SlideShare a Scribd company logo
1 of 6
CURRICULUM – VITAE
Mr. Sagar Kumar Behera
Email: - sagarkumarbehera@yahoo.co.in
Mobile No. : +971 561743325,
+91 8018158560,
Objective:-
Looking for a career in EPC Industry and Project Management.
Key Skills:-
Proposal, Estimation, Cost Estimation, MS Project, Construction Execution, QC and safety .
Profile:-
Experience (8 years and 6 month’s)
 In construction / Manufacturing Industries and EPC Company as a Proposal Estimator, Cost Estimator , MS Project
Level II Planning , Execution, ISO metric drawing of steam pipeline, connection Piping take offs , fabrication /
Erection Of piping.
Achievement:-
Employer: - Integrated Specialized General Contracting Company W.L.L Role: - Proposal Engineer
w www.iscco.ae Period: Dec. 2015 – Till date.
Responsibility:-
• Study all Bid documents along with specification, Addendum and Equipment Data Sheet.
• Prepare Project synopsis based upon Scope of work & Tender document’s.
• Attend site visit.
• Coordinate with Engineering and Procurement Department.
• Prepare RFQ based upon Scope of supply.
• Reply queries of the subcontractor.
• Prepare Level II Planning Schedule.
• Taking QTY Based upon Project Scope.
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• Train 1 & 2 Gasco Short down Project.
• Long Term SD Y2017 to Y2022.
• Gasco EPC Project’s .
Employer: - Arabian Industry Manuafacturing LLC Role: - Proposal Estimation Engineer
w www.arabian-industries.net Period: Mar. 2014 – Till date.
Responsibility:-
• Study all Bid documents along with specification, Addendum and Equipment Data Sheet.
• Prepare Project synopsis based upon Scope of work & Tender document’s.
• Attend site visit.
• Coordinate with Engineering and Procurement Department.
• Prepare RFQ based upon Scope of supply.
• Reply query’s of the subcontractor.
• Prepare Direct Cost & Indirect Cost for Tank / Pig Traps / Vessel fabrication.
• Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• Design, Fabrication & Supply of Pig Traps for KOC Project ( Petrofac International UAE.)
• Design, Fabrication & Supply 40 No Pig Traps, Vessel’s & Air Receiver for ADCO Project (Petrofac Emirate
UAE).
• Design, Fabrication & Supply of Prefabricated and fabricated Tanks 25 No for Yibal Khuff Project, PDO.
• Design, Fabrication & Supply of Air receiver for OXY Project - Oman Pipeline Supply Company LLC.
• EPC for Internal Modifications In DHDS Unit for Cool Sepatator ( V-2002 ) & LP Flash Drum ( V-2005 )
Orpic.
Employer: - Petron Engineering Construction.Ltd Role: - Sr. Executive Engineer
w www.petronengineering.com Period: Jan. 2013 – Feb.2014.
Responsibility:-
• Study Tender document along with scope of work, specification and Addendum and P&ID,
• Prepare Project synopsis based upon Scope of work & Tender document’s.
• Attend site visit.
• Forward all tender document to Engineering Department for Preparation of BOQ.
• Coordinate with Marketing, Engineering and Procurement Department.
• Prepare RFQ float enquiry for Quotation based upon Scope of supply.
• BOQ analysis of Piping fabrication & Erection, Equipment Erection, Structural Fabrication & Erection.
• Construction Estimation Detail Scope of work breaks up.
• Prepare Direct Cost & Indirect Cost for Piping, Equipment and Structural Steel fabrication & Erection.
• Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• Zeeco. ( Flare stack Erction Work’s )
• TECHNIMONT ICB. (Mechanical & Equipment Erection works).
• IHI CORPORATION LTD. ( Mechanical & Electrical works , Dahej Expention Phase – III , Petronet LNG )
Employer: - Bharath Quality Engineers.Pvt.Ltd Role: - Sr. Cost Estimation Engineer
w www.bqengineers.com Period: Sep.2012 – Dec. 2012.
Responsibility:-
• Prepared PQ Based Upon SOI.
• Prepare RFQ based upon Scope of supply.
• BOQ analysis of Piping, Equipment for Construction Estimation.
• Prepare Direct Cost & Indirect Cost Sheet Piping, Equipment, Structural Steel fabrication & Erection, Fill
total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepare RFQ based upon Scope of work.
• Vender selection & Negotiation for Subcontractor.
• Prepared Technical Doc Based on Project Requirement.
Major project involved:-
• ENVIROPOL ENGINEERS PVT. LTD. (Blasting & Painting Project - WO Relish).
• Lanco Infratech Limited - EPC Division (Blasting & Painting Project) (Under Negotiation).
• R.K.POWERGEN (P) Ltd. (Boiler Shut down Project) (Under Negotiation).
• BPCL- Kochi Shut down Project throught M/s SHILPI ENGINEERING PVT. LTD. (API Certified Inspectors &
NDT Inspectors – manpower supply WO Relish )
• BPCL Mahul Refinery during Shut down Project through M/s SHILPI ENGINEERING PVT. LTD. (Under
Negotiation).
Employer: - Mohammad Al-Mojil Group (Mmg). Role: - Proposal Estimation E&C, Maintenance
www.almojilgroup.com Period: Oct 2010 –Oct 2011.
Responsibility:-
• Study Tender documents along with scope of work, specification and Addendum and P&ID Detail Scope
of work break up.
• Prepare Preliminary Level – 2 Construction Schedule.
• Prepared BOQ from P&ID’s.
• Prepare Direct Cost & Indirect Cost Sheet Piping, Equipment, Structural Steel Erection
• Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis).
• Prepared Technical Doc Based on Project Requirement.
• Attend Site visit.
Major project involved:-
• Package 1 to 12 (YR Refinery-Execution of Various Projects). ( Completed )
• UNITED EG – 2 LSTK (Completed) (PO Relish).
• SAFCO – IV; Cooling Tower Civil Repair (TA 2011).
• YRD – Revamp of CDU Column internals (Tray Replacement Work).( Completed )
• YRD - Execute 2011 PP & EU Projects during TA Feb 2011.( Completed )
• YRD – Execute 2011 TRS Projects during Yanbu TA Feb – 2011. ( Completed )
• STS / DRIC Al – Tuwairqi, Reformer - I Tubes & Catalyst Replacement. ( PO Relish)
• STS / DRIC Al – Tuwairqi, Reformer - II Tubes & Catalyst Replacement. ( PO Relish)
• Removal and Load Catalyst Sulfer Converters. (Hawiyah Gas Plant) ( Completed )
• Aramco Plant 493 E15 Equipment Drums & Exchangers.( Completed )
• Unloading / Reloading Activated Carbon from absorption Drumps.( Completed )
• Removing & Reinstallation of Tubes Bundles at Hawiyah Gas Plant.( Completed )
• PR for Supply & Construction At IBB AL– BAYTAR Plant.
• Provide and install New Recovery water line14” Inch.(SADAF SABIC) (Under Negotiation)
• Replacement of HP Scrubber.
Employer:- PUNJ LLOYD LTD (Gurgaon) Role:- Sr. Proposal Estimation Engineer
www.punjlloyd.com Period: April 2008 – Oct – 2009.
Responsibility:-
• Study Tender documents along with scope of work, specification and Addendum.
• Forward Scope Of work P&ID , Plot Plan , Equipment data Sheet’s & Project Specification for BOQ.
• Prepared RFQ based upon Scope of work & forward all required documents to Procurement Department
for quotation.
• Prepared Project Synopsis.
• Detail Scope of work break up, few projects’ Taking piping MTO.
• Coordinate with Marketing, Engineering and Procurement Department.
• Check the entire MTO'S and Equipment list after received from Engineering Department based upon P &
ID & Plot plan.
• Preparation of technical Bid.
• Received Technical Quires from procurement Department and reply to procurement Department.
• Prepare difference between two projects.
• Prepare Direct Cost & indirect cost A3 Sheet for Piping, Equipment, NDT, Insulation, Structural Steel fab &
Erection etc.
Major project involved:-
• NHRC Project (ONGC Project). (completed)
• MHN Project (ONGC Project). (completed)
• B-22 Project (ONGC Project). (completed)
• Ruwais 4th NGL Train_GASCO_Linde. (UAE Project). (completed)
• Habshan5_ GASCO_ Saipem (UAE Project). (completed)
• Eastern Province Phase-2 Water Transmission System (SAUDI ARABIA. Project) (completed)
• Habshan5_Saipem (UAE GASCO Project). (completed)
Employer:- Foster wheeler India PVT.LTD, ( Chennai ) Role:- Estimation Engineer piping
www.fwc.com Period:-May 2007- April 2008
Responsibility:-
• Study P&id and plot plan’s ,
• MTO take off Notes according to our pipest and k- base software,
• Prepare the checklist , for each unit,
• Download all the necessary documents from the docs store and placed it on the w-drive,
• After preparation of MTO sheets prepared softcopy,
• Checking my own MTO sheets after preparation ,
Major project involved:-
• NLLNG
• Saudi Aramco manifa project
• Para deep IOCL Project, ( PO Relish)
• Karan gas projects,
Involvement in project units:-
• NLLNG- Alkylation unit,( completed )
• Saudi Aramco manifa – sulpher complex and GOSSE – I, GOSSE – II,( completed )
• Para deep IOCL -- Hydro generation unit, completely done by alone,( completed )
• Karan gas ( completed )
Employer: - Reliance Engineering Associate Role: Mechanical Engineer
Private Limited, Jamnagar. Period: July 2005 –April 2007,
www.ril.com
Responsibility:
• Interpretation of Standard Drawings for U/G piping & A/G Piping according to the specification,
Verification & Monitoring the pipeline drawing.
• Estimation & vendor co-ordination
• Site supervision and Execution of time bound jobs.
• Preparation of manpower & material take-off requirement
• Co-ordination with contractor & sub-contractor.
• Co-ordination our planning & quality Department
• Review and verification for engineering, procurement & construction and the overall project
• Planning for pre fabrication & Erection of spools.
• Attending weekly meet with the contractor.
Major Project Involved:
• Sulpher complex A/G piping
• Alkali A/G piping and U/G piping
• FCC Structure
Academic Qualification:
Qualification : B.E. (Mechanical)
Industrial Training : C.T.T.C Auto-CAD Bhubaneswar
Computer Exposure : Auto-CAD, MS Office, C and C++
Personal Details:
o Father Name : Nayan Kumar Behera
o Date of Birth : 14th April 1982
o Gender : Male
o Marital Status : married
o Nationality : Indian
o Passport Number : H7150396
o Religion : Hindu
o Language known : Hindi, English.
Date:
Place: (Sagar Kumar Behera)
Academic Qualification:
Qualification : B.E. (Mechanical)
Industrial Training : C.T.T.C Auto-CAD Bhubaneswar
Computer Exposure : Auto-CAD, MS Office, C and C++
Personal Details:
o Father Name : Nayan Kumar Behera
o Date of Birth : 14th April 1982
o Gender : Male
o Marital Status : married
o Nationality : Indian
o Passport Number : H7150396
o Religion : Hindu
o Language known : Hindi, English.
Date:
Place: (Sagar Kumar Behera)

More Related Content

What's hot

Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEHSAN ASGHAR, RE
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectAllen Green
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Manish Gupta
 

What's hot (20)

Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
AMM_Resume_160620
AMM_Resume_160620AMM_Resume_160620
AMM_Resume_160620
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
cv
cvcv
cv
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 

Viewers also liked

sujitResume (76)
sujitResume (76)sujitResume (76)
sujitResume (76)S phutane
 
New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2Khaled Al Awadi
 
Resume updated
Resume updatedResume updated
Resume updatedbight anto
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH M
 
David J. Kuff Resume 9.04
David J. Kuff Resume 9.04David J. Kuff Resume 9.04
David J. Kuff Resume 9.04kufflink
 
Tanver ali (inspector) 01 09-16
Tanver ali (inspector)   01 09-16Tanver ali (inspector)   01 09-16
Tanver ali (inspector) 01 09-16ali tanveer
 
Structural ENgineer (Civil)
Structural ENgineer (Civil)Structural ENgineer (Civil)
Structural ENgineer (Civil)Phani Krisha
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 

Viewers also liked (18)

Sheik Nizamuddin CV
Sheik Nizamuddin CV Sheik Nizamuddin CV
Sheik Nizamuddin CV
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
sujitResume (76)
sujitResume (76)sujitResume (76)
sujitResume (76)
 
MuraliCV
MuraliCVMuraliCV
MuraliCV
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2
 
C.V Ibrahim AlSalmi
C.V Ibrahim AlSalmiC.V Ibrahim AlSalmi
C.V Ibrahim AlSalmi
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
Resume updated
Resume updatedResume updated
Resume updated
 
R BALAJI - JUNE 2016
R BALAJI - JUNE 2016R BALAJI - JUNE 2016
R BALAJI - JUNE 2016
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)
 
David J. Kuff Resume 9.04
David J. Kuff Resume 9.04David J. Kuff Resume 9.04
David J. Kuff Resume 9.04
 
Tanver ali (inspector) 01 09-16
Tanver ali (inspector)   01 09-16Tanver ali (inspector)   01 09-16
Tanver ali (inspector) 01 09-16
 
Komninos_CV_Jan2015
Komninos_CV_Jan2015Komninos_CV_Jan2015
Komninos_CV_Jan2015
 
CV-JAYA MISHRA
CV-JAYA MISHRACV-JAYA MISHRA
CV-JAYA MISHRA
 
Structural ENgineer (Civil)
Structural ENgineer (Civil)Structural ENgineer (Civil)
Structural ENgineer (Civil)
 
AMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - CopyAMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - Copy
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 

Similar to Sagar_cv

ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCIbrahim Moustafa Farag
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docMuthukumar RajaGounder
 
Subin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin Singh
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSubin Singh
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_NewHamed Elawady
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 
TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract Tivra Tarun
 

Similar to Sagar_cv (20)

ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOC
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
CV
CVCV
CV
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
bio data 1
bio data 1bio data 1
bio data 1
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Subin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin singh steel_structural_engineer
Subin singh steel_structural_engineer
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 

Sagar_cv

  • 1. CURRICULUM – VITAE Mr. Sagar Kumar Behera Email: - sagarkumarbehera@yahoo.co.in Mobile No. : +971 561743325, +91 8018158560, Objective:- Looking for a career in EPC Industry and Project Management. Key Skills:- Proposal, Estimation, Cost Estimation, MS Project, Construction Execution, QC and safety . Profile:- Experience (8 years and 6 month’s)  In construction / Manufacturing Industries and EPC Company as a Proposal Estimator, Cost Estimator , MS Project Level II Planning , Execution, ISO metric drawing of steam pipeline, connection Piping take offs , fabrication / Erection Of piping. Achievement:- Employer: - Integrated Specialized General Contracting Company W.L.L Role: - Proposal Engineer w www.iscco.ae Period: Dec. 2015 – Till date. Responsibility:- • Study all Bid documents along with specification, Addendum and Equipment Data Sheet. • Prepare Project synopsis based upon Scope of work & Tender document’s. • Attend site visit. • Coordinate with Engineering and Procurement Department. • Prepare RFQ based upon Scope of supply. • Reply queries of the subcontractor. • Prepare Level II Planning Schedule. • Taking QTY Based upon Project Scope. • Prepared Technical Doc Based on Project Requirement. Major project involved:- • Train 1 & 2 Gasco Short down Project. • Long Term SD Y2017 to Y2022. • Gasco EPC Project’s . Employer: - Arabian Industry Manuafacturing LLC Role: - Proposal Estimation Engineer w www.arabian-industries.net Period: Mar. 2014 – Till date. Responsibility:- • Study all Bid documents along with specification, Addendum and Equipment Data Sheet. • Prepare Project synopsis based upon Scope of work & Tender document’s. • Attend site visit. • Coordinate with Engineering and Procurement Department. • Prepare RFQ based upon Scope of supply. • Reply query’s of the subcontractor. • Prepare Direct Cost & Indirect Cost for Tank / Pig Traps / Vessel fabrication. • Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis). • Prepared Technical Doc Based on Project Requirement. Major project involved:- • Design, Fabrication & Supply of Pig Traps for KOC Project ( Petrofac International UAE.)
  • 2. • Design, Fabrication & Supply 40 No Pig Traps, Vessel’s & Air Receiver for ADCO Project (Petrofac Emirate UAE). • Design, Fabrication & Supply of Prefabricated and fabricated Tanks 25 No for Yibal Khuff Project, PDO. • Design, Fabrication & Supply of Air receiver for OXY Project - Oman Pipeline Supply Company LLC. • EPC for Internal Modifications In DHDS Unit for Cool Sepatator ( V-2002 ) & LP Flash Drum ( V-2005 ) Orpic. Employer: - Petron Engineering Construction.Ltd Role: - Sr. Executive Engineer w www.petronengineering.com Period: Jan. 2013 – Feb.2014. Responsibility:- • Study Tender document along with scope of work, specification and Addendum and P&ID, • Prepare Project synopsis based upon Scope of work & Tender document’s. • Attend site visit. • Forward all tender document to Engineering Department for Preparation of BOQ. • Coordinate with Marketing, Engineering and Procurement Department. • Prepare RFQ float enquiry for Quotation based upon Scope of supply. • BOQ analysis of Piping fabrication & Erection, Equipment Erection, Structural Fabrication & Erection. • Construction Estimation Detail Scope of work breaks up. • Prepare Direct Cost & Indirect Cost for Piping, Equipment and Structural Steel fabrication & Erection. • Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis). • Prepared Technical Doc Based on Project Requirement. Major project involved:- • Zeeco. ( Flare stack Erction Work’s ) • TECHNIMONT ICB. (Mechanical & Equipment Erection works). • IHI CORPORATION LTD. ( Mechanical & Electrical works , Dahej Expention Phase – III , Petronet LNG ) Employer: - Bharath Quality Engineers.Pvt.Ltd Role: - Sr. Cost Estimation Engineer w www.bqengineers.com Period: Sep.2012 – Dec. 2012. Responsibility:- • Prepared PQ Based Upon SOI. • Prepare RFQ based upon Scope of supply. • BOQ analysis of Piping, Equipment for Construction Estimation. • Prepare Direct Cost & Indirect Cost Sheet Piping, Equipment, Structural Steel fabrication & Erection, Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis). • Prepare RFQ based upon Scope of work. • Vender selection & Negotiation for Subcontractor. • Prepared Technical Doc Based on Project Requirement. Major project involved:- • ENVIROPOL ENGINEERS PVT. LTD. (Blasting & Painting Project - WO Relish). • Lanco Infratech Limited - EPC Division (Blasting & Painting Project) (Under Negotiation). • R.K.POWERGEN (P) Ltd. (Boiler Shut down Project) (Under Negotiation). • BPCL- Kochi Shut down Project throught M/s SHILPI ENGINEERING PVT. LTD. (API Certified Inspectors & NDT Inspectors – manpower supply WO Relish ) • BPCL Mahul Refinery during Shut down Project through M/s SHILPI ENGINEERING PVT. LTD. (Under Negotiation).
  • 3. Employer: - Mohammad Al-Mojil Group (Mmg). Role: - Proposal Estimation E&C, Maintenance www.almojilgroup.com Period: Oct 2010 –Oct 2011. Responsibility:- • Study Tender documents along with scope of work, specification and Addendum and P&ID Detail Scope of work break up. • Prepare Preliminary Level – 2 Construction Schedule. • Prepared BOQ from P&ID’s. • Prepare Direct Cost & Indirect Cost Sheet Piping, Equipment, Structural Steel Erection • Fill total Summary sheet based upon Scope of Work (unit rates/ Lum Sum Basis). • Prepared Technical Doc Based on Project Requirement. • Attend Site visit. Major project involved:- • Package 1 to 12 (YR Refinery-Execution of Various Projects). ( Completed ) • UNITED EG – 2 LSTK (Completed) (PO Relish). • SAFCO – IV; Cooling Tower Civil Repair (TA 2011). • YRD – Revamp of CDU Column internals (Tray Replacement Work).( Completed ) • YRD - Execute 2011 PP & EU Projects during TA Feb 2011.( Completed ) • YRD – Execute 2011 TRS Projects during Yanbu TA Feb – 2011. ( Completed ) • STS / DRIC Al – Tuwairqi, Reformer - I Tubes & Catalyst Replacement. ( PO Relish) • STS / DRIC Al – Tuwairqi, Reformer - II Tubes & Catalyst Replacement. ( PO Relish) • Removal and Load Catalyst Sulfer Converters. (Hawiyah Gas Plant) ( Completed ) • Aramco Plant 493 E15 Equipment Drums & Exchangers.( Completed ) • Unloading / Reloading Activated Carbon from absorption Drumps.( Completed ) • Removing & Reinstallation of Tubes Bundles at Hawiyah Gas Plant.( Completed ) • PR for Supply & Construction At IBB AL– BAYTAR Plant. • Provide and install New Recovery water line14” Inch.(SADAF SABIC) (Under Negotiation) • Replacement of HP Scrubber. Employer:- PUNJ LLOYD LTD (Gurgaon) Role:- Sr. Proposal Estimation Engineer www.punjlloyd.com Period: April 2008 – Oct – 2009. Responsibility:- • Study Tender documents along with scope of work, specification and Addendum. • Forward Scope Of work P&ID , Plot Plan , Equipment data Sheet’s & Project Specification for BOQ. • Prepared RFQ based upon Scope of work & forward all required documents to Procurement Department for quotation. • Prepared Project Synopsis. • Detail Scope of work break up, few projects’ Taking piping MTO. • Coordinate with Marketing, Engineering and Procurement Department. • Check the entire MTO'S and Equipment list after received from Engineering Department based upon P & ID & Plot plan. • Preparation of technical Bid. • Received Technical Quires from procurement Department and reply to procurement Department. • Prepare difference between two projects. • Prepare Direct Cost & indirect cost A3 Sheet for Piping, Equipment, NDT, Insulation, Structural Steel fab & Erection etc. Major project involved:- • NHRC Project (ONGC Project). (completed) • MHN Project (ONGC Project). (completed) • B-22 Project (ONGC Project). (completed) • Ruwais 4th NGL Train_GASCO_Linde. (UAE Project). (completed)
  • 4. • Habshan5_ GASCO_ Saipem (UAE Project). (completed) • Eastern Province Phase-2 Water Transmission System (SAUDI ARABIA. Project) (completed) • Habshan5_Saipem (UAE GASCO Project). (completed) Employer:- Foster wheeler India PVT.LTD, ( Chennai ) Role:- Estimation Engineer piping www.fwc.com Period:-May 2007- April 2008 Responsibility:- • Study P&id and plot plan’s , • MTO take off Notes according to our pipest and k- base software, • Prepare the checklist , for each unit, • Download all the necessary documents from the docs store and placed it on the w-drive, • After preparation of MTO sheets prepared softcopy, • Checking my own MTO sheets after preparation , Major project involved:- • NLLNG • Saudi Aramco manifa project • Para deep IOCL Project, ( PO Relish) • Karan gas projects, Involvement in project units:- • NLLNG- Alkylation unit,( completed ) • Saudi Aramco manifa – sulpher complex and GOSSE – I, GOSSE – II,( completed ) • Para deep IOCL -- Hydro generation unit, completely done by alone,( completed ) • Karan gas ( completed ) Employer: - Reliance Engineering Associate Role: Mechanical Engineer Private Limited, Jamnagar. Period: July 2005 –April 2007, www.ril.com Responsibility: • Interpretation of Standard Drawings for U/G piping & A/G Piping according to the specification, Verification & Monitoring the pipeline drawing. • Estimation & vendor co-ordination • Site supervision and Execution of time bound jobs. • Preparation of manpower & material take-off requirement • Co-ordination with contractor & sub-contractor. • Co-ordination our planning & quality Department • Review and verification for engineering, procurement & construction and the overall project • Planning for pre fabrication & Erection of spools. • Attending weekly meet with the contractor. Major Project Involved: • Sulpher complex A/G piping • Alkali A/G piping and U/G piping • FCC Structure
  • 5. Academic Qualification: Qualification : B.E. (Mechanical) Industrial Training : C.T.T.C Auto-CAD Bhubaneswar Computer Exposure : Auto-CAD, MS Office, C and C++ Personal Details: o Father Name : Nayan Kumar Behera o Date of Birth : 14th April 1982 o Gender : Male o Marital Status : married o Nationality : Indian o Passport Number : H7150396 o Religion : Hindu o Language known : Hindi, English. Date: Place: (Sagar Kumar Behera)
  • 6. Academic Qualification: Qualification : B.E. (Mechanical) Industrial Training : C.T.T.C Auto-CAD Bhubaneswar Computer Exposure : Auto-CAD, MS Office, C and C++ Personal Details: o Father Name : Nayan Kumar Behera o Date of Birth : 14th April 1982 o Gender : Male o Marital Status : married o Nationality : Indian o Passport Number : H7150396 o Religion : Hindu o Language known : Hindi, English. Date: Place: (Sagar Kumar Behera)