CURRICULUM VITAE
Index
- Personal Information
- Personal Contact
- Academic Qualification
- Groups and Association
- Languages & Computer Background
- Professional Experience
1
Eng.Wael Darkazanli
MCM,PGDSE,BScCE
Jeddah – SaudiArabia
Mob.: +966(0)548299332
+963 (0)933559360
Email:
wael_darkazanli@yahoo.com
Website:
http://www.wael-dar.com
1
PERSONAL INFORMATION
NAME:
WAEL DARKAZANLI
PROFESSION:
CIVIL/STRUCTURAL ENGINEER
FATHER'S NAME:
MOHAMMAD MARWAN
DATE OF BIRTH:
NOVEMBER 28th, 1979
NATIONALITY:
SYRIAN
PLACE OF BIRTH:
SAUDIAARABIA
MARITAL STATUS:
MARRIED
2
Index
-Personal
Information
-Personal Contact
-Academic
Qualification
-Groups and
Association
-Languages &
Computer
Background
-Professional
Experience
PERSONAL CONTACTS
E-mail address :
wael_darkazanli@yahoo.com
Website :
www.wael-dar.com
LinkedIn:
http://sa.linkedin.com/pub/wael-
darkazanli/16/83b/3b6
Twitter:
http://twitter.com/wael_darkazanli
Skype:
wael_darkazanli
Phone nos. :
+966 (0)548 299 332 (Saudi Arabia)
+963 (0)933 559 360 (Syria)
3
Index
-Personal
Information
-Personal Contact
-Academic
Qualification
-Groups and
Association
-Languages &
Computer
Background
-Professional
Experience
ACADEMIC QUALIFICATION
Master of Science in Project Management
Robert Kennedy College – University of Wales – UK –
2011 (expected).
Master in Construction Management
MUST University – USA – 2010.
Post Graduate Diploma in Structural
Engineering
Aleppo University – Syria – 2004.
Bachelor of Civil/Structural Engineering -
Aleppo University – Syria – 2002.
4
Index
-Personal
Information
-Personal Contact
-Academic
Qualification
-Groups and
Association
-Languages &
Computer
Background
-Professional
Experience
GROUPS AND ASSOCIATION
• Project Management Institute PMI.
• Project Management Institute – Arabian
Gulf Chapter – PMI-AGC.
• Engineers Association – Aleppo – Syria.
5
Index
-Personal
Information
-Personal Contact
-Academic
Qualification
-Groups and
Association
-Languages &
Computer
Background
-Professional
Experience
LANGUAGES & COMPUTER BACKGROUND
Languages:
Arabic: Native Language
English: Fluent
Computer Background:
Good knowledge of the following packages:
-PRIMAVERA
-ROBOT 18
-ETABS 9
-SAP 2000 – 10
-AUTOCAD 2010
-MS OFFICE 2007 (Word, Excel & Power Point)
6
Index
-Personal
Information
-Personal Contact
-Academic
Qualification
-Groups and
Association
-Languages &
Computer
Background
-Professional
Experience
PROFESSIONAL EXPERIENCE
Since December, 2008
Employer: FADEN Trading & Contracting , Jeddah – Saudi Arabia
Since July, 2006 to October, 2008
Employer: Redco International, Doha – Qatar
Since April, 2006 to July, 2006
Employer: Al-Maher Company for Contracting & Services, Doha – Qatar
Since July, 2005 to February, 2006
Employer: Rapid Construction Company, Homs – Syria
Since May, 2005 to July, 2005
Employer: Technical Services Establishment, Aleppo – Syria
Since November, 2003 to May, 2005
Employer: Military Sociability Establishment, Aleppo – Syria
Since May, 2003 to November, 2003
Employer: Design office, Aleppo – Syria
Since September, 2002 to May, 2003, "evening time"
Employer: Engineering United Office, Aleppo – Syria
Since September, 2002 to May, 2003, "morning time"
Employer: Technical Services Establishment, Aleppo – Syria
7
Index
-Personal
Information
-Personal Contact
-Academic
Qualification
-Groups and
Association
-Languages &
Computer
Background
-Professional
Experience
FADEN Trading and Contracting
Company Description:
FADEN Trading and Contracting was established
in 1976 with its head office in Riyadh, the
Kingdom of Saudi Arabia.
Since its establishment, the company has
successfully completed different government
and private projects throughout the Kingdom.
FADEN consists of four main divisions:
Contracting, Electrical, Commercial and
FADEN Factory for Wood works.
Recently, FADEN has started a new type of
projects; a High Rise Building in Jeddah –
Saudi Arabia which will be the base for the
future innovation projects.
8
Index
FADEN
Trading &
Contracting
-Company
Description
-FADEN’s
Projects
FADEN Trading and Contracting
Projects:
 KING ROAD TOWER, JEDDAH – SAUDI
ARABIA
9
Index
FADEN
Trading &
Contracting
-Company
Description
-FADEN’s
Projects
FADEN Trading and Contracting
Project Description:
• This project consists of a 36 storey attached with
two annexes (north & south) 2B+ GF+ MEZ+ 5P for
each. All slabs are post-tension system.
• Three façades are full height Media Screen.
• The main façade is curved with a globe at the top.
• The roof is Helipad slab.
• The Employer is UNITED TRADING EST.
• The Engineer ASD ARCHITECTS
(ALDUGHAITHER ARCHITECTS).
• The Designer is KLING CONSULTANT (Branch
Office Dubai).
10
Index
FADEN’s
Projects
King Road
Tower
-Project Description
-Sub-Contractors
-Scope of Work
-Description of
Duties
FADEN Trading and Contracting
Sub-Contractors:
• CCL KSA for Post Tension System.
• Saudi Bauer for Piling and Dewatering Systems.
• TECHNO for Electro-Mechanical Works.
• 3i Solution-QUANTUM for IBMS.
• CitiLed for Media Screen Led.
• Thyssenkrup for Conveying Systems.
• SALUMCO for External Aluminum Façades.
• SOCOTEC as QA/QC Advisor.
• SBM for Ready mix Concrete and Concrete
Technology.
11
Index
FADEN’s
Projects
King Road
Tower
-Project Description
-Sub-Contractors
-Scope of Work
-Description of
Duties
FADEN Trading and Contracting
Scope of work:
• Project Engineer.
• QS Engineer
12
Index
FADEN’s
Projects
King Road
Tower
-Project Description
-Sub-Contractors
-Scope of Work
-Description of
Duties
FADEN Trading and Contracting
Description of Duties:
• Following the progress of the civil works through daily
reports submitted by all parties.
• Following the progress of all the subcontractors through
their daily reports.
• Preparing the final Daily Report about the project and
reporting the Project Manager.
• Following and preparing the Monthly Report about the
project.
• Preparing a monthly Presentation with a full description
about the current project status.
• Preparing and submitting all the Paper Work required for
the project.
• Preparing and submitting all the Paper Work required
for the project.
• Reporting the civil works to the Planner about the
updated progress for updating the schedule.
• Quantity surveying for the concrete works.
• Making comparison between BOQ quantities and
actual ones for concrete works.
• Tracking the executed concrete works to update the
executed percent-age in accordance with BOQ.
• Following Concrete Tests at the site, and Concrete Test
Results, and then reporting to the Construction
Management.
13
Index
FADEN’s
Projects
King Road
Tower
-Project Description
-Sub-Contractors
-Scope of Work
-Description of
Duties
Redco International
Company Description:
• Redco International was established in 1984
in Doha – Qatar
• Redco International Company is specialized
in Precast & Hollow Core Slabs.
• The scope of work has been increased to
cover Earth Works, Enabling Works, Ready
Mix Concrete and Electro-Mechanical Works.
• Recently, it expanded to be as a Main
Contractor for many big projects in Qatar.
14
Index
Redco
International
-Company
Description
-Scope of Work
-Design Office
-Marketing
Redco International
Scope of work:
• Manager of Design & Marketing
• Projects Coordinator.
• Coordination between pricing, designing, production
and erection.
• QC & Technical Engineer for dealing with consultants
and clients.
• Checking and following Quantity Surveying Section.
• Following all tenders, quotations and contracts.
• Following the Clients and Consultants to get the work
done as per the specifications and requirements.
• Preparing and making all the required design
calculations for precast elements and pre-tension
hollow core slabs by using EXCEL software, and in
accordance with ACI and PCI Codes.
• Making regular visits to all the clients to be updated for
all the new projects.
• Direct relation with top management of all companies
and clients was essential (with the support by our
Managing Director).
15
Index
Redco
International
-Company
Description
-Scope of Work
-Design Office
-Marketing
Redco International
DESIGN OFFICE
Projects:
 30 KINDERGARTENS IN DOHA AND VILLAGES, DOHA – QATAR
 7 SCHOOLS IN DOHA AND VILLAGES – DOHA – QATAR
 QIPCO OFFICE TOWER “THE TORNADO”– DOHA – QATAR
 QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI
– DOHA – QATAR
 B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT
BUILDING – DOHA – QATAR
 THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN
JABOR AL-THANI – DOHA – QATAR
 PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA STREET NO. 18 – DOHA – QATAR
 TEXAS A & M COLLAGE OF ENGINEERING – DOHA – QATAR
 UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) –
DOHA – QATAR
 PALACE FOR SHEIKH ABDULLAH BIN FALEH AL-THANI – DOHA
- QATAR
 QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI –
DOHA – QATAR
 LUSAIL DEVELOPMENT MARINE EARTH WORKS AND
PREPARATION – DOHA – QATAR
 PRIVATE BEACH VILLA COMPLEX – DOHA – QATAR
 DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF
FINANCE BUILDING AND CAR PARK – DOHA – QATAR
 RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA – DOHA – QATAR
 138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-
THANI – DOHA – QATAR
 AL ATHIYA HOLLOW CORE PROJECT – DOHA – QATAR
 QATAR POWER TRANSIMISSON SYSTEM EXPARSION - PHASE
VII – DOHA – QATAR
16
Index
Redco
International
-Company
Description
-Scope of Work
-Design Office
-Marketing
Redco International
30 KINDERGARTENS IN DOHAAND VILLAGES
DOHA – QATAR
• This project consists of 30 kindergartens.
• The Employer is ASHGHAL (PUBLICH WORKS AUTHORITY
PWA).
• Our company was awarded 28 kindergartens as follow,
• Package I: 10 kindergartens for DARWISH ENGINEERING, the
Engineer is ARAB CONSULTING ENGINEERS MOHARRAM-
BAKHOUM (ACE).
• Package II: 10 kindergartens for REDCO-NLC J.V, the Engineer
is GULF ENGINEERING AND INDUSTRIAL
CONSULTANTS (GEIC).
• Package III: 8 kindergartens, three are for HKH (HAMAD BIN
KHALID BIN HAMAD CO.), three are for QATARI
DEVELOPMENT and two are for AL-ATTIYAH ALCAT, and the
Engineer is QATAR ENGINEER & ASSOCIATES (QEA).
• Our scope of work is to design, produce and erect precast boundary
walls and precast cladding which were two thicknesses, 100mm and
250mm for 28 kindergartens, and 10 as a main contractor (REDCO-
NLC J.V.).
17
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
7 SCHOOLS IN DOHAAND VILLAGES
DOHA – QATAR
• This project consists of 7 schools.
• The Employer is ASHGHAL (PUBLICH WORKS AUTHORITY
PWA).
• The contractor is RAMCO TRADING AND CONTRACTING, and
the Engineer is MICA.
• Our scope of work is to design, produce and erect precast boundary
walls.
QIPCO OFFICE TOWER “THE TORNADO”
DOHA – QATAR
• This project consists of B2+B1+G+52 storey as cast in situ structure.
Stairs are pre cast concrete. The main contractor is SIX
CONSTRUCT - MIDMAC J.V.
• Our scope of work is to produce the pre cast stairs.
18
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE VI
DOHA – QATAR
• This project consists of boundary wall for 28 substations.
• The Employer is KAHRAMAA, Qatar General Electricity & Water
Corporation.
• The main contractor is GULF HOUSUNG & CONSTRUCTION
CO. (GHC).
• The Engineer is ENERGOPROJEKT FICHTNER CONSORTIUM
(EFC).
• Our scope of work is to design, produce and erect the boundary
walls as a subcontractor.
B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST
APARTMENT BUILDING
DOHA – QATAR
• This project consists of B1+B2+G+14storey.
• The Employer is ABDULAZIZ ABDURRAHIM AL EMADI.
• The Engineer is UNITED CONSULTANT (UC), and then changed
to GLOBAL VISION.
• Our scope of work is to construct the tower as cast in situ building
, floors are Hollow Core Slabs , cladding is pre cast panels.
19
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
DOHA – QATAR
• This project consists of two parts, first one is a new boundary
wall which is an extension to the existing wall, second one is a
new substation.
• The Employer is H.E.SHEIKH HAMAD BIN JASSIM BIN JABOR
AL-THANI – Prime Minister – Foreign Minister.
• The Engineer is ARAB ENGINEERING BUREAU (AEB).
• Our scope of work is to design , produce and erect the
boundary wall, and a complete construction of the substation
as cast in site with hollow core roof (turn key project).
PRECAST WORKS-SKELETION FOR 23 BUILDINGS
(G+2) AT INDUSTRIAL AREA STREET NO. 18
DOHA – QATAR
• This project consists of 23 buildings. These buildings are as villas
compound. The structural system is walls and hollow core slabs
which rest on those walls by making some connection details to
satisfy the complete connection between all elements.
• The Employer is ALI BIN HAMAD AL-ATTIYAH.
• Our scope of work is constructing the foundations, ground beams
and slabs as cast in situ, producing and erection of pre cast panels
and hollow core slabs to construct those villas.20
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
TEXAS A & M COLLAGE OF ENGINEERING
DOHA – QATAR
• This project is a part of the Education City in Doha.
• The Employer is Qatar Foundation and Qatar Petroleum.
• The Engineer is Kuwait Engineering Office (KEO).
• The main contractor is MIDMAC Contracting Co.
• Our scope of work is to fabricate and erect pre cast cladding with
different shapes and sizes as per architectural design.
UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT
(DIA)
DOHA – QATAR
• This project is located inside DIA to provide it with Jersey Barriers
to separate planes line from other facilities.
• The Employer is Doha International Airport.
• The Engineer is Dar Al-Handasah.
• The main contractor is Gulf Housing & Construction Co.
• Our scope of work is to produce and erect these Jersey Barriers.
21
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
PALACE FOR SHEIKH ABDULLAH BIN FALEH AL-
THANI
DOHA – QATAR
• This project consists of 30 kindergartens.
• This project consists of pre cast boundary walls and hollow core
slabs.
• Our scope of work is to design, produce and erect the boundary wall
and hollow core slabs 150mm, 200mm and 265mm thicknesses.
• The Employer is SHEIKH ABDULLAH BIN FALEH AL-THANI.
• The Engineer is ARAB ENGINEERING BUREAU (AEB).
• The main contractor is QATAR ARAB CONTRACTORS.
QATAR POWER TRANMISSION SYSTEM EXPANSION
PHASE VI
DOHA – QATAR
• This project consists of pre cast boundary walls.
• Our scope of work is to design, produce and erect the boundary wall.
• The Employer is KAHRAMAA, Qatar General Electricity & Water
Corporation.
• The Engineer is ENERGOPROJEKT FICHTNER CONSORTIUM
(EFC).
• The main contractor is Green Top International Co. (GTI).
22
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
LUSAIL DEVELOPMENT MARINE EARTH WORKS AND
PREPARATION
DOHA – QATAR
• This project consists of pre cast boundary walls.
• Our scope of work is to design, produce and erect the boundary wall.
• The Employer is Qatari Diar Real Estate Investment Co.
• The Engineer is Hyder Consulting.
• The main contractor is Mushrif Trading and Contracting Co.
PRIVATE BEACH VILLA COMPLEX
DOHA – QATAR
• This project consists of pre cast boundary walls.
• Our scope of work is to design, produce and erect the boundary wall.
• The Employer is AMIR HAMAD BIN KHALIFA AL – THANI.
• The Engineer is Hill International.
• The main contractor is Al-Darwish Engineering – STRABAG J.V.
23
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
DEVELOPMENT WORK AND ADDITIONAL FOR
MINISTRY OF FINANCE BUILDING AND CAR PARK
DOHA – QATAR
• This project consists of pre cast boundary walls.
• Our scope of work is to design, produce and erect the boundary wall.
• The Employer is State of Public Works Authority (Ashghal).
• The Engineer is Arab Engineering Bureau (AEB).
• The main contractor is Ramco Trading and Contracting.
RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM
AL MOUTAWA
DOHA – QATAR
• This project consists of pre cast boundary walls.
• Our scope of work is to design, produce and erect the boundary wall.
• The Employer is Mr. Ibrahim Al Moutawa.
• The main contractor is Shelter Qatar.
24
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER
FALEH AL-THANI
DOHA – QATAR
• This project consists of pre cast boundary walls and hollow core
slabs with different thicknesses (150mm, 200mm, and 265mm).
• Our scope of work is to design, produce and erect the boundary wall
and hollow core slabs.
• The Employer is Shk. Nasser Faleh Al- Thani .
• The Engineer is Designers South West Architecture.
• The main contractor is Imperial Trading and Contracting Co (ITCC).
AL ATHIYA HOLLOW CORE PROJECT
DOHA – QATAR
• This project consists of hollow core slabs (150 mm THK.) for the
final roof of three residential buildings.
• Our scope of work is to design, produce and erect the hollow core
slabs.
• The Employer is Al Fatimiya General Trading Contracting and
Heavy Equipment.
• The Engineer is Al Gazeerah Consulting & Engineering Office.
25
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
QATAR POWER TRANSIMISSON SYSTEM EXPARSION -
PHASE VII
DOHA – QATAR
• This project consists of boundary walls for many substations. The
total length of all boundary walls is 9.3 km. Our company was
awarded 6.5 Km.
• Our scope of work is to design, produce and erect the boundary
wall.
• The Employer is KAHRAMAA, Qatar General Electricity & Water
Corporation.
• The Engineer is ENERGOPROJEKT FICHTNER CONSORTIUM
(EFC).
• The main contractor is Gulf Housing & Construction Co. (GHC).
26
Index
Redco’s Projects
-30 KINDERGARTENS IN DOHA
AND VILLAGES
-7 SCHOOLS IN DOHA AND
VILLAGES
-QIPCO OFFICE TOWER “THE
TORNADO”
-QATAR POWER
TRANSMISSION SYSTEM
EXPANSION PHASE VI
-B1+B2+G+ 14 STOREY & PENT
HOUSE TOURIST APARTMENT
BUILDING
-THE NEW VILLA FOR H.E.
SHEIKH HAMAD BIN JASSIM
BIN JABOR AL-THANI
-PRECAST WORKS-SKELETION
FOR 23 BUILDINGS (G+2) AT
INDUSTRIAL AREA
-TEXAS A&M COLLAGE OF
ENGINEERING
-UPGRADE WORKS AT DOHA
INTERNATIONAL AIRPORT
(DIA)
-PALACE FOR SHEIKH
ABDULLAH BIN FALEH AL-
THANI
-QATAR POWER
TRANMISSION SYSTEM
EXPANSION PHASE VI
-LUSAIL DEVELOPMENT
MARINE EARTH WORKS AND
PREPARATION
-PRIVATE BEACH VILLA
COMPLEX
-DEVELOPMENT WORK AND
ADDITIONAL FOR MINISTRY
OF FINANCE BUILDING
-RESIDENTIAL VILLA IN AL
DUHAIL FOR Mr. IBRAHIM AL
MOUTAWA
-138 VILLA+RESIDENTIAL
FLATS FOR SHK.NASSER
FALEH AL-THANI
-AL ATHIYA HOLLOW CORE
Redco International
MARKETING
Projects:
 During working in Marketing, our company had been
awarded the following through me:
 Palace for Sheikh Abdullah Bin Faleh Al-Thani – Precast
Boundary Wall and Hollow Core Slabs – 1.3 millions QR.
 7 Schools in Doha and Villages for Ramco Trading &
Contracting – Precast Boundary Wall – 8 millions QR.
 3 Kindergartens in Doha & Villages for HKH (Hamad Bin
Khalid Bin Hamad) – Precast Cladding and Boundary Wall
– 4.5 millions QR.
 3 Kindergartens in Doha & Villages for Qatari
Development – Precast Cladding and Boundary Wall – 4.5
millions QR.
 2 Kindergartens in Doha & Villages for Al-Attiyah ALCAT
– Precast Cladding and Boundary Wall – 3.5 millions QR.
27
Index
Redco
International
-Company
Description
-Scope of Work
-Design Office
-Marketing
Al-Maher Company for Contracting & Services
Company Description:
Al-Maher Company for Contracting & Services
is a specialized company in producing Porta-
Cabins for all the required offices at sites
during projects construction.
Those offices contain management offices, staff
offices, labors accommodations, WCs and big
hall offices for multiple use as meeting
rooms, creation halls or any other activity as
per the customers requirements.
28
Index
Al-Maher
Company
-Company
Description
-Al-Maher’s
Projects
Al-Maher Company for Contracting & Services
Projects:
 PORTA CABINS FOR LUSAIL
DEVELOPMENT AREA – DOHA – QATAR
 PORTA CABINS FOR RAS LAFFAN AREA –
DOHA – QATAR
29
Index
Al-Maher
Company
-Company
Description
-Al-Maher’s
Projects
Al-Maher Company for Contracting & Services
PORTA CABINS FOR LUSAIL DEVELOPMENT AREA
DOHA – QATAR
• This project consists of 30 kindergartens.
• This project consists of one floor cabins for Lusail area in Doha,
Qatar. The Employer of this project is REDCO INTERNATIONAL
COMPANY.
• Our scope of work is to design, produce and erect these cabins.
Cabins are many types, some of them are small 12.2x3.5m and some
are big 128x80m.
Description of Duties:
• Simple design for the steel floor of cabins which consist of I-beam
sections and truss roof which consists of L section connected to each
other by welding by using ROBOT 18 program.
• Quantities for all materials required in this project by making
complete files by using EXCEL program.
• Making shop drawings for production and erection.
• Site engineer after finishing designing and starting the erection.
30
Index
Al-Maher’s
Projects
-PORTA CABINS
FOR LUSAIL
DEVELOPMENT
AREA
-PORTA CABINS
FOR RAS LAFFAN
AREA
Al-Maher Company for Contracting & Services
PORTA CABINS FOR RAS LAFFAN AREA
DOHA – QATAR
• This project consists of double stories cabins in Ras Laffan Area
north of al-Khor, Qatar. The Employer of this project is CCC
Company.
• Our scope of work is to design, produce and erect these cabins.
Description of Duties:
• Designing double stories cabins which consist of I-beam sections
and truss roof which consists of L section connected to each other by
welding by using ROBOT 18 program.
• Quantities for all materials required in this project by making
complete files by using EXCEL program.
• Making shop drawings for production and erection.
31
Index
Al-Maher’s
Projects
-PORTA CABINS
FOR LUSAIL
DEVELOPMENT
AREA
-PORTA CABINS
FOR RAS LAFFAN
AREA
Rapid Construction Company
Company Description:
Rapid Construction Company is a specialized
company in Precast Concrete Panels and Pre-
stress Concrete.
Rapid Construction Company produces many
types of Pre-stress Concrete, such as Double
Tee Slab, I Beam and T section Beam,
including different heights and widths for all
sections.
Precast Concrete Panels include Slabs, Walls,
Boundary Walls and a specialized system
which produces a complete room including
the slab and the walls.
32
Index
Rapid
Construction
Company
-Company
Description
-Scope of Work
-Rapid
Construction’s
Projects
Rapid Construction Company
Scope of work:
• Structural Engineer, responsible for the Design Office in
the factory for making all details and shop drawings.
• Quality Control Engineer for the moulds and production.
• Tracking the production to updated the schedule, and then
to revise the action plan as per the requirements.
• Responsible for the dealing with consultants of our clients
to get the approval of our design and solving all comments
which are given by them.
• Responsible for dealing with the engineers from
companies which provide us with all accessories for pre
cast & pre stress concrete.
• Dealing with foremen and skilled labors and guiding them
to proceed the production.
• Supervising the repair works which were executed by
using Carbon Fibers.
• Designing the required moulds for pre cast and pre stress
units by using ROBOT 18.0 software.
• Earthquake design by using ETABS software.
• Main design depends on ACI 318-02 & PCI Codes.
• Analyzing the pre-stress report in order to prepare the shop
drawings.
33
Index
Rapid
Construction
Company
-Company
Description
-Scope of Work
-Rapid
Construction’s
Projects
Rapid Construction Company
Projects:
 INTERNATIONAL UNIVERSITY FOR
SCIENCE & TECHNOLOGY (IUST) –
DAMASCUS – SYRIA
 INDUSTRIAL BUILDINGS IN INDUSTRIAL
AREA – ALEPPO - SYRIA
34
Index
Rapid
Construction
Company
-Company
Description
-Scope of Work
-Rapid
Construction’s
Projects
Rapid Construction Company
INTERNATIONAL UNIVERSITY FOR SCIENCE &
TECHNOLOGY (IUST)
DAMASCUS – SYRIA
• This project consists of two buildings as L shape of each, ground
floor & two storey. Footing, columns & walls are pre cast, slabs &
beams are pre stress.
• Our scope of work is to design, produce and erect complete
buildings.
INDUSTRIAL BUILDINGS IN INDUSTRIAL AREA
ALEPPO – SYRIA
• These projects consist of one storey buildings, which consist of pre
cast footing, columns & walls, and pre stress slabs & beams. Some
factories have cranes which will have rails carried on cantilevers on
columns.
• Our score of work is to design, produce & erect all those factories.
35
Index
Rapid
Construction’s
Projects
-INTERNATIONAL
UNIVERSITY FOR
SCIENCE &
TECHNOLOGY
(IUST)
-INDUSTRIAL
BUILDINGS IN
INDUSTRIAL
AREA
Technical Services Establishment
Company Description:
Technical Services Establishment is a
Governmental Establishment concerned for
all types of School and Industrial buildings.
The scope of work is as a supervisor of
construction as the client representative.
It has a design office which is responsible for
making a complete design for any new
building for the establishment itself.
36
Index
Technical Services
Establishment
-Company
Description
-Scope of Work
-Technical
Service’s Projects
Technical Services Establishment
Scope of work:
 Earthquake designing of all buildings. The design
depends on combined system (shear walls & frames)
by representing complete structure in ETABS program,
then finding all resultant stresses on shear walls &
frames.
 Finding all required sections of beams, columns,
foundations & mats in accordance with earthquake
designing.
 Making all required shop drawings for all elements.
 The supervision on this project was by PhD. Molham
Badawi & PhD. Maher Naser.
 Designing depends on Syrian Arab Code for mats,
foundations, columns & beams, and UBC 97 for
earthquake designing.
37
Index
Technical Services
Establishment
-Company
Description
-Scope of Work
-Technical
Service’s Projects
Technical Services Establishment
Projects:
THE NEW BUILDING OF TECHNICAL SERVICES
DEPARTMENT
ALEPPO – SYRIA
• This project consists of three buildings which consist of ground
floor & six floors.
• Our scope of work is to design these three buildings with complete
shop drawings and analysis files.
38
Index
Technical Services
Establishment
-Company
Description
-Scope of Work
-Technical
Service’s Projects

Resume

  • 1.
    CURRICULUM VITAE Index - PersonalInformation - Personal Contact - Academic Qualification - Groups and Association - Languages & Computer Background - Professional Experience 1 Eng.Wael Darkazanli MCM,PGDSE,BScCE Jeddah – SaudiArabia Mob.: +966(0)548299332 +963 (0)933559360 Email: wael_darkazanli@yahoo.com Website: http://www.wael-dar.com 1
  • 2.
    PERSONAL INFORMATION NAME: WAEL DARKAZANLI PROFESSION: CIVIL/STRUCTURALENGINEER FATHER'S NAME: MOHAMMAD MARWAN DATE OF BIRTH: NOVEMBER 28th, 1979 NATIONALITY: SYRIAN PLACE OF BIRTH: SAUDIAARABIA MARITAL STATUS: MARRIED 2 Index -Personal Information -Personal Contact -Academic Qualification -Groups and Association -Languages & Computer Background -Professional Experience
  • 3.
    PERSONAL CONTACTS E-mail address: wael_darkazanli@yahoo.com Website : www.wael-dar.com LinkedIn: http://sa.linkedin.com/pub/wael- darkazanli/16/83b/3b6 Twitter: http://twitter.com/wael_darkazanli Skype: wael_darkazanli Phone nos. : +966 (0)548 299 332 (Saudi Arabia) +963 (0)933 559 360 (Syria) 3 Index -Personal Information -Personal Contact -Academic Qualification -Groups and Association -Languages & Computer Background -Professional Experience
  • 4.
    ACADEMIC QUALIFICATION Master ofScience in Project Management Robert Kennedy College – University of Wales – UK – 2011 (expected). Master in Construction Management MUST University – USA – 2010. Post Graduate Diploma in Structural Engineering Aleppo University – Syria – 2004. Bachelor of Civil/Structural Engineering - Aleppo University – Syria – 2002. 4 Index -Personal Information -Personal Contact -Academic Qualification -Groups and Association -Languages & Computer Background -Professional Experience
  • 5.
    GROUPS AND ASSOCIATION •Project Management Institute PMI. • Project Management Institute – Arabian Gulf Chapter – PMI-AGC. • Engineers Association – Aleppo – Syria. 5 Index -Personal Information -Personal Contact -Academic Qualification -Groups and Association -Languages & Computer Background -Professional Experience
  • 6.
    LANGUAGES & COMPUTERBACKGROUND Languages: Arabic: Native Language English: Fluent Computer Background: Good knowledge of the following packages: -PRIMAVERA -ROBOT 18 -ETABS 9 -SAP 2000 – 10 -AUTOCAD 2010 -MS OFFICE 2007 (Word, Excel & Power Point) 6 Index -Personal Information -Personal Contact -Academic Qualification -Groups and Association -Languages & Computer Background -Professional Experience
  • 7.
    PROFESSIONAL EXPERIENCE Since December,2008 Employer: FADEN Trading & Contracting , Jeddah – Saudi Arabia Since July, 2006 to October, 2008 Employer: Redco International, Doha – Qatar Since April, 2006 to July, 2006 Employer: Al-Maher Company for Contracting & Services, Doha – Qatar Since July, 2005 to February, 2006 Employer: Rapid Construction Company, Homs – Syria Since May, 2005 to July, 2005 Employer: Technical Services Establishment, Aleppo – Syria Since November, 2003 to May, 2005 Employer: Military Sociability Establishment, Aleppo – Syria Since May, 2003 to November, 2003 Employer: Design office, Aleppo – Syria Since September, 2002 to May, 2003, "evening time" Employer: Engineering United Office, Aleppo – Syria Since September, 2002 to May, 2003, "morning time" Employer: Technical Services Establishment, Aleppo – Syria 7 Index -Personal Information -Personal Contact -Academic Qualification -Groups and Association -Languages & Computer Background -Professional Experience
  • 8.
    FADEN Trading andContracting Company Description: FADEN Trading and Contracting was established in 1976 with its head office in Riyadh, the Kingdom of Saudi Arabia. Since its establishment, the company has successfully completed different government and private projects throughout the Kingdom. FADEN consists of four main divisions: Contracting, Electrical, Commercial and FADEN Factory for Wood works. Recently, FADEN has started a new type of projects; a High Rise Building in Jeddah – Saudi Arabia which will be the base for the future innovation projects. 8 Index FADEN Trading & Contracting -Company Description -FADEN’s Projects
  • 9.
    FADEN Trading andContracting Projects:  KING ROAD TOWER, JEDDAH – SAUDI ARABIA 9 Index FADEN Trading & Contracting -Company Description -FADEN’s Projects
  • 10.
    FADEN Trading andContracting Project Description: • This project consists of a 36 storey attached with two annexes (north & south) 2B+ GF+ MEZ+ 5P for each. All slabs are post-tension system. • Three façades are full height Media Screen. • The main façade is curved with a globe at the top. • The roof is Helipad slab. • The Employer is UNITED TRADING EST. • The Engineer ASD ARCHITECTS (ALDUGHAITHER ARCHITECTS). • The Designer is KLING CONSULTANT (Branch Office Dubai). 10 Index FADEN’s Projects King Road Tower -Project Description -Sub-Contractors -Scope of Work -Description of Duties
  • 11.
    FADEN Trading andContracting Sub-Contractors: • CCL KSA for Post Tension System. • Saudi Bauer for Piling and Dewatering Systems. • TECHNO for Electro-Mechanical Works. • 3i Solution-QUANTUM for IBMS. • CitiLed for Media Screen Led. • Thyssenkrup for Conveying Systems. • SALUMCO for External Aluminum Façades. • SOCOTEC as QA/QC Advisor. • SBM for Ready mix Concrete and Concrete Technology. 11 Index FADEN’s Projects King Road Tower -Project Description -Sub-Contractors -Scope of Work -Description of Duties
  • 12.
    FADEN Trading andContracting Scope of work: • Project Engineer. • QS Engineer 12 Index FADEN’s Projects King Road Tower -Project Description -Sub-Contractors -Scope of Work -Description of Duties
  • 13.
    FADEN Trading andContracting Description of Duties: • Following the progress of the civil works through daily reports submitted by all parties. • Following the progress of all the subcontractors through their daily reports. • Preparing the final Daily Report about the project and reporting the Project Manager. • Following and preparing the Monthly Report about the project. • Preparing a monthly Presentation with a full description about the current project status. • Preparing and submitting all the Paper Work required for the project. • Preparing and submitting all the Paper Work required for the project. • Reporting the civil works to the Planner about the updated progress for updating the schedule. • Quantity surveying for the concrete works. • Making comparison between BOQ quantities and actual ones for concrete works. • Tracking the executed concrete works to update the executed percent-age in accordance with BOQ. • Following Concrete Tests at the site, and Concrete Test Results, and then reporting to the Construction Management. 13 Index FADEN’s Projects King Road Tower -Project Description -Sub-Contractors -Scope of Work -Description of Duties
  • 14.
    Redco International Company Description: •Redco International was established in 1984 in Doha – Qatar • Redco International Company is specialized in Precast & Hollow Core Slabs. • The scope of work has been increased to cover Earth Works, Enabling Works, Ready Mix Concrete and Electro-Mechanical Works. • Recently, it expanded to be as a Main Contractor for many big projects in Qatar. 14 Index Redco International -Company Description -Scope of Work -Design Office -Marketing
  • 15.
    Redco International Scope ofwork: • Manager of Design & Marketing • Projects Coordinator. • Coordination between pricing, designing, production and erection. • QC & Technical Engineer for dealing with consultants and clients. • Checking and following Quantity Surveying Section. • Following all tenders, quotations and contracts. • Following the Clients and Consultants to get the work done as per the specifications and requirements. • Preparing and making all the required design calculations for precast elements and pre-tension hollow core slabs by using EXCEL software, and in accordance with ACI and PCI Codes. • Making regular visits to all the clients to be updated for all the new projects. • Direct relation with top management of all companies and clients was essential (with the support by our Managing Director). 15 Index Redco International -Company Description -Scope of Work -Design Office -Marketing
  • 16.
    Redco International DESIGN OFFICE Projects: 30 KINDERGARTENS IN DOHA AND VILLAGES, DOHA – QATAR  7 SCHOOLS IN DOHA AND VILLAGES – DOHA – QATAR  QIPCO OFFICE TOWER “THE TORNADO”– DOHA – QATAR  QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI – DOHA – QATAR  B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING – DOHA – QATAR  THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI – DOHA – QATAR  PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA STREET NO. 18 – DOHA – QATAR  TEXAS A & M COLLAGE OF ENGINEERING – DOHA – QATAR  UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) – DOHA – QATAR  PALACE FOR SHEIKH ABDULLAH BIN FALEH AL-THANI – DOHA - QATAR  QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI – DOHA – QATAR  LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION – DOHA – QATAR  PRIVATE BEACH VILLA COMPLEX – DOHA – QATAR  DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING AND CAR PARK – DOHA – QATAR  RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA – DOHA – QATAR  138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL- THANI – DOHA – QATAR  AL ATHIYA HOLLOW CORE PROJECT – DOHA – QATAR  QATAR POWER TRANSIMISSON SYSTEM EXPARSION - PHASE VII – DOHA – QATAR 16 Index Redco International -Company Description -Scope of Work -Design Office -Marketing
  • 17.
    Redco International 30 KINDERGARTENSIN DOHAAND VILLAGES DOHA – QATAR • This project consists of 30 kindergartens. • The Employer is ASHGHAL (PUBLICH WORKS AUTHORITY PWA). • Our company was awarded 28 kindergartens as follow, • Package I: 10 kindergartens for DARWISH ENGINEERING, the Engineer is ARAB CONSULTING ENGINEERS MOHARRAM- BAKHOUM (ACE). • Package II: 10 kindergartens for REDCO-NLC J.V, the Engineer is GULF ENGINEERING AND INDUSTRIAL CONSULTANTS (GEIC). • Package III: 8 kindergartens, three are for HKH (HAMAD BIN KHALID BIN HAMAD CO.), three are for QATARI DEVELOPMENT and two are for AL-ATTIYAH ALCAT, and the Engineer is QATAR ENGINEER & ASSOCIATES (QEA). • Our scope of work is to design, produce and erect precast boundary walls and precast cladding which were two thicknesses, 100mm and 250mm for 28 kindergartens, and 10 as a main contractor (REDCO- NLC J.V.). 17 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 18.
    Redco International 7 SCHOOLSIN DOHAAND VILLAGES DOHA – QATAR • This project consists of 7 schools. • The Employer is ASHGHAL (PUBLICH WORKS AUTHORITY PWA). • The contractor is RAMCO TRADING AND CONTRACTING, and the Engineer is MICA. • Our scope of work is to design, produce and erect precast boundary walls. QIPCO OFFICE TOWER “THE TORNADO” DOHA – QATAR • This project consists of B2+B1+G+52 storey as cast in situ structure. Stairs are pre cast concrete. The main contractor is SIX CONSTRUCT - MIDMAC J.V. • Our scope of work is to produce the pre cast stairs. 18 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 19.
    Redco International QATAR POWERTRANSMISSION SYSTEM EXPANSION PHASE VI DOHA – QATAR • This project consists of boundary wall for 28 substations. • The Employer is KAHRAMAA, Qatar General Electricity & Water Corporation. • The main contractor is GULF HOUSUNG & CONSTRUCTION CO. (GHC). • The Engineer is ENERGOPROJEKT FICHTNER CONSORTIUM (EFC). • Our scope of work is to design, produce and erect the boundary walls as a subcontractor. B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING DOHA – QATAR • This project consists of B1+B2+G+14storey. • The Employer is ABDULAZIZ ABDURRAHIM AL EMADI. • The Engineer is UNITED CONSULTANT (UC), and then changed to GLOBAL VISION. • Our scope of work is to construct the tower as cast in situ building , floors are Hollow Core Slabs , cladding is pre cast panels. 19 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 20.
    Redco International THE NEWVILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI DOHA – QATAR • This project consists of two parts, first one is a new boundary wall which is an extension to the existing wall, second one is a new substation. • The Employer is H.E.SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI – Prime Minister – Foreign Minister. • The Engineer is ARAB ENGINEERING BUREAU (AEB). • Our scope of work is to design , produce and erect the boundary wall, and a complete construction of the substation as cast in site with hollow core roof (turn key project). PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA STREET NO. 18 DOHA – QATAR • This project consists of 23 buildings. These buildings are as villas compound. The structural system is walls and hollow core slabs which rest on those walls by making some connection details to satisfy the complete connection between all elements. • The Employer is ALI BIN HAMAD AL-ATTIYAH. • Our scope of work is constructing the foundations, ground beams and slabs as cast in situ, producing and erection of pre cast panels and hollow core slabs to construct those villas.20 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 21.
    Redco International TEXAS A& M COLLAGE OF ENGINEERING DOHA – QATAR • This project is a part of the Education City in Doha. • The Employer is Qatar Foundation and Qatar Petroleum. • The Engineer is Kuwait Engineering Office (KEO). • The main contractor is MIDMAC Contracting Co. • Our scope of work is to fabricate and erect pre cast cladding with different shapes and sizes as per architectural design. UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) DOHA – QATAR • This project is located inside DIA to provide it with Jersey Barriers to separate planes line from other facilities. • The Employer is Doha International Airport. • The Engineer is Dar Al-Handasah. • The main contractor is Gulf Housing & Construction Co. • Our scope of work is to produce and erect these Jersey Barriers. 21 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 22.
    Redco International PALACE FORSHEIKH ABDULLAH BIN FALEH AL- THANI DOHA – QATAR • This project consists of 30 kindergartens. • This project consists of pre cast boundary walls and hollow core slabs. • Our scope of work is to design, produce and erect the boundary wall and hollow core slabs 150mm, 200mm and 265mm thicknesses. • The Employer is SHEIKH ABDULLAH BIN FALEH AL-THANI. • The Engineer is ARAB ENGINEERING BUREAU (AEB). • The main contractor is QATAR ARAB CONTRACTORS. QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI DOHA – QATAR • This project consists of pre cast boundary walls. • Our scope of work is to design, produce and erect the boundary wall. • The Employer is KAHRAMAA, Qatar General Electricity & Water Corporation. • The Engineer is ENERGOPROJEKT FICHTNER CONSORTIUM (EFC). • The main contractor is Green Top International Co. (GTI). 22 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 23.
    Redco International LUSAIL DEVELOPMENTMARINE EARTH WORKS AND PREPARATION DOHA – QATAR • This project consists of pre cast boundary walls. • Our scope of work is to design, produce and erect the boundary wall. • The Employer is Qatari Diar Real Estate Investment Co. • The Engineer is Hyder Consulting. • The main contractor is Mushrif Trading and Contracting Co. PRIVATE BEACH VILLA COMPLEX DOHA – QATAR • This project consists of pre cast boundary walls. • Our scope of work is to design, produce and erect the boundary wall. • The Employer is AMIR HAMAD BIN KHALIFA AL – THANI. • The Engineer is Hill International. • The main contractor is Al-Darwish Engineering – STRABAG J.V. 23 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 24.
    Redco International DEVELOPMENT WORKAND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING AND CAR PARK DOHA – QATAR • This project consists of pre cast boundary walls. • Our scope of work is to design, produce and erect the boundary wall. • The Employer is State of Public Works Authority (Ashghal). • The Engineer is Arab Engineering Bureau (AEB). • The main contractor is Ramco Trading and Contracting. RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA DOHA – QATAR • This project consists of pre cast boundary walls. • Our scope of work is to design, produce and erect the boundary wall. • The Employer is Mr. Ibrahim Al Moutawa. • The main contractor is Shelter Qatar. 24 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 25.
    Redco International 138 VILLA+RESIDENTIALFLATS FOR SHK.NASSER FALEH AL-THANI DOHA – QATAR • This project consists of pre cast boundary walls and hollow core slabs with different thicknesses (150mm, 200mm, and 265mm). • Our scope of work is to design, produce and erect the boundary wall and hollow core slabs. • The Employer is Shk. Nasser Faleh Al- Thani . • The Engineer is Designers South West Architecture. • The main contractor is Imperial Trading and Contracting Co (ITCC). AL ATHIYA HOLLOW CORE PROJECT DOHA – QATAR • This project consists of hollow core slabs (150 mm THK.) for the final roof of three residential buildings. • Our scope of work is to design, produce and erect the hollow core slabs. • The Employer is Al Fatimiya General Trading Contracting and Heavy Equipment. • The Engineer is Al Gazeerah Consulting & Engineering Office. 25 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 26.
    Redco International QATAR POWERTRANSIMISSON SYSTEM EXPARSION - PHASE VII DOHA – QATAR • This project consists of boundary walls for many substations. The total length of all boundary walls is 9.3 km. Our company was awarded 6.5 Km. • Our scope of work is to design, produce and erect the boundary wall. • The Employer is KAHRAMAA, Qatar General Electricity & Water Corporation. • The Engineer is ENERGOPROJEKT FICHTNER CONSORTIUM (EFC). • The main contractor is Gulf Housing & Construction Co. (GHC). 26 Index Redco’s Projects -30 KINDERGARTENS IN DOHA AND VILLAGES -7 SCHOOLS IN DOHA AND VILLAGES -QIPCO OFFICE TOWER “THE TORNADO” -QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE VI -B1+B2+G+ 14 STOREY & PENT HOUSE TOURIST APARTMENT BUILDING -THE NEW VILLA FOR H.E. SHEIKH HAMAD BIN JASSIM BIN JABOR AL-THANI -PRECAST WORKS-SKELETION FOR 23 BUILDINGS (G+2) AT INDUSTRIAL AREA -TEXAS A&M COLLAGE OF ENGINEERING -UPGRADE WORKS AT DOHA INTERNATIONAL AIRPORT (DIA) -PALACE FOR SHEIKH ABDULLAH BIN FALEH AL- THANI -QATAR POWER TRANMISSION SYSTEM EXPANSION PHASE VI -LUSAIL DEVELOPMENT MARINE EARTH WORKS AND PREPARATION -PRIVATE BEACH VILLA COMPLEX -DEVELOPMENT WORK AND ADDITIONAL FOR MINISTRY OF FINANCE BUILDING -RESIDENTIAL VILLA IN AL DUHAIL FOR Mr. IBRAHIM AL MOUTAWA -138 VILLA+RESIDENTIAL FLATS FOR SHK.NASSER FALEH AL-THANI -AL ATHIYA HOLLOW CORE
  • 27.
    Redco International MARKETING Projects:  Duringworking in Marketing, our company had been awarded the following through me:  Palace for Sheikh Abdullah Bin Faleh Al-Thani – Precast Boundary Wall and Hollow Core Slabs – 1.3 millions QR.  7 Schools in Doha and Villages for Ramco Trading & Contracting – Precast Boundary Wall – 8 millions QR.  3 Kindergartens in Doha & Villages for HKH (Hamad Bin Khalid Bin Hamad) – Precast Cladding and Boundary Wall – 4.5 millions QR.  3 Kindergartens in Doha & Villages for Qatari Development – Precast Cladding and Boundary Wall – 4.5 millions QR.  2 Kindergartens in Doha & Villages for Al-Attiyah ALCAT – Precast Cladding and Boundary Wall – 3.5 millions QR. 27 Index Redco International -Company Description -Scope of Work -Design Office -Marketing
  • 28.
    Al-Maher Company forContracting & Services Company Description: Al-Maher Company for Contracting & Services is a specialized company in producing Porta- Cabins for all the required offices at sites during projects construction. Those offices contain management offices, staff offices, labors accommodations, WCs and big hall offices for multiple use as meeting rooms, creation halls or any other activity as per the customers requirements. 28 Index Al-Maher Company -Company Description -Al-Maher’s Projects
  • 29.
    Al-Maher Company forContracting & Services Projects:  PORTA CABINS FOR LUSAIL DEVELOPMENT AREA – DOHA – QATAR  PORTA CABINS FOR RAS LAFFAN AREA – DOHA – QATAR 29 Index Al-Maher Company -Company Description -Al-Maher’s Projects
  • 30.
    Al-Maher Company forContracting & Services PORTA CABINS FOR LUSAIL DEVELOPMENT AREA DOHA – QATAR • This project consists of 30 kindergartens. • This project consists of one floor cabins for Lusail area in Doha, Qatar. The Employer of this project is REDCO INTERNATIONAL COMPANY. • Our scope of work is to design, produce and erect these cabins. Cabins are many types, some of them are small 12.2x3.5m and some are big 128x80m. Description of Duties: • Simple design for the steel floor of cabins which consist of I-beam sections and truss roof which consists of L section connected to each other by welding by using ROBOT 18 program. • Quantities for all materials required in this project by making complete files by using EXCEL program. • Making shop drawings for production and erection. • Site engineer after finishing designing and starting the erection. 30 Index Al-Maher’s Projects -PORTA CABINS FOR LUSAIL DEVELOPMENT AREA -PORTA CABINS FOR RAS LAFFAN AREA
  • 31.
    Al-Maher Company forContracting & Services PORTA CABINS FOR RAS LAFFAN AREA DOHA – QATAR • This project consists of double stories cabins in Ras Laffan Area north of al-Khor, Qatar. The Employer of this project is CCC Company. • Our scope of work is to design, produce and erect these cabins. Description of Duties: • Designing double stories cabins which consist of I-beam sections and truss roof which consists of L section connected to each other by welding by using ROBOT 18 program. • Quantities for all materials required in this project by making complete files by using EXCEL program. • Making shop drawings for production and erection. 31 Index Al-Maher’s Projects -PORTA CABINS FOR LUSAIL DEVELOPMENT AREA -PORTA CABINS FOR RAS LAFFAN AREA
  • 32.
    Rapid Construction Company CompanyDescription: Rapid Construction Company is a specialized company in Precast Concrete Panels and Pre- stress Concrete. Rapid Construction Company produces many types of Pre-stress Concrete, such as Double Tee Slab, I Beam and T section Beam, including different heights and widths for all sections. Precast Concrete Panels include Slabs, Walls, Boundary Walls and a specialized system which produces a complete room including the slab and the walls. 32 Index Rapid Construction Company -Company Description -Scope of Work -Rapid Construction’s Projects
  • 33.
    Rapid Construction Company Scopeof work: • Structural Engineer, responsible for the Design Office in the factory for making all details and shop drawings. • Quality Control Engineer for the moulds and production. • Tracking the production to updated the schedule, and then to revise the action plan as per the requirements. • Responsible for the dealing with consultants of our clients to get the approval of our design and solving all comments which are given by them. • Responsible for dealing with the engineers from companies which provide us with all accessories for pre cast & pre stress concrete. • Dealing with foremen and skilled labors and guiding them to proceed the production. • Supervising the repair works which were executed by using Carbon Fibers. • Designing the required moulds for pre cast and pre stress units by using ROBOT 18.0 software. • Earthquake design by using ETABS software. • Main design depends on ACI 318-02 & PCI Codes. • Analyzing the pre-stress report in order to prepare the shop drawings. 33 Index Rapid Construction Company -Company Description -Scope of Work -Rapid Construction’s Projects
  • 34.
    Rapid Construction Company Projects: INTERNATIONAL UNIVERSITY FOR SCIENCE & TECHNOLOGY (IUST) – DAMASCUS – SYRIA  INDUSTRIAL BUILDINGS IN INDUSTRIAL AREA – ALEPPO - SYRIA 34 Index Rapid Construction Company -Company Description -Scope of Work -Rapid Construction’s Projects
  • 35.
    Rapid Construction Company INTERNATIONALUNIVERSITY FOR SCIENCE & TECHNOLOGY (IUST) DAMASCUS – SYRIA • This project consists of two buildings as L shape of each, ground floor & two storey. Footing, columns & walls are pre cast, slabs & beams are pre stress. • Our scope of work is to design, produce and erect complete buildings. INDUSTRIAL BUILDINGS IN INDUSTRIAL AREA ALEPPO – SYRIA • These projects consist of one storey buildings, which consist of pre cast footing, columns & walls, and pre stress slabs & beams. Some factories have cranes which will have rails carried on cantilevers on columns. • Our score of work is to design, produce & erect all those factories. 35 Index Rapid Construction’s Projects -INTERNATIONAL UNIVERSITY FOR SCIENCE & TECHNOLOGY (IUST) -INDUSTRIAL BUILDINGS IN INDUSTRIAL AREA
  • 36.
    Technical Services Establishment CompanyDescription: Technical Services Establishment is a Governmental Establishment concerned for all types of School and Industrial buildings. The scope of work is as a supervisor of construction as the client representative. It has a design office which is responsible for making a complete design for any new building for the establishment itself. 36 Index Technical Services Establishment -Company Description -Scope of Work -Technical Service’s Projects
  • 37.
    Technical Services Establishment Scopeof work:  Earthquake designing of all buildings. The design depends on combined system (shear walls & frames) by representing complete structure in ETABS program, then finding all resultant stresses on shear walls & frames.  Finding all required sections of beams, columns, foundations & mats in accordance with earthquake designing.  Making all required shop drawings for all elements.  The supervision on this project was by PhD. Molham Badawi & PhD. Maher Naser.  Designing depends on Syrian Arab Code for mats, foundations, columns & beams, and UBC 97 for earthquake designing. 37 Index Technical Services Establishment -Company Description -Scope of Work -Technical Service’s Projects
  • 38.
    Technical Services Establishment Projects: THENEW BUILDING OF TECHNICAL SERVICES DEPARTMENT ALEPPO – SYRIA • This project consists of three buildings which consist of ground floor & six floors. • Our scope of work is to design these three buildings with complete shop drawings and analysis files. 38 Index Technical Services Establishment -Company Description -Scope of Work -Technical Service’s Projects