• Campus Wide Network (CWN) interconnects networks in a limited
geographical area such as university campus.
• Emerging global economy require faster communication services and
improved productivity and effectiveness.
• Universities need to support demands and diverse issues.
• University network is required for its staff, faculty, students and
researchers to discover, learn, reach-out and serve the society.
Introduction
Arup Bhattacharjee, NIT Silchar
• Information Technology has been driving force in the development of
universities for some time now.
• A robust technical infrastructure and sound network architecture is needed.
• Network Architecture is the guide for the technical design of the network
using high-level design principles.
• Good network architecture meet and adapt to the specific need of the
university and also provide flexibility, scalability and manageability.
• CWN should support Next Generation Network (NGN) with integrated
services as well as Internet-of-Things (IoT) layout.
Significance
Arup Bhattacharjee, NIT Silchar
• CEO
▫ Marketable infrastructure
▫ Increase productivity – publication, student intake
▫ Fund
• Network Administrator
▫ Faster provisioning
▫ Ease of maintenance
▫ Availability
• End User
▫ Speed
▫ Reachability
Perspective
Arup Bhattacharjee, NIT Silchar
• Improve student outcome using technology
• Funding strategy for IT growth
• Organizational model for openness and agility
• Sustainable strategy for online learning
• Leveraging device explosion
• Use of cloud based solution
• Balancing between openness and security
Issues
Arup Bhattacharjee, NIT Silchar
• Mandatory requirement for accreditation for funding.
• Act as a performance measure of system, institution and department.
• Leverage technology for design, creation and delivery of learning experience to the
students.
• Use technology for face-to-face, blended as well as totally online learning.
• Use of services such as Google+, iTunes, Youtube etc. but challenge is lack of policy
for IPR, privacy issues, quality etc.
• Use of open educational resources such as MIT OpenCourseWare, Khan Academy,
MOOCs etc. challenge is to identify and select quality resource, creating new
material etc. by the faculty.
• Using social networks such as Facebook, Twitter etc. for connecting students at the
course, program and the insttute.
Student Outcome
Arup Bhattacharjee, NIT Silchar
• IT is a service to the university much like Academic, Student Administration,
Finance and Accounts etc. – not to be treated in isolation.
• An operating model is needed based on existing business process in order to
position IT.
• One may view IT both as cost center as well as revenue generator.
• Investments need to be made based on expected organizational
transformation and strategic growth.
• Develop a cost metric to assess cost of each IT Service.
• Need a strategy for identifying areas of technology adoption and innovation.
• Draw policies for leveraging local resources for enabling collaboration.
Funding
Arup Bhattacharjee, NIT Silchar
• Cloud Computing, BYOD, e-Governance, Analytics are new demands.
• Demands arise from ERP or LMS system of the institution and the level of
support needed.
• Traditional computer labs, classrooms must be supported while exploring and
integrating newer technologies.
• As institutions move to outsource more solutions, staff need to assume new
roles and form new units for service management and strategy.
• Will the institute be able to adapt to dynamic environment?
• Fund crunch often require smaller units to be consolidated towards
centralization with more specialist and fewer generalist roles.
Organizational Model
Arup Bhattacharjee, NIT Silchar
• Massive Open Online Course (MOOC) is here for supporting design and
delivery of quality leaning experiences.
• Institutions need to understand about goal, audience and quality of
experience in their MOOC endeavor.
• Institutions need to balance between broad availability of online courses vis-
à-vis restrictive approach.
• Right scope and positioning of the online courses is very important.
• Faculty need to adjust to the new way of instruction; a deviation from purely
lecture based model of course delivery.
• A well developed assessment strategy is needed against online courses as
traditional pedagogical theory do not hold any longer.
Online Learning
Arup Bhattacharjee, NIT Silchar
• Bring-Your-Own-Device (BYOD) trend is rising and is supported.
• Challenge of network coverage has been surpassed by the bandwidth requirements
due to density of devices.
• Upgrading of devices more frequently is the newer challenge.
• Providing contents ranging from class schedule to campus news to faculty, staff and
students anywhere, anytime and on any device is the biggest challenge.
• Wireless technology is adopted for ease of deployment.
• But, what will be the security implication, is sufficient Internet bandwidth available,
is instructional model is being affected, should mobility be supported?
• Should the institute support mobility and if so, does it need custom application?
Device Explosion
Arup Bhattacharjee, NIT Silchar
• One of the fastest changing aspect of the industry.
• Software-as-a-Service (SaaS) model is now being adopted.
• Proper cloud computing framework can make institute more agile in
delivering newer service faster yet keeping upfront cost low.
• Initiatives such as Internet2 provides an opportunity for institutions to
collaborate for developing fair legal and business contracts, share experience.
• Platform-as-a-Service (PaaS) model is easier to deploy while Infrastructure-as-
a-Service (IaaS) model may require more planning and integration.
• Stable policy is needed to ensure data security, data location, who has access
and to what, recovery point objectives and recovery time objective in the
event of disaster.
Cloud Strategy
Arup Bhattacharjee, NIT Silchar
• Safeguarding data and protecting privacy of higher education community.
• Equity, diversity and sharing define higher education.
• Community such as REN-ISAC provide security watches and remediation
information.
• Institutions should have formal risk management process.
• A formal process for data classification is needed for sensitive data.
• A review mechanism for security practices/policies/processes need to be in
place for guaranteeing reasonableness.
• Identify, review and remediate if security practice is inhabiting collaboration.
Balance of openness and security
Arup Bhattacharjee, NIT Silchar
• These diverse issues are not independent.
• Emphasizes interaction among institutional policies, transformation towards
IT and external forces.
• Clearly external forces influence institutional priorities but are reshaping
higher education IT.
• A more direct connection between external forces and university IT is the
matter of openness versus security, adoption of cloud technology.
• A key requirement is therefore is the ability to aggregate, de-aggregate and
re-aggregate resources, services and applications of every component of
research and education.
• A well developed network architecture is expected to meet this requirement.
Lesson
Arup Bhattacharjee, NIT Silchar
Parameters of CWN:-
• Large network over broad geographies.
• Constantly changing large user base.
• Wide variety of network devices in terms of OS, make, type etc.
• High volume of large file sharing and downloading.
• Open network.
• Track user for copyright infringement, cheating etc.
• Breach of network security.
• Varieties of applications and databases accessed.
Network Administrator’s Corner
Arup Bhattacharjee, NIT Silchar
• Decide about architecture to be deployed.
• Work-out implementation strategy.
• A well planned commissioning timeline.
• Human resource requirement and its sustenance.
• Plan for maintenance schedule.
• Roadmap according to expansion plan.
• Disaster recovery plan.
• Response mechanism towards IPR violation, virus outbreak, network
slowdown etc.
Challenges
Arup Bhattacharjee, NIT Silchar
• Hierarchical or flat network?
• Routing or switching or hybrid?
• Single OEM or multi-vendor?
• Wired or Wireless or both?
• Data network or convergent network?
• Open access or restricted access?
• Logging or no-logging?
Architecture
Arup Bhattacharjee, NIT Silchar
Sample
Arup Bhattacharjee, NIT Silchar
Arup Bhattacharjee, NIT Silchar
Arup Bhattacharjee, NIT Silchar
Arup Bhattacharjee, NIT Silchar
Thank You
Arup Bhattacharjee, NIT Silchar

CWN By Arup

  • 1.
    Presented by Arup Bhattacharjee Issues& Challenges in Campus Wide Networking
  • 2.
    • Campus WideNetwork (CWN) interconnects networks in a limited geographical area such as university campus. • Emerging global economy require faster communication services and improved productivity and effectiveness. • Universities need to support demands and diverse issues. • University network is required for its staff, faculty, students and researchers to discover, learn, reach-out and serve the society. Introduction Arup Bhattacharjee, NIT Silchar
  • 3.
    • Information Technologyhas been driving force in the development of universities for some time now. • A robust technical infrastructure and sound network architecture is needed. • Network Architecture is the guide for the technical design of the network using high-level design principles. • Good network architecture meet and adapt to the specific need of the university and also provide flexibility, scalability and manageability. • CWN should support Next Generation Network (NGN) with integrated services as well as Internet-of-Things (IoT) layout. Significance Arup Bhattacharjee, NIT Silchar
  • 4.
    • CEO ▫ Marketableinfrastructure ▫ Increase productivity – publication, student intake ▫ Fund • Network Administrator ▫ Faster provisioning ▫ Ease of maintenance ▫ Availability • End User ▫ Speed ▫ Reachability Perspective Arup Bhattacharjee, NIT Silchar
  • 5.
    • Improve studentoutcome using technology • Funding strategy for IT growth • Organizational model for openness and agility • Sustainable strategy for online learning • Leveraging device explosion • Use of cloud based solution • Balancing between openness and security Issues Arup Bhattacharjee, NIT Silchar
  • 6.
    • Mandatory requirementfor accreditation for funding. • Act as a performance measure of system, institution and department. • Leverage technology for design, creation and delivery of learning experience to the students. • Use technology for face-to-face, blended as well as totally online learning. • Use of services such as Google+, iTunes, Youtube etc. but challenge is lack of policy for IPR, privacy issues, quality etc. • Use of open educational resources such as MIT OpenCourseWare, Khan Academy, MOOCs etc. challenge is to identify and select quality resource, creating new material etc. by the faculty. • Using social networks such as Facebook, Twitter etc. for connecting students at the course, program and the insttute. Student Outcome Arup Bhattacharjee, NIT Silchar
  • 7.
    • IT isa service to the university much like Academic, Student Administration, Finance and Accounts etc. – not to be treated in isolation. • An operating model is needed based on existing business process in order to position IT. • One may view IT both as cost center as well as revenue generator. • Investments need to be made based on expected organizational transformation and strategic growth. • Develop a cost metric to assess cost of each IT Service. • Need a strategy for identifying areas of technology adoption and innovation. • Draw policies for leveraging local resources for enabling collaboration. Funding Arup Bhattacharjee, NIT Silchar
  • 8.
    • Cloud Computing,BYOD, e-Governance, Analytics are new demands. • Demands arise from ERP or LMS system of the institution and the level of support needed. • Traditional computer labs, classrooms must be supported while exploring and integrating newer technologies. • As institutions move to outsource more solutions, staff need to assume new roles and form new units for service management and strategy. • Will the institute be able to adapt to dynamic environment? • Fund crunch often require smaller units to be consolidated towards centralization with more specialist and fewer generalist roles. Organizational Model Arup Bhattacharjee, NIT Silchar
  • 9.
    • Massive OpenOnline Course (MOOC) is here for supporting design and delivery of quality leaning experiences. • Institutions need to understand about goal, audience and quality of experience in their MOOC endeavor. • Institutions need to balance between broad availability of online courses vis- à-vis restrictive approach. • Right scope and positioning of the online courses is very important. • Faculty need to adjust to the new way of instruction; a deviation from purely lecture based model of course delivery. • A well developed assessment strategy is needed against online courses as traditional pedagogical theory do not hold any longer. Online Learning Arup Bhattacharjee, NIT Silchar
  • 10.
    • Bring-Your-Own-Device (BYOD)trend is rising and is supported. • Challenge of network coverage has been surpassed by the bandwidth requirements due to density of devices. • Upgrading of devices more frequently is the newer challenge. • Providing contents ranging from class schedule to campus news to faculty, staff and students anywhere, anytime and on any device is the biggest challenge. • Wireless technology is adopted for ease of deployment. • But, what will be the security implication, is sufficient Internet bandwidth available, is instructional model is being affected, should mobility be supported? • Should the institute support mobility and if so, does it need custom application? Device Explosion Arup Bhattacharjee, NIT Silchar
  • 11.
    • One ofthe fastest changing aspect of the industry. • Software-as-a-Service (SaaS) model is now being adopted. • Proper cloud computing framework can make institute more agile in delivering newer service faster yet keeping upfront cost low. • Initiatives such as Internet2 provides an opportunity for institutions to collaborate for developing fair legal and business contracts, share experience. • Platform-as-a-Service (PaaS) model is easier to deploy while Infrastructure-as- a-Service (IaaS) model may require more planning and integration. • Stable policy is needed to ensure data security, data location, who has access and to what, recovery point objectives and recovery time objective in the event of disaster. Cloud Strategy Arup Bhattacharjee, NIT Silchar
  • 12.
    • Safeguarding dataand protecting privacy of higher education community. • Equity, diversity and sharing define higher education. • Community such as REN-ISAC provide security watches and remediation information. • Institutions should have formal risk management process. • A formal process for data classification is needed for sensitive data. • A review mechanism for security practices/policies/processes need to be in place for guaranteeing reasonableness. • Identify, review and remediate if security practice is inhabiting collaboration. Balance of openness and security Arup Bhattacharjee, NIT Silchar
  • 13.
    • These diverseissues are not independent. • Emphasizes interaction among institutional policies, transformation towards IT and external forces. • Clearly external forces influence institutional priorities but are reshaping higher education IT. • A more direct connection between external forces and university IT is the matter of openness versus security, adoption of cloud technology. • A key requirement is therefore is the ability to aggregate, de-aggregate and re-aggregate resources, services and applications of every component of research and education. • A well developed network architecture is expected to meet this requirement. Lesson Arup Bhattacharjee, NIT Silchar
  • 14.
    Parameters of CWN:- •Large network over broad geographies. • Constantly changing large user base. • Wide variety of network devices in terms of OS, make, type etc. • High volume of large file sharing and downloading. • Open network. • Track user for copyright infringement, cheating etc. • Breach of network security. • Varieties of applications and databases accessed. Network Administrator’s Corner Arup Bhattacharjee, NIT Silchar
  • 15.
    • Decide aboutarchitecture to be deployed. • Work-out implementation strategy. • A well planned commissioning timeline. • Human resource requirement and its sustenance. • Plan for maintenance schedule. • Roadmap according to expansion plan. • Disaster recovery plan. • Response mechanism towards IPR violation, virus outbreak, network slowdown etc. Challenges Arup Bhattacharjee, NIT Silchar
  • 16.
    • Hierarchical orflat network? • Routing or switching or hybrid? • Single OEM or multi-vendor? • Wired or Wireless or both? • Data network or convergent network? • Open access or restricted access? • Logging or no-logging? Architecture Arup Bhattacharjee, NIT Silchar
  • 17.