Sandip Karmakar has over 5 years of experience managing piping fabrication, erection, and commissioning projects in India and Bangladesh. He has expertise in piping design, material procurement, budgeting, scheduling, and ensuring quality standards. Currently, he is the Site Execution Engineer for a 360 MW power plant project in Bangladesh, overseeing fuel oil and fire protection piping installation.
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
Highly ambitious and self-motivated Project Management Professional with over 10 years in the Oil & Gas Industry in the fields of Project Construction & Commissioning. All experience enhanced by multi-functional business trips in United Arab Emirates, Oman, Algeria and Egypt for large scale EPC projects with Major EPC and Petroleum companies’ region.
Dedicated with more than 23 years of experience in construction field (Power, Oil & Gas ) including exclusively 16 years’ experience for Flange management and Hydro testing of cross country Pipeline (CS, DSS, HDPE and GRE), Plant piping & Storage tanks in Oil & Gas industry. Worked as a Piping engineer, Hydro testing coordinator, Hydro-testing engineer, Hydro-testing Superintendent and Pre-commissioning manager. Familiar with International standards (ASME, API, ASTM, ISO & MSS SP) and Aramco standards, Petroleum Development specification, Shell DEP/ERD, Exxon Mobil specifications. Worked with ARAMCO, SHELL, PDO, ENI, EXXON MOBIL, BGC, SOC, RELIANCE, BECHTEL, GS engineering and ESSAR. Solid and extensive knowledge in the analysis on the feasibility in planning for over all Hydro-testing / Pre-commissioning activities.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
Sr. QA/QC Mechanical Engineer with 8 years experience in power plant, oil and gas.
Industrial Project QA/QC Mechanical Head professional with 8 years of experience from the well-recognized organizations in the field of Industrial Inspection, Quality assurance, Quality control, Welding inspection and conformity Assessment of products and services.
Expertise in conducting receiving, in process and final inspection for achieving enhanced Quality. Having good working experience as a Third party inspector for SGS industrial services.
Distinctively been a Internal auditor for ISO 9001:2008 Quality management systems. Self-directed, team-oriented, enthusiastic & possessing solid organizational skills.
Dedicated with more than 23 years of experience in construction field (Power, Oil & Gas ) including exclusively 16 years’ experience for Flange management and Hydro testing of cross country Pipeline (CS, DSS, HDPE and GRE), Plant piping & Storage tanks in Oil & Gas industry. Worked as a Piping engineer, Hydro testing coordinator, Hydro-testing engineer, Hydro-testing Superintendent and Pre-commissioning manager. Familiar with International standards (ASME, API, ASTM, ISO & MSS SP) and Aramco standards, Petroleum Development specification, Shell DEP/ERD, Exxon Mobil specifications. Worked with ARAMCO, SHELL, PDO, ENI, EXXON MOBIL, BGC, SOC, RELIANCE, BECHTEL, GS engineering and ESSAR. Solid and extensive knowledge in the analysis on the feasibility in planning for over all Hydro-testing / Pre-commissioning activities.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
Sr. QA/QC Mechanical Engineer with 8 years experience in power plant, oil and gas.
Industrial Project QA/QC Mechanical Head professional with 8 years of experience from the well-recognized organizations in the field of Industrial Inspection, Quality assurance, Quality control, Welding inspection and conformity Assessment of products and services.
Expertise in conducting receiving, in process and final inspection for achieving enhanced Quality. Having good working experience as a Third party inspector for SGS industrial services.
Distinctively been a Internal auditor for ISO 9001:2008 Quality management systems. Self-directed, team-oriented, enthusiastic & possessing solid organizational skills.
1. Key Skills
Strategic Planning & Management
Vendor Management
EPC Project Management
Site Management
Fabrication
Erection & Commissioning
Construction Management
Resource Optimization
Team Building & Leadership
“Versatile, high-energy professional, offering over 5 years of dynamic career in
Fabrication, Erection , Commissioning of Thermal & Gas Power plant HP,LP
Piping,scalingnewheights of success with hard work & dedication and leaving a
mark of excellence on each step”
Profile Summary
Incisive acumen in managing EPC project life-cycle right from development
to delivery encompassing monitoring, inter-discipline co-ordination and
resource planning.
Pivotal in preparing master schedules for all projects including resource
schedules, executionmethodologies,milestones,cash flow projections and budgets
Profound experience in planning & executingfabrication functions,performing
tests & inspection for various processes and checking quality standards
Leveraged skills in performing inspection for the fabricated
pipelinesand fittings; verifying piping material identity (pipe, valves &
fittings) and its conformance to the installation drawings
Expertise in managing the Piping Fabrication & Site Installation with key focus
on top & bottom line profitability by ensuring optimal utilization of resources
Showcased excellence in preparing project estimate, finalizing contractors,
checking the bills with estimated quantities and purchasing the materials for
the site.
Track record of successful completion of projects by developing positive
rapport with architects, engineers, vendors & clients and controlling costs;
flair for adopting modern construction methodologies / techniques in
compliance with quality standards
A leader with excellent communication, negotiation and relationship
building skills
Soft Skills
Timeline
XIIfrom West
Bengal Council of
HigherSecondary
Education
Diploma in
Mechanical
Engineering from
West Bengal State
Council of Technical
Education
Larsen &
Toubro Ltd.,
Location as
Site
Execution
Engineer -
Mechanical
2008 2011 Since Jul’11
SANDIP KARMAKAR
Piping Engineer Fabrication | Erection & Commissioning
sandipkarmakar85@gmail.com | sandip.karmakar@lntpower.com
+91 8670219586 | + 8801787664861 |+91 7720033694
Industry Preference: Manufacturing | Construction
Location Preference: India
Change Agent
Motivational
Leader
Thinker
Collaborator
Communicator
Planner
oto
3. WorkExperience
Since Jul’11 Larsen & Toubro Ltd, as Site Execution Engineer - Mechanical
Growth Path / Deputations:
Jul’11 – aug’14 Diploma Engineer Trainee & Mechanical Engineer, L&T TPPC Ltd at 3x660 MW Talwandi
Sabo Power Limited, Clint - SEPCO-1 (Owner-Vedanta), Bhatinda, Punjab, India
Aug’14 - Feb’15 Mechanical Engineer, 3x660 MW Koradi TPS Thermal Power Plant, (Owner - Mahagenco),
Nagpur, Maharashtra, India, India
Feb’15 - Sep’15 Piping production Engineer, Hazira Piping Center, L&T Power’s workshop,Surat, Gujrat
Sep’15-Oct’15 Site Execution Engineer – Mechanical - 225 MW Sikalbaha gas Power Plant(dual fuel)
EPC contractor-L&T Power Ltd (Clint-BPDB) Chittagong, Bangladesh
Oct’16 - present Site Execution Engineer – Mechanical - 360 MW Bheramara CCPP Power Plant(dual fuel)
EPC contractor-L&T Power Ltd (Clint-Marubeni Corporation, TEPSCO, Owner-NWPGCL) ,
Bangladesh
Key Result Areas:
Administering activities like monitoring, weekly and monthly target preparation, calculation of ready work front
availability, allotting work material, reporting to clients about daily progress
Mobilizing and demobilizing the required resources in line with the client’s safety & statutory requirements
Working in coordination with contractor, vendors and client representation
Preparing punch lists and following-up of the same, mechanical clearance of piping and inspection
Coordinating the generation of procurement, fabrication and installation documentation (scopes of work, procedures,
drawings, sketches)
Managing functions like contract management and contract administration including variation claims/change orders
Identifying & providing resolutions for the technical queries and issues raised during the performance of offshore
construction and inspection activities .
Monitoring the procurement & fabrication of the piping materials for ensuring the schedule, cost & quality standards are
being met sufficiently with the shut-down activities and normal construction execution.
Responsible for working with construction supervisors during fabrication, erection, and testing, pre-commissioning &
commissioning activities, providing field engineering expertise on any installation problems
Managing the preparation of fabrication and offshore construction "as-built" documentation packages.
Education
Diploma in Mechanical Engineering from Sree Ramkrishna Shilpa Vidyapith, Suri, Birbhum, West Bengal State
Council of Technical Education with 81% in 2011
XII from Dhaniakhali Mahamaya Vidyamandir, Hooghly, West Bengal Council of Higher Secondary Education with
81% in 2008
X from Boso Priyanath high school, Hooghly Bengal Board of Secondary Education with 85% in 2006
IT Skills
Microsoft Office (Word, Excel & PowerPoint),
SAP
Navisworks freedom review.
AutoCAD (Package -2008 to 2015)
Internet Applications
Personal Details
Date of Birth:18th October 1990
Languages Known: Bengali, Hindi & English
Address:Sandip Karmakar, Vill.+P.O-Boso, P.S-Dhaniakhali, Dist. Hooghly -712302, West Bengal, India
LinkedIn:https://bd.linkedin.com/in/sandip-karmakar-374032128
Skype: sandipkarmakar85@gmail.com
4. ANNEXURE: PROJECTS
Project Title: L&T Power Ltd. (EPC Contractor) at Bheramara CCPP Project (360 MW) Combined Cycle Gas Plant, NWPGCL,
Bangladesh
Period: Oct’2016 to till date
Responsibilities:
Responsible for total fuel oil piping & fire protection piping of HSD tanks.
Working with BOP rack piping including DM water transfer, Instrument air etc process piping & utility piping.
Project Title: L&T Power Ltd. (EPC Contractor) at Shikalbaha Project (225 MW) Combined Cycle Gas Plant, BPDB, Bangladesh
Period: Nov’2015 to oct’2016
Responsibilities:
Worked as site piping in charge of total under-ground fire protection system , CW & ACW system.
Also responsible for fuel oil piping & inter connecting piping of Gas module 1 to GBC & GBC to GCS 3.
Highlights:
Successfully accomplished:
Fire Protection under-ground piping & above ground piping of main plant with successfully flushing, hydro test.
Completed fuel oil piping with successfully hydro test.
Project Title: L&T Power Ltd. (CCU) at 3x660 MW Koradi TPS Thermal Power Plant,(Owner-MAHAGENCO) Nagpur,
Maharashtra, India
Period: Jun’15 – Nov’15
Responsibilities:
Steered efforts in fabrication & erection of Boiler LP Pipe including shoot blower piping of unit 8.
Project Title: Hazira Piping Center (workshop), (Owner-L&T Power) Surat, Gujarat, India
Period: Jan’2015 - Jun’2015
Responsibilities:
Acted as Shop Piping Production Engineer.
Managed reliance J3 refinary & RRVUNL Power plant HP pipe fabrication work.
Assisted in pipe fit up checking & welding inspection as per drawing.
Project Title: 3x660 MW Talwandi Sabo Power Limited, Clint – SEPCO - 1 (owner-Vedanta), Bhatinda, Punjab, India
Period: Jul’2011 - Jan’2015
Responsibilities:
Worked as Diploma Engineer trainee in pressure parts fabrication & erection of upper straight wall, bottom spiral
water wall for first 6 months.
Then shifted to Boiler piping work including Main steam, HRH,CRH, BFP heavy wall P91 & CS piping .there I learned
HP piping work with my team member.
After completion my 18 months training then I took responsibility of BFP,CRH –heavy wall & boiler missleneous LP
piping work.
After completion of HP piping I was responsible for TG steam extraction LP piping & CPU unit Piping (SS-big bore).
Highlights:
Steered efforts in accomplishing:
o Successfully completed Main stream, HRH, CRH, BFP heavy wall piping including successfully Hydro test.
o Completed TG Steam extraction lines with 100% RT & handed over to Client.
o Successfully Completed the CPU system from installation to hydro test.
o Associated with the Boiler & TG LP piping Chemical Cleaning process including making temporary loops.