CHANDAN KUMAR
Contact: +91-9996448851, 7004386935
Email: chandanmechkumar@yahoo.co.in
STRUCTURAL & PIPING ENGINEER
Seeking a position in an organization that provides me ample opportunity to explore & excel while carving out the
niche for personal, professional as well as organizational goals
PROFILE
 Sincere, competent and goal-oriented professional having over 8 years of experience across Piping
Operations, Fabrication & Erection and Installation, heavy Equipments, Rotary & Static Equipment,
Preparing BOM and Project Management; spearheading efforts as Planning Engineer with M/S.KKSEPL.
 Adept at detailed planning and scheduling to meet preset project targets and conceptualizing &
implementingprocessmodifications to enhance operational efficiency and optimize resource utilization and
achieve consistent increase in profitability.
 Proficient with P& ID diagrams and possess knowledge of materials like CS, SS, LTCS, Alloy Steel Pipes
and Fitting.
 Deft at designing & executing activities & ensuring compliance to quality standards and maintaining all
related documents.
 Focused, hardworking and self-motivated; with the capability to meet high-pressure deadlines and
coordinate multiple projects; effective team player with excellent communication and inter-personal skills.
Technical Skills
Operating System Windows 2000/XP
Software Primavera P6
Tools MS Office , MS Project and Internet Applications
PROFESSIONAL EXPERIENCE
M/S. KKSEPL since 15 July 2016
Planning Engineer.
 Spearheading efforts as Lead Engineer; responsible for execution of job allotted by the company.
 Deftly involved in preparing the bill of material with respect to ISO and GA drawings; coordinate with the
system of plant.
 Efficiently handle the problems of sub-contractors on site, meet with client in order to fulfill their requirements
as well as meets their targets.
 Look after fabrication & layout of Underground Piping Spools with respect to ISO and GA drawings.
 Deftly prepare loops files and manage loop clearance according to client needs; perform Hydro Testing etc.
 Accountable for erection of Piping Spools on Naphtha Furnaces, Equipment and Pipe Racks with respect to ISO
and GA drawings.
 Responsible for checking the quality of welding; effectively give targets to contractors so that the work is
completed on time.
 Meticulously check whether job is done according to specification or procedure accepted by client; look after
billing to client and carry out Structural Planning.
 Erection & Installation of Heat Exchanger & other Heavy Equipments.
M/S. Punj Lloyd Ltd -12 June 2015 to 04 July 2016
Sr. Site Engineer (Mechanical) Reliance Industries Limited. J3, Project OSBL Reliance SEZ Jamnagar (Gujarat).
 Instrumental in project planning & execution and structural engineering and ensured smooth operations for
contract execution without incidences of overruns
 Accountable for planning, designing and scheduling projects including judicious deployment of resources to
achieve project completion within agreed time/cost parameters.
 Efficiently maintained daily working report, weekly work progress reported as per required standards.
 Ensured adherence to Safety standards in all functional areas and implemented measures for enhancing safety
levels.
 Erection & Installation of Pumps Motor, Heat Exchanger (PHE), and other heavy equipments.
M/S. Prumatech Services Pvt. Ltd-19 Aug. 2013 to 08 June 2015
Project Engineer - Reliance Industries Ltd – Nagothane (MH)
 Read Isometric & G.A. drawings and executed the job accordingly to the specification of the Client.
 Knowledge to prepare the overall Plan and completion schedule of the job as per completion date.
 Know to prepare the monthly and micro planning of the job.
 Know to prepare man power and machinery deployment plan as per completion schedule.
 Knowledge to prepare Bill. For Piping Work.
 Knowledge to prepare Bill as per SOR.
M/s. Ram Kripal Singh Cons. Pvt. Ltd -17 Aug 2009 to 13 Aug 2013.
Planning & Billing Engineer- Indian Oil CorporationLtd's (IOCL), Panipat (HR) with consultant EIL
 Knowledge to prepare the overall Plan and completion schedule of the job as per completion date.
 Know to prepare the monthly and micro planning of the job.
 Know to prepare man power and machinery deployment plan as per completion schedule.
 Knowledge to prepare Bill. For Piping Work.
 Knowledge to prepare Bill as per SOR
 Studying the Tenders and estimating the cost for the same.
 Checking the Design Drawings of Pipes and Structure.
 Maintaining relations With the Clients.
 Procurement of technically important material specially pipes and fittings.
 Responsible for endorsements of Quality assurance plan (QAP) & PQR.
 Maintaining the Daily progress reports (DPRs)
 Prepare Bill as per SOR.
Projects Undertaken
 Offsite A/G Piping & U/G Fabrication & Erection at Indian Oil Corporation Ltd's (IOCL), Panipat (HR) with
consultant EIL.
 Structural Steel, Fabrication & Erection, Blasting Painting, Alignment at Indian Oil Corporation Ltd's (IOCL), Panipat
(HR) with consultant Tecnimont ICB
 Structural Erection at National Fertilizer Limited, Vijaipur, Guna (M.P.) with consultant PDIL.
 Structural Erection at MPPGCL site Khandwa (M.P.) with consultant L&T.
M/s. Durha Construction Pvt. Ltd -18 Aug 2008 to 13 Aug 2009
Site Engineer- Bharat Oman Refineries Limited, Bina (MP) with consultant Engineers India Limited.
 Fabrication, erection & hydro-testing of piping Making sure that all work is proceeding in accordance with contract
specification, project planning schedules and approved method statements, construction drawings, Clients HSE
standards.
 Knowledge of HSS Wrapping and Coating & using coating of Poly glass, R-95.
 Monitoring of all project activities on regular basis to ensure that time lines adhered, in compliance with standard
procedures and contract requirement.
 Plan and arrange adequate resources for project execution with customer and colleagues.
 Actively participating in knowledge sharing session.
 Reviewing and monitoring project schedule by using MSP tool
EDUCATIONAL CREDENTIALS
Passed B.Tech Mechanical Engg. From faculty of College of Engineering & Technology From. Allahabad Agricultural Institute
Deemed University, (UP) in 2008.
Passed Intermediate From R.K.J.L. College, Khurhan, Madhepura, Bihar in 2004.
Passed High School From Gandhi High School, Rajpur (Supaul), Bihar in 2002.
Personal Details:
Father’s Name Sh.Nageshwar Prasad Yadav
Date of Birth 15/06/1986
Sex Male
Language known English, Hindi,
Martial Status Single
Nationality Indian
Contact detail +91-9996448851
Permanent Address Vill.-Balawa (Sonbrasa)
Post: - Sonbrsa
Distt. Madhepura (Bihar)
Pin Code-852128
Declaration:
I hereby declare that all the statements made in this application are true and complete to the best of my
knowledge. I am free to work anywhere in India & Abroad.
Date:
Place: CHANDAN KUMAR

chandankumar

  • 1.
    CHANDAN KUMAR Contact: +91-9996448851,7004386935 Email: chandanmechkumar@yahoo.co.in STRUCTURAL & PIPING ENGINEER Seeking a position in an organization that provides me ample opportunity to explore & excel while carving out the niche for personal, professional as well as organizational goals PROFILE  Sincere, competent and goal-oriented professional having over 8 years of experience across Piping Operations, Fabrication & Erection and Installation, heavy Equipments, Rotary & Static Equipment, Preparing BOM and Project Management; spearheading efforts as Planning Engineer with M/S.KKSEPL.  Adept at detailed planning and scheduling to meet preset project targets and conceptualizing & implementingprocessmodifications to enhance operational efficiency and optimize resource utilization and achieve consistent increase in profitability.  Proficient with P& ID diagrams and possess knowledge of materials like CS, SS, LTCS, Alloy Steel Pipes and Fitting.  Deft at designing & executing activities & ensuring compliance to quality standards and maintaining all related documents.  Focused, hardworking and self-motivated; with the capability to meet high-pressure deadlines and coordinate multiple projects; effective team player with excellent communication and inter-personal skills. Technical Skills Operating System Windows 2000/XP Software Primavera P6 Tools MS Office , MS Project and Internet Applications PROFESSIONAL EXPERIENCE M/S. KKSEPL since 15 July 2016 Planning Engineer.  Spearheading efforts as Lead Engineer; responsible for execution of job allotted by the company.  Deftly involved in preparing the bill of material with respect to ISO and GA drawings; coordinate with the system of plant.  Efficiently handle the problems of sub-contractors on site, meet with client in order to fulfill their requirements as well as meets their targets.  Look after fabrication & layout of Underground Piping Spools with respect to ISO and GA drawings.  Deftly prepare loops files and manage loop clearance according to client needs; perform Hydro Testing etc.  Accountable for erection of Piping Spools on Naphtha Furnaces, Equipment and Pipe Racks with respect to ISO and GA drawings.  Responsible for checking the quality of welding; effectively give targets to contractors so that the work is completed on time.  Meticulously check whether job is done according to specification or procedure accepted by client; look after billing to client and carry out Structural Planning.  Erection & Installation of Heat Exchanger & other Heavy Equipments.
  • 2.
    M/S. Punj LloydLtd -12 June 2015 to 04 July 2016 Sr. Site Engineer (Mechanical) Reliance Industries Limited. J3, Project OSBL Reliance SEZ Jamnagar (Gujarat).  Instrumental in project planning & execution and structural engineering and ensured smooth operations for contract execution without incidences of overruns  Accountable for planning, designing and scheduling projects including judicious deployment of resources to achieve project completion within agreed time/cost parameters.  Efficiently maintained daily working report, weekly work progress reported as per required standards.  Ensured adherence to Safety standards in all functional areas and implemented measures for enhancing safety levels.  Erection & Installation of Pumps Motor, Heat Exchanger (PHE), and other heavy equipments. M/S. Prumatech Services Pvt. Ltd-19 Aug. 2013 to 08 June 2015 Project Engineer - Reliance Industries Ltd – Nagothane (MH)  Read Isometric & G.A. drawings and executed the job accordingly to the specification of the Client.  Knowledge to prepare the overall Plan and completion schedule of the job as per completion date.  Know to prepare the monthly and micro planning of the job.  Know to prepare man power and machinery deployment plan as per completion schedule.  Knowledge to prepare Bill. For Piping Work.  Knowledge to prepare Bill as per SOR. M/s. Ram Kripal Singh Cons. Pvt. Ltd -17 Aug 2009 to 13 Aug 2013. Planning & Billing Engineer- Indian Oil CorporationLtd's (IOCL), Panipat (HR) with consultant EIL  Knowledge to prepare the overall Plan and completion schedule of the job as per completion date.  Know to prepare the monthly and micro planning of the job.  Know to prepare man power and machinery deployment plan as per completion schedule.  Knowledge to prepare Bill. For Piping Work.  Knowledge to prepare Bill as per SOR  Studying the Tenders and estimating the cost for the same.  Checking the Design Drawings of Pipes and Structure.  Maintaining relations With the Clients.  Procurement of technically important material specially pipes and fittings.  Responsible for endorsements of Quality assurance plan (QAP) & PQR.  Maintaining the Daily progress reports (DPRs)  Prepare Bill as per SOR. Projects Undertaken  Offsite A/G Piping & U/G Fabrication & Erection at Indian Oil Corporation Ltd's (IOCL), Panipat (HR) with consultant EIL.  Structural Steel, Fabrication & Erection, Blasting Painting, Alignment at Indian Oil Corporation Ltd's (IOCL), Panipat (HR) with consultant Tecnimont ICB  Structural Erection at National Fertilizer Limited, Vijaipur, Guna (M.P.) with consultant PDIL.  Structural Erection at MPPGCL site Khandwa (M.P.) with consultant L&T. M/s. Durha Construction Pvt. Ltd -18 Aug 2008 to 13 Aug 2009 Site Engineer- Bharat Oman Refineries Limited, Bina (MP) with consultant Engineers India Limited.  Fabrication, erection & hydro-testing of piping Making sure that all work is proceeding in accordance with contract specification, project planning schedules and approved method statements, construction drawings, Clients HSE standards.  Knowledge of HSS Wrapping and Coating & using coating of Poly glass, R-95.  Monitoring of all project activities on regular basis to ensure that time lines adhered, in compliance with standard procedures and contract requirement.  Plan and arrange adequate resources for project execution with customer and colleagues.
  • 3.
     Actively participatingin knowledge sharing session.  Reviewing and monitoring project schedule by using MSP tool EDUCATIONAL CREDENTIALS Passed B.Tech Mechanical Engg. From faculty of College of Engineering & Technology From. Allahabad Agricultural Institute Deemed University, (UP) in 2008. Passed Intermediate From R.K.J.L. College, Khurhan, Madhepura, Bihar in 2004. Passed High School From Gandhi High School, Rajpur (Supaul), Bihar in 2002. Personal Details: Father’s Name Sh.Nageshwar Prasad Yadav Date of Birth 15/06/1986 Sex Male Language known English, Hindi, Martial Status Single Nationality Indian Contact detail +91-9996448851 Permanent Address Vill.-Balawa (Sonbrasa) Post: - Sonbrsa Distt. Madhepura (Bihar) Pin Code-852128 Declaration: I hereby declare that all the statements made in this application are true and complete to the best of my knowledge. I am free to work anywhere in India & Abroad. Date: Place: CHANDAN KUMAR