Enterprising leader & planner with a strong record of contributions in streamlining operations, energizing
businesses, heightening productivity, systems & procedures
|Site & Construction Management | Erection & Commissioning | Project Management|
PROFILE SUMMARY
A dynamic professional with over 7 years of experience in:
Project Management Site & Construction Management Documentation
Quality Management Erection & Commissioning Fabrication
Operations
Team Management
• Skillfully worked for four Green Field Projects which include all work from planning, fabrication, erection and commissioning
• Expertise in planning and executing construction projects with a flair for adopting modern construction methodologies;
complying with quality standards.
• Had been a proud team member of world’s largest petrochemical complex of Reliance Industries Limited located at
Jamnagar India.
• Anchoring erection & commissioning of equipment’s like Valves, Pumps, Vertical roller mills, Belt Conveyors, Apron Feeder,
Dampers, Slide Gates, Diverting Gates, Bucket Elevator’s and Process Fan’s (FD) and ensuring completion of project in
minimum turnaround time effective resource utilization to maximize the output
• Proficient in handling fabrication & erection of piping, steel structures and tankage.
• Handling overall activities of projects like civil, piping, structure, insulation in brown field project with risk factor of zone 1.
• An enterprising leader with proven dexterity in leading and directing personnel towards accomplishment of a common goal
CORE COMPETENCIES
• Spearheading activities involving working out various requirements & monitoring overall project operations for ensuring
timely completion
• Coordinating & executing projects for the set up standards with accountability for strategic utilization & deployment of
available resources to achieve organizational objectives
• Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective
resource utilization to maximize the output
• Studying drawings, plans or patterns of structures to be made or repaired as per requirements
• Liaising with the customer and coordinating the QC / QA services for preparation of project
• Creating & sustaining a dynamic environment that fosters development opportunities and motivates high performance
amongst team members
ORGANIZATIONAL EXPERIENCE
Overseas Experience:
Since July’15 Audex Fujairah as Engineer (Subsidiary of Plant Engineering Construction, Singapore)
Client Brooje Petroleum Gas Investment Company Fujairah, UAE.
Scope Turnkey project on expansion and rerouting of pipe crude lines in existing tank terminal.
Project Role Planning and execution of piping work at PORT OF FUJAIRAH (brown field).
July’15 to April’16 Audex Fujairah as Engineer (Subsidiary of Plant Engineering Construction, Singapore)
Client Vitol Tank Terminal Ltd. Fujairah, UAE.
Scope Turnkey project on expansion and rerouting of pipe crude lines in existing tank terminal.
Project Role Planning and execution of piping work at PORT OF FUJAIRAH (brown field).
Home country Experience:
Jun’13 to July ‘15 Reliance Industries Limited as Manager
Scope Construction of World’s largest petrochemical complex at Jamanagar, Gujarat, India
Project Role Project coordination of Petrochemical Complex in Jamnagar (J3).
Mar’13 to Jun’13 NEESA Venture’s Holdings Ltd. as Asst. Manager
Client Oil and Natural Gas Corporation, Dahej, Gujarat, India
Scope Construction of Crude Oil storage tanks.
Project Role Business development across all the parameters of the organization.
Mar’11 to Feb’13 ABG Cement Ltd. as Engineer Mechanical
Scope Erection & commissioning of a clinkerisation plant of 10,000 TPD in single unit
Project Role Erection and commissioning of rotating equipment’s and structural steel.
Jul’09 to Feb’11 Prashanth Projects Ltd. as Execution Engineer.
Client Hindustan Petroleum Corporation Limited Terminal Ennore, Tamilnadu, India
Scope Erection and commissioning of 34 No. double deck floating roof and cone roof tanks with pipeline
with
Dock lines.
Project Role Erection and commissioning of dock line piping of High speed diesel, Moto spirit and aviation turbine
fuel.
Key Result Areas:
• Coordinating with Clients, Engineering & other Cross Functional Teams for various projects as well as other techno-
commercial matters Scheduling and forecasting in assigned area
• Implementing relevant measures to ensure smooth functioning of all departments of Project team as well as monitoring
project activities & performance
• Reviewing progress on weekly, monthly and quarterly basis with top management
• Involved in material management from vendor’s and making sure the materials are received and distributed to the
contractors at proper time in a channelized manner
• Leading a team for ensuring timely completion of projects; preparing periodical review of the progress
• Creating awareness among team members on various on-going projects and providing support to them
• Preparing master schedules for all projects including resource schedules, execution methodologies, milestones, cash flow
projections and budgets
• Generating and monitoring resource requirements based on budgetary parameters, making changes in the same as per
revised schedules and budgets, tracking and controlling cost accruals with respect to budgets.
• Interacting with vendors for achieving cost effective purchase of equipment, accessories, material with timely delivery so as
to minimize project cost
• Managing a team and guiding site staff members to address and resolve performance bottlenecks
• Effecting preventive maintenance schedules of various kind of equipment to increase the equipment uptime, reliability &
accomplishing project targets
• Planning and effectuating preventive, condition based maintenance schedules of various machineries and equipment to
increase machine up time and equipment reliability
• Identifying areas of obstruction & breakdowns and taking steps to rectify the equipment through application of troubleshooting
tools
Highlights:
• Executed cryogenic tank and sphere used for storage of nitrogen at -50 degree Celsius and spheres for storage of LPG.
• Executed VRM69.6 through measures such as Manpower management and squeezing major activities like roller erection &
booster fan commissioning which resulted in benefits to the company within given time period
• Pivotal in streamlining processes through measures such as implementation of Just in time in Neesa Venture Holdings to all
business areas
TRAINING ATTENDED
• Underwent 3 weeks training in various techniques involved in production and extraction of crude which includes IN-SITU
combustion, operations of SRP, etc. at ONGC, Mehsana Asset.
EDUCATION
2013 MBA in Project Management from Sikkim Manipal University
2009 BE in Mechanical from K.V.G College of Engineering, Visvesvaraya Technological University, Belgaum.
PROJECTS HANDLED
• Designing and assembling of Go Kart at College Final Year Project
• State Level Paper Presentation on Scram Jet held in KVG Sullia State level
IT SKILLS
• Proficiency in SAP
• Primavera P6
• MS Office
PERSONAL DETAILS
Date of Birth: 13th
August 1986
Languages Known: English, Hindi, Gujarati and Malayalam
Present Address: 204 Reem Building, Qidfa Fujairah UAE.
Permanent Address: B102, Swagat City, Adalaj, Gandhinagar, Gujarat, India
Passport No: J4532610
Date of Issue: 01/11/2010
Date of Expiry: 31/10/2020
Emirates ID: 784-1986-9874213-1
Expiry Date: 09/08/2018
Driving License No India: GJ02/024738/04
Date of Issue: 24/08/2004 Gujarat
Date of Expiry: 23/09/2024
Language Proficiency: English, Hindi, Gujarati & Malayalam

Anuraj panicker

  • 1.
    Inse rt a phot o ANURAJ M.PANICKER Contact: +971 501626918 E-Mail: anurajpanicker@gmail.com Enterprising leader & planner with a strong record of contributions in streamlining operations, energizing businesses, heightening productivity, systems & procedures |Site & Construction Management | Erection & Commissioning | Project Management| PROFILE SUMMARY A dynamic professional with over 7 years of experience in: Project Management Site & Construction Management Documentation Quality Management Erection & Commissioning Fabrication Operations Team Management • Skillfully worked for four Green Field Projects which include all work from planning, fabrication, erection and commissioning • Expertise in planning and executing construction projects with a flair for adopting modern construction methodologies; complying with quality standards. • Had been a proud team member of world’s largest petrochemical complex of Reliance Industries Limited located at Jamnagar India. • Anchoring erection & commissioning of equipment’s like Valves, Pumps, Vertical roller mills, Belt Conveyors, Apron Feeder, Dampers, Slide Gates, Diverting Gates, Bucket Elevator’s and Process Fan’s (FD) and ensuring completion of project in minimum turnaround time effective resource utilization to maximize the output • Proficient in handling fabrication & erection of piping, steel structures and tankage. • Handling overall activities of projects like civil, piping, structure, insulation in brown field project with risk factor of zone 1. • An enterprising leader with proven dexterity in leading and directing personnel towards accomplishment of a common goal CORE COMPETENCIES • Spearheading activities involving working out various requirements & monitoring overall project operations for ensuring timely completion • Coordinating & executing projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives • Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output • Studying drawings, plans or patterns of structures to be made or repaired as per requirements • Liaising with the customer and coordinating the QC / QA services for preparation of project • Creating & sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members ORGANIZATIONAL EXPERIENCE Overseas Experience: Since July’15 Audex Fujairah as Engineer (Subsidiary of Plant Engineering Construction, Singapore) Client Brooje Petroleum Gas Investment Company Fujairah, UAE. Scope Turnkey project on expansion and rerouting of pipe crude lines in existing tank terminal. Project Role Planning and execution of piping work at PORT OF FUJAIRAH (brown field). July’15 to April’16 Audex Fujairah as Engineer (Subsidiary of Plant Engineering Construction, Singapore) Client Vitol Tank Terminal Ltd. Fujairah, UAE. Scope Turnkey project on expansion and rerouting of pipe crude lines in existing tank terminal. Project Role Planning and execution of piping work at PORT OF FUJAIRAH (brown field). Home country Experience:
  • 2.
    Jun’13 to July‘15 Reliance Industries Limited as Manager Scope Construction of World’s largest petrochemical complex at Jamanagar, Gujarat, India Project Role Project coordination of Petrochemical Complex in Jamnagar (J3). Mar’13 to Jun’13 NEESA Venture’s Holdings Ltd. as Asst. Manager Client Oil and Natural Gas Corporation, Dahej, Gujarat, India Scope Construction of Crude Oil storage tanks. Project Role Business development across all the parameters of the organization. Mar’11 to Feb’13 ABG Cement Ltd. as Engineer Mechanical Scope Erection & commissioning of a clinkerisation plant of 10,000 TPD in single unit Project Role Erection and commissioning of rotating equipment’s and structural steel. Jul’09 to Feb’11 Prashanth Projects Ltd. as Execution Engineer. Client Hindustan Petroleum Corporation Limited Terminal Ennore, Tamilnadu, India Scope Erection and commissioning of 34 No. double deck floating roof and cone roof tanks with pipeline with Dock lines. Project Role Erection and commissioning of dock line piping of High speed diesel, Moto spirit and aviation turbine fuel. Key Result Areas: • Coordinating with Clients, Engineering & other Cross Functional Teams for various projects as well as other techno- commercial matters Scheduling and forecasting in assigned area • Implementing relevant measures to ensure smooth functioning of all departments of Project team as well as monitoring project activities & performance • Reviewing progress on weekly, monthly and quarterly basis with top management • Involved in material management from vendor’s and making sure the materials are received and distributed to the contractors at proper time in a channelized manner • Leading a team for ensuring timely completion of projects; preparing periodical review of the progress • Creating awareness among team members on various on-going projects and providing support to them • Preparing master schedules for all projects including resource schedules, execution methodologies, milestones, cash flow projections and budgets • Generating and monitoring resource requirements based on budgetary parameters, making changes in the same as per revised schedules and budgets, tracking and controlling cost accruals with respect to budgets. • Interacting with vendors for achieving cost effective purchase of equipment, accessories, material with timely delivery so as to minimize project cost • Managing a team and guiding site staff members to address and resolve performance bottlenecks • Effecting preventive maintenance schedules of various kind of equipment to increase the equipment uptime, reliability & accomplishing project targets • Planning and effectuating preventive, condition based maintenance schedules of various machineries and equipment to increase machine up time and equipment reliability • Identifying areas of obstruction & breakdowns and taking steps to rectify the equipment through application of troubleshooting tools Highlights: • Executed cryogenic tank and sphere used for storage of nitrogen at -50 degree Celsius and spheres for storage of LPG. • Executed VRM69.6 through measures such as Manpower management and squeezing major activities like roller erection & booster fan commissioning which resulted in benefits to the company within given time period • Pivotal in streamlining processes through measures such as implementation of Just in time in Neesa Venture Holdings to all business areas TRAINING ATTENDED • Underwent 3 weeks training in various techniques involved in production and extraction of crude which includes IN-SITU combustion, operations of SRP, etc. at ONGC, Mehsana Asset.
  • 3.
    EDUCATION 2013 MBA inProject Management from Sikkim Manipal University 2009 BE in Mechanical from K.V.G College of Engineering, Visvesvaraya Technological University, Belgaum. PROJECTS HANDLED • Designing and assembling of Go Kart at College Final Year Project • State Level Paper Presentation on Scram Jet held in KVG Sullia State level IT SKILLS • Proficiency in SAP • Primavera P6 • MS Office PERSONAL DETAILS Date of Birth: 13th August 1986 Languages Known: English, Hindi, Gujarati and Malayalam Present Address: 204 Reem Building, Qidfa Fujairah UAE. Permanent Address: B102, Swagat City, Adalaj, Gandhinagar, Gujarat, India Passport No: J4532610 Date of Issue: 01/11/2010 Date of Expiry: 31/10/2020 Emirates ID: 784-1986-9874213-1 Expiry Date: 09/08/2018 Driving License No India: GJ02/024738/04 Date of Issue: 24/08/2004 Gujarat Date of Expiry: 23/09/2024 Language Proficiency: English, Hindi, Gujarati & Malayalam