SlideShare a Scribd company logo
NADEEM KUMAR
MOBILE # +966(0)-564954855
EMAIL: nadeem_muhanta@yahoo.com
ADDRESS: Tuaqbah, Al-Khobar, Saudi Arabia.
Objective:
My sufficient experience is fully enriched with construction projects of plant process Piping,
equipment erection, Steel Structure & supervision of field inspection of materials in
accordance with project specifications and governing Standards and Codes. In addition I
have accomplished numerous piping & pipeline projects and shutdowns/turnarounds.
Academic Qualification:
Bachelor of Engineering (BE) MUET Jamshoro (2011) 1stDivision
Project/Construction Experience:
CLIENT: Saudi Aramco
COMPANY: Wipro Arabia Limited
DESIGNATION: Field Engineer-Piping
PERIOD: - Feb 2019 to till date
CLIENT: Saudi Electricity Company
COMPANY: Worley Parsons (Consultant)
DESIGNATION: PIPING ENGINEER
PERIOD: - Oct 2017 to Oct 2018
Roles and Responsibilities:
➢ Managing construction activities carried out by contractors, ensuring the scope of
work is achieved in accordance with contract requirement and time frame, and
compliance with specifications and standard established.
➢ To provide technical assistance, direction, and support to the construction and
installation activities for all Mechanical and Piping works.
➢ Ensuring that contractor’s duties are performed by competent and experienced
personnel and in sufficient number to achieve objectives.
➢ Raise the Issues at Daily coordination meeting/ Weekly Progress Meeting with
Contractor and Sub contractor occurred during execution and suggest the
solutions.
➢ Issue the work permits ensuring HSE requirements.
➢ Ensuring that construction activities are performed in the highest HSE standards,
cooperating closely with the company and contractors HSE staff, managing,
monitoring, reporting and acting to constantly maintain the highest HSE standards
and promoting internally the HSE culture.
➢ Reviewing and commenting on documentation produced by contractors (technical
reports, specifications, procedures, method of statement, TQ, Site instruction etc.
ensuring implementation of established procedures and good engineering practice.
➢ Ensuring that the all the documentation relevant to construction, pre-
commissioning and commissioning phases is produced by contractor in
compliance with the international standards and requirement, liaise at this purpose
with internal and external QA/QC, PRC, Supervisor, etc.
CLIENT: United Energy Pakistan LTD.
COMPANY: STEELMAN Engineering & Const. Company
DESIGNATION: PIPING ENGINEER
PERIOD: - June 2016 to Sep 2017
CLIENT: UNITED ENERGY PAKISTAN LTD.
COMPANY: PETROCON (Pvt) LTD.
DESIGNATION: Site Engineer Piping
PERIOD: - Oct 2014 to Feb 2016
CLIENT: OCCIDENTAL PETROLEUM CORPORATION
COMPANY: - The Oman Construction Company L.L.C
DESIGNATION: Sr. Supervisor Piping
PERIOD: - May 2014 to Sept. 2014
CLIENT: UNITED ENERGY PAKISTAN LTD.
COMPANY: STEELMAN Engineering and Const. Company
DESIGNATION: Execution Engineer
PERIOD: - Jan 2012 to Dec 2013
Roles and Responsibilities:
➢ Monitor and maintenance of all piping work.
➢ Execution & monitoring / supervision for different projects of maintenance, construction and
production related to ensure for timely completion within completion date also to ensure
quality standards in accordance with ASME, API & ANSI Codes.
➢ Handling the job of fabrication & erection of piping & supports.
➢ Calculation of BOQ from Drawings / Isometric.
➢ Monitoring the manpower.
➢ Close co-ordination with material management group.
➢ Ensure that effective control of maintenance man-hours, making efficient use of the manpower
resources under his control by the establishment of work priorities on a daily and long-term
basis.
➢ Preparation of mobilization and demobilization plan for manpower &equipments.
➢ Preparation and review of TRA (Task Risk Assessments) Checklist of equipments,
implements of HSE policy of client and internationals standards.
➢ Identify and arrange the resources required to execute the job.
➢ Solve the problems related to piping & supports arising during erection.
➢ Handling the job of verification of test pack, loop verification & punch list assurance of test
pack.
➢ Checking of all pipes and fittings as per material specification.
➢ Supervision of various activities from mobilization to ROW,
➢ Laying of cross country pipe lines, Stringing, Production Welding, Lowering, HS Sleeve
installation, Holiday, Hydrostatic Testing, Pigging, Commissioning Punch list killing.
➢ Coordinate with site Field Engineering team to resolve day to day site construction issues.
Shutdown/Turnaround Experience:
CLIENT: AD-GAS (DAS ISLAND)
COMPANY: Qatar Engineering and Construction Company
DESIGNATION: AREA ENGINEER PIPING
PERIOD: - Feb 2016 to May 2016
CLIENT: DOLPHIN ENERGY & QAPCO
COMPANY: DESCON Engineering Qatar L.L.C
DESIGNATION: Assistant Engineer Piping.
PERIOD: - Jan 2014 to March 2014
CLIENT: NAIMAT BASAL LPG PLANT (UEPL)
COMPANY: STEELMAN Engineering and Const. Company
DESIGNATION: Piping Engineer
PERIOD: - Jan 2013 to April 2013
Roles and Responsibilities:
➢ Scope study and Identify scope of work with respect to the given drawing and work book.
➢ Verification of reserved material and issue to site.
➢ Coordinate with scaffolding supervisor for necessary scaffolding.
➢ Evaluate manpower & equipment planning given by Planning Engineers.
➢ Maintenance jobs for Package Equipment’s.
➢ Attending meetings and coordination with Client and Subcontractors with respect to Project
requirements.
➢ JSA and Method Statements approval.
➢ Resource management.
➢ Set daily targets and ensure timely completion
➢ Aware of all the permits required for safe execution of the job.
• Cold Work Permit (CW) based on the work scope.
• Hot Work Permit (HW) based on the work scope.
• Confined Space Work Permit (CS) based on the work scope.
➢ Aware of the QA/QC requirements for each of the equipment
➢ Ensure a list of spares required for all his equipment to be inspected.
➢ Ensure that all gaskets and COMPANY’S materials are stored properly at site after withdrawal
from the material store container.
➢ Monitor the installation of pipes to ensure the work agrees with the turnaround SOW.
➢ Inspect work progress to identify challenges, mitigate risks and guarantee the safety of piping
staff.
➢ Perform engineering coordination duties as advised under supervision of Shut down Manager/
Project Manager.
➢ Co-ordinate with team and Sub contractor staff to achieve the targets before gas-in date and
schedule set by the planning.
➢ Supervision of all piping works and ensures safety and quality standards.
➢ Joint Walk Down with Operation Team, Commissioning Team, Sub-Contractor, Third Party
Inspection for the MCC of Units/ Systems.
➢ Make sure that all required work permits are obtained in time and that the team
understands and follows the conditions of the permit, in order to avoid any subsequent
problems and conflicts.
➢ Ensure that all activities for whole Project just like scaffolding, Piping Fabrication and
erection, NDT, Hydro testing, demolishing works, equipment installation etc. have been
taken care of in advance, in order to execute the work according to the plan.
Area of Expertise:
• Project/ Maintenance Planning & Construction management.
• Project Execution / Monitoring /Project Engineering / Co-ordination.
• Fabrication & Erection of Piping, Pipe Supports, Pipelines.
CERTIFICATION:
• Primavera (P6).
• IOSH by Maxtrain International.
HSE Training:
• PTW Authority PP13 by Saudi Electricity Company,KSA.
• PTW by ADGAS,Das-Island,UAE.
• Hazard Identification, ADGAS,DasIsland,UAE
• BA and CSE by APTECH, Qatar
• Hazard Identification Task Risk Assessment (HITRA) Team Leader @ UEPL.
• SAFETY WATCH/FIRE WATCH by Maxtrain International @ UEPL.
• Permit To Work (PTW) @ UEPL.
Courses Attended:
➢ Short course on “Production Logging”
➢ Short course on “Fundamental of Vertical Drilling, Well control & monitoring”
➢ Short course on “Basics of Directional Drilling & Planning”
➢ Short course on “Under Balance Drilling”
➢ Short course on “Well Testing, Completion And Well Fluid Processing”
➢ Short course on “Optimizing The Production Rate by Using Perforation Techniques”
Professional Key Skills:
• Strong team building skills.
• Strong communication skills.
• Ability to work as a team.
Professional Registrations:
• Saudi Council of Engineers ( Registration# 423990)
• Pakistan Engineering Council (Registration# PETGAS/1447)
Computer Skills:
• Microsoft office (Word, Excel, Power Point)
• Internet etc.
Personal Information:
• Father’s Name : Jagdeesh
• NIC No : 41104-0854781-5
• Nationality : Pakistani
• Religion : Hinduism
• D.O.B : 9th
June 1990
• Passport : CU4227812 ( EXP:08-July-2028)
• Domicile : Badin(Rural)
Reference:
• Will be furnished upon request.

More Related Content

What's hot

CV
CVCV
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
ahmad dodo
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
andi dipayadnya
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
BINOY TC
 
CV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& WeldingCV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& Welding
AboEzz77
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
Delfim Moreira
 
C.V
C.VC.V
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
OKECHUKWU OKWORDU
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
Joseph Bracic
 
Sandip new c v 12
Sandip new c v 12Sandip new c v 12
Sandip new c v 12
Sandip Patil
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
ramon carcido
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
Cameron Punton
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi
 
Kal resume
Kal resumeKal resume
CV TemplateREV [1]
CV TemplateREV [1]CV TemplateREV [1]
CV TemplateREV [1]
Brian Roberts
 
Waseem CV
Waseem CVWaseem CV
Waseem CV
MUHAMMAD WASEEM
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
omijie ehinomen prince
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
Raghavendra Velayutharaja
 

What's hot (20)

CV
CVCV
CV
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
 
CV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& WeldingCV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& Welding
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
C.V
C.VC.V
C.V
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Sandip new c v 12
Sandip new c v 12Sandip new c v 12
Sandip new c v 12
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
Kal resume
Kal resumeKal resume
Kal resume
 
CV TemplateREV [1]
CV TemplateREV [1]CV TemplateREV [1]
CV TemplateREV [1]
 
Waseem CV
Waseem CVWaseem CV
Waseem CV
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 

Similar to Nadeem kumar cv

CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
Broosto George
 
Resume UAE
Resume UAEResume UAE
Resume UAE
santosh pawar
 
YOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUMEYOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUME
Yogesh Padiya
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
mohammad hasnat
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
Abu Dhabi Oil Company (JAPAN)
 
PIPING SUPERVISOR
PIPING SUPERVISORPIPING SUPERVISOR
PIPING SUPERVISOR
MdShahidIqubal4
 
navjay
navjaynavjay
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
Saha Devan
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
Shabin Shajahan
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
Fikruddien YusoF
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
TREVOR KEMP
 
CV Updated
CV UpdatedCV Updated
CV Updated
akhlaq ahmad
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
Arunkumar M A
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
Rajeshwaran Somasundaram
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
RESUME=
RESUME=RESUME=
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
leonkidlat
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
Sajjad Ali
 

Similar to Nadeem kumar cv (20)

CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
YOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUMEYOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUME
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
PIPING SUPERVISOR
PIPING SUPERVISORPIPING SUPERVISOR
PIPING SUPERVISOR
 
navjay
navjaynavjay
navjay
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
RESUME=
RESUME=RESUME=
RESUME=
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 

Recently uploaded

Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 

Recently uploaded (20)

Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 

Nadeem kumar cv

  • 1. NADEEM KUMAR MOBILE # +966(0)-564954855 EMAIL: nadeem_muhanta@yahoo.com ADDRESS: Tuaqbah, Al-Khobar, Saudi Arabia. Objective: My sufficient experience is fully enriched with construction projects of plant process Piping, equipment erection, Steel Structure & supervision of field inspection of materials in accordance with project specifications and governing Standards and Codes. In addition I have accomplished numerous piping & pipeline projects and shutdowns/turnarounds. Academic Qualification: Bachelor of Engineering (BE) MUET Jamshoro (2011) 1stDivision Project/Construction Experience: CLIENT: Saudi Aramco COMPANY: Wipro Arabia Limited DESIGNATION: Field Engineer-Piping PERIOD: - Feb 2019 to till date CLIENT: Saudi Electricity Company COMPANY: Worley Parsons (Consultant) DESIGNATION: PIPING ENGINEER PERIOD: - Oct 2017 to Oct 2018 Roles and Responsibilities: ➢ Managing construction activities carried out by contractors, ensuring the scope of work is achieved in accordance with contract requirement and time frame, and compliance with specifications and standard established. ➢ To provide technical assistance, direction, and support to the construction and installation activities for all Mechanical and Piping works. ➢ Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient number to achieve objectives. ➢ Raise the Issues at Daily coordination meeting/ Weekly Progress Meeting with Contractor and Sub contractor occurred during execution and suggest the solutions. ➢ Issue the work permits ensuring HSE requirements. ➢ Ensuring that construction activities are performed in the highest HSE standards, cooperating closely with the company and contractors HSE staff, managing, monitoring, reporting and acting to constantly maintain the highest HSE standards and promoting internally the HSE culture. ➢ Reviewing and commenting on documentation produced by contractors (technical reports, specifications, procedures, method of statement, TQ, Site instruction etc. ensuring implementation of established procedures and good engineering practice. ➢ Ensuring that the all the documentation relevant to construction, pre- commissioning and commissioning phases is produced by contractor in compliance with the international standards and requirement, liaise at this purpose with internal and external QA/QC, PRC, Supervisor, etc.
  • 2. CLIENT: United Energy Pakistan LTD. COMPANY: STEELMAN Engineering & Const. Company DESIGNATION: PIPING ENGINEER PERIOD: - June 2016 to Sep 2017 CLIENT: UNITED ENERGY PAKISTAN LTD. COMPANY: PETROCON (Pvt) LTD. DESIGNATION: Site Engineer Piping PERIOD: - Oct 2014 to Feb 2016 CLIENT: OCCIDENTAL PETROLEUM CORPORATION COMPANY: - The Oman Construction Company L.L.C DESIGNATION: Sr. Supervisor Piping PERIOD: - May 2014 to Sept. 2014 CLIENT: UNITED ENERGY PAKISTAN LTD. COMPANY: STEELMAN Engineering and Const. Company DESIGNATION: Execution Engineer PERIOD: - Jan 2012 to Dec 2013 Roles and Responsibilities: ➢ Monitor and maintenance of all piping work. ➢ Execution & monitoring / supervision for different projects of maintenance, construction and production related to ensure for timely completion within completion date also to ensure quality standards in accordance with ASME, API & ANSI Codes. ➢ Handling the job of fabrication & erection of piping & supports. ➢ Calculation of BOQ from Drawings / Isometric. ➢ Monitoring the manpower. ➢ Close co-ordination with material management group. ➢ Ensure that effective control of maintenance man-hours, making efficient use of the manpower resources under his control by the establishment of work priorities on a daily and long-term basis. ➢ Preparation of mobilization and demobilization plan for manpower &equipments. ➢ Preparation and review of TRA (Task Risk Assessments) Checklist of equipments, implements of HSE policy of client and internationals standards. ➢ Identify and arrange the resources required to execute the job. ➢ Solve the problems related to piping & supports arising during erection. ➢ Handling the job of verification of test pack, loop verification & punch list assurance of test pack. ➢ Checking of all pipes and fittings as per material specification. ➢ Supervision of various activities from mobilization to ROW, ➢ Laying of cross country pipe lines, Stringing, Production Welding, Lowering, HS Sleeve installation, Holiday, Hydrostatic Testing, Pigging, Commissioning Punch list killing. ➢ Coordinate with site Field Engineering team to resolve day to day site construction issues.
  • 3. Shutdown/Turnaround Experience: CLIENT: AD-GAS (DAS ISLAND) COMPANY: Qatar Engineering and Construction Company DESIGNATION: AREA ENGINEER PIPING PERIOD: - Feb 2016 to May 2016 CLIENT: DOLPHIN ENERGY & QAPCO COMPANY: DESCON Engineering Qatar L.L.C DESIGNATION: Assistant Engineer Piping. PERIOD: - Jan 2014 to March 2014 CLIENT: NAIMAT BASAL LPG PLANT (UEPL) COMPANY: STEELMAN Engineering and Const. Company DESIGNATION: Piping Engineer PERIOD: - Jan 2013 to April 2013 Roles and Responsibilities: ➢ Scope study and Identify scope of work with respect to the given drawing and work book. ➢ Verification of reserved material and issue to site. ➢ Coordinate with scaffolding supervisor for necessary scaffolding. ➢ Evaluate manpower & equipment planning given by Planning Engineers. ➢ Maintenance jobs for Package Equipment’s. ➢ Attending meetings and coordination with Client and Subcontractors with respect to Project requirements. ➢ JSA and Method Statements approval. ➢ Resource management. ➢ Set daily targets and ensure timely completion ➢ Aware of all the permits required for safe execution of the job. • Cold Work Permit (CW) based on the work scope. • Hot Work Permit (HW) based on the work scope. • Confined Space Work Permit (CS) based on the work scope. ➢ Aware of the QA/QC requirements for each of the equipment ➢ Ensure a list of spares required for all his equipment to be inspected. ➢ Ensure that all gaskets and COMPANY’S materials are stored properly at site after withdrawal from the material store container. ➢ Monitor the installation of pipes to ensure the work agrees with the turnaround SOW. ➢ Inspect work progress to identify challenges, mitigate risks and guarantee the safety of piping staff. ➢ Perform engineering coordination duties as advised under supervision of Shut down Manager/ Project Manager. ➢ Co-ordinate with team and Sub contractor staff to achieve the targets before gas-in date and schedule set by the planning. ➢ Supervision of all piping works and ensures safety and quality standards. ➢ Joint Walk Down with Operation Team, Commissioning Team, Sub-Contractor, Third Party Inspection for the MCC of Units/ Systems. ➢ Make sure that all required work permits are obtained in time and that the team understands and follows the conditions of the permit, in order to avoid any subsequent problems and conflicts. ➢ Ensure that all activities for whole Project just like scaffolding, Piping Fabrication and erection, NDT, Hydro testing, demolishing works, equipment installation etc. have been taken care of in advance, in order to execute the work according to the plan.
  • 4. Area of Expertise: • Project/ Maintenance Planning & Construction management. • Project Execution / Monitoring /Project Engineering / Co-ordination. • Fabrication & Erection of Piping, Pipe Supports, Pipelines. CERTIFICATION: • Primavera (P6). • IOSH by Maxtrain International. HSE Training: • PTW Authority PP13 by Saudi Electricity Company,KSA. • PTW by ADGAS,Das-Island,UAE. • Hazard Identification, ADGAS,DasIsland,UAE • BA and CSE by APTECH, Qatar • Hazard Identification Task Risk Assessment (HITRA) Team Leader @ UEPL. • SAFETY WATCH/FIRE WATCH by Maxtrain International @ UEPL. • Permit To Work (PTW) @ UEPL. Courses Attended: ➢ Short course on “Production Logging” ➢ Short course on “Fundamental of Vertical Drilling, Well control & monitoring” ➢ Short course on “Basics of Directional Drilling & Planning” ➢ Short course on “Under Balance Drilling” ➢ Short course on “Well Testing, Completion And Well Fluid Processing” ➢ Short course on “Optimizing The Production Rate by Using Perforation Techniques” Professional Key Skills: • Strong team building skills. • Strong communication skills. • Ability to work as a team. Professional Registrations: • Saudi Council of Engineers ( Registration# 423990) • Pakistan Engineering Council (Registration# PETGAS/1447) Computer Skills: • Microsoft office (Word, Excel, Power Point) • Internet etc. Personal Information: • Father’s Name : Jagdeesh • NIC No : 41104-0854781-5 • Nationality : Pakistani • Religion : Hinduism • D.O.B : 9th June 1990 • Passport : CU4227812 ( EXP:08-July-2028) • Domicile : Badin(Rural) Reference: • Will be furnished upon request.