SlideShare a Scribd company logo
1 of 5
Abi Ninan Joseph
Career Objective
To enter into an organization having wide opportunities which will exploit my inherent capabilities to the peak and to be a leading factor
in the development of the firm.
Strong Traits
 Strong Planning, Scheduling & coordinating skills.
 Strong Project management skills from initiating, planning, executing, monitoring& control till the
closing of an industrial project.
 Ability to lead and motivate.
 Strong interpersonal skills.
 Adapt well to work in a team and also individually.
 Flexible and has a capacity to organize any job in a systematic manner.
 Excellent communication and presentation skills.
Academic Credentials
B. E (Mechanical) Acharya Institute Of Technology,
(Visweswaraiyah Technological University), Bangalore,India.
Aug-2008
12th (CBSE) Indian School, Bahrain. Mar-2003
10th (CBSE) Indian School, Bahrain Mar-2001
Certifications
1) AutoCAD 6.0(Autodesk certified) 2)Inventor(Autodesk certified) 3)solid works
4) SAP (MM module) 5) Primavera P6
Tel :00973-39300075(Bahrain)
:00973-39660716(BAH)
Email: abijoseph688@hotmail.com
: abi.rox@gmail.com
WORK EXPERIENCE
MECHANICAL ENGINEER/CO-ORDINATOR
MAC, Bahrain (Mohd.Ahmadi Group) 2008-2010
(Mechanical Fabrication & erection)
 Responsible for conducting site visits to estimate the work as per the client requirement. Based on these estimate, assisted
the engineering department to develop the shop drawings.
 Prepared the quotations, method statements and scheduled the job as per the client requirement.
 Worked closely with the team members right from the beginning and assured effective job completion with in the scheduled
period.
 Controlled and supervised staff functioning.
MECHANICAL ENGINEER (SITE ENGINEER)
Metal services for trading & contracting. (Aramco and MEP contractor) 2010-2012
MSTC, KSA,
Plumbing & fire water lines(Mechanical Fabrication & erection) KSU HOSPITAL PROJECT
 Responsible for installation of piping (plumbing, &firefighting) works at site by reading and interpreting the technical
drawings to the supervisors.
 Preparing the material take off for the piping work based on the priority list .Also planned and distributed the work as
per the project schedule.
 Provided feedback/report to the design engineers/consultants about the site problems and requirements.
 Raising the material purchase request based on the schedule and specification.
 Performing and inspecting the hydro/pressure test at site.
 Ensured that the piping is in accordance with the approved engineering drawings and specification.
 Prepared & submitted the daily progress report to the Project Manager.
 Planning along with supervisors ahead of the schedule.
 Preparing the method statements and AS BUILT drawings.
 Commissioning.
PROJECT ENGINEER (MECHANICAL ENGINEER)
Nass Mechanical Contracting.(Bapco approved contractor) 2012-current date
NMC, Bahrain,
SULB steel plant NGL 14" and 20" pipeline (UG/AG) project
(Fabrication, erection & commissioning)
 Maintaining proper coordination with consultants and contractors for basic engineering & detail engineering aspects of Project.
 Worked towards achieving timely completion of all the project activities as per the
 Submitted/approved project schedule.
 Prepared Method statements for various activities, and submitting TQ’s & material transmittals
 To the consultants for approval.
 Arranged and attending Progressive meetings with client, Consultant, Bahrain petroleum (Bapco) and sub-contractors.
 Controlled and supervised staff functioning.
 Responsible for installation of piping work (U/G, A/G) and performing hydro test, pigging,
 Nitrogen purging works at site.
 Provided feed back to the design engineers/consultants on the problems and suggested the site Requirements.
 Raised the Purchase requisition for the materials required for installation.
 Prepared the AS BUILT drawings.
 Ensured that pipeline is constructed in accordance with the approved engineering drawings.
 Calculated the additional variations for the additional activities.
 Reporting the daily site activities to the project manager.
 Participated in Pre Start-up Safety Review (PSSR) & HAZOP meeting with the consultant and Bapco.
 Commissioning of the gas line & handing over the project to the client.
Tank Projects
Tank Fabrication and Erection : Tatweer Petroleum C project of Storage Tanks (TB-07 & TB-08) as per API 650 – 22 Nos.
Client – Tatweer Petroleum Bahrain.
Consultant – Ismail Khonji Associate,
Duration – 12 Month.
TankFabrication & Erection: Arabian Sugar Plant, Bahrain
Fabrication and Erection of Stainless Steel Tank – 02 Nos. (Φ4m x 8m) & C.S. Tanks – 01 No. (Φ8M x 16m). Client
– Alliance Project. (ARABIAN SUGAR PLANT) – Bahrain.
Duration - 3 Month
Responsibilities handled in the Tank Projects
 Worked as site engineer.
 Arrange the kick off meetings with internal department to identify clear scope of work for execute the successful
project.
 Responsibilities included to Participate and developed Project initiation phase, Project execution, Project planning
& control analysis, project execution plan, and project close out.
 Controlled and supervised staff functioning.
 Worked closely with the engineering, procurement and construction Team.
 Prepared project schedule.
 Coordination and ensuring of engineering deliverables on time to client.
 Ensure focus on client requirement throughout the project.
 Ensure the effective and efficient Quality/HSE management system on the project.
 Participating in client meeting and resolve project issue.
 Arrange the weekly internal meeting to discuss on the project progress in order to avoid any delay in project.
 Ensure that tanks are constructed in accordance with the engineering drawings.
 Ensuring all the fabrication and construction work are going as per the Project Schedule.
 Liaise with production, stores and accountants.
 Maintaining proper coordination with consultants and contractors for basic engineering & detail engineering
aspects of Project.
 Provide the technical support to site construction team to identify field construction problem and take remedy
action to solve the problem.
 Prepare and monitoring weekly and monthly progress reports.
 Prepare monthly manpower histogram.
 Identifying all cost and/ or Schedule trends that may adversely affect project progress, & contractual commitments.
 Calculated the additional variations for the additional activities.
 Prepared the AS BUILT drawings.
Assembly &erection of steel arch bridge : US Navy, Bahrain
Erection of 540 Ton Steel Structure of ARCH Bridge for US NAVY.
Client – Cleveland & Bridge (CBME).
Duration: 03 Month. (Started Sept. 2013)
 Worked as a project engineer
 Performed site visits along with the client and consultants.
 Prepared method statement & rigging plan for the bridge erection.
 Worked closely with the team members right from the mobilization stage to the demobilization stage and assured
effective job completion with in the scheduled period.
 Responsible for overall site co-ordination and work progress.
 Prepared daily reports & progress.
 Prepared variations for the additional work carried out.
Fabrication and erection of Lifting Beam to transport the steel arch bridge.
Fabrication and Erection of 200 Ton Lifting Beam of ARCH Bridge for US NAVY. Client – Nass Contrack.
Duration - 0 4 Month (Started Aug, 2013)
 Worked as a project engineer
 Performed site visits to prepare the rigging plan along with all the other contractors.
 Prepared erection method statement.
 Attended the client co-ordination & progress meetings
 responsible for overall site co-ordination
 Prepared daily reports & progress.
 Site erection with in the approved project schedule.
 Assisted M/s Sarens in transporting (using SPMT) 2800T bridge to its final position.
Fabrication and erection of Nitrogen purging piping to export DRI (shut down project)
(contact with SULB)
• Performed site visits during vessel arrival to ensure the access and permit for the workforce.
• Scheduled and arranged materials, manpower and equipments for site activities.
• Attended the client co-ordination & progress meetings.
• Responsible for overall site co-ordination and Piping.
• Ensured fabrication & erection with in the shutdown period (I day).
• Prepared the variation for the additional works (out of scope activities) .
HPC Power Plant Distiller piping (shut down project :- Fabrication & erection)
HPC Power Plant Co2 Piping replacement (Fabrication and erection)
• Worked as a project engineer
• Performed site visits to take the site measurement.
• Prepared fabrication & erection method statement.
• Attended the client meetings
• responsible for overall site co-ordination and Piping.
• Assisted engineering in preparing the piping drawing.
• Ensured fabrication & erection with in the shutdown period.
• Prepared site access passes for all the manpower.
• Scheduled and arranged materials, manpower and equipments for site activities.
Heat recovery Duct for Kobelco (Fabrication)
• Prepared TQ's and submittals for approval.
• Attended the client meetings
• Prepared daily progress reports.
• responsible for overall co-ordination & fabrication.
• Ensured fabrication with in the allotted period.
• Scheduled and arranged manpower & equipments for delivery at site.
• Prepared variations for the additional work.
Awal modern lift crane girder fabrication and erection- 4 units at different location
• Worked as a project engineer
• Performed site visits to take the site measurement.
• Prepared fabrication & erection schedule.
• responsible for overall site co-ordination & fabrication.
• Assisted engineering in preparing the fabrication and erection drawings.
• Ensured fabrication & erection with in the schedule.
• Scheduled and arranged materials, manpower and equipments for site erection
• Prepared variations for the additional work.
Tekfen Bending (SADARA project)- Pipe Bending
• Bending 2",3",4",6" CS & SS lines
• Released bending drawing along with the bending list
• Prepared bending report
• Follow up with qc dept. on the bending inspection
• Monitoring bending progress.
• Co-ordination with engineering regarding bending activities.
• Prepared and issued bending list daily.
• Prepared dispatch report for the pipe spools and crosschecked it with the production dispatch
Report to minimize error.
GPIC Petrochemical PlantShutdown 2015.
(Project In-charge for 198 manpower of different trade like supervisors, foreman, riggers, stationary mechanics, welders, fabricators,
helpers, drivers, storekeepers etc. during the turnaround 2015)
GPIC Petrochemical Plant generator removal (old) and Erection (New).
• Worked as project engineer.
• Prepared method statement.
• Prepared the schedule.
• Visited the site for preparing the rigging/erection plan and risk assessment.
• prepared the drawing by taking site measurement
• Scheduling the manpower and equipments required for site activities.
• Executed the activities as per the schedule during the shutdown & commissioning.
FALCON CEMENT PLANT EXPANSION PROJECT (ONGOING).
780TON STEEL STRUCTURE FOR BELT CONVEYORS,BUCKET ELEVATORS, MATERIAL HOPPERS, BALL MILL (500TON),
AIRSLIDES & SILOS
• Working as a project engineer.
• Reading & interpreting IFC drawings to the supervisors.
• preparing the erection /assembly reports
• Prepared the schedule.
• Preparing the daily progress reports & material segregation report.
• Preparing the technical queries & RFI's
• Monitoring the progress based on the schedule and updating it.
• Arranging & attending client progressive meetings.
Personal Details
Date of Birth : 30-09-1985
Father's Name : Joseph Daniel
Languages known : English, Hindi, Malayalam
Passport Number : M3902979
Validity : NOV-2014 to NOV-2024
Place of Issue : Trivandrum
Address
Permanent address
Ottaplavilayil Peniel Mandiram,
Pathanamthitta District,
Adoor P.O, Kannamkodu, Kerala.
Current address
Ahmadi Packing & forwarding
P.O.20267,
Manama, Kingdom Of Bahrain.
Declaration
I hereby declare that the above furnished details are true to the best of my knowledge.
Place: Bahrain
Date: 10/01/2016
Abi Ninan Joseph

More Related Content

What's hot

SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringM.K NARAYANA
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineerandi dipayadnya
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resumeiminneedofu
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDhakshina murthy
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tcBINOY TC
 

What's hot (20)

CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Updated CV
Updated CVUpdated CV
Updated CV
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normal
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
 

Similar to Abi Ninan Joseph Career Profile

Similar to Abi Ninan Joseph Career Profile (20)

KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
RAVI CV (1)
RAVI CV (1)RAVI CV (1)
RAVI CV (1)
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 

Abi Ninan Joseph Career Profile

  • 1. Abi Ninan Joseph Career Objective To enter into an organization having wide opportunities which will exploit my inherent capabilities to the peak and to be a leading factor in the development of the firm. Strong Traits  Strong Planning, Scheduling & coordinating skills.  Strong Project management skills from initiating, planning, executing, monitoring& control till the closing of an industrial project.  Ability to lead and motivate.  Strong interpersonal skills.  Adapt well to work in a team and also individually.  Flexible and has a capacity to organize any job in a systematic manner.  Excellent communication and presentation skills. Academic Credentials B. E (Mechanical) Acharya Institute Of Technology, (Visweswaraiyah Technological University), Bangalore,India. Aug-2008 12th (CBSE) Indian School, Bahrain. Mar-2003 10th (CBSE) Indian School, Bahrain Mar-2001 Certifications 1) AutoCAD 6.0(Autodesk certified) 2)Inventor(Autodesk certified) 3)solid works 4) SAP (MM module) 5) Primavera P6 Tel :00973-39300075(Bahrain) :00973-39660716(BAH) Email: abijoseph688@hotmail.com : abi.rox@gmail.com
  • 2. WORK EXPERIENCE MECHANICAL ENGINEER/CO-ORDINATOR MAC, Bahrain (Mohd.Ahmadi Group) 2008-2010 (Mechanical Fabrication & erection)  Responsible for conducting site visits to estimate the work as per the client requirement. Based on these estimate, assisted the engineering department to develop the shop drawings.  Prepared the quotations, method statements and scheduled the job as per the client requirement.  Worked closely with the team members right from the beginning and assured effective job completion with in the scheduled period.  Controlled and supervised staff functioning. MECHANICAL ENGINEER (SITE ENGINEER) Metal services for trading & contracting. (Aramco and MEP contractor) 2010-2012 MSTC, KSA, Plumbing & fire water lines(Mechanical Fabrication & erection) KSU HOSPITAL PROJECT  Responsible for installation of piping (plumbing, &firefighting) works at site by reading and interpreting the technical drawings to the supervisors.  Preparing the material take off for the piping work based on the priority list .Also planned and distributed the work as per the project schedule.  Provided feedback/report to the design engineers/consultants about the site problems and requirements.  Raising the material purchase request based on the schedule and specification.  Performing and inspecting the hydro/pressure test at site.  Ensured that the piping is in accordance with the approved engineering drawings and specification.  Prepared & submitted the daily progress report to the Project Manager.  Planning along with supervisors ahead of the schedule.  Preparing the method statements and AS BUILT drawings.  Commissioning. PROJECT ENGINEER (MECHANICAL ENGINEER) Nass Mechanical Contracting.(Bapco approved contractor) 2012-current date NMC, Bahrain, SULB steel plant NGL 14" and 20" pipeline (UG/AG) project (Fabrication, erection & commissioning)  Maintaining proper coordination with consultants and contractors for basic engineering & detail engineering aspects of Project.  Worked towards achieving timely completion of all the project activities as per the  Submitted/approved project schedule.  Prepared Method statements for various activities, and submitting TQ’s & material transmittals  To the consultants for approval.  Arranged and attending Progressive meetings with client, Consultant, Bahrain petroleum (Bapco) and sub-contractors.  Controlled and supervised staff functioning.  Responsible for installation of piping work (U/G, A/G) and performing hydro test, pigging,  Nitrogen purging works at site.  Provided feed back to the design engineers/consultants on the problems and suggested the site Requirements.  Raised the Purchase requisition for the materials required for installation.  Prepared the AS BUILT drawings.  Ensured that pipeline is constructed in accordance with the approved engineering drawings.  Calculated the additional variations for the additional activities.  Reporting the daily site activities to the project manager.  Participated in Pre Start-up Safety Review (PSSR) & HAZOP meeting with the consultant and Bapco.  Commissioning of the gas line & handing over the project to the client. Tank Projects Tank Fabrication and Erection : Tatweer Petroleum C project of Storage Tanks (TB-07 & TB-08) as per API 650 – 22 Nos. Client – Tatweer Petroleum Bahrain. Consultant – Ismail Khonji Associate, Duration – 12 Month.
  • 3. TankFabrication & Erection: Arabian Sugar Plant, Bahrain Fabrication and Erection of Stainless Steel Tank – 02 Nos. (Φ4m x 8m) & C.S. Tanks – 01 No. (Φ8M x 16m). Client – Alliance Project. (ARABIAN SUGAR PLANT) – Bahrain. Duration - 3 Month Responsibilities handled in the Tank Projects  Worked as site engineer.  Arrange the kick off meetings with internal department to identify clear scope of work for execute the successful project.  Responsibilities included to Participate and developed Project initiation phase, Project execution, Project planning & control analysis, project execution plan, and project close out.  Controlled and supervised staff functioning.  Worked closely with the engineering, procurement and construction Team.  Prepared project schedule.  Coordination and ensuring of engineering deliverables on time to client.  Ensure focus on client requirement throughout the project.  Ensure the effective and efficient Quality/HSE management system on the project.  Participating in client meeting and resolve project issue.  Arrange the weekly internal meeting to discuss on the project progress in order to avoid any delay in project.  Ensure that tanks are constructed in accordance with the engineering drawings.  Ensuring all the fabrication and construction work are going as per the Project Schedule.  Liaise with production, stores and accountants.  Maintaining proper coordination with consultants and contractors for basic engineering & detail engineering aspects of Project.  Provide the technical support to site construction team to identify field construction problem and take remedy action to solve the problem.  Prepare and monitoring weekly and monthly progress reports.  Prepare monthly manpower histogram.  Identifying all cost and/ or Schedule trends that may adversely affect project progress, & contractual commitments.  Calculated the additional variations for the additional activities.  Prepared the AS BUILT drawings. Assembly &erection of steel arch bridge : US Navy, Bahrain Erection of 540 Ton Steel Structure of ARCH Bridge for US NAVY. Client – Cleveland & Bridge (CBME). Duration: 03 Month. (Started Sept. 2013)  Worked as a project engineer  Performed site visits along with the client and consultants.  Prepared method statement & rigging plan for the bridge erection.  Worked closely with the team members right from the mobilization stage to the demobilization stage and assured effective job completion with in the scheduled period.  Responsible for overall site co-ordination and work progress.  Prepared daily reports & progress.  Prepared variations for the additional work carried out. Fabrication and erection of Lifting Beam to transport the steel arch bridge. Fabrication and Erection of 200 Ton Lifting Beam of ARCH Bridge for US NAVY. Client – Nass Contrack. Duration - 0 4 Month (Started Aug, 2013)  Worked as a project engineer  Performed site visits to prepare the rigging plan along with all the other contractors.  Prepared erection method statement.  Attended the client co-ordination & progress meetings  responsible for overall site co-ordination  Prepared daily reports & progress.  Site erection with in the approved project schedule.  Assisted M/s Sarens in transporting (using SPMT) 2800T bridge to its final position.
  • 4. Fabrication and erection of Nitrogen purging piping to export DRI (shut down project) (contact with SULB) • Performed site visits during vessel arrival to ensure the access and permit for the workforce. • Scheduled and arranged materials, manpower and equipments for site activities. • Attended the client co-ordination & progress meetings. • Responsible for overall site co-ordination and Piping. • Ensured fabrication & erection with in the shutdown period (I day). • Prepared the variation for the additional works (out of scope activities) . HPC Power Plant Distiller piping (shut down project :- Fabrication & erection) HPC Power Plant Co2 Piping replacement (Fabrication and erection) • Worked as a project engineer • Performed site visits to take the site measurement. • Prepared fabrication & erection method statement. • Attended the client meetings • responsible for overall site co-ordination and Piping. • Assisted engineering in preparing the piping drawing. • Ensured fabrication & erection with in the shutdown period. • Prepared site access passes for all the manpower. • Scheduled and arranged materials, manpower and equipments for site activities. Heat recovery Duct for Kobelco (Fabrication) • Prepared TQ's and submittals for approval. • Attended the client meetings • Prepared daily progress reports. • responsible for overall co-ordination & fabrication. • Ensured fabrication with in the allotted period. • Scheduled and arranged manpower & equipments for delivery at site. • Prepared variations for the additional work. Awal modern lift crane girder fabrication and erection- 4 units at different location • Worked as a project engineer • Performed site visits to take the site measurement. • Prepared fabrication & erection schedule. • responsible for overall site co-ordination & fabrication. • Assisted engineering in preparing the fabrication and erection drawings. • Ensured fabrication & erection with in the schedule. • Scheduled and arranged materials, manpower and equipments for site erection • Prepared variations for the additional work. Tekfen Bending (SADARA project)- Pipe Bending • Bending 2",3",4",6" CS & SS lines • Released bending drawing along with the bending list • Prepared bending report • Follow up with qc dept. on the bending inspection • Monitoring bending progress. • Co-ordination with engineering regarding bending activities. • Prepared and issued bending list daily. • Prepared dispatch report for the pipe spools and crosschecked it with the production dispatch Report to minimize error. GPIC Petrochemical PlantShutdown 2015. (Project In-charge for 198 manpower of different trade like supervisors, foreman, riggers, stationary mechanics, welders, fabricators, helpers, drivers, storekeepers etc. during the turnaround 2015)
  • 5. GPIC Petrochemical Plant generator removal (old) and Erection (New). • Worked as project engineer. • Prepared method statement. • Prepared the schedule. • Visited the site for preparing the rigging/erection plan and risk assessment. • prepared the drawing by taking site measurement • Scheduling the manpower and equipments required for site activities. • Executed the activities as per the schedule during the shutdown & commissioning. FALCON CEMENT PLANT EXPANSION PROJECT (ONGOING). 780TON STEEL STRUCTURE FOR BELT CONVEYORS,BUCKET ELEVATORS, MATERIAL HOPPERS, BALL MILL (500TON), AIRSLIDES & SILOS • Working as a project engineer. • Reading & interpreting IFC drawings to the supervisors. • preparing the erection /assembly reports • Prepared the schedule. • Preparing the daily progress reports & material segregation report. • Preparing the technical queries & RFI's • Monitoring the progress based on the schedule and updating it. • Arranging & attending client progressive meetings. Personal Details Date of Birth : 30-09-1985 Father's Name : Joseph Daniel Languages known : English, Hindi, Malayalam Passport Number : M3902979 Validity : NOV-2014 to NOV-2024 Place of Issue : Trivandrum Address Permanent address Ottaplavilayil Peniel Mandiram, Pathanamthitta District, Adoor P.O, Kannamkodu, Kerala. Current address Ahmadi Packing & forwarding P.O.20267, Manama, Kingdom Of Bahrain. Declaration I hereby declare that the above furnished details are true to the best of my knowledge. Place: Bahrain Date: 10/01/2016 Abi Ninan Joseph