMINISTRATION.
   FURTHERMORE, AS WE HAVE IDENTIFIED DEVELOPMENT
    ADMINISTRATION AS AN INSTRUMENTALITY OF
    DEVELOPMENT, ITS PRACTITIONERS MUST BE INTIMATELY
    CONCERNED WITH THE GOALS OF DEVELOPMENT.
   WHETHER IN ANALYSIS OR PRACTICE THERE IS NO VALUE
    NEUTRALITY. ALL VIEWS AND ACTIONS HAVE SOME POLITICAL
    MEANING, ESPECIALLY IF DEVELOPMENT SHOULD BE
    ORIENTED TO THE POOR, MOSTLY DEFINED BY THE POOR
    AND INCOPORATING A STRONG ELEMENT OF GRASSROOTS
    KNOWLEDGE AND WISDOM.


S3-Unpas_2012           www.ginandjar.com              39
FINALLY, DEVELOPMENT ADMINISTRATION (OR POLICY OR
  MANAGEMENT) APPLIES TO A HUGE NUMBER OF PEOPLE IN A
  LARGE NUMBER OF COUNTRIES. THE COUNTRIES VARY
  ENORMOUSLY WHEN MEASURED BY STATISTICAL INDICATORS
  OF DEVELOPMENT OR IN TERMS OF CULTURE AND HISTORY.
  EVEN WITHIN NATIONS, HOWEVER SMALL IN POPULATION
  TERMS, THERE CAN BE GREAT REGIONAL DIFFERENTIATION.
 COLLECTIVE TITLES SUCH AS THIRD WORLD OR THE SOUTH
  GIVE AN IMPRESSION OF SIMILARITY TO A DISPARATE GROUP
  OF COUNTRIES. DIVERSITY IS WHAT DEVELOPMENT
  ADMINISTRATION MUST ADDRESS.




S3-Unpas_2012          www.ginandjar.com             40
DEVELOPMENT
                            ADMINISTRATION                     APPROACH




                       ADMINISTRATION
                             OF                               MANAGEMENT
                        DEVELOPMENT




                                                              ORGANIZATION/
ECONOMIC        POLITICAL    SOCIAL          ADMINISTRATIVE    INSTITUTION




S3-Unpas_2012                         www.ginandjar.com                 41
MANAGEMENT
 DEVELOPMENT
ADMINISTRATION   =       PUBLIC
                     ADMINISTRATION         +        OF
                                                DEVELOPMENT




S3-Unpas_2012           www.ginandjar.com                     42
Some contemporary themes in development administration

1. Governments are limited in their capacity, and these limitations
   should be incorporated into the design of public programmes.
2. Because governments cannot do it all, alternative and
   complementary channels need to be identified and fostered.
3. Programme designers recognize and capitalize on the pluralistic
   properties of public administration.
4. Participation is an important dimension in the administration of
   Public services.
5. Societal contexts provide both specific opportunities and special
   constraints for development administration.
6. There is an enhanced appreciation of the uncertainties and
   contingencies inherent in deliberate efforts at developmental
   change.
7. There are renewed pressures on governments (a) to extract greater
   productivity from continuing expenditures and (b) to reorient
   government bureaucracies to serve large disadvantaged publics
   more responsively.
Source: Esman, M.]. (1988) 'The Maturing of Development Administration, Public Administration and Development,
Vo. 8 (2), pp 125-34.
S3-Unpas_2012                                www.ginandjar.com                                            43
MANAGEMENT PERSPECTIVES OF DEVELOPMENT
ADMINISTRATION
  TWO COMPETING PERSPECTIVE HAVE EMERGED.
  THE FIRST FOCUSED ON THE DEVELOPMENT OF MANAGERIAL
   CAPABILITIES AND INSTITUTIONS. UNDERLYING THIS APPROACH
   IS THE ASSUMPTION THAT ONCE CAPABILITIES ARE IN PLACE, THE
   VARIOUS ENTITIES IN THE PUBLIC SECTOR WILL BE ENDOWED
   WITH THE ABILITY TO UNDERTAKE THE DEVELOPMENTAL TASK
   THAT GOVERNMENT REQUIRES, TO USE RESOURCES EFFICIENTLY,
   TO SOLVE FRESH PROBLEMS AS THEY ARISE, AND TO SUSTAIN
   INCREASINGLY COMPLEX AND SOPHISTICATED ACTIVITIES OVER
   TIME. THIS, IN BRIEF, CONSTITUTES THE CAPACITY-
   STRENGTHENING AND INSTITUTION BUILDING PERSPECTIVE IN
   DEVELOPMENT MANAGEMENT (HONADLE AND VAN SANT, 1986).
                                             (MILTON J. ESMAN, 1991)
S3-Unpas_2012            www.ginandjar.com                     44
 THE OTHER APPROACH EMPHASIZES THE MANAGEMENT OF
  CONCRETE DEVELOPMENT ACTIVITIES, ARGUING THAT THE
  PUBLIC SECTOR MUST CONCENTRATE PERFORMANCE –ON
  DELIVERING THE GOODS, MEETING NEEDS, AND PROVIDING
  TANGIBLE BENEFIT. THESE SHORTER-TERM EXIGENCIES , IT IS
  ARGUED, MUST TAKE PRIORITY IN THE ALLOCATION OF
  RESOURCES AND ENERGIES OVER LONG –TERM CAPACITY
  BUILDING; INDEED, SUCCESSFUL EXPERIENCE IN PROGRAM
  OPERATIONS AND IN CONCRETE PROBLEM SOLVING IS THE
  SUREST WAY TO DEVELOP AND SUSTAIN MANAGERIAL
  CAPACITY.




S3-Unpas_2012            www.ginandjar.com                  45
 LONG-TERM CAPACITIES MUST BE DEVELOPED IN
  GOVERNMENT AND IN THE PRIVATE REALM. AS THESE
  CAPACITIES ARE UNLIKELY TO EVOLVES SPONTANEOUSLY,
  GOVERNMENTS MUST BE PREPARED TO INVEST IN
  INDIVIDUAL AND ORGANIZATIONAL CAPABILITIES. AT THE
  SAME TIME, POLICIES MUST BE CARRIED OUT, PROGRAMS
  MUST BE OPERATED, AND SERVICES MUST BE DELIVERED
  WITH SUCH MANAGERIAL RESOURCES AS EXIT. BOTH
  OBJECTIVES MUST BE PURSUED SIMULTANEOUSLY, NOT AS
  TRADE-OFFS BUT AS COMPLEMENTARY MEASURES.




S3-Unpas_2012         www.ginandjar.com            46
 SCHOLARS LOOK UPON DEVELOPMENT MANAGEMENT
  AS COMPRISING BOTH THE STRENGTHENING OF
  MANAGERIAL CAPABILITIES THAT CAN SUSTAIN
  COMPLEX ACTIVITIES THROUGH TIME AND CHANGING
  CIRCUMSTANCES AND THE ONGOING MANAGEMENT OF
  DEVELOPMENT PROGRAMS IN THE PUBLIC SECTOR.




S3-Unpas_2012      www.ginandjar.com        47
 WHAT MOST DISTINGUISHED ADVANCE SOCIETIES AND
  THEIR GOVERNMENT IS NOT THEIR “CULTURE”, NOR
  THEIR NATURAL ENDOWMENTS, NOR THE AVAILABILITY
  OF CAPITAL, NOR THE RATIONALLY OF PUBLIC POLICIES,
  BUT PRECISELY THE CAPACITIES OF THEIR INSTITUTIONS
  AND THE SKILLS OF INDIVIDUALS, INCLUDING THOSE OF
  MANAGEMENT. TOGETHER THESE REFLECT THEIR
  DIFFERENTIAL CAPACITIES TO UTILIZE RESOURCES ,
  CAPITALIZE ON OPPORTUNITIES, AND ADJUST TO
  CHANGES (ESMAN, 1991).




S3-Unpas_2012        www.ginandjar.com           48
 IT IS CRITICAL THAT SUBSTANTIAL ENERGIES AND
  RESOURCES BE DEDICATED TO AND INVESTED IN THE
  ENHANCEMENT OF THE HUMAN RESOURCES AND
  INSTITUTIONAL CAPACITIES THAT DETERMINE THE
  ABILITY OF SOCIETIES TO ACHIEVE AND SUSTAIN
  ECONOMIC DEVELOPMENTS. IN AN IMPORTANT
  SENSE, THIS IS WHAT DEVELOPMENT IS ALL ABOUT.




S3-Unpas_2012       www.ginandjar.com         49
ENVIRONTMENTAL FACTORS FOR PUBLIC SECTORS
                   MANAGERS

       ECONOMIC                        CULTURAL

       GROSS NATIONAL PRODUCT          ETHNICITY
       STRUCTURE OF PRODUCTION         FAMILY AND KINSHIP
       LABOUR                          VALUES AND NORMS
       DOMESTIC CAPITAL                GENDER
       FOREIGN EXCHANGE                HISTORY
       FOREIGN AID AND DEBT
       INFRASTRUCTURE
       TECHNOLOGY
       POVERTY AND INEQUALITY
       INFORMAL SECTOR

       DEMOGRAPHIC                     POLITICAL
                                                                 SOURCE: MODIFIED
       POPULATION GROWTH               STATE-SOCIETY RELATIONS   FROM AUSTIN, J.E.
       AGE STRUCTURE                   LEGITIMACY                (1990) MANAGING IN
       URBANIZATION AND MIGRATION      REGIME TYPE               DEVELOPING
       HELATH                          IDEOLOGY                  COUNTRIES: STRATEGIC
                                       ELITES AND CLASSES        ANALIYSIS AND
                                       INTERNATIONAL LINKS       OPERATING
                                       INSTITUTION               TECHNIQUES (NEW
                                                                 YORK: FREE PRESS)

  (MILTON ESMAN, 1991)

S3-Unpas_2012                       www.ginandjar.com                         50
MANAGEMENT PERSPECTIVES
                    OF DEVELOPMENT
                    ADMINISTRATION




      DEVELOPMENT OF                    MANAGEMENT OF
  MANAGERIAL CAPABILITIES            CONCRETE DEVELOPMENT
     AND INSTITUTIONS                     ACTIVITIES




S3-Unpas_2012          www.ginandjar.com                    51
1)     PLANNING
 2)     RESOURCE MOBILIZATION
 3)     CIVIL-PARTICIPATION MOBILIZATION
 4)     BUDGETING
 5)     IMPLEMENTATION OF DEVELOPMENT IN THE PUBLIC
        SECTOR
 6)     COORDINATION
 7)     MONITORING AND EVALUATION
 8)     CONTROLLING (OVERSIGHT FUNCTION)
 9)     INFORMATION SYSTEM
                                            (KARTASASMITA, 1997)
S3-Unpas_2012           www.ginandjar.com                     52
 IT IS CRITICAL THAT SUBSTANTIAL ENERGIES AND
    RESOURCES BE DEDICATED TO AND INVESTED IN
    THE ENHANCEMENT OF THE HUMAN RESOURCES
    AND INSTITUTIONAL CAPACITIES THAT DETERMINE
    THE ABILITY OF SOCIETIES TO ACHIEVE AND
    SUSTAIN ECONOMIC DEVELOPMENTS. IN AN
    IMPORTANT SENSE, THIS IS WHAT DEVELOPMENT IS
    ALL ABOUT.



S3-Unpas_2012       www.ginandjar.com         53
 PLANNING IS AN ORGANIZED, CONSCIOUS AND
   CONTINUAL ATTEMPT TO SELECT THE BEST
   AVAILABLE ALTERNATIVES TO ACHIEVE SPECIFIC
   GOALS.

                                  (ALBERT WATERSTON, 1965)




S3-Unpas_2012        www.ginandjar.com                   54
 'DURING THE 1960s AND 1970s PROJECTS BECAME
  THE PRIMARY MEANS THROUGH WHICH
  GOVERNMENTS OF DEVELOPING COUNTRIES
  TRANSLATED THEIR PLANS AND POLICIES INTO
  PROGRAMMES OF ACTION' (RONDINELLI, 1993).
 PROJECTS WERE SEEN AS THE 'CUTTING EDGE OF
  DEVELOPMENT' (GITTINGER, 1982), WHERE
  RESOURCES WERE CONVERTED INTO IMPROVED
  LIVELIHOODS AND ECONOMIC GROWTH.

S3-Unpas_2012       www.ginandjar.com           55
 UNFORTUNATELY, THE RIGOUR THAT SUCH
    TECHNIQUES BRING TO PROJECT ANALYSIS HAS
    NOT ALWAYS REVEALED ITSELF IN TERMS OF
    PROJECT RESULTS. THE WORLD BANK (1988) HAS
    FOUND THAT SOME 51 PER CENT OF ITS RURAL
    DEVELOPMENT AREA PROJECTS, OVER THE
    PERIOD 1965 TO 1985, FAILED TO ACHIEVE THE
    BANK'S MINIMUM ACCEPTABLE RATE OF RETURN
    OF 10 PER CENT.
   POOR DATA, UNCERTAINTY, LACK OF BENECIFIARY
    PARTICIPATION, POLITICAL INVOLVEMENT.

S3-Unpas_2012        www.ginandjar.com            56
ALTERNATIVE APPROACHES TO PROJECT
PLANNING
 THE SEARCH IS ON FOR APPROACHES THAT MAKE
  PROJECTS MORE EFFECTIVE, AND TWO
  FUNDAMENTALLY DIFFERENT RESPONSES CAN BE
  DISTINGUISHED.
 ADAPTIVE ADMINISTRATIVE
 EMPOWERMENT


S3-Unpas_2012      www.ginandjar.com          57
ADAPTIVE ADMINISTRATION
 RONDINELLI (1993) HAS MADE AN IMPASSIONED PLEA FOR
  DEVELOPMENT PROJECTS TO BE CONCEPTUALIZED AS 'POLICY
  EXPERIMENTS' REQUIRING 'ADAPTIVE ADMINISTRATION'. HE
  ARGUES THAT AN EXPERIMENTAL APPROACH WHICH PLACES
  ELEMENTS OF PLANNING, IMPLEMENTATION AND
  MONITORING IN THE HANDS OF PROJECT MANAGERS, IS
  ESSENTIAL.
 THIS IS BECAUSE OF THE ENVIRONMENTS IN WHICH
  DEVELOPMENT PROJECTS OPERATE (LIMITED INFORMATION,
  HIGH RISK, UNCERTAINTY AND POLITICAL MANIPULATION)
  AND THE CAPACITIES THAT ARE REQUIRED TO BECOME
  EFFECTIVE IN SUCH ENVIRONMENTS (LEARNING,
  EXPERIMENTATION, CREATIVITY, ORGANIZATIONAL
  FLEXIBILITY AND ACCESS TO LOCAL KNOWLEDGE).
S3-Unpas_2012          www.ginandjar.com             58
EMPOWERMENT

 FOR THE OTHER RADICAL CRITICS OF CONVENTIONAL
  APPROACHES TO PROJECT PLANNING, THE KEY THEMES
  OF ADAPTIVE ADMINISTRATION –EXPERIMENTATION,
  FLEXIBILITY, LEARNING AND CREATIVITY –ARE CRUCIAL,
  BUT THERE REMAINS TOO GREAT AN EMPHASIS ON THE
  ROLE OF EXTERNAL EXPERTS, BUREAUCRATS AND AID
  AGENCIES.
 INSTEAD, WHAT IS REQUIRED IS AN APPROACH THAT
  PERMITS MUCH GREATER BENEFICIARY INVOLVEMENT
  IN PROJECT IDENTIFICATION, SELECTION, DESIGN,
  IMPLEMENTATION AND EVALUATION.

S3-Unpas_2012         www.ginandjar.com            59
 ASPECTS OF DEVELOPMENT
                 MACRO
                 SECTORAL
                 REGIONAL
                      DECENTRALIZATION
                      SPATIAL DEVELOPMENT
                      PARTICIPATION
                      POLICY DIVERSITY


S3-Unpas_2012              www.ginandjar.com   61
EITHER

   CENTRALIZED                          DECENTRALIZED
                      OR




CENTRALIZED                            DECENTRALIZED

                 CONTINUUM


S3-Unpas_2012      www.ginandjar.com                63
S3-Unpas_2012   www.ginandjar.com   64
WHY DECENTRALIZE?

A MAJOR OBSTACLE TO THE EFFECTIVE PERFORMANCE OF
 PUBLIC BUREAUCRACIES IN MOST DEVELOPING COUNTRIES
 IS THE EXCESSIVE CONCENTRATION OR DECISION-MAKING
 AUTHORITY WITHIN CENTRAL GOVERNMENT.
PUBLIC SECTOR INSTITUTIONS ARE COMMONLY PERCEIVED
 TO BE GEOGRAPHICALLY AND SOCIALLY REMOTE FROM
 'THE PEOPLE' AND TO TAKE DECISIONS WITHOUT
 KNOWLEDGE OR CONCERN ABOUT ACTUAL PROBLEMS AND
 PREFERENCES.


S3-Unpas_2012        www.ginandjar.com          65
SOME IMPORTANT DEFINITIONS

   DECENTRALIZATION IS THE TRANSFER OF
    AUTHORITY AND RESPONSIBILITY FOR PUBLIC
    FUNCTIONS FROM THE CENTRAL GOVERNMENT TO
    SUBORDINATE OR QUASI-INDEPENDENT
    GOVERNMENT ORGANIZATIONS AND/OR THE
    PRIVATE SECTOR
                                        (WORLD BANK, 2001)




S3-Unpas_2012       www.ginandjar.com                        66
DECENTRALIZATION




                           TRANSFER OF
                        AUTHORITY CLOSER
                       TO THE PUBLIC TO BE
                             SERVED




                TERRITORIAL                   FUNCTIONAL



S3-Unpas_2012             www.ginandjar.com                67
AUTONOMOUS LOCAL GOVERNMENT
    LOCAL GOVERNMENT CAN BE SAID TO BE
     AUTONOMOUS IF THEY ENJOY A SUBSTANTIAL
     DEGREE OF INDEPENDENCE, ALTHOUGH AUTONOMY
     IN THIS CONNECTION IS SOMETIMES TAKEN TO
     IMPLY A HIGH MEASURE OF SELF-GOVERNMENT,
     RATHER THAN SOVEREIGN INDEPENDENCE


                                 (ADAPTED FROM HEYWOOD, 2002)




S3-Unpas_2012       www.ginandjar.com                      68
TYPES OF DECENTRALIZATION

       1. POLITICAL
       2. ADMINISTRATIVE
       3. FISCAL
       4. MARKET




S3-Unpas_2012              www.ginandjar.com   69
DECENTRALIZATION AND GOVERNANCE

      DECENTRALIZATION IN SOME COUNTRIES HAS
       BEEN SEEN AS POLITICALLY EXPEDIENT FOR
       DEALING WITH REBELLIOUS REGIONS.
      IT HAS HOWEVER, MORE BASIC VALUE TO
       DEMOCRACY AND DEMOCRATIC CONSOLIDATION.
       MANY SCHOLARS HAVE PRESENTED THE
       ARGUMENT THAT DECENTRALIZATION ENHANCES
       THE LEGITIMACY, AND HENCE, STABILITY OF
       DEMOCRACY.


S3-Unpas_2012       www.ginandjar.com       70
 DECENTRALIZATION IS NOT JUST A POLITICAL
  NECESSITY FOR KEEPING THE COUNTRY FROM FALLING
  APART OR FOR FOSTERING DEMOCRACY.
 IF MANAGED WELL, DECENTRALIZATION CAN BRING
  IMPORTANT BENEFITS TO THE COMMUNITIES AND THE
  ECONOMY AS A WHOLE.
 HOWEVER, IF MANAGED BADLY, IT COULD HARM THE
  PEOPLE AND SQUANDER RESOURCES AND BRING
  INSTABILITY INSTEAD.



S3-Unpas_2012       www.ginandjar.com         71
 TRANSFERS OF REVENUE TO THE AUTONOMOUS
    DISTRICTS MUST BE ACCOMPANIED BY TRANSFERS
    OF EXPENDITURE RESPONSIBILITY AND ITS
    ASSOCIATED FUNCTIONS. THEY ARE IMPORTANT
    TO PREVENT THE CENTRAL GOVERNMENT FISCAL
    DEFICIT TO INCREASE UNABATEDLY CAUSING
    SEVERE FINANCING AND DEBT PROBLEMS FOR THE
    COUNTRY IN THE FUTURE.



S3-Unpas_2012       www.ginandjar.com            72
 A NORMATIVE APPROACH:
        GRADUAL/INCREMENTAL PROCESS
        SYSTEMATIC PREPARATION
        NORMAL CONDITION IN TERMS OF POLITIC, SOCIAL
         AND ECONOMY

  A BIG-BANG APPROACH:
        ONCE FOR ALL
        LEARNING BY DOING
        TRANSITION CONDITION IN TERMS POLITIC, SOCIAL
         AND ECONOMY

S3-Unpas_2012             www.ginandjar.com              74
 INDONESIA FOLLOWED THE “BIG BANG” APPROACH
     TO DECENTRALIZATION.
    IT STARTED IN 1999, BUT MUCH OF THE
     RESPONSIBILITY FOR PUBLIC SERVICES WAS
     DECENTRALIZED IN 2001 AFTER THE SECOND
     AMENDMENT TO THE CONSTITUTION IN 2000.




S3-Unpas_2012        www.ginandjar.com        75
 BY THE END OF THE OLD REGIME, AT THE ONSET OF THE
  DEMOCRATIZATION PROCESS AND POLITICAL REFORMS
  IN 1999, THERE WERE 26 PROVICES [NOT INCLUDING
  EAST TIMOR], 234 DISTRICTS AND 59 MUNICIPALITIES,
  IN TOTAL 319 AUTONOMOUS REGIONS.
 IN 2010, THERE ARE 33 PROVINCES, 398 DISTRICTS AND
  93 MUNICIPALITIES, IN TOTAL 524 AUTONOMOUS
  REGIONS, INCREASING IN TEN YEARS BY 205
  AUTONOMOUS REGIONS OR BY ALMOST TWO THIRD.



S3-Unpas_2012         www.ginandjar.com            76
Desentralisasi 1999
                                                          % kenaikan
                  Sebelum       Sesudah
Desa                  59.834          68.442 8.608              (14,4%)
Kelurahan              5. 935           8.068 2.133            (35,0%)
Kecamatan              5.480             6.519 1.039           (18,9%)

Kabupaten                234               398      164        (70,0%)

Kota                      59                 93      34        (57,6%)
Provinsi                  27                 33       6        (22,2%)

Kabupaten:
Diluar 1 Kab. Adm. di DKI Jakarta
Kota:
Diluar 5 Kota Adm di DKI Jakarta
  S3-Unpas_2012                 www.ginandjar.com                         77
DISTRIBUTION OF AUTHORITIES AND FUNCTIONS 78
          Central                            Local www.ginandjar.com Day3_GRIPS
                                                   Government        2012

                                Obligatory Function                       Optional
1. Foreign Affairs       1. Planning and Monitoring                 1. Mining
2. Defense               2. Spatial Planning                        2. Fishery
3. Security              3. Social order and security               3. Agriculture
4. Religion              4. Public infrastructure services          4. Farm
5. Judicial              5. Health Services                         5. Forestry
6. Monetary and Fiscal   6. Educational Services                    6. Tourism
 7. Others               7. Social
                         8. Labor
                         9. SME’s and Cooperatives
                         10. Environment
                         11. Land (?)
                         12. Civil administration
                         13. Government Administration
                         14. Investment Administration
                         15. Other services
                         16. Other obligatory function
  S3-Unpas_2012                   www.ginandjar.com                                  78
REVENUES SHARING BETWEEN CENTRAL AND LOCAL
                                               Before                                   After
                                   Central      Province   District/   Central   Province   District/   Share to
       Shared-
       Shared-Revenues                                       City                             City       Other
                                                                                                        District/
                                                                                                          City

1. Property Tax                     10%         16.2% 64.8%                      16.2% 64.8%
2. Property Title Transfer Tax      20%          16%   64%                        16%   64%
3. Levy on Forestry Right to        55%          30%   15%             20%        16%   64%
   operate
4. Commission on Forestry           55%          30%         15%       20%        16%        32%         32%
   Resource
5. Land Rent on Mining Sector       20%          16%         64%       20%        16%        64%
6. Royalties from Mining Sector     20%          16%         64%       20%        16%        32%         32%
7. Tax on Fisheries Operation       100%                               20%                               80%
8. Tax on Fisheries Output          100%                               20%                               80%
9. Oil Revenues                     100%                               85%         3%         6%          6%
10. Natural gas Revenues            100%                               70%         6%        12%         12%
11. Personal Income Tax             100%                               80%         8%        12%
Source: Government Regulation No. 104/2000 and Law No. 17/2003
    S3-Unpas_2012                            www.ginandjar.com                                            79
 SUBSTANTIAL AMOUNT OF GOVERNMENT BUDGET HAS BEEN
  TRANSFERRED TO THE REGIONS.
 FOR 2012, ALMOST ONE THIRD [32.8%] OR $52 BILLION IS
  DIRECT TRANSFER TO THE AUTONOMOUS REGIONS’ BUDGET,
  IN THE FORM OF NATURAL RESOURCES SHARING FUND FOR
  $11 BILLION, GENERAL ALLOCATION FUND FOR $30 BILLION,
  SPECIAL ALLOCATION FUND FOR $3 BILLION AND SPECIAL
  AUTONOMY FUND FOR THE TWO PAPUA PROVINCES AND
  ACEH, $1.3 BILLION, AND ADJUSTMENT FUND [FOR
  INFRASTRUCTURE DEVELOPMENT] FOR $6.5 BILLION.
 BUT OVERALL GOVERNMENT BUDGET THAT GOES TO THE
  REGIONS THROUGH VARIOUS SCHEMES IS MUCH HIGHER,
  CLOSE TO TWO THIRD [62%].

S3-Unpas_2012           www.ginandjar.com                 80
GROWTH OF GENERAL ALOCATION FUND (GAF)
VS AVERAGE FOR LOCAL GOVERNMENT




                TOTAL
                               AVERAGE GROWTH
                GROWTH
SOURCE: MOF, 2011


S3-Unpas_2012            www.ginandjar.com      81
GROWTH OF GOVERNMENT EMPLOYEES




SOURCE: MOF, 2011


S3-Unpas_2012       www.ginandjar.com   82
GOOD THEORY POOR PRACTICE




S3-Unpas_2012   www.ginandjar.com   83
GOOD THEORY                         POOR PRACTICE


  • Basic Human Rights                • Disunity

  • Democracy                         • Warlordism

  • Decision Making                   • Nepotism

  • Participation :                   • Exclusivism
     i. Grass Root,
     ii. Empowerment,                 • Local Elites
    iii. Responsiveness

  • Prevent disintegration


S3-Unpas_2012             www.ginandjar.com            84
GOOD THEORY                             POOR PRACTICE


  •   Debureaucratization
  •   Efficiency                          •       Weak Institution
  •   Effectiveness
  •   Span of Control                     •       Limited Human
  •   License and Permit
  •   Client Interaction                          Resources
  •   Representativeness
  •   Populism/Pluralism                  •       Unclear Responsibility
  •   Differentiated Public
  •   Better:                             •       Decentralization of
      i.     Planning
      ii.    Execution
      iii.   Supervision                          corruption
      iv.    Monitoring

S3-Unpas_2012                 www.ginandjar.com                         85
GOOD THEORY                                    POOR PRACTICE


• Efficiency
• Resource Optimization                        • Rich Region    Richer
• Equity                                       • Poor Region    Poorer
    i. Resource allocation/distribution        • Regional Barrier to
    ii. Poverty                                  Commerce
    iii.Closing disparity                      • Environment knows no
    iv.Opportunity
    v. Empowerment                               Administrative border
•   Demonopolization                           • National vs Local Rules
•   Entrepreneurship                           • National vs Local Taxes
•   Environment
•   Inter-Regional Cooperation
•   Inter-Regional Competition
•   Ownership of Development

S3-Unpas_2012                    www.ginandjar.com                    86
GOOD THEORY                         POOR PRACTICE


• Efficiency in Delivery of
  i. Education                      • Different Level & Quality
  ii. Health                          of
  iii. Other social                    i. Education
  Services.                            ii. Health
                                       iii. Social
• Local Capabilities in                Services.
  Service Delivery
• Responsive to Local               • Social Immobility
  i. Needs
  ii. Potential
  iii. Shortcomings

• Social Cohessivenes
• Social Solidarity

S3-Unpas_2012             www.ginandjar.com                   87
GOOD THEORY                            POOR PRACTICE


  • Plurality                            • Primordialism
  • Diversity
  • Preservation of local:               • Local vs Modern Values
      i. Language
      ii. Arts
      iii. Tradition
  •   Dignity
  •   Self Esteem
  •   Confidence
  •   Local Wisdom




S3-Unpas_2012                www.ginandjar.com                  88
 TATA RUANG PADA HAKIKATNYA MERUPAKAN
  LINGKUNGAN FISIK YANG MEMPUNYAI HUBUNGAN
  ORGANISATORIS / FUNGSIONAL ANTARA BERBAGAI
  MACAM OBYEK DAN MANUSIA YANG TERPISAH
  DALAM RUANG – RUANG (RAPOPORT, 1980).
 DI DALAM TATA RUANG TERDAPAT SUATU DISTRIBUSI
  DARI TINDAKAN MANUSIA DAN KEGIATANNYA UNTUK
  MENCAPAI TUJUAN SEBAGAIMANA DIRUMUSKAN
  SEBELUMNYA. TATA RUANG DALAM HAL INI,
  MENURUT WETZING (1978), MERUPAKAN JABATARAN
  DARI SUATU PRODUK PERENCANAAN FISIK.

S3-Unpas_2012      www.ginandjar.com         90
 KONSEPSI TATA RUANG INI TIDAK HANYA
    MENYANGKUT SUATU WAWASAN YANG DISEBUT
    WAWASAN SPASIAL, TETAPI MENYANGKUT PULA
    ASPEK – ASPEK NON SPASIAL ATAU A-SPASIAL
    (FOLEY, 1970). HAL INI DIDASARKAN PADA
    KENYATAAN BAHWA STRUKTUR FISIKS ANGAT
    DITENTUKAN DAN DIPENGARUHI OLEH FAKTOR –
    FAKTOR NONFISIK SEPERTI ORGANISASI
    FUNGSIONAL, POLA SOSIAL BUDAYA, DAN NILAI
    KEHIDUPAN KOMUNITAS (PORTEOUS, 1981).


S3-Unpas_2012       www.ginandjar.com           91
 PENATAAN RUANG SECARA UMUM MEMILIKI
    PENGERTIAN SEBAGAI SUATU PROSES YANG
    MELIPUTI PROSES PERENCANAAN, PELAKSANAAN
    ATAU PEMANFAATAN TATA RUANG, DAN
    PENGENDALIAN PELAKSANAAN ATAU
    PEMANFAATAN RUANG YANG TERKAIT SATU
    DENGAN LAINNYA.




S3-Unpas_2012       www.ginandjar.com          92
 BERDASARKAN KONSEPSI INI, PENATAAN RUANG
    DAPAT DISEBUTKAN SECARA LEBIH SPESIFIK
    SEBAGAI UPAYA MEWUJUDKAN TATA RUANG YANG
    TERENCANA, DENGAN MEMPERHATIKAN:
          KEADAAN LINGKUNGAN ALAM,
          LINGKUNGAN BUATAN,
          LINGKUNGAN SOSIAL,
          INTERAKSI ANTAR LINGKUNGAN,
          TAHAPAN DAN PENGELOLAAN PEMBANGUNAN,
          KEMAMPUAN KELEMBAGAAN DAN SUMBER DAYA
           MANUSIA.

S3-Unpas_2012             www.ginandjar.com        93
95



 SALAH SATU KARAKTERISTIK ATAU CIRI SISTEM
  ADMINISTRASI MODERN ADALAH BAHWA
  PENGAMBILAN KEPUTUSAN DILAKUKAN SEDAPAT –
  DAPATNYA PADA TINGKAT YANG PALING BAWAH
  (GRASS-ROOT LEVEL).
 DALAM HAL INI MASYARAKAT, BERSAMA – SAMA
  DENGAN APARATUR PEMERINTAH, MENJADI
  STAKEHOLDER DALAM PERUMUSAN, IMPLEMENTASI,
  DAN EVALUASI DARIS ETIAP UPAYA PEMBANGUNAN.
  DENGAN MENINGKATNYA PENDIDIKAN, MASYARAKAT
  AKAN MENJADI SEMAKIN TERBUKA, SEMAKIN MAJU
  DAN MODERN.

S3-Unpas_2012      www.ginandjar.com            95
96




 DALAM KONDISI SEPERTI INI, MASYARAKAT TIDAK
  AKAN PUAS DENGAN HANYA MENDEGAR DAN
  MELAKSANAKAN PETUNJUK, TETAPI JUGA INGIN IKUT
  BERPARTISIPASI DALAM PEMBANGUNAN DAN
  MENENTUKAN NASIB MEREKA SENDIRI.
 PEMBANGUNAN YANG MEMBERI KESEMPATAN DAN
  BERTUMPU PADA MASYARAKAT TELAH MENJADI
  PARADIGMA PEMBANGUNAN YANG SEKARANG
  BERKEMBANG DAN DIANUT SECARA LUAS
  (KARTASASMITA, 1996B).


S3-Unpas_2012       www.ginandjar.com             96
98



 SEBAGAI IMPLIKASI DARI DIMENSI ADMINISTRASI DALAM
  PEMBANGUNAN DAERAH YANG DIKAITKAN DENGAN
  KEMAJEMUKAN ADALAH DIMUNGKINKANNYA
  KERAGAMAN DALAM KEBIJAKSANAAN (POLICY DIVERSITY).
  DARI SEGI PERENCANAAN PEMBANGUNAN HARUS
  DIPAHAMI BAHWA SATU DAERAH BERBEDA DENGAN
  DAERAH LAINNYA.
 TAK ADA SATU PUN DAERAH YANG MEMILIKI
  KARAKTERISTIK YANG SAMA, BAIK DARI POTENSI EKONOMI,
  SUMBER DAYA MANUSIA, MAUPUN KELEMBAGAAN
  MASYARAKATNYA. DISAMPING ITU, PREMIS BAHWA
  PEMERINTAHAN DI DAERAH LEBIH MENGETAHUI
  PERMASALAHAN DAERAHNYA SEMAKIN MENGUAT.
S3-Unpas_2012        www.ginandjar.com           98
99




 DALAM KERANGKA INI, KEBIJAKSANAAN YANG BERSIFAT
  NASIONAL HARUS LUWES (FLEXIBLE), AGAR APARAT
  PEMERINTAH DIBAWAHNYA DAPAT MENGEMBANGKAN
  DAN MEMODIFIKASI KEBIJAKSANAAN TERSEBUT SESUAI
  DENGAN KONDISI MASING – MASING WILAYAH (HEAPHY,
  1971).
 UNTUK ITU, KEBIJAKSANAAN NASIONAL HARUS
  MEMAHAMI KARAKTERISTIK DAERAH DALAM
  MEMPERTIMBANGKAN POTENSI PEMBANGUNAN DI
  DAERAH TERUTAMA DALAM KEBIJAKSANAAN INVESTASI
  SARANA DAN PRASARANA GUNA MERANGSANG
  BERKEMBANGNYA KEGIATAN EKONOMI DAERAH.

S3-Unpas_2012        www.ginandjar.com              99

Development Administration chapter 6 (UNPAS 2012)

  • 1.
    Prof. Ginandjar Kartasasmita Program Doktor Bidang Ilmu Sosial Universitas Pasundan Bandung 2011
  • 2.
     CULTURAL PROCESSESUNDERLIE MUCH OF WHAT HAPPENS IN MODERN ORGANIZATIONS. CULTURE FILTERS THE WAYS IN WHICH PEOPLE SEE AND UNDERSTAND THEIR WORLDS. CULTURE PRESCRIBES SOME BEHAVIORS AND FORBIDS OTHERS. CULTURE COLORS THE EMOTIONAL RESPONSES THAT PEOPLE HAVE TO EVENTS.  FROM THE POINT OF VIEW OF PUBLIC ADMINISTRATION, SCHOLARS DEFINE CULTURE AS EXISTING AT THREE DISTINCT LEVELS: SOCIETAL, POLITICAL, AND ADMINISTRATIVE. S3-Unpas_2012 www.ginandjar.com 2
  • 3.
    Societal Culture Public Administration Adminis- Political trative Culture Culture S3-Unpas_2012 www.ginandjar.com 3
  • 4.
     AROUND THEGLOBE, THE TYPICAL PUBLIC ORGANIZATION IS DEEPLY ENTRENCHED IN THE CLASSICAL WEBERIAN-TYPE BUREAUCRATIC MODEL. WITH EMPHASIS ON CONTROL AND COMPLIANCE, THE TRADITIONAL PUBLIC ORGANIZATION IS A DETERMINISTIC SYSTEM SEEKING EQUILIBRIUM AND STABILITY IN WHICH DISORDER AND UNCERTAINTY ARE VIEWED AS DYSFUNCTIONAL. S3-Unpas_2012 www.ginandjar.com 4
  • 5.
     THEREFORE, TRANSFORMATIONOF THE STRUCTURES, PROCESSES, AND CULTURES WITHIN PUBLIC BUREAUCRACIES IS NOT LIKELY TO OCCUR VIA SELF- ORGANIZING PROCESSES. TO REALIZE FUNDAMENTAL REFORM OF PUBLIC ORGANIZATIONS THUS REQUIRES AN ORGANIC PROCESS THAT FITS WITH ADAPTIVE SYSTEMS [ARKADY IN BOX, IBID]. NEEDLESS TO SAY AN ORGANIC PROCESS IS A CULTURAL PROCESS. S3-Unpas_2012 www.ginandjar.com 5
  • 6.
     MULTICULTURAL SOCIETY.CULTURAL VARIATION DOES NOT ONLY DISTINGUISH ONE SOCIETY AGAINST THE OTHER, BUT WITHIN A SOCIETY, ESPECIALLY IN A COUNTRY SUCH AS INDONESIA WHICH IS A MULTICUTURAL SOCIETY. VALUES, NORMS AND TRADITION IN ACEH IS DIFFERENT THAN IN JAVA OR IN BALI OR IN PAPUA. S3-Unpas_2012 www.ginandjar.com 6
  • 7.
     INDEED MANYNATIONS ARE MULTICULTURAL AND DIVERSE IN TERMS OF RACE, ETHNICITY, RELIGION, IDENTITY, TRADITION. IN MULTICULTURAL SOCIETY PUBLIC ADMINISTRATORS WORK IN DIVERSE ORGANIZATIONS AND DEAL WITH A DIVERSE CITIZENRY. MULTICULTURALISM IMPACTS PUBLIC ADMINISTRATION IN TWO MAJOR DOMAINS: WITHIN PUBLIC ORGANIZATIONS AND IN THE GREATER SOCIETY [ARKADY, IBID]. S3-Unpas_2012 www.ginandjar.com 7
  • 8.
     DAHL ANDWALDO ALSO POINTED OUT, CULTURAL FACTORS COULD MAKE PUBLIC ADMINISTRATIONS ON ONE PART OF THE GLOBE QUITE A DIFFERENT ANIMAL FROM PUBLIC ADMINISTRATION ON ANOTHER PART.  THE MOVEMENT GAVE RISE TO A SEMIAUTONOMOUS SUBFIELD OF COMPARATIVE PUBLIC ADMINISTRATION IN WHICH DEVELOPMENT ADMINISTRATION CONCENTRATES ON THE DEVELOPING NATIONS. S3-Unpas_2012 www.ginandjar.com 8
  • 9.
     THE NATIONALDEVELOPMENT OF AN EMERGING NATION INEVITABLY INCARNATES PARTICULAR NEEDS AND DEMANDS THAT REQUIRE SPECIFIC ADMINISTRATIVE ABILITIES.  THIS TYPE OF ADMINISTRATION OR MANAGEMENT, ADAPTED FOR THE PARTICULAR NEEDS OF DEVELOPING COUNTRIES, HAS BEEN REFERRED TO INTERCHANGEABLY AS DEVELOPMENT ADMINISTRATION OR DEVELOPMENT MANAGEMENT. S3-Unpas_2012 www.ginandjar.com 9
  • 10.
     BROADLY, DEVELOPMENTADMINISTRATION IS AN INTEGRAL PART OF SOCIETAL DEVELOPMENT AND IS PROFOUNDLY INFLUENCED BY THE OVERALL POLITICAL, ECONOMIC, AND CULTURAL ATTRIBUTES OF THE SOCIETY.  DEVELOPMENT ADMINISTRATION IS DIFFERENT FROM ADMINISTRATIVE DEVELOPMENT, WHICH COULD BE ANY ADMINISTRATION IN ANY SETTING SEEKING REFORM, CHANGE, OR IMPROVEMENT OF ITS CAPACITY. S3-Unpas_2012 www.ginandjar.com 10
  • 11.
    PUBLIC ADMINISTRATION COMPARATIVE PUBLIC ADMINISTRATION DEVELOPED DEVELOPING COUNTRIES COUNTRIES DEVELOPMENT ADMINISTRATION S3-Unpas_2012 www.ginandjar.com 11
  • 12.
    THE OBJECTIVE OFDEVELOPMENT ADMINISTRATION  THE CONCERN OF DEVELOPMENT ADMINISTRATION IS HOW CAN THE IDEAS AND MECHANISMS OF PUBLIC ADMINISTRATION BE USED AS INSTRUMENTS OF SOCIAL AND ECONOMIC DEVELOPMENT? S3-Unpas_2011 www.ginandjar.com 12
  • 13.
    PUBLIC ADMINISTRATION MAIN IDEAS MECHANISM EFFICIENCY ORGANIZATION EFFECTIVENESS MANAGEMENT ECONOMY DEVELOPMENT S3-Unpas_2011 www.ginandjar.com 13
  • 14.
     “DEVELOPMENT ADMINISTRATION”IS GENERALLY SIMILAR TO THE TRADITIONAL “PUBLIC ADMINISTRATION” IN ITS CONCERN WITH HOW A GOVERNMENT IMPLEMENTS ITS RULES, POLICIES, AND NORMS.  IT DIFFERS, HOWEVER, IN ITS OBJECTIVES, SCOPE, AND COMPLEXITY.  DEVELOPMENT ADMINISTRATION IS MORE INNOVATIVE, SINCE IT IS CONCERNED WITH THE SOCIETAL CHANGES INVOLVED IN ACHIEVING DEVELPOMENTAL OBJECTIVES. S3-Unpas_2011 www.ginandjar.com 14
  • 15.
     DEVELOPMENT ADMINISTRATIONIS THE NAME OFTEN GIVEN TO THE WAY A COUNTRY’S GOVERNMENT ACTS TO FULFILL ITS ROLE IN ACHIEVING DEVELOPMENT. (RIGGS, 1977) S3-Unpas_2012 www.ginandjar.com 15
  • 16.
    THE THREE AREASOF CONCERN : 1. HOW PURPOSEFULLY TO GUIDE GOVERNMENT ACTION TOWARD DEVELOPMENT OBJECTIVES; 2. HOW ACTUALLY TO TAKE ACCOUNT OF THE MANY AND COMPLEX INTERDEPENDENCIES OF SOCIETAL CHANGE; AND 3. HOW TO INSURE THAT GOVERNMENTAL ADMINISTRATION IS DYNAMIC AND INNOVATIVE. S3-Unpas_2012 www.ginandjar.com 16
  • 17.
    THE FUNCTION OFDEVELOPMENT ADMINISTRATION  TO ASSURE THAT AN APPROPRIATELY CONGENIAL ENVIRONMENT AND EFFECTIVE ADMINISTRATION SUPPORT ARE PROVIDED FOR DELIVERY OF CAPITAL, MATERIALS, AND SERVICES WHERE NEEDED IN THE PRODUCTIVE PROCESS –WHETHER IN PUBLIC, PRIVATE, OR MIXED ECONOMIES. (GANT, 1979) S3-Unpas_2012 www.ginandjar.com 17
  • 18.
     SIX GROUPSOF NEEDED INPUTS: 1) SKILLED MANPOWER, 2) FINANCES, 3) LOGISTICS (OR FACILITIES FOR THE PHYSICAL FLOW OF GOODS AND SERVICES), 4) INFORMATION (FACILITIES FOR THE PHYSICAL TRANSMISSION OF DATA), 5) PARTICIPATION (OF INDIVIDUALS AND GROUPS), AND 6) LEGITIMATE POWER (TO ENFORCE DECISIONS).  THESE SIX INPUTS TOGETHER COMPOSE THE CONTENT OF DEVELOPMENT ACTION. S3-Unpas_2011 www.ginandjar.com 18
  • 19.
    MODELS OF DEVELOPMENTADMINISTRATION  THERE IS A LACK CONSENSUS ON WHAT IS CHARACTERISTIC OF THE ADMINISTRATIVE SITUATION IN TRANSITIONAL SOCIETIES, ON POSSIBLE STAGES OR SEQUENCES IN THE PROCESS OF ADMINISTRATIVE TRANSFORMATION, ON RELATIONSHIPS BETWEEN ADMINISTRATIVE CHANGE AND CORRESPONDING PROCESSES OF POLITICAL, ECONOMIC, AND CULTURAL DEVELOPMENT.  THERE IS EVEN DISAGREEMENT ON THE RELATION BETWEEN ADMINISTRATION AND CULTURE—WHETHER ADMINISTRATIVE BEHAVIOR IS UNIQUELY DETERMINED BY PARTICULAR CULTURES OR CORRESPONDS TO GENERAL LEVELS OF SOCIO­POLITICAL INTEGRATION" (RIGGS). S3-Unpas_2011 www.ginandjar.com 19
  • 20.
     IN ADMINISTRATIONIN DEVELOPING COUNTRIES (1964), RIGGS PRESENTED THE CONCEPT OF "PRISMATIC SOCIETY" TO EXPLAIN THE UNIQUE CONDITIONS AND THE DYNAMICS OF POLITICS AND ADMINISTRATION IN DEVELOPING COUNTRIES. S3-Unpas_2012 www.ginandjar.com 20
  • 21.
     AS ANALTERNATIVE MODEL FOR CONCEPTUALIZING DEVELOPING COUNTRIES, RIGGS OFFERED HIS "PRISMATIC MODEL“, BASED ON THE METAPHOR OF A PRISM. WHEN WHITE LIGHT (THAT IS, LIGHT MADE UP OF ALL VISIBLE WAVELENGTHS) PASSES THROUGH A PRISM, IT IS DIFFRACTED, BROKEN INTO A VARIETY OF COLORS—A RAINBOW.  SIMILARLY, RIGGS CONTENDED, SOCIETIES IN THE PROCESS OF DEVELOPMENT MOVE FROM A FUSED MODE, IN WHICH LITTLE OR NO DIFFERENTIATION EXISTS, TO A DIFFRACTED CONDITION IN WHICH THERE IS A HIGH DEGREE OF FUNCTIONAL SPECIALIZATION. S3-Unpas_2012 www.ginandjar.com 21
  • 22.
    RIGG’S PRISMATIC MODEL SOCIETY: FUSED PRISMATIC DIFFRACTED BUREAUCRATIC: CHAMBER SALA/BUREAU OFFICE MODEL ROSTOW FIVE STAGES OF GROWTH NAL SOCIETY CONDITION TRADITIO- THE DRIVE MATURITY THE TAKE FOR TAKE CONSUM- THE PRE- OF HIGH THE AGE PTION MASS OFF OFF TO S3-Unpas_2012 www.ginandjar.com 22
  • 23.
    RELATIVELY FOCUS RELATIVELY SPECIFIED UNSPECIFIED RELATIVELY SPECIFIED PHASE III PHASE II LOCUS RELATIVELY UNSPECIFIED PHASE I PHASE IV The four cells of a 2 X 2 matrix relating two combinations of locus and focus S3-Unpas_2012 www.ginandjar.com 23
  • 24.
    THE RISE ANDFALL OF DEVELOPMENT ADMINISTRATION  WITH THE INVENTION OF DEVELOPMENT BY THE WESTERN NATIONS IN THE IMMEDIATE POST-WAR PERIOD AND ITS ADOPTION AS STATE IDEOLOGY BY THE GOVERNMENTS AND EMERGING ELITES OF THE POORER NATIONS, THE QUESTION AROSE AS TO HOW THE PROMISED SOCIAL TRANSFORMATION WAS TO BE ACHIEVED.  ‘THE PRIMARY OBSTACLES TO DEVELOPMENT ARE ADMINISTRATIVE RATHER THAN ECONOMIC', DECLARED DONALD STONE (1965). OTHERS AGREED AND DEVELOPMENT ADMINISTRATION WAS CREATED TO PLAY A MAJOR ROLE IN FACILITATING DEVELOPMENT. S3-Unpas_2012 www.ginandjar.com 24
  • 25.
     MANY DEVELOPINGCOUNTRIES FACE AN ONGOING NEED TO BUILD INSTITUTIONS AND ORGANIZATIONS ABLE TO OVERCOME TRADITIONAL BARRIERS TO THE EFFECTIVE IMPLEMENTATION OF DEVELOPMENTAL POLICIES. S3-Unpas_2012 www.ginandjar.com 25
  • 26.
     DEVELOPMENT ADMINISTRATIONREPRESENTED THE PRACTICAL APPLICATION OF MODERNIZATION THEORY. ITS PROMOTERS SAW IT AS 'A MIDWIFE FOR WESTERN DEVELOPMENT-CREATING STABLE AND ORDERLY CHANGE' (DWIVEDI AND NEF, 1982).  IT WAS A FORM OF SOCIAL ENGINEERING IMPORTED FROM THE WEST AND EMBODYING FAITH IN THE APPLICATION OF RATIONAL SCIENTIFIC PRINCIPLES AND THE EFFICACY OF KEYNESIAN WELFARE ECONOMICS. S3-Unpas_2012 www.ginandjar.com 26
  • 27.
     THE CREATIONAND USE OF THESE ABILITIES HAVE ALWAYS BEEN PRIMARY CHALLENGES OF DEVELOPMENT ADMINISTRATION. THE ABSENCE AND BREAKDOWN OF THESE ABILITIES HAVE OFTEN BEEN MAJOR FACTORS IN DEVELOPMENT ADMINISTRATION'S FAILURE TO MEET SATISFACTORY LEVELS OF PERFORMANCE.  AS A RESULT, DEVELOPMENT ADMINISTRATION HAS NOT FARED WELL IN SOME CRITICAL AREAS, SUCH AS THE CONCEPTION OF AN INSPIRING, COMPATIBLE VISION AND MANAGING EFFECTIVELY TO ACHIEVE THIS VISION. S3-Unpas_2012 www.ginandjar.com 27
  • 28.
     IN UTILIZINGMODERN TECHNIQUES, DEVELOPMENT ADMINISTRATION, FOR EXAMPLE, SEEMS TO LAG BEHIND THE PRIVATE SECTOR IN LEVERAGING TECHNOLOGY TO IMPROVE INTERNAL OPERATIONS AND TO ENHANCE THE OVERALL EFFECTIVENESS OF DEVELOPMENT ORGANIZATIONS. S3-Unpas_2012 www.ginandjar.com 28
  • 29.
     UNABLE TOATTAIN A TIMELY CORRECTION OF ITS DEFICIENCIES OR TO LEARN FROM ITS FAILURES, DEVELOPMENT ADMINISTRATION LARGELY REMAINS BURDENED BY A COMBINATION OF INHERITED STRUCTURES AND BEHAVIORS AND DEEPLY INTERNALIZED LOCAL CULTURAL PATTERNS.  THIS COMBINATION OF LEGACIES HAS HAD THE EFFECT OF IMPEDING PERFORMANCE AND WASTING BADLY NEEDED INSTITUTIONAL ENERGIES ON OTHER THAN PRODUCTIVE ENDEAVORS TO ACCOMPLISH DEVELOPMENTAL MANDATES. S3-Unpas_2012 www.ginandjar.com 29
  • 30.
    S3-Unpas_2012 www.ginandjar.com 30
  • 31.
    REVIVAL OF DEVELOPMENTADMINISTRATION  THE MOST IMPORTANT DIFFERENCE BETWEEN ADMINISTRATION IN DEVELOPING COUNTRIES AND IN THE WEST WAS BEING INCREASINGLY IDENTIFIED AS THAT ENVELOPE OF FACTORS AND FORCES WHICH WE COLLECTIVELY CALL THE ORGANIZATIONAL ENVIRONMENT.  WHETHER IT WAS THE SOCIAL CLASS CONTEXT, THE INFLUENCE OF THE WORLD BANK, THE TYPE OF REGIME, THE NATURE OF THE POLICY­MAKING PROCESS OR SIMPLY THE PREVAILING CULTURE, THE CENTRALITY OF THE ENVIRONMENT FOR UNDERSTANDING ADMINISTRATIVE ACTION AND PARALYSIS WAS BECOMING FIRMLY ESTABLISHED. S3-Unpas_2012 www.ginandjar.com 31
  • 32.
     THE NEO-CLASSICALECONOMISTS HAD MEANWHILE GAINED CONSIDERABLE INFLUENCE IN POLICY CIRCLES AND WERE ALSO POINTING TO INEFFICIENCY AND INEFFECTIVENESS IN THE PUBLIC SECTOR.  BIG GOVERNMENT HAD NOT BEEN EFFECTIVE GOVERNMENT AND IT WAS TIME THE PRINCIPALS OF THE MARKET WERE ALLOWED TO OPREATE. REDUCING THE SIZE OF THE STATE AND RESTRICTING THE OPERATION OF THE STATE WOULD BRING CONSIDERABLE SAVINGS.  PROGRAMMES TO INCREASE BUREAUCRATIC CAPACITY AND EFFICIENCY AND TO ENCOURAGE PRIVATE SECTOR GROWTH THROUGH MARKET MECHANISMS WOULD THEN ENSURE THAT DEVELOPMENT WOULD TAKE PLACE. S3-Unpas_2012 www.ginandjar.com 32
  • 33.
     THE OLDDISTINCTION BETWEEN PUBLIC SECTOR AND PRIVATE SECTOR MANAGEMENT BECAME BLURRED. THE DISSEMINATION OF THIS MODEL TO DEVELOPING COUNTRIES WAS UNDERTAKEN BY ENTHUSIASTIC WESTERN ADVOCATES AND MULTILATERAL FINANCIAL INSTITUTIONS SUCH AS THE WORLD BANK AND IMF. S3-Unpas_2012 www.ginandjar.com 33
  • 34.
    ANOTHER APPROACH  FORCEFULLYADVOCATED BY DWIVEDI AND, NEF (1982) WAS THE SEARCH FOR ALTERNATIVE FORMS OF ORGANIZATIONAL APPROACH TO DEVELOPMENT. INSTEAD OF SIMPLY CRITICISING THE FAILURES, PEOPLE BEGAN TO LOOK AT THE SUCCESSES AND INNOVATIONS.  RONDINELLI (1983) WAS KEEN TO IDENTIFY LESSONS FROM PAST EXPERIENCE THAT COULD ENHANCE DEVELOPMENT ADMINISTRATION IN THE FUTURE. HIS ANALYSIS INDICATED THAT THE MAIN REASON FOR POOR PAST PERFORMANCE IN THE PUBLIC SECTOR WAS THE FAILURE TO COPE WITH THE COMPLEXITY AND UNCERTAINTY OF ORGANIZATIONAL ENVIRONMENTS IN DEVELOPING COUNTRIES. S3-Unpas_2012 www.ginandjar.com 34
  • 35.
     THE REMEDYLAY IN CHANGING STRUCTURES AND PROCEDURES SO THAT EXPERIMENTATION AND LEARNING OCCURRED. THIS CREATIVE HYBRID COMPRISES A HUMAN-RELATIONS TYPE OF MANAGEMENT THEORY COUPLED WITH A CONTINGENCY-STYLE ACKNOWLEDGEMENT OF HIGHLY VARIABLE ENVIRONMENTAL CONDITIONS, INCLUDING THE POLITICAL ENVIRONMENT. S3-Unpas_2012 www.ginandjar.com 35
  • 36.
     IN THELATE 1980s DEVELOPMENT ADMINISTRATION WAS EMERGING FROM SELF-CRITICISM AND DOUBT AND WAS ACQUIRING A NEW LEASE OF LIFE.  MILTON ESMAN (1988) DECLARED THAT DEVELOPMENT ADMINISTRATION HAS NOT ONLY SURVIVED THE LIMITATIONS OF ITS FOUNDERS, BUT IT HAS SUCCESSFULLY ADAPTED TO A MUCH MORE REALISTIC SET OF EXPECTATIONS ABOUT THE PROCESS OF DEVELOPMENT AND THE POTENTIALITIES OF THE PUBLIC SECTOR.  DEVELOPMENT ADMINISTRATION, ACCORDING TO SUCH WRITERS, HAD MATURED BUT IT WAS STILL DYNAMIC. S3-Unpas_2012 www.ginandjar.com 36
  • 37.
     SO HOWDO WE CHARACTERIZE THE CONTEMPORARY PRACTICE OF DEVELOPMENT ADMINISTRATION?  DEVELOPMENT ADMINISTRATION REMAINS HEAVILY BUT NOT EXCLUSIVELY FOCUSED ON PUBLIC ADMINISTRATION. IT IS NO LONGER PREMISED ON THE NOTION OF BIG GOVERNMENT; THIS IS IN PART DUE TO DISAPPOINTING RESULTS OF OFFICIAL DEVELOPMENT INTERVENTIONS AND TO THE SHORTAGE OF FINANCIAL RESOURCES. S3-Unpas_2012 www.ginandjar.com 37
  • 38.
     SUSTAINED INSTITUTIONALDEVELOPMENT REQUIRES CERTAIN CONDITIONS. THESE REQUISITES HAVE INCREASINGLY BECOME MORE SPECIFIC: 1) TAPPING STAKEHOLDERS' SUPPORT, 2) PROMOTING ONGOING STRATEGIC PLANNING, 3) ENGAGING IN MARKETING, AND 4) REDUCING DEPENDENCY THROUGH THE USE OF LOCAL RESOURCES. (GOLDSMITH 1992, 586) S3-Unpas_2012 www.ginandjar.com 38
  • 39.
    BOTH MACRO ANDMICRO POLITICAL PROCESSES ARE CENTRAL CONCERNS IN THE PRACTICE AND ANALYSIS OF DEVELOPMENT ADMINISTRATION. FURTHERMORE, AS WE HAVE IDENTIFIED DEVELOPMENT ADMINISTRATION AS AN INSTRUMENTALITY OF DEVELOPMENT, ITS PRACTITIONERS MUST BE INTIMATELY CONCERNED WITH THE GOALS OF DEVELOPMENT. WHETHER IN ANALYSIS OR PRACTICE THERE IS NO VALUE NEUTRALITY. ALL VIEWS AND ACTIONS HAVE SOME POLITICAL MEANING, ESPECIALLY IF DEVELOPMENT SHOULD BE ORIENTED TO THE POOR, MOSTLY DEFINED BY THE POOR AND INCOPORATING A STRONG ELEMENT OF GRASSROOTS KNOWLEDGE AND WISDOM. S3-Unpas_2012 www.ginandjar.com 39
  • 40.
    FINALLY, DEVELOPMENT ADMINISTRATION(OR POLICY OR MANAGEMENT) APPLIES TO A HUGE NUMBER OF PEOPLE IN A LARGE NUMBER OF COUNTRIES. THE COUNTRIES VARY ENORMOUSLY WHEN MEASURED BY STATISTICAL INDICATORS OF DEVELOPMENT OR IN TERMS OF CULTURE AND HISTORY. EVEN WITHIN NATIONS, HOWEVER SMALL IN POPULATION TERMS, THERE CAN BE GREAT REGIONAL DIFFERENTIATION. COLLECTIVE TITLES SUCH AS THIRD WORLD OR THE SOUTH GIVE AN IMPRESSION OF SIMILARITY TO A DISPARATE GROUP OF COUNTRIES. DIVERSITY IS WHAT DEVELOPMENT ADMINISTRATION MUST ADDRESS. S3-Unpas_2012 www.ginandjar.com 40
  • 41.
    DEVELOPMENT ADMINISTRATION APPROACH ADMINISTRATION OF MANAGEMENT DEVELOPMENT ORGANIZATION/ ECONOMIC POLITICAL SOCIAL ADMINISTRATIVE INSTITUTION S3-Unpas_2012 www.ginandjar.com 41
  • 42.
    MANAGEMENT DEVELOPMENT ADMINISTRATION = PUBLIC ADMINISTRATION + OF DEVELOPMENT S3-Unpas_2012 www.ginandjar.com 42
  • 43.
    Some contemporary themesin development administration 1. Governments are limited in their capacity, and these limitations should be incorporated into the design of public programmes. 2. Because governments cannot do it all, alternative and complementary channels need to be identified and fostered. 3. Programme designers recognize and capitalize on the pluralistic properties of public administration. 4. Participation is an important dimension in the administration of Public services. 5. Societal contexts provide both specific opportunities and special constraints for development administration. 6. There is an enhanced appreciation of the uncertainties and contingencies inherent in deliberate efforts at developmental change. 7. There are renewed pressures on governments (a) to extract greater productivity from continuing expenditures and (b) to reorient government bureaucracies to serve large disadvantaged publics more responsively. Source: Esman, M.]. (1988) 'The Maturing of Development Administration, Public Administration and Development, Vo. 8 (2), pp 125-34. S3-Unpas_2012 www.ginandjar.com 43
  • 44.
    MANAGEMENT PERSPECTIVES OFDEVELOPMENT ADMINISTRATION  TWO COMPETING PERSPECTIVE HAVE EMERGED.  THE FIRST FOCUSED ON THE DEVELOPMENT OF MANAGERIAL CAPABILITIES AND INSTITUTIONS. UNDERLYING THIS APPROACH IS THE ASSUMPTION THAT ONCE CAPABILITIES ARE IN PLACE, THE VARIOUS ENTITIES IN THE PUBLIC SECTOR WILL BE ENDOWED WITH THE ABILITY TO UNDERTAKE THE DEVELOPMENTAL TASK THAT GOVERNMENT REQUIRES, TO USE RESOURCES EFFICIENTLY, TO SOLVE FRESH PROBLEMS AS THEY ARISE, AND TO SUSTAIN INCREASINGLY COMPLEX AND SOPHISTICATED ACTIVITIES OVER TIME. THIS, IN BRIEF, CONSTITUTES THE CAPACITY- STRENGTHENING AND INSTITUTION BUILDING PERSPECTIVE IN DEVELOPMENT MANAGEMENT (HONADLE AND VAN SANT, 1986). (MILTON J. ESMAN, 1991) S3-Unpas_2012 www.ginandjar.com 44
  • 45.
     THE OTHERAPPROACH EMPHASIZES THE MANAGEMENT OF CONCRETE DEVELOPMENT ACTIVITIES, ARGUING THAT THE PUBLIC SECTOR MUST CONCENTRATE PERFORMANCE –ON DELIVERING THE GOODS, MEETING NEEDS, AND PROVIDING TANGIBLE BENEFIT. THESE SHORTER-TERM EXIGENCIES , IT IS ARGUED, MUST TAKE PRIORITY IN THE ALLOCATION OF RESOURCES AND ENERGIES OVER LONG –TERM CAPACITY BUILDING; INDEED, SUCCESSFUL EXPERIENCE IN PROGRAM OPERATIONS AND IN CONCRETE PROBLEM SOLVING IS THE SUREST WAY TO DEVELOP AND SUSTAIN MANAGERIAL CAPACITY. S3-Unpas_2012 www.ginandjar.com 45
  • 46.
     LONG-TERM CAPACITIESMUST BE DEVELOPED IN GOVERNMENT AND IN THE PRIVATE REALM. AS THESE CAPACITIES ARE UNLIKELY TO EVOLVES SPONTANEOUSLY, GOVERNMENTS MUST BE PREPARED TO INVEST IN INDIVIDUAL AND ORGANIZATIONAL CAPABILITIES. AT THE SAME TIME, POLICIES MUST BE CARRIED OUT, PROGRAMS MUST BE OPERATED, AND SERVICES MUST BE DELIVERED WITH SUCH MANAGERIAL RESOURCES AS EXIT. BOTH OBJECTIVES MUST BE PURSUED SIMULTANEOUSLY, NOT AS TRADE-OFFS BUT AS COMPLEMENTARY MEASURES. S3-Unpas_2012 www.ginandjar.com 46
  • 47.
     SCHOLARS LOOKUPON DEVELOPMENT MANAGEMENT AS COMPRISING BOTH THE STRENGTHENING OF MANAGERIAL CAPABILITIES THAT CAN SUSTAIN COMPLEX ACTIVITIES THROUGH TIME AND CHANGING CIRCUMSTANCES AND THE ONGOING MANAGEMENT OF DEVELOPMENT PROGRAMS IN THE PUBLIC SECTOR. S3-Unpas_2012 www.ginandjar.com 47
  • 48.
     WHAT MOSTDISTINGUISHED ADVANCE SOCIETIES AND THEIR GOVERNMENT IS NOT THEIR “CULTURE”, NOR THEIR NATURAL ENDOWMENTS, NOR THE AVAILABILITY OF CAPITAL, NOR THE RATIONALLY OF PUBLIC POLICIES, BUT PRECISELY THE CAPACITIES OF THEIR INSTITUTIONS AND THE SKILLS OF INDIVIDUALS, INCLUDING THOSE OF MANAGEMENT. TOGETHER THESE REFLECT THEIR DIFFERENTIAL CAPACITIES TO UTILIZE RESOURCES , CAPITALIZE ON OPPORTUNITIES, AND ADJUST TO CHANGES (ESMAN, 1991). S3-Unpas_2012 www.ginandjar.com 48
  • 49.
     IT ISCRITICAL THAT SUBSTANTIAL ENERGIES AND RESOURCES BE DEDICATED TO AND INVESTED IN THE ENHANCEMENT OF THE HUMAN RESOURCES AND INSTITUTIONAL CAPACITIES THAT DETERMINE THE ABILITY OF SOCIETIES TO ACHIEVE AND SUSTAIN ECONOMIC DEVELOPMENTS. IN AN IMPORTANT SENSE, THIS IS WHAT DEVELOPMENT IS ALL ABOUT. S3-Unpas_2012 www.ginandjar.com 49
  • 50.
    ENVIRONTMENTAL FACTORS FORPUBLIC SECTORS MANAGERS ECONOMIC CULTURAL GROSS NATIONAL PRODUCT ETHNICITY STRUCTURE OF PRODUCTION FAMILY AND KINSHIP LABOUR VALUES AND NORMS DOMESTIC CAPITAL GENDER FOREIGN EXCHANGE HISTORY FOREIGN AID AND DEBT INFRASTRUCTURE TECHNOLOGY POVERTY AND INEQUALITY INFORMAL SECTOR DEMOGRAPHIC POLITICAL SOURCE: MODIFIED POPULATION GROWTH STATE-SOCIETY RELATIONS FROM AUSTIN, J.E. AGE STRUCTURE LEGITIMACY (1990) MANAGING IN URBANIZATION AND MIGRATION REGIME TYPE DEVELOPING HELATH IDEOLOGY COUNTRIES: STRATEGIC ELITES AND CLASSES ANALIYSIS AND INTERNATIONAL LINKS OPERATING INSTITUTION TECHNIQUES (NEW YORK: FREE PRESS) (MILTON ESMAN, 1991) S3-Unpas_2012 www.ginandjar.com 50
  • 51.
    MANAGEMENT PERSPECTIVES OF DEVELOPMENT ADMINISTRATION DEVELOPMENT OF MANAGEMENT OF MANAGERIAL CAPABILITIES CONCRETE DEVELOPMENT AND INSTITUTIONS ACTIVITIES S3-Unpas_2012 www.ginandjar.com 51
  • 52.
    1) PLANNING 2) RESOURCE MOBILIZATION 3) CIVIL-PARTICIPATION MOBILIZATION 4) BUDGETING 5) IMPLEMENTATION OF DEVELOPMENT IN THE PUBLIC SECTOR 6) COORDINATION 7) MONITORING AND EVALUATION 8) CONTROLLING (OVERSIGHT FUNCTION) 9) INFORMATION SYSTEM (KARTASASMITA, 1997) S3-Unpas_2012 www.ginandjar.com 52
  • 53.
     IT ISCRITICAL THAT SUBSTANTIAL ENERGIES AND RESOURCES BE DEDICATED TO AND INVESTED IN THE ENHANCEMENT OF THE HUMAN RESOURCES AND INSTITUTIONAL CAPACITIES THAT DETERMINE THE ABILITY OF SOCIETIES TO ACHIEVE AND SUSTAIN ECONOMIC DEVELOPMENTS. IN AN IMPORTANT SENSE, THIS IS WHAT DEVELOPMENT IS ALL ABOUT. S3-Unpas_2012 www.ginandjar.com 53
  • 54.
     PLANNING ISAN ORGANIZED, CONSCIOUS AND CONTINUAL ATTEMPT TO SELECT THE BEST AVAILABLE ALTERNATIVES TO ACHIEVE SPECIFIC GOALS. (ALBERT WATERSTON, 1965) S3-Unpas_2012 www.ginandjar.com 54
  • 55.
     'DURING THE1960s AND 1970s PROJECTS BECAME THE PRIMARY MEANS THROUGH WHICH GOVERNMENTS OF DEVELOPING COUNTRIES TRANSLATED THEIR PLANS AND POLICIES INTO PROGRAMMES OF ACTION' (RONDINELLI, 1993).  PROJECTS WERE SEEN AS THE 'CUTTING EDGE OF DEVELOPMENT' (GITTINGER, 1982), WHERE RESOURCES WERE CONVERTED INTO IMPROVED LIVELIHOODS AND ECONOMIC GROWTH. S3-Unpas_2012 www.ginandjar.com 55
  • 56.
     UNFORTUNATELY, THERIGOUR THAT SUCH TECHNIQUES BRING TO PROJECT ANALYSIS HAS NOT ALWAYS REVEALED ITSELF IN TERMS OF PROJECT RESULTS. THE WORLD BANK (1988) HAS FOUND THAT SOME 51 PER CENT OF ITS RURAL DEVELOPMENT AREA PROJECTS, OVER THE PERIOD 1965 TO 1985, FAILED TO ACHIEVE THE BANK'S MINIMUM ACCEPTABLE RATE OF RETURN OF 10 PER CENT.  POOR DATA, UNCERTAINTY, LACK OF BENECIFIARY PARTICIPATION, POLITICAL INVOLVEMENT. S3-Unpas_2012 www.ginandjar.com 56
  • 57.
    ALTERNATIVE APPROACHES TOPROJECT PLANNING  THE SEARCH IS ON FOR APPROACHES THAT MAKE PROJECTS MORE EFFECTIVE, AND TWO FUNDAMENTALLY DIFFERENT RESPONSES CAN BE DISTINGUISHED.  ADAPTIVE ADMINISTRATIVE  EMPOWERMENT S3-Unpas_2012 www.ginandjar.com 57
  • 58.
    ADAPTIVE ADMINISTRATION RONDINELLI(1993) HAS MADE AN IMPASSIONED PLEA FOR DEVELOPMENT PROJECTS TO BE CONCEPTUALIZED AS 'POLICY EXPERIMENTS' REQUIRING 'ADAPTIVE ADMINISTRATION'. HE ARGUES THAT AN EXPERIMENTAL APPROACH WHICH PLACES ELEMENTS OF PLANNING, IMPLEMENTATION AND MONITORING IN THE HANDS OF PROJECT MANAGERS, IS ESSENTIAL. THIS IS BECAUSE OF THE ENVIRONMENTS IN WHICH DEVELOPMENT PROJECTS OPERATE (LIMITED INFORMATION, HIGH RISK, UNCERTAINTY AND POLITICAL MANIPULATION) AND THE CAPACITIES THAT ARE REQUIRED TO BECOME EFFECTIVE IN SUCH ENVIRONMENTS (LEARNING, EXPERIMENTATION, CREATIVITY, ORGANIZATIONAL FLEXIBILITY AND ACCESS TO LOCAL KNOWLEDGE). S3-Unpas_2012 www.ginandjar.com 58
  • 59.
    EMPOWERMENT  FOR THEOTHER RADICAL CRITICS OF CONVENTIONAL APPROACHES TO PROJECT PLANNING, THE KEY THEMES OF ADAPTIVE ADMINISTRATION –EXPERIMENTATION, FLEXIBILITY, LEARNING AND CREATIVITY –ARE CRUCIAL, BUT THERE REMAINS TOO GREAT AN EMPHASIS ON THE ROLE OF EXTERNAL EXPERTS, BUREAUCRATS AND AID AGENCIES.  INSTEAD, WHAT IS REQUIRED IS AN APPROACH THAT PERMITS MUCH GREATER BENEFICIARY INVOLVEMENT IN PROJECT IDENTIFICATION, SELECTION, DESIGN, IMPLEMENTATION AND EVALUATION. S3-Unpas_2012 www.ginandjar.com 59
  • 61.
     ASPECTS OFDEVELOPMENT  MACRO  SECTORAL  REGIONAL  DECENTRALIZATION  SPATIAL DEVELOPMENT  PARTICIPATION  POLICY DIVERSITY S3-Unpas_2012 www.ginandjar.com 61
  • 63.
    EITHER CENTRALIZED DECENTRALIZED OR CENTRALIZED DECENTRALIZED CONTINUUM S3-Unpas_2012 www.ginandjar.com 63
  • 64.
    S3-Unpas_2012 www.ginandjar.com 64
  • 65.
    WHY DECENTRALIZE? A MAJOROBSTACLE TO THE EFFECTIVE PERFORMANCE OF PUBLIC BUREAUCRACIES IN MOST DEVELOPING COUNTRIES IS THE EXCESSIVE CONCENTRATION OR DECISION-MAKING AUTHORITY WITHIN CENTRAL GOVERNMENT. PUBLIC SECTOR INSTITUTIONS ARE COMMONLY PERCEIVED TO BE GEOGRAPHICALLY AND SOCIALLY REMOTE FROM 'THE PEOPLE' AND TO TAKE DECISIONS WITHOUT KNOWLEDGE OR CONCERN ABOUT ACTUAL PROBLEMS AND PREFERENCES. S3-Unpas_2012 www.ginandjar.com 65
  • 66.
    SOME IMPORTANT DEFINITIONS  DECENTRALIZATION IS THE TRANSFER OF AUTHORITY AND RESPONSIBILITY FOR PUBLIC FUNCTIONS FROM THE CENTRAL GOVERNMENT TO SUBORDINATE OR QUASI-INDEPENDENT GOVERNMENT ORGANIZATIONS AND/OR THE PRIVATE SECTOR (WORLD BANK, 2001) S3-Unpas_2012 www.ginandjar.com 66
  • 67.
    DECENTRALIZATION TRANSFER OF AUTHORITY CLOSER TO THE PUBLIC TO BE SERVED TERRITORIAL FUNCTIONAL S3-Unpas_2012 www.ginandjar.com 67
  • 68.
    AUTONOMOUS LOCAL GOVERNMENT  LOCAL GOVERNMENT CAN BE SAID TO BE AUTONOMOUS IF THEY ENJOY A SUBSTANTIAL DEGREE OF INDEPENDENCE, ALTHOUGH AUTONOMY IN THIS CONNECTION IS SOMETIMES TAKEN TO IMPLY A HIGH MEASURE OF SELF-GOVERNMENT, RATHER THAN SOVEREIGN INDEPENDENCE (ADAPTED FROM HEYWOOD, 2002) S3-Unpas_2012 www.ginandjar.com 68
  • 69.
    TYPES OF DECENTRALIZATION 1. POLITICAL 2. ADMINISTRATIVE 3. FISCAL 4. MARKET S3-Unpas_2012 www.ginandjar.com 69
  • 70.
    DECENTRALIZATION AND GOVERNANCE  DECENTRALIZATION IN SOME COUNTRIES HAS BEEN SEEN AS POLITICALLY EXPEDIENT FOR DEALING WITH REBELLIOUS REGIONS.  IT HAS HOWEVER, MORE BASIC VALUE TO DEMOCRACY AND DEMOCRATIC CONSOLIDATION. MANY SCHOLARS HAVE PRESENTED THE ARGUMENT THAT DECENTRALIZATION ENHANCES THE LEGITIMACY, AND HENCE, STABILITY OF DEMOCRACY. S3-Unpas_2012 www.ginandjar.com 70
  • 71.
     DECENTRALIZATION ISNOT JUST A POLITICAL NECESSITY FOR KEEPING THE COUNTRY FROM FALLING APART OR FOR FOSTERING DEMOCRACY.  IF MANAGED WELL, DECENTRALIZATION CAN BRING IMPORTANT BENEFITS TO THE COMMUNITIES AND THE ECONOMY AS A WHOLE.  HOWEVER, IF MANAGED BADLY, IT COULD HARM THE PEOPLE AND SQUANDER RESOURCES AND BRING INSTABILITY INSTEAD. S3-Unpas_2012 www.ginandjar.com 71
  • 72.
     TRANSFERS OFREVENUE TO THE AUTONOMOUS DISTRICTS MUST BE ACCOMPANIED BY TRANSFERS OF EXPENDITURE RESPONSIBILITY AND ITS ASSOCIATED FUNCTIONS. THEY ARE IMPORTANT TO PREVENT THE CENTRAL GOVERNMENT FISCAL DEFICIT TO INCREASE UNABATEDLY CAUSING SEVERE FINANCING AND DEBT PROBLEMS FOR THE COUNTRY IN THE FUTURE. S3-Unpas_2012 www.ginandjar.com 72
  • 74.
     A NORMATIVEAPPROACH:  GRADUAL/INCREMENTAL PROCESS  SYSTEMATIC PREPARATION  NORMAL CONDITION IN TERMS OF POLITIC, SOCIAL AND ECONOMY  A BIG-BANG APPROACH:  ONCE FOR ALL  LEARNING BY DOING  TRANSITION CONDITION IN TERMS POLITIC, SOCIAL AND ECONOMY S3-Unpas_2012 www.ginandjar.com 74
  • 75.
     INDONESIA FOLLOWEDTHE “BIG BANG” APPROACH TO DECENTRALIZATION.  IT STARTED IN 1999, BUT MUCH OF THE RESPONSIBILITY FOR PUBLIC SERVICES WAS DECENTRALIZED IN 2001 AFTER THE SECOND AMENDMENT TO THE CONSTITUTION IN 2000. S3-Unpas_2012 www.ginandjar.com 75
  • 76.
     BY THEEND OF THE OLD REGIME, AT THE ONSET OF THE DEMOCRATIZATION PROCESS AND POLITICAL REFORMS IN 1999, THERE WERE 26 PROVICES [NOT INCLUDING EAST TIMOR], 234 DISTRICTS AND 59 MUNICIPALITIES, IN TOTAL 319 AUTONOMOUS REGIONS.  IN 2010, THERE ARE 33 PROVINCES, 398 DISTRICTS AND 93 MUNICIPALITIES, IN TOTAL 524 AUTONOMOUS REGIONS, INCREASING IN TEN YEARS BY 205 AUTONOMOUS REGIONS OR BY ALMOST TWO THIRD. S3-Unpas_2012 www.ginandjar.com 76
  • 77.
    Desentralisasi 1999 % kenaikan Sebelum Sesudah Desa 59.834 68.442 8.608 (14,4%) Kelurahan 5. 935 8.068 2.133 (35,0%) Kecamatan 5.480 6.519 1.039 (18,9%) Kabupaten 234 398 164 (70,0%) Kota 59 93 34 (57,6%) Provinsi 27 33 6 (22,2%) Kabupaten: Diluar 1 Kab. Adm. di DKI Jakarta Kota: Diluar 5 Kota Adm di DKI Jakarta S3-Unpas_2012 www.ginandjar.com 77
  • 78.
    DISTRIBUTION OF AUTHORITIESAND FUNCTIONS 78 Central Local www.ginandjar.com Day3_GRIPS Government 2012 Obligatory Function Optional 1. Foreign Affairs 1. Planning and Monitoring 1. Mining 2. Defense 2. Spatial Planning 2. Fishery 3. Security 3. Social order and security 3. Agriculture 4. Religion 4. Public infrastructure services 4. Farm 5. Judicial 5. Health Services 5. Forestry 6. Monetary and Fiscal 6. Educational Services 6. Tourism 7. Others 7. Social 8. Labor 9. SME’s and Cooperatives 10. Environment 11. Land (?) 12. Civil administration 13. Government Administration 14. Investment Administration 15. Other services 16. Other obligatory function S3-Unpas_2012 www.ginandjar.com 78
  • 79.
    REVENUES SHARING BETWEENCENTRAL AND LOCAL Before After Central Province District/ Central Province District/ Share to Shared- Shared-Revenues City City Other District/ City 1. Property Tax 10% 16.2% 64.8% 16.2% 64.8% 2. Property Title Transfer Tax 20% 16% 64% 16% 64% 3. Levy on Forestry Right to 55% 30% 15% 20% 16% 64% operate 4. Commission on Forestry 55% 30% 15% 20% 16% 32% 32% Resource 5. Land Rent on Mining Sector 20% 16% 64% 20% 16% 64% 6. Royalties from Mining Sector 20% 16% 64% 20% 16% 32% 32% 7. Tax on Fisheries Operation 100% 20% 80% 8. Tax on Fisheries Output 100% 20% 80% 9. Oil Revenues 100% 85% 3% 6% 6% 10. Natural gas Revenues 100% 70% 6% 12% 12% 11. Personal Income Tax 100% 80% 8% 12% Source: Government Regulation No. 104/2000 and Law No. 17/2003 S3-Unpas_2012 www.ginandjar.com 79
  • 80.
     SUBSTANTIAL AMOUNTOF GOVERNMENT BUDGET HAS BEEN TRANSFERRED TO THE REGIONS.  FOR 2012, ALMOST ONE THIRD [32.8%] OR $52 BILLION IS DIRECT TRANSFER TO THE AUTONOMOUS REGIONS’ BUDGET, IN THE FORM OF NATURAL RESOURCES SHARING FUND FOR $11 BILLION, GENERAL ALLOCATION FUND FOR $30 BILLION, SPECIAL ALLOCATION FUND FOR $3 BILLION AND SPECIAL AUTONOMY FUND FOR THE TWO PAPUA PROVINCES AND ACEH, $1.3 BILLION, AND ADJUSTMENT FUND [FOR INFRASTRUCTURE DEVELOPMENT] FOR $6.5 BILLION.  BUT OVERALL GOVERNMENT BUDGET THAT GOES TO THE REGIONS THROUGH VARIOUS SCHEMES IS MUCH HIGHER, CLOSE TO TWO THIRD [62%]. S3-Unpas_2012 www.ginandjar.com 80
  • 81.
    GROWTH OF GENERALALOCATION FUND (GAF) VS AVERAGE FOR LOCAL GOVERNMENT TOTAL AVERAGE GROWTH GROWTH SOURCE: MOF, 2011 S3-Unpas_2012 www.ginandjar.com 81
  • 82.
    GROWTH OF GOVERNMENTEMPLOYEES SOURCE: MOF, 2011 S3-Unpas_2012 www.ginandjar.com 82
  • 83.
    GOOD THEORY POORPRACTICE S3-Unpas_2012 www.ginandjar.com 83
  • 84.
    GOOD THEORY POOR PRACTICE • Basic Human Rights • Disunity • Democracy • Warlordism • Decision Making • Nepotism • Participation : • Exclusivism i. Grass Root, ii. Empowerment, • Local Elites iii. Responsiveness • Prevent disintegration S3-Unpas_2012 www.ginandjar.com 84
  • 85.
    GOOD THEORY POOR PRACTICE • Debureaucratization • Efficiency • Weak Institution • Effectiveness • Span of Control • Limited Human • License and Permit • Client Interaction Resources • Representativeness • Populism/Pluralism • Unclear Responsibility • Differentiated Public • Better: • Decentralization of i. Planning ii. Execution iii. Supervision corruption iv. Monitoring S3-Unpas_2012 www.ginandjar.com 85
  • 86.
    GOOD THEORY POOR PRACTICE • Efficiency • Resource Optimization • Rich Region Richer • Equity • Poor Region Poorer i. Resource allocation/distribution • Regional Barrier to ii. Poverty Commerce iii.Closing disparity • Environment knows no iv.Opportunity v. Empowerment Administrative border • Demonopolization • National vs Local Rules • Entrepreneurship • National vs Local Taxes • Environment • Inter-Regional Cooperation • Inter-Regional Competition • Ownership of Development S3-Unpas_2012 www.ginandjar.com 86
  • 87.
    GOOD THEORY POOR PRACTICE • Efficiency in Delivery of i. Education • Different Level & Quality ii. Health of iii. Other social i. Education Services. ii. Health iii. Social • Local Capabilities in Services. Service Delivery • Responsive to Local • Social Immobility i. Needs ii. Potential iii. Shortcomings • Social Cohessivenes • Social Solidarity S3-Unpas_2012 www.ginandjar.com 87
  • 88.
    GOOD THEORY POOR PRACTICE • Plurality • Primordialism • Diversity • Preservation of local: • Local vs Modern Values i. Language ii. Arts iii. Tradition • Dignity • Self Esteem • Confidence • Local Wisdom S3-Unpas_2012 www.ginandjar.com 88
  • 90.
     TATA RUANGPADA HAKIKATNYA MERUPAKAN LINGKUNGAN FISIK YANG MEMPUNYAI HUBUNGAN ORGANISATORIS / FUNGSIONAL ANTARA BERBAGAI MACAM OBYEK DAN MANUSIA YANG TERPISAH DALAM RUANG – RUANG (RAPOPORT, 1980).  DI DALAM TATA RUANG TERDAPAT SUATU DISTRIBUSI DARI TINDAKAN MANUSIA DAN KEGIATANNYA UNTUK MENCAPAI TUJUAN SEBAGAIMANA DIRUMUSKAN SEBELUMNYA. TATA RUANG DALAM HAL INI, MENURUT WETZING (1978), MERUPAKAN JABATARAN DARI SUATU PRODUK PERENCANAAN FISIK. S3-Unpas_2012 www.ginandjar.com 90
  • 91.
     KONSEPSI TATARUANG INI TIDAK HANYA MENYANGKUT SUATU WAWASAN YANG DISEBUT WAWASAN SPASIAL, TETAPI MENYANGKUT PULA ASPEK – ASPEK NON SPASIAL ATAU A-SPASIAL (FOLEY, 1970). HAL INI DIDASARKAN PADA KENYATAAN BAHWA STRUKTUR FISIKS ANGAT DITENTUKAN DAN DIPENGARUHI OLEH FAKTOR – FAKTOR NONFISIK SEPERTI ORGANISASI FUNGSIONAL, POLA SOSIAL BUDAYA, DAN NILAI KEHIDUPAN KOMUNITAS (PORTEOUS, 1981). S3-Unpas_2012 www.ginandjar.com 91
  • 92.
     PENATAAN RUANGSECARA UMUM MEMILIKI PENGERTIAN SEBAGAI SUATU PROSES YANG MELIPUTI PROSES PERENCANAAN, PELAKSANAAN ATAU PEMANFAATAN TATA RUANG, DAN PENGENDALIAN PELAKSANAAN ATAU PEMANFAATAN RUANG YANG TERKAIT SATU DENGAN LAINNYA. S3-Unpas_2012 www.ginandjar.com 92
  • 93.
     BERDASARKAN KONSEPSIINI, PENATAAN RUANG DAPAT DISEBUTKAN SECARA LEBIH SPESIFIK SEBAGAI UPAYA MEWUJUDKAN TATA RUANG YANG TERENCANA, DENGAN MEMPERHATIKAN:  KEADAAN LINGKUNGAN ALAM,  LINGKUNGAN BUATAN,  LINGKUNGAN SOSIAL,  INTERAKSI ANTAR LINGKUNGAN,  TAHAPAN DAN PENGELOLAAN PEMBANGUNAN,  KEMAMPUAN KELEMBAGAAN DAN SUMBER DAYA MANUSIA. S3-Unpas_2012 www.ginandjar.com 93
  • 95.
    95  SALAH SATUKARAKTERISTIK ATAU CIRI SISTEM ADMINISTRASI MODERN ADALAH BAHWA PENGAMBILAN KEPUTUSAN DILAKUKAN SEDAPAT – DAPATNYA PADA TINGKAT YANG PALING BAWAH (GRASS-ROOT LEVEL).  DALAM HAL INI MASYARAKAT, BERSAMA – SAMA DENGAN APARATUR PEMERINTAH, MENJADI STAKEHOLDER DALAM PERUMUSAN, IMPLEMENTASI, DAN EVALUASI DARIS ETIAP UPAYA PEMBANGUNAN. DENGAN MENINGKATNYA PENDIDIKAN, MASYARAKAT AKAN MENJADI SEMAKIN TERBUKA, SEMAKIN MAJU DAN MODERN. S3-Unpas_2012 www.ginandjar.com 95
  • 96.
    96  DALAM KONDISISEPERTI INI, MASYARAKAT TIDAK AKAN PUAS DENGAN HANYA MENDEGAR DAN MELAKSANAKAN PETUNJUK, TETAPI JUGA INGIN IKUT BERPARTISIPASI DALAM PEMBANGUNAN DAN MENENTUKAN NASIB MEREKA SENDIRI.  PEMBANGUNAN YANG MEMBERI KESEMPATAN DAN BERTUMPU PADA MASYARAKAT TELAH MENJADI PARADIGMA PEMBANGUNAN YANG SEKARANG BERKEMBANG DAN DIANUT SECARA LUAS (KARTASASMITA, 1996B). S3-Unpas_2012 www.ginandjar.com 96
  • 98.
    98  SEBAGAI IMPLIKASIDARI DIMENSI ADMINISTRASI DALAM PEMBANGUNAN DAERAH YANG DIKAITKAN DENGAN KEMAJEMUKAN ADALAH DIMUNGKINKANNYA KERAGAMAN DALAM KEBIJAKSANAAN (POLICY DIVERSITY). DARI SEGI PERENCANAAN PEMBANGUNAN HARUS DIPAHAMI BAHWA SATU DAERAH BERBEDA DENGAN DAERAH LAINNYA.  TAK ADA SATU PUN DAERAH YANG MEMILIKI KARAKTERISTIK YANG SAMA, BAIK DARI POTENSI EKONOMI, SUMBER DAYA MANUSIA, MAUPUN KELEMBAGAAN MASYARAKATNYA. DISAMPING ITU, PREMIS BAHWA PEMERINTAHAN DI DAERAH LEBIH MENGETAHUI PERMASALAHAN DAERAHNYA SEMAKIN MENGUAT. S3-Unpas_2012 www.ginandjar.com 98
  • 99.
    99  DALAM KERANGKAINI, KEBIJAKSANAAN YANG BERSIFAT NASIONAL HARUS LUWES (FLEXIBLE), AGAR APARAT PEMERINTAH DIBAWAHNYA DAPAT MENGEMBANGKAN DAN MEMODIFIKASI KEBIJAKSANAAN TERSEBUT SESUAI DENGAN KONDISI MASING – MASING WILAYAH (HEAPHY, 1971).  UNTUK ITU, KEBIJAKSANAAN NASIONAL HARUS MEMAHAMI KARAKTERISTIK DAERAH DALAM MEMPERTIMBANGKAN POTENSI PEMBANGUNAN DI DAERAH TERUTAMA DALAM KEBIJAKSANAAN INVESTASI SARANA DAN PRASARANA GUNA MERANGSANG BERKEMBANGNYA KEGIATAN EKONOMI DAERAH. S3-Unpas_2012 www.ginandjar.com 99