1. CURRICULUM – VITAE
Mr. Sagar Kumar Behera
Email: - sagarkumarbehera@yahoo.co.in
Mobile No. : +971 561743325,
+91 8018158560,
Objective:-
Looking for a career in EPC Industry and Project Management.
Key Skills:-
Proposal, Estimation, Cost Estimation, MS Project, Construction Execution, QC and safety .
Profile:-
Experience (8 years and 6 month’s)
In construction / Manufacturing Industries and EPC Company as a Proposal Estimator, Cost Estimator , MS Project
Level II Planning , Execution, ISO metric drawing of steam pipeline, connection Piping take offs , fabrication /
Erection Of piping.
Achievement:-
Employer: - Integrated Specialized General Contracting Company W.L.L Role: - Proposal Engineer
w www.iscco.ae Period: Dec. 2015 – Till date.
Responsibility:-
• Study all Bid documents along with specification, Addendum and Equipment Data Sheet.
• Prepare Project synopsis based upon Scope of work & Tender document’s.
• Attend site visit.
• Coordinate with Engineering and Procurement Department.
• Prepare RFQ based upon Scope of supply.
• Reply queries of the subcontractor.
• Prepare Level II Planning Schedule.
• Taking QTY Based upon Project Scope.
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• Train 1 & 2 Gasco Short down Project.
• Long Term SD Y2017 to Y2022.
• Gasco EPC Project’s .
Employer: - Arabian Industry Manuafacturing LLC Role: - Proposal Estimation Engineer
w www.arabian-industries.net Period: Mar. 2014 – Till date.
Responsibility:-
• Study all Bid documents along with specification, Addendum and Equipment Data Sheet.
• Prepare Project synopsis based upon Scope of work & Tender document’s.
• Attend site visit.
• Coordinate with Engineering and Procurement Department.
• Prepare RFQ based upon Scope of supply.
• Reply query’s of the subcontractor.
• Prepare Direct Cost & Indirect Cost for Tank / Pig Traps / Vessel fabrication.
• Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• Design, Fabrication & Supply of Pig Traps for KOC Project ( Petrofac International UAE.)
2. • Design, Fabrication & Supply 40 No Pig Traps, Vessel’s & Air Receiver for ADCO Project (Petrofac Emirate
UAE).
• Design, Fabrication & Supply of Prefabricated and fabricated Tanks 25 No for Yibal Khuff Project, PDO.
• Design, Fabrication & Supply of Air receiver for OXY Project - Oman Pipeline Supply Company LLC.
• EPC for Internal Modifications In DHDS Unit for Cool Sepatator ( V-2002 ) & LP Flash Drum ( V-2005 )
Orpic.
Employer: - Petron Engineering Construction.Ltd Role: - Sr. Executive Engineer
w www.petronengineering.com Period: Jan. 2013 – Feb.2014.
Responsibility:-
• Study Tender document along with scope of work, specification and Addendum and P&ID,
• Prepare Project synopsis based upon Scope of work & Tender document’s.
• Attend site visit.
• Forward all tender document to Engineering Department for Preparation of BOQ.
• Coordinate with Marketing, Engineering and Procurement Department.
• Prepare RFQ float enquiry for Quotation based upon Scope of supply.
• BOQ analysis of Piping fabrication & Erection, Equipment Erection, Structural Fabrication & Erection.
• Construction Estimation Detail Scope of work breaks up.
• Prepare Direct Cost & Indirect Cost for Piping, Equipment and Structural Steel fabrication & Erection.
• Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• Zeeco. ( Flare stack Erction Work’s )
• TECHNIMONT ICB. (Mechanical & Equipment Erection works).
• IHI CORPORATION LTD. ( Mechanical & Electrical works , Dahej Expention Phase – III , Petronet LNG )
Employer: - Bharath Quality Engineers.Pvt.Ltd Role: - Sr. Cost Estimation Engineer
w www.bqengineers.com Period: Sep.2012 – Dec. 2012.
Responsibility:-
• Prepared PQ Based Upon SOI.
• Prepare RFQ based upon Scope of supply.
• BOQ analysis of Piping, Equipment for Construction Estimation.
• Prepare Direct Cost & Indirect Cost Sheet Piping, Equipment, Structural Steel fabrication & Erection, Fill
total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepare RFQ based upon Scope of work.
• Vender selection & Negotiation for Subcontractor.
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• ENVIROPOL ENGINEERS PVT. LTD. (Blasting & Painting Project - WO Relish).
• Lanco Infratech Limited - EPC Division (Blasting & Painting Project) (Under Negotiation).
• R.K.POWERGEN (P) Ltd. (Boiler Shut down Project) (Under Negotiation).
• BPCL- Kochi Shut down Project throught M/s SHILPI ENGINEERING PVT. LTD. (API Certified Inspectors &
NDT Inspectors – manpower supply WO Relish )
• BPCL Mahul Refinery during Shut down Project through M/s SHILPI ENGINEERING PVT. LTD. (Under
Negotiation).
3. Employer: - Mohammad Al-Mojil Group (Mmg). Role: - Proposal Estimation E&C, Maintenance
www.almojilgroup.com Period: Oct 2010 –Oct 2011.
Responsibility:-
• Study Tender documents along with scope of work, specification and Addendum and P&ID Detail Scope
of work break up.
• Prepare Preliminary Level – 2 Construction Schedule.
• Prepared BOQ from P&ID’s.
• Prepare Direct Cost & Indirect Cost Sheet Piping, Equipment, Structural Steel Erection
• Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepared Technical Doc Based on Project Requirement.
• Attend Site visit.
Major project involved:-
• Package 1 to 12 (YR Refinery-Execution of Various Projects). ( Completed )
• UNITED EG – 2 LSTK (Completed) (PO Relish).
• SAFCO – IV; Cooling Tower Civil Repair (TA 2011).
• YRD – Revamp of CDU Column internals (Tray Replacement Work).( Completed )
• YRD - Execute 2011 PP & EU Projects during TA Feb 2011.( Completed )
• YRD – Execute 2011 TRS Projects during Yanbu TA Feb – 2011. ( Completed )
• STS / DRIC Al – Tuwairqi, Reformer - I Tubes & Catalyst Replacement. ( PO Relish)
• STS / DRIC Al – Tuwairqi, Reformer - II Tubes & Catalyst Replacement. ( PO Relish)
• Removal and Load Catalyst Sulfer Converters. (Hawiyah Gas Plant) ( Completed )
• Aramco Plant 493 E15 Equipment Drums & Exchangers.( Completed )
• Unloading / Reloading Activated Carbon from absorption Drumps.( Completed )
• Removing & Reinstallation of Tubes Bundles at Hawiyah Gas Plant.( Completed )
• PR for Supply & Construction At IBB AL– BAYTAR Plant.
• Provide and install New Recovery water line14” Inch.(SADAF SABIC) (Under Negotiation)
• Replacement of HP Scrubber.
Employer:- PUNJ LLOYD LTD (Gurgaon) Role:- Sr. Proposal Estimation Engineer
www.punjlloyd.com Period: April 2008 – Oct – 2009.
Responsibility:-
• Study Tender documents along with scope of work, specification and Addendum.
• Forward Scope Of work P&ID , Plot Plan , Equipment data Sheet’s & Project Specification for BOQ.
• Prepared RFQ based upon Scope of work & forward all required documents to Procurement Department
for quotation.
• Prepared Project Synopsis.
• Detail Scope of work break up, few projects’ Taking piping MTO.
• Coordinate with Marketing, Engineering and Procurement Department.
• Check the entire MTO'S and Equipment list after received from Engineering Department based upon P &
ID & Plot plan.
• Preparation of technical Bid.
• Received Technical Quires from procurement Department and reply to procurement Department.
• Prepare difference between two projects.
• Prepare Direct Cost & indirect cost A3 Sheet for Piping, Equipment, NDT, Insulation, Structural Steel fab &
Erection etc.
Major project involved:-
• NHRC Project (ONGC Project). (completed)
• MHN Project (ONGC Project). (completed)
• B-22 Project (ONGC Project). (completed)
• Ruwais 4th NGL Train_GASCO_Linde. (UAE Project). (completed)
4. • Habshan5_ GASCO_ Saipem (UAE Project). (completed)
• Eastern Province Phase-2 Water Transmission System (SAUDI ARABIA. Project) (completed)
• Habshan5_Saipem (UAE GASCO Project). (completed)
Employer:- Foster wheeler India PVT.LTD, ( Chennai ) Role:- Estimation Engineer piping
www.fwc.com Period:-May 2007- April 2008
Responsibility:-
• Study P&id and plot plan’s ,
• MTO take off Notes according to our pipest and k- base software,
• Prepare the checklist , for each unit,
• Download all the necessary documents from the docs store and placed it on the w-drive,
• After preparation of MTO sheets prepared softcopy,
• Checking my own MTO sheets after preparation ,
Major project involved:-
• NLLNG
• Saudi Aramco manifa project
• Para deep IOCL Project, ( PO Relish)
• Karan gas projects,
Involvement in project units:-
• NLLNG- Alkylation unit,( completed )
• Saudi Aramco manifa – sulpher complex and GOSSE – I, GOSSE – II,( completed )
• Para deep IOCL -- Hydro generation unit, completely done by alone,( completed )
• Karan gas ( completed )
Employer: - Reliance Engineering Associate Role: Mechanical Engineer
Private Limited, Jamnagar. Period: July 2005 –April 2007,
www.ril.com
Responsibility:
• Interpretation of Standard Drawings for U/G piping & A/G Piping according to the specification,
Verification & Monitoring the pipeline drawing.
• Estimation & vendor co-ordination
• Site supervision and Execution of time bound jobs.
• Preparation of manpower & material take-off requirement
• Co-ordination with contractor & sub-contractor.
• Co-ordination our planning & quality Department
• Review and verification for engineering, procurement & construction and the overall project
• Planning for pre fabrication & Erection of spools.
• Attending weekly meet with the contractor.
Major Project Involved:
• Sulpher complex A/G piping
• Alkali A/G piping and U/G piping
• FCC Structure
5. Academic Qualification:
Qualification : B.E. (Mechanical)
Industrial Training : C.T.T.C Auto-CAD Bhubaneswar
Computer Exposure : Auto-CAD, MS Office, C and C++
Personal Details:
o Father Name : Nayan Kumar Behera
o Date of Birth : 14th April 1982
o Gender : Male
o Marital Status : married
o Nationality : Indian
o Passport Number : H7150396
o Religion : Hindu
o Language known : Hindi, English.
Date:
Place: (Sagar Kumar Behera)
6. Academic Qualification:
Qualification : B.E. (Mechanical)
Industrial Training : C.T.T.C Auto-CAD Bhubaneswar
Computer Exposure : Auto-CAD, MS Office, C and C++
Personal Details:
o Father Name : Nayan Kumar Behera
o Date of Birth : 14th April 1982
o Gender : Male
o Marital Status : married
o Nationality : Indian
o Passport Number : H7150396
o Religion : Hindu
o Language known : Hindi, English.
Date:
Place: (Sagar Kumar Behera)