CURRICULUM VITAE
EQUBAL AHMAD
Mechanical Engineer
E-mail: Equbalahmad0309@gmail.com
Mobile: +919631575826, +91- 7506908722
POST APPLIED FOR : PIPING CONSTRUCTION SUPERVISOR
OBJECTIVE
To associate with an esteemed industry that provides me an opportunity to show my skills,
improve my ken with latest trends and to be a part of the team that works dynamically towards the
growth of the organization
PROFILE SUMMARY
6 years’experience in piping
Installation of pipe, erection of pipe, small bore Drainage & piping installation
material and practices, clearance of loop for visual test, NDT, RT, (radiographic test),
MPT(magnetic particle test) etc. Installation & erection of pipe support (primary
support, secondary support, etc.)
EXPERIENCE
Professional Experience: 1
Company: GS ENGINEERING (HDGSK JV-IRAQ)
Client : SCOP (MENISTRY OF OIL IRAQ)
Date : JAN 2016 to till date
Position: PIPING ENGINEER (Emp. ID. NO. Kis-00090)
Project : Shah Process Plant EPC2 East, Shah Gas Development (SGD) Project
Location : Karbala Refinery Project IRAQ.
Duties & Responsibilities:-
 Supervise and monitor various constructions activities related to above ground piping.
 Support sub-contractors for the erection of above ground piping spools and coordination with
drawings and materials availability.
 Fully appraise with following day’s work in advance and discuss any special requirements
with Area In charge.
 Coordinates with engineering and other department with regards to site modification and
technical query.
 Ensure safe and effective of piping construction activities with respect to the quality and
schedule.
 Follow-up and pushed sub-contractor for better progress in day to day activities including
precise keeping of records, paper works and filing.
 Prepare site instruction and review sub-contractors construction technical query (CTQ) before
forwarding to engineering.
 Review and sign RFI (Request for Inspection) of subcontractor for equipment which are ready
for client inspection.
 Prepare daily production report and attend weekly meeting with the project manager.
 Familiar with various codes and standards viz., ANSI, ASME, API, ASTM, etc.
 Ensuring the construction work are carried out to the required project
specification , Drawing & compliance to the specific ITP/MS/QC procedure.
 Coordinate between fabrication QA/QC and planning.
Professional Experience: 2
Designation : (piping supervisor)
Company : HPCL MUMBAI AS A SUBCONTRACTER 8 MONTH
SHUTDOWN PROJECT
Duration : Since 23/03/2015 to 30/11/2015.
ADDITIONAL INFORMATION:-
 Supervising and handling of drawing (isometric, general arrangement, P&ID) for project
work and guide of worker which are present in site work.
 Handling the assigned area as a fully responsibilities as an area in charge.
 Plan drawing, isometric drawing, scotches drawing.
 Excellent communication and interpersonal skills.
 Ensure safe and effective of piping construction activities with respect to the quality and schedule
 Fabrication and erection of piping and structural works as per the issued construction drawings.
 Direct control over fabrication and erection of piping and pipe support for various systems.
 Organize daily Toolbox Talk explaining the team target of the day and safety and technical
requirement to execute the target job for the day.
 Conducting hydro testing accordance with the approved hydro test procedure.
 Piping & pipe support as built drawing.
 Supervision of all piping works and ensures safety and quality standards of the client.
Professional Experience: 3
Designation: Piping Engineer
Company : IRAQI ELITE COMPANY FOR GENERAL CONTRACTS &
ENGINEERING LTD
Duration : Since June 2013 to September 2014.
Project : Badra oil field project IRAQ.
Role and Responsibilities:
 Handling the assigned area as a fully responsibilities as an area in charge.
 Working on piping connection and installation of all utility piping system within the
assignment area.
 Installation of civil support, primary support and secondary support and all type of structure.
 Supervising and handling of drawing (isometric, general arrangement, P&ID) for project
work and guide of worker which are present in site work.
 Planning as daily and weekly basis to meet project target.
 Attending the meeting with management to aware about the project status and requirement
for system completion.
 Attending system and subsystem wise test pack and follow up its release for hydro test.
 Monitor and ensure working hours are maximized without a reduction in Quality. Monitor
and report manning levels daily.
 Ensuring all fabrication is to approve drawings and all flanges/valves etc are correctly
orientated and that spools are correctly identified.
 Ensure spools are installed in Rack on site methodically in order to open a number of work
fronts ensuring Sub contractor maintains maximum productivity.
 Prepare daily reports of work progress and man power utilization.
 Prepare weekly reports of the total spool erection, isometric weight installed, welded dia
inches of supports and joints and the remaining work front with the materials available.
 Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning.
 Issue the work permits ensuring SHE requirements.
 Conduct safety walk through in the site in co-ordination with the safety department on
weekly basis.
 Supervision of all piping works and ensures safety and quality standards of the client
Professional Experience: 4
Designation : Mechanical Engineer (piping engineer)
Company : D - MECH ENGINEERING CO. (DME)
Duration : 11/05/2011 to 27/04/2013.
Role and Responsibilities:
 Responsible for analysis of piping systems in conformance with project requirements, design
parameters, codes and industry practices under general direction of the Chief Engineer. May
supervise specialized technical sub-groups.
 Experience in pipe fitting, pressure testing, commissioning and welding procedure will
be highly advantageous in the application process.
• Resolved all complaints regarding material and control work and updated all equipment and
maintain in system accordingly requirement..
• Supervising and handling of drawing for project work and guide of worker which are present
in site work.
• Working in assign area as a fully responsibility as a area in charge.
• Monitoring the productivity of fitters and welder and insure the completion of task in given
time frame.
• Preparing daily and weekly productivity report and submitting to management
• Supervision of all piping works and ensures safety and quality standards of the client.
• Inspection and approval of all the QA/QC submittals of the subcontractor.
ProjectCoordination
 Handling project activities to ensure timely accomplishment of targets within
the time and cost parameters.
 Executing of project activities in the plant.
 Coordinating with Fabricators and Contractors for planning and effective
execution of the jobs.
 Presenting current commercial & job execution status of various projects in
front of senior management when need.
ACADEMIC CREDENTIALS
2011
B Tech in
Mechanical
engineer
Royal institute of technology and science,
Jawaharlal Nehru Technological University-Hyderabad
2007
Intermediate(XII)
Science (PCM)
Bihar Intermediate Education Council , Patna (Bihar)
2004 S.S.C. (Class X) Bihar State Examination Board, Patna (Bihar)
CERTIFICATION UNDERGONE
 AutoCAD 2D/3D from CAD/CAM INFOTECH, Mehdipatnam Hyderabad, (A.P)
 Quality Control & Engineering Inspection from ADVANCED TRAINING INSTITUTE
(A.T.I.) Hyderabad (A.P).
 TQM&ISO 9001-2008 full time course from ADVANCED TRAINING INSTITUTE
(A.T.I.) Hyderabad (A.P).
COMPUTER SKILLS
 Proficient in Microsoft Word, Excel and Power Point
 Proficient in handling Internet & Computer
 knowledge of AutoCAD (2D, 3D),
 knowledge and operating of Navies Works freedom-2015
STRENGTH
● Good problem understanding and solving ability.
● Can do work as individual or a team member.
● Quick learner
● Passion for learning new technologies
● Loyalty/commitment towards my work.
PERSONAL PROFILE
Date of Birth : 24th
May, 1989
Marital Status : Single
Blood Group : O+
Nationality : Indian
Religion : Muslim
Passport No. : K1332364
Date of issue : 28-10-2011
Date of expiry : 27-10-2021
Languages Known : English, Hindi, and Urdu
PERSONAL PROFILE
I hereby declare that the above mentioned information is correct up to my knowledge and I
bear responsibilities for the correction of the above mentioned particulars.
DATE :-
PLACE:-
SIGNATURE

cv piping(1)

  • 1.
    CURRICULUM VITAE EQUBAL AHMAD MechanicalEngineer E-mail: Equbalahmad0309@gmail.com Mobile: +919631575826, +91- 7506908722 POST APPLIED FOR : PIPING CONSTRUCTION SUPERVISOR OBJECTIVE To associate with an esteemed industry that provides me an opportunity to show my skills, improve my ken with latest trends and to be a part of the team that works dynamically towards the growth of the organization PROFILE SUMMARY 6 years’experience in piping Installation of pipe, erection of pipe, small bore Drainage & piping installation material and practices, clearance of loop for visual test, NDT, RT, (radiographic test), MPT(magnetic particle test) etc. Installation & erection of pipe support (primary support, secondary support, etc.) EXPERIENCE Professional Experience: 1 Company: GS ENGINEERING (HDGSK JV-IRAQ) Client : SCOP (MENISTRY OF OIL IRAQ) Date : JAN 2016 to till date Position: PIPING ENGINEER (Emp. ID. NO. Kis-00090) Project : Shah Process Plant EPC2 East, Shah Gas Development (SGD) Project Location : Karbala Refinery Project IRAQ. Duties & Responsibilities:-  Supervise and monitor various constructions activities related to above ground piping.  Support sub-contractors for the erection of above ground piping spools and coordination with drawings and materials availability.  Fully appraise with following day’s work in advance and discuss any special requirements with Area In charge.  Coordinates with engineering and other department with regards to site modification and technical query.  Ensure safe and effective of piping construction activities with respect to the quality and schedule.  Follow-up and pushed sub-contractor for better progress in day to day activities including precise keeping of records, paper works and filing.  Prepare site instruction and review sub-contractors construction technical query (CTQ) before forwarding to engineering.  Review and sign RFI (Request for Inspection) of subcontractor for equipment which are ready for client inspection.  Prepare daily production report and attend weekly meeting with the project manager.  Familiar with various codes and standards viz., ANSI, ASME, API, ASTM, etc.  Ensuring the construction work are carried out to the required project specification , Drawing & compliance to the specific ITP/MS/QC procedure.  Coordinate between fabrication QA/QC and planning.
  • 2.
    Professional Experience: 2 Designation: (piping supervisor) Company : HPCL MUMBAI AS A SUBCONTRACTER 8 MONTH SHUTDOWN PROJECT Duration : Since 23/03/2015 to 30/11/2015. ADDITIONAL INFORMATION:-  Supervising and handling of drawing (isometric, general arrangement, P&ID) for project work and guide of worker which are present in site work.  Handling the assigned area as a fully responsibilities as an area in charge.  Plan drawing, isometric drawing, scotches drawing.  Excellent communication and interpersonal skills.  Ensure safe and effective of piping construction activities with respect to the quality and schedule  Fabrication and erection of piping and structural works as per the issued construction drawings.  Direct control over fabrication and erection of piping and pipe support for various systems.  Organize daily Toolbox Talk explaining the team target of the day and safety and technical requirement to execute the target job for the day.  Conducting hydro testing accordance with the approved hydro test procedure.  Piping & pipe support as built drawing.  Supervision of all piping works and ensures safety and quality standards of the client. Professional Experience: 3 Designation: Piping Engineer Company : IRAQI ELITE COMPANY FOR GENERAL CONTRACTS & ENGINEERING LTD Duration : Since June 2013 to September 2014. Project : Badra oil field project IRAQ. Role and Responsibilities:  Handling the assigned area as a fully responsibilities as an area in charge.  Working on piping connection and installation of all utility piping system within the assignment area.  Installation of civil support, primary support and secondary support and all type of structure.  Supervising and handling of drawing (isometric, general arrangement, P&ID) for project work and guide of worker which are present in site work.  Planning as daily and weekly basis to meet project target.  Attending the meeting with management to aware about the project status and requirement for system completion.  Attending system and subsystem wise test pack and follow up its release for hydro test.  Monitor and ensure working hours are maximized without a reduction in Quality. Monitor and report manning levels daily.  Ensuring all fabrication is to approve drawings and all flanges/valves etc are correctly orientated and that spools are correctly identified.  Ensure spools are installed in Rack on site methodically in order to open a number of work fronts ensuring Sub contractor maintains maximum productivity.  Prepare daily reports of work progress and man power utilization.  Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.  Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning.  Issue the work permits ensuring SHE requirements.
  • 3.
     Conduct safetywalk through in the site in co-ordination with the safety department on weekly basis.  Supervision of all piping works and ensures safety and quality standards of the client Professional Experience: 4 Designation : Mechanical Engineer (piping engineer) Company : D - MECH ENGINEERING CO. (DME) Duration : 11/05/2011 to 27/04/2013. Role and Responsibilities:  Responsible for analysis of piping systems in conformance with project requirements, design parameters, codes and industry practices under general direction of the Chief Engineer. May supervise specialized technical sub-groups.  Experience in pipe fitting, pressure testing, commissioning and welding procedure will be highly advantageous in the application process. • Resolved all complaints regarding material and control work and updated all equipment and maintain in system accordingly requirement.. • Supervising and handling of drawing for project work and guide of worker which are present in site work. • Working in assign area as a fully responsibility as a area in charge. • Monitoring the productivity of fitters and welder and insure the completion of task in given time frame. • Preparing daily and weekly productivity report and submitting to management • Supervision of all piping works and ensures safety and quality standards of the client. • Inspection and approval of all the QA/QC submittals of the subcontractor. ProjectCoordination  Handling project activities to ensure timely accomplishment of targets within the time and cost parameters.  Executing of project activities in the plant.  Coordinating with Fabricators and Contractors for planning and effective execution of the jobs.  Presenting current commercial & job execution status of various projects in front of senior management when need. ACADEMIC CREDENTIALS 2011 B Tech in Mechanical engineer Royal institute of technology and science, Jawaharlal Nehru Technological University-Hyderabad 2007 Intermediate(XII) Science (PCM) Bihar Intermediate Education Council , Patna (Bihar) 2004 S.S.C. (Class X) Bihar State Examination Board, Patna (Bihar)
  • 4.
    CERTIFICATION UNDERGONE  AutoCAD2D/3D from CAD/CAM INFOTECH, Mehdipatnam Hyderabad, (A.P)  Quality Control & Engineering Inspection from ADVANCED TRAINING INSTITUTE (A.T.I.) Hyderabad (A.P).  TQM&ISO 9001-2008 full time course from ADVANCED TRAINING INSTITUTE (A.T.I.) Hyderabad (A.P). COMPUTER SKILLS  Proficient in Microsoft Word, Excel and Power Point  Proficient in handling Internet & Computer  knowledge of AutoCAD (2D, 3D),  knowledge and operating of Navies Works freedom-2015 STRENGTH ● Good problem understanding and solving ability. ● Can do work as individual or a team member. ● Quick learner ● Passion for learning new technologies ● Loyalty/commitment towards my work. PERSONAL PROFILE Date of Birth : 24th May, 1989 Marital Status : Single Blood Group : O+ Nationality : Indian Religion : Muslim Passport No. : K1332364 Date of issue : 28-10-2011 Date of expiry : 27-10-2021 Languages Known : English, Hindi, and Urdu PERSONAL PROFILE I hereby declare that the above mentioned information is correct up to my knowledge and I bear responsibilities for the correction of the above mentioned particulars. DATE :- PLACE:- SIGNATURE