AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 1 of 8
EDUCATION
Bachelor of Architecture
American University of Beirut,
Lebanon- 1986
COMPUTER SKILLS
Microsoft Office: word & excel.
AutoCAD- Power Point
PROFESSIONAL AFFILIATIONS
Member of the Lebanese Order of
Engineers and Architects
PERSONAL DOSSIER:
Date of Birth: Feb. 19, 1961
Nationality : Lebanese
Languages: Arabic, French &
English: excellent in
Written & Spoken.
Spanish (Fair)
References : Available upon
Request.
Email: ahmad.alattar61
@gmail.com
Mobile: +974-55249331
AREAS OF EXPERIENCE:
Project Management to mega size projects covering: Master Planning, Stakeholder
Consultations, Design, Tendering, Construction, Project Planning & Project Controls
Management, Risk Management and Testing / Commissioning / handover
Management.
SYNOPSIS
 Architect with 29 years of Project Management experience gained in the private
and public sectors with international contractors & consultants mainly in the
Middle East (Qatar 13 years, Saudi Arabia, Kuwait and Lebanon) delivering
wide spectrum of mega size projects (ports, iconic towers, buildings, museums,
libraries, theatres, infrastructure, etc..) from inception to completion.
 Project Manager on the New Port Project (NPP) with AECOM (Project
Management Consultant) responsible for three of the ports building packages
exceeding 70 buildings with a budget in excess of 2.5 Billion Riyals covering
iconic buildings, administrative offices, accommodation, mosques, data centre,
medical centre, fire stations, workshops and utility buildings with emphasis on
architecture, fit out and furniture with a horizontal spread into other disciplines
(Electrical, mechanical, telecommunication and security systems, infrastructure,
etc…).
 Excellent relationship management, communication skills and the ability to
network with client, end users, project members, consultants, contractors,
statutory agencies with consummate ease.
 Managing Consultants & Contractors, monitoring deliverables, progress,
program and quality compliance to ensure satisfactory execution of projects to
time, quality and cost.
 Evaluating & determining appropriate construction delivery systems and the
most cost-effective plan and schedule for project completion.
 Liaise with client, end users and project team for preparation and
implementation of functional and technical requirements.
SUMMARY OF EMPLOYMENT HISTORY
Date Company Position Held
2002– 2015 AECOM Project Manager, Qatar
2000- 2002 ZAK International Ass. Gen. Manager, Lebanon
1998- 2000 Al Attar Trading & Contracting Operations Manager, Lebanon
1996- 1997 Alumco Project Manager, Lebanon
1993- 1996 Diyar Consultants Project Manager, Lebanon
1990- 1993 Al Attar Trading & Contracting Arch / Project Manager , Lebanon
1989- 1990 Sabah Abi Hanna Architect, Kuwait
1987 – 1988 Simone Kosremelli Architect, Lebanon
1986- 1987 German Institute for Oriental Studies Architect, Lebanon
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 2 of 8
EXPERIENCE HISTORY / BACKGROUND
December 2002 to December 2015
AECOM Middle East. Doha, Qatar
Thirteen years with AECOM with the last seven years on the New Port Project as
the Project Manager responsible for three of the ports building packages with
emphasis on architecture, fit out and furniture with a horizontal spread into other
disciplines (Electrical, mechanical, telecommunication and security systems,
infrastructure, etc…) on a wide range of buildings from a 110 meters high iconic
tower to administrative offices, accommodation, mosques and utility buildings.
Projects Undertaken within AECOM
November 2008 – December 2015
New Port Project, Qatar
Aecom Middle East
Position: Project Manager for Buildings’ Packages
Client: Government of Qatar- New Port Project Steering Committee
Project Brief:
The New Port Project (NPP) is one of the largest “Greenfield” projects in the world,
spanning 26.5 km2. The overall objective of the NPP is to construct a world-class
Port. The Project Master Plan includes a new port (19.5 km2), a Naval Base for the
Qatar Emiri Naval Forces (4.5 km2) and a Canal for Qatar Economic Zone (2.5
km2).
The QAR 27 Billion (USD 7.4 Billion) megaproject is located approximately 25km
south of Doha on the coastal strip north of Mesaieed Industrial City and south of Al
Wakra in the southern section of the Qatar Economic Zone 3. Currently the project
is in excess of 80 separate contract packages.
The Project is managed by the New Port Project Steering Committee, chaired by the
Minister of Transport, His Excellency Jassim Bin Saif Al Sulaiti, and includes the
Programme Management Consultant, AECOM, WorleyParsons as Engineering
Design Consultant and COWI as Environmental Consultant. The NPP Project
Executive Director, with a project team, manages the Consultants and Contractors.
Notable accomplishments
Over 7 years working on the New Port Project with duties spread over the whole
port with the main focus on buildings, architecture, fit out and furniture.
Responsibilities varied from establishment of the project offices, to coordination with
statutory authorities for transfer of land deeds, master planning approvals and
building permits for marine works, Stakeholder Co-ordination, management of the
Building Design Consultant and Engineering Design Consultant for infrastructure
and utility buildings up to issuance of IFT deliverables, preparation and issuance of
tenders up to award of construction packages,
Duties and responsibilities
Overall port
 NPP project offices within Doha including fit out, furniture and equipment:
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 3 of 8
preparation of design, prequalification, tender, evaluation, award and site
supervision with testing, commissioning and handover.
 Coordination with statutory authorities for land transfer and obtaining of the
New Port land deed.
 Assist in the preparation of the master plan according to the “Ministry of
Municipality and Urban Planning / MMUP’s” requirements. Set up and attend all
coordination meetings with MMUP and obtain MMUP’s” final approval on the
New Port Master Plan.
 Prepare, submit and obtain the building permits from MMUP and Wakrah
Municipality for the first two port construction packages: the Port Basin and the
Dredging contracts.
 Assist the client in becoming a self-permitting authority through numerous
correspondences and meetings with MMUP.
Port Buildings Packages
Work focused on architecture, fit out and furniture with a horizontal spread into other
disciplines and Infrastructure for the New Port’s Building Packages: the Port
Administration Authority facilities, the Port Marine Unit, the Coast Guard Area,
Container Terminal and the General Cargo Terminal. Originally started work on all 5
packages then main focus was on 3 packages only. The other two packages
(Container Terminal and the General Cargo Terminal) were issued as Design & Built
to 2 different contractors. The 3 packages cover around 70 buildings, 3 of which are
iconic and include a control tower 110 meters high designed by an international UK
firm (PLP). The buildings total built up area is around 120,000 m2 with expected
occupancy to exceed 2500 persons to cover all port’s operation staff. The 3
packages also include 21 utility buildings and all infrastructure works within the
boundary limits. The value of all works is estimated at QR 2.5 billion.
Main duties and responsibilities:
 Management of the Engineering Design Consultant (Worley Parsons)
responsible for the preparation of the original buildings functional requirements
(design briefs) , procurement and management of the Building Design
Consultant up to issuance of IFT deliverables by the Building Design
Consultant.
 Leading and chairing the Stakeholder consultations associated with the delivery
of Buildings functional requirements. List of stakeholders included MWANI / the
Port Authority, Ministry of Interior, General Authority of Customs, AWQAF,
HASSAD, MAWASHI, Civil Aviation, Coast Guard, Internal Security Forces,
QCDD and the Ministry of Environment.
 Assist the Engineering Design Consultant in the preparation of the Building
Design Consultant’s prequalification documents and evaluation.
 Assist in the preparation of the different tender strategies for the procurement of
the “Building Design Consultant” presented to the NPP committees, tender
documents, tender issue and evaluation up to award of contract.
 Management of the Engineering Design Consultant and the Building Design
Consultant throughout all design stages and stakeholder coordination to ensure
all requirements have been implemented up to issuance of technical tender
documentation.
 Management of the Engineering Design Consultant responsible for the design
of the infrastructure package from detailed design until issue of tender
documents.
 Preparation of constructability review reports: Heading a team of 40 engineers
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 4 of 8
from different disciplines.
 Preparation of Tender documents for the “Buildings and Infrastructure
construction packages”, tender, evaluation up to award of contracts.
 Manage the “Engineering Design Consultant” in the preparation of the Design &
Build Concept design deliverables for the visitors centre.
 Preparation of the Visitors Centre tender documents.
 Chair and Minute progress, technical, design and stakeholder meetings.
 Review schedule and design deliverables to monitor progress.
 Preparation of weekly and monthly reports.
 Assist in the development of a master time schedule for project delivery.
 Work closely with the Employer’s Representative to ensure instructions and
decisions are fully implemented.
 Working closely with the Client Project Team to ensure client directions, budget
and program are fully implemented.
 Reporting to the client, Technical, Steering and Tender Committees.
August 2007- October 2008
Company: Aecom Middle East
Project: Barwa Al Khor Development- Al Khor, Qatar
Position: Assistant Project Manager
Client: Barwa
Barwa Al Khor Development with a budget of around QR 35 billion is a mixed use
megaproject spanning 550 hectares and will accommodate 105,000 people. The
development includes over 7.5 million square meters of residential, commercial and
retail, a hotel, golf course, schools, nurseries, Mosques, public beach and plazas.
Duties and responsibilities:
 Direct follow up with the MMUP for Master Plan coordination meetings and
approval.
 Direct follow up with Statutory Authorities.
 End user coordination and meetings.
 Day to day coordination with the Abu Dhabi office preparing the Master plan.
March 2005- July 2007
Al Waab City Development, Qatar
Aecom Middle East
Position: Assistant Project Manager
Client: Nasser Bin Khaled
The Al Waab city with a budget of around QAR 7.0 Billion will accommodate 8000
people in over 2000 homes, ranging from luxurious villas to contemporary
apartments. The development includes over 100,000 square meters of retail space
and 200,000 square meters of office accommodation - all spread over 1.25million
square meters and supported by considered infrastructure and 10,700 off-road
parking spaces. At the heart of the project, lies the multi-facility 50,000 m2 urban
plaza of Barahat Al Waab.
I was assigned as Assistant Project Manager for the whole project with main focus
on the Design phase of a 3 stories combined retail / office multiple showrooms
development (total 50,000 m2.) with a budget of QR 250 million.
Duties and Responsibilities:
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 5 of 8
 Site offices: Design, construction, site supervision and fit out with testing,
commissioning and handover.
 Direct follow up with local governmental agencies to obtain land transfers, land
deeds, master plan approval and building permits for the whole of Al Waab City
development.
 Day to day managing of the building design consultant on behalf of the
Client/developer. Direct report to internal Al Waab City Project Director and
Client representatives.
 Liaison with Client/Developer, design consultants (architects, engineers, and
interior designers) and end users (automobile dealership and high-end fashion
retail).
 Performance management of design consultant to ensure contractual
obligations, schedules and costs are maintained.
 Provide ongoing project status/progress reporting updates with all parties
throughout design and construction phases.
 Ensuring that all senior management is kept abreast of the project through the
appropriate reporting structures.
 Responsible for preparation of all internal and external project correspondence
(letters, weekly reports, minute of meeting, presentations, etc.).
Dec 2002- Feb 2005
Multiple projects, Qatar
Aecom Middle East
Position: Senior Architect
Client: Government of Qatar- National Council for Culture, Arts and Heritage /
NCCAH
Senior Architect on various new projects undertaken on behalf of the National
Council for Culture, Arts and Heritage, with an emphasis on museums.
Duties and Responsibilities:
 Review the design at various stages of the design process.
 Monitor progress.
 Participate in coordination and progress meetings with Building Engineering
Department / Government agencies, QP, Turner International, local and
international consultants and specialist sub consultants.
 Site inspection visits and snag list for the NCCAH offices, National Theatre,
Fahd Bin Ali Fort and Museum Store.
 Ensure projects goals were being achieved on time.
 Involved in the preparation of architectural briefs for various landmark and
development projects.
 Preparation of Consultants scope of work, review of consultant’s proposals.
The projects included:
 The Museum of Islamic Art: I.M.PEI and Jean Michel Wilmotte for the interior
design.
 Qatar National Library: Arata Isozaki
 Qatar National Museum: Jean Nouvel and CEG.
 Photography Museum: Santiago Calatrava
 Traditional Clothes Museum:
 The Museum Store at Wajbah: CEG.
 NCCAH Headquarters: renovation / CICO.
 Qatar National Theater: renovation / CICO.
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 6 of 8
 Fahd Bin Ali Fort at Souk Wakef: renovation.
 The Weapons Museum.
November 2000- October 2002
Company: ZAK International- Beirut, Lebanon
Project: Mouawad Village – Broummana, Lebanon.
Position: Assistant General Manager.
Mouawad Village Broummana is a mixed use village with a hotel, apartments, Spa,
restaurants, shopping area, theater, ballrooms, etc. The scope included the
execution of all internal finishes.
Duties and Responsibilities:
 Managing a team of architects and engineers in the factory, office and site for
the execution of all internal finishes and wooden furniture for the following areas
within the mixed use hotel/ village: SPA, Ball room, French Restaurant, Cigar
Bar, Lobby Bar, Business Centre, Administration, Nursery and Hotel Lobby,
Hotel Baths and Corridors.
 Finishes included very intricate marble flooring and designs, each floor with
different designs, color and material- Intricate Ceiling Gypsum works, intricate
paint works and gold leaf applications, installation of old antique marble and
wooden fire places from China, custom made carpet installation, floor and wall
marble tiling for all bathrooms and all wooden works.
 Follow up on design reviews.
 Preparation and review of shop drawings submittals.
 Generating cutting lists for marble and their corresponding bill of quantities.
 Procurement of all material.
 Site/ office/ factory coordination.
 Office and client coordination including meetings, correspondences, progress
reports, etc…
 General site supervision.
 Testing and commissioning.
 Handover.
January 1998 – Oct 2000
Company: Al Attar Trading & Contracting- Beirut, Lebanon
Project: Various tenders for Lebanon and Syria
Position: Operations Manager.
Assisted in the preparation of multi million dollars tenders in various Engineering
fields for Syria and Lebanon for the following products:
 Chemical products for the oil, mining, and glass industries
 Heavy machinery equipment: trucks, tractors, bulldozers
 Cranes and lift machines
 Electrical wooden poles
 Water and Waste water treatment plants
 Electrical equipment: meters, cables
Duties and Responsibilities:
 Review tender documents and product specifications
 Search for and contact international companies through their local embassies
or related commercial sections.
 Review company profiles.
 Obtain letters of interest.
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 7 of 8
 Assist in submittals of the tender documents.
September 1996 - December 1997
Company: ALUMCO- Beirut, Lebanon
Project: New ESCWA Headquarters: Beirut- Lebanon
Position: Project Manager
Alumco was awarded the contract related to the execution of the external envelope
of the new ESCWA headquarters in Beirut. An innovative unitized curtain wall
system comprising of a combination of glass, aluminum and granite used for the first
time in Lebanon and executed according to very strict International laws and under
the supervision of Technal France, Fairhurst International, Bureau Veritas, and with
the collaboration of internationally reputable companies such as Zamil Glass
Industries, Marmo Décor for the granite, Balexco Bahrain for the aluminum profiles
extrusion, Rhone Poullenc and Dow Corning for the gaskets and silicone, etc
Duties and Responsibilities:
 Coordination with the client Solidere, the main contractor A.C.C, Fairhurst
International the project management company, the consultants Pierre and Rafik
El Khoury and all trades involved.
 Follow up on shop drawings submittals and presentation.
 Generating cutting lists and their corresponding bill of quantities.
 Procurement of material: glass, granite, aluminum, sealants, gaskets, rock wool,
screws, bolts, etc.
 Follow up on material delivery, quantity, quality, color, and defects for all
preceding items.
 Site / workshop / office coordination. General site supervision.
 Testing and commissioning.
 Handing over of the project.
December 1993 – January 1996
Company - DIYAR Consultants- Lebanon / Saudi Arabia
Project: multiple projects
Position: Project Manager
Duties and Responsibilities:
 Responsible for the design, design review and assessment design development,
preparation and checking of working drawings, coordination with all disciplines in
addition to the preparation of permit drawings for a variety of commercial,
residential and religious buildings in the Lebanon and Saudi Arabia.
 Preparation of various bids and pre-qualification files that were presented to the
C.D.R (Council of Development and Reconstruction) and Solidère.
 All design co-ordination between the main office in Saudi Arabia and the company
offices in Lebanon for all the previous projects.
 The design, design review, design development and permit drawings for a
number of newly built and restored residential buildings in the Beirut Central
District (BCD) through the Solidère.
December 1990- November 1993
Company: Al Attar Trading & Contracting, Beirut Lebanon
Project: multiple projects
Position –Free Lance Architect / Project Manager
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 8 of 8
Projects Undertaken:
March 1993 – July 1993
Project: Al-Attar Travel and Tourism- Beirut, Lebanon
 Interior design and shop drawings
 Execution
 Supervision with direct hire
 Handover
March 1992 - Sept. 1993
Project: Residential and Office buildings- Mazraa / Kraytem - Beirut, Lebanon
 Design review
 Execution
 Site supervision
 Subcontracting
 Management
Feb. 1991 – Feb. 1992
Project: Residential building - Tallet El-Khayyat- Beirut, Lebanon
 Prepared design and working drawings for fit out of building.
 Requested and reviewed offers from suppliers and contractors for fit out of the
building.
Dec. 1990- Feb. 1991
Project: Soft Landscape for a Palace & Residential buildings- Beirut, Lebanon
 Design
 Execution.
 Site supervision
 Handover.
October 1989 - August 1990
Company: Sabah Abi Hanna & Salem Al Marzouk- Kuwait
Position: Architect
 Prepared preliminary conceptual drawings for a competition entry for the
Headquarters Office building of the “Petrochemical Industrial Company” (P.I.C.)
in Kuwait, then the final design drawings after the project has been approved.
 Participated in competition of the redesign of an existing park “Al Shaab Park”
which involved the addition of new facilities such as a shopping mall, a sports
center, a covered stadium, a day care centre and a library.
 Work also included the preparation of design and working drawings for the
renovation of all “National bank of Kuwait” branches and for the “Third Floor
redesign” of the Amir’s residence, The BAYAN PALACE. This project also
involved the selection of furniture, fabric, and material.
Nov 1987-Dec 1988
Company: Simone Kosremelli- Beirut Lebanon
Position: Architect
 Worked on several projects preparing conceptual and detail drawings and
AHMAD. F. AL ATTAR, PROJECT MANAGER
Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 9 of 8
architectural designs.
 The projects varied in nature, and size ranging from small residences to large
palaces for Saudi Arabia.
 The projects included a design competition for Al-Ain University and the palace
of the Crown Prince in the United Arab Emirates.
Nov 1986- July 1987
Company: German Institute for Oriental Studies- Beirut, Lebanon
Position: Architect
 Prepared design and working drawings for a library and office extension to the
German Institute for Oriental Studies, which is a Lebanese house dating back to
the 1860’s.
 Supervised construction and completed project with direct hire and sub-
contracted forces.
 Landscape design and execution.
 Testing and commissioning.
 Handover.

More Related Content

What's hot

Carlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos Alberto Reparaz
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Amin
 
2nd Annual Underground UAE - 13 July
2nd Annual Underground UAE - 13 July2nd Annual Underground UAE - 13 July
2nd Annual Underground UAE - 13 JulyIoannis.M. Saplamidis
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy
 
CV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhCV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhMaher Abu-Mallouh
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015mohammed bataiha
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad Sahi
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
Philip Mok
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInGabriel Koncal
 
Arch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfArch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfMahmoud Mansour
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
Mohamed Omer
 
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan
 
Resume
ResumeResume
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
Amr Abdul-Moneim
 

What's hot (20)

CV
CVCV
CV
 
Carlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_EN
 
Siemer_June 2016_updated
Siemer_June 2016_updatedSiemer_June 2016_updated
Siemer_June 2016_updated
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
CV_Mahmoud_Reda
CV_Mahmoud_RedaCV_Mahmoud_Reda
CV_Mahmoud_Reda
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
 
2nd Annual Underground UAE - 13 July
2nd Annual Underground UAE - 13 July2nd Annual Underground UAE - 13 July
2nd Annual Underground UAE - 13 July
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
CV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu MallouhCV-06-20-16 Maher Abu Mallouh
CV-06-20-16 Maher Abu Mallouh
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedIn
 
Arch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sfArch.Mahmoud Majdi- English only-sf
Arch.Mahmoud Majdi- English only-sf
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
 
Resume
ResumeResume
Resume
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 

Similar to CV Ahmad Al Attar- Updated 07 March 2016

C.V Mr. Rabih Makhoul
C.V Mr. Rabih MakhoulC.V Mr. Rabih Makhoul
C.V Mr. Rabih MakhoulRabih Makhoul
 
Arul Nathan CV 19 Oct15
Arul Nathan CV  19 Oct15Arul Nathan CV  19 Oct15
Arul Nathan CV 19 Oct15arul nathan
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
Tarek Ali
 
Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCE
enghatem
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
Ehab A. Azeem
 
Eng. Tarek Ali cv - 29 oct 2015
Eng. Tarek Ali   cv - 29 oct 2015Eng. Tarek Ali   cv - 29 oct 2015
Eng. Tarek Ali cv - 29 oct 2015
Tarek Ali
 
K_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_RevK_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_RevKeith Niven
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Albitar
 

Similar to CV Ahmad Al Attar- Updated 07 March 2016 (20)

C.V Mr. Rabih Makhoul
C.V Mr. Rabih MakhoulC.V Mr. Rabih Makhoul
C.V Mr. Rabih Makhoul
 
Arul Nathan CV 19 Oct15
Arul Nathan CV  19 Oct15Arul Nathan CV  19 Oct15
Arul Nathan CV 19 Oct15
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
cv
cvcv
cv
 
AMIR' s CV
AMIR' s CVAMIR' s CV
AMIR' s CV
 
John CV
John CVJohn CV
John CV
 
Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCE
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
Eng. Tarek Ali cv - 29 oct 2015
Eng. Tarek Ali   cv - 29 oct 2015Eng. Tarek Ali   cv - 29 oct 2015
Eng. Tarek Ali cv - 29 oct 2015
 
K_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_RevK_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_Rev
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Sats Ganesh_
Sats Ganesh_Sats Ganesh_
Sats Ganesh_
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 

CV Ahmad Al Attar- Updated 07 March 2016

  • 1. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 1 of 8 EDUCATION Bachelor of Architecture American University of Beirut, Lebanon- 1986 COMPUTER SKILLS Microsoft Office: word & excel. AutoCAD- Power Point PROFESSIONAL AFFILIATIONS Member of the Lebanese Order of Engineers and Architects PERSONAL DOSSIER: Date of Birth: Feb. 19, 1961 Nationality : Lebanese Languages: Arabic, French & English: excellent in Written & Spoken. Spanish (Fair) References : Available upon Request. Email: ahmad.alattar61 @gmail.com Mobile: +974-55249331 AREAS OF EXPERIENCE: Project Management to mega size projects covering: Master Planning, Stakeholder Consultations, Design, Tendering, Construction, Project Planning & Project Controls Management, Risk Management and Testing / Commissioning / handover Management. SYNOPSIS  Architect with 29 years of Project Management experience gained in the private and public sectors with international contractors & consultants mainly in the Middle East (Qatar 13 years, Saudi Arabia, Kuwait and Lebanon) delivering wide spectrum of mega size projects (ports, iconic towers, buildings, museums, libraries, theatres, infrastructure, etc..) from inception to completion.  Project Manager on the New Port Project (NPP) with AECOM (Project Management Consultant) responsible for three of the ports building packages exceeding 70 buildings with a budget in excess of 2.5 Billion Riyals covering iconic buildings, administrative offices, accommodation, mosques, data centre, medical centre, fire stations, workshops and utility buildings with emphasis on architecture, fit out and furniture with a horizontal spread into other disciplines (Electrical, mechanical, telecommunication and security systems, infrastructure, etc…).  Excellent relationship management, communication skills and the ability to network with client, end users, project members, consultants, contractors, statutory agencies with consummate ease.  Managing Consultants & Contractors, monitoring deliverables, progress, program and quality compliance to ensure satisfactory execution of projects to time, quality and cost.  Evaluating & determining appropriate construction delivery systems and the most cost-effective plan and schedule for project completion.  Liaise with client, end users and project team for preparation and implementation of functional and technical requirements. SUMMARY OF EMPLOYMENT HISTORY Date Company Position Held 2002– 2015 AECOM Project Manager, Qatar 2000- 2002 ZAK International Ass. Gen. Manager, Lebanon 1998- 2000 Al Attar Trading & Contracting Operations Manager, Lebanon 1996- 1997 Alumco Project Manager, Lebanon 1993- 1996 Diyar Consultants Project Manager, Lebanon 1990- 1993 Al Attar Trading & Contracting Arch / Project Manager , Lebanon 1989- 1990 Sabah Abi Hanna Architect, Kuwait 1987 – 1988 Simone Kosremelli Architect, Lebanon 1986- 1987 German Institute for Oriental Studies Architect, Lebanon
  • 2. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 2 of 8 EXPERIENCE HISTORY / BACKGROUND December 2002 to December 2015 AECOM Middle East. Doha, Qatar Thirteen years with AECOM with the last seven years on the New Port Project as the Project Manager responsible for three of the ports building packages with emphasis on architecture, fit out and furniture with a horizontal spread into other disciplines (Electrical, mechanical, telecommunication and security systems, infrastructure, etc…) on a wide range of buildings from a 110 meters high iconic tower to administrative offices, accommodation, mosques and utility buildings. Projects Undertaken within AECOM November 2008 – December 2015 New Port Project, Qatar Aecom Middle East Position: Project Manager for Buildings’ Packages Client: Government of Qatar- New Port Project Steering Committee Project Brief: The New Port Project (NPP) is one of the largest “Greenfield” projects in the world, spanning 26.5 km2. The overall objective of the NPP is to construct a world-class Port. The Project Master Plan includes a new port (19.5 km2), a Naval Base for the Qatar Emiri Naval Forces (4.5 km2) and a Canal for Qatar Economic Zone (2.5 km2). The QAR 27 Billion (USD 7.4 Billion) megaproject is located approximately 25km south of Doha on the coastal strip north of Mesaieed Industrial City and south of Al Wakra in the southern section of the Qatar Economic Zone 3. Currently the project is in excess of 80 separate contract packages. The Project is managed by the New Port Project Steering Committee, chaired by the Minister of Transport, His Excellency Jassim Bin Saif Al Sulaiti, and includes the Programme Management Consultant, AECOM, WorleyParsons as Engineering Design Consultant and COWI as Environmental Consultant. The NPP Project Executive Director, with a project team, manages the Consultants and Contractors. Notable accomplishments Over 7 years working on the New Port Project with duties spread over the whole port with the main focus on buildings, architecture, fit out and furniture. Responsibilities varied from establishment of the project offices, to coordination with statutory authorities for transfer of land deeds, master planning approvals and building permits for marine works, Stakeholder Co-ordination, management of the Building Design Consultant and Engineering Design Consultant for infrastructure and utility buildings up to issuance of IFT deliverables, preparation and issuance of tenders up to award of construction packages, Duties and responsibilities Overall port  NPP project offices within Doha including fit out, furniture and equipment:
  • 3. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 3 of 8 preparation of design, prequalification, tender, evaluation, award and site supervision with testing, commissioning and handover.  Coordination with statutory authorities for land transfer and obtaining of the New Port land deed.  Assist in the preparation of the master plan according to the “Ministry of Municipality and Urban Planning / MMUP’s” requirements. Set up and attend all coordination meetings with MMUP and obtain MMUP’s” final approval on the New Port Master Plan.  Prepare, submit and obtain the building permits from MMUP and Wakrah Municipality for the first two port construction packages: the Port Basin and the Dredging contracts.  Assist the client in becoming a self-permitting authority through numerous correspondences and meetings with MMUP. Port Buildings Packages Work focused on architecture, fit out and furniture with a horizontal spread into other disciplines and Infrastructure for the New Port’s Building Packages: the Port Administration Authority facilities, the Port Marine Unit, the Coast Guard Area, Container Terminal and the General Cargo Terminal. Originally started work on all 5 packages then main focus was on 3 packages only. The other two packages (Container Terminal and the General Cargo Terminal) were issued as Design & Built to 2 different contractors. The 3 packages cover around 70 buildings, 3 of which are iconic and include a control tower 110 meters high designed by an international UK firm (PLP). The buildings total built up area is around 120,000 m2 with expected occupancy to exceed 2500 persons to cover all port’s operation staff. The 3 packages also include 21 utility buildings and all infrastructure works within the boundary limits. The value of all works is estimated at QR 2.5 billion. Main duties and responsibilities:  Management of the Engineering Design Consultant (Worley Parsons) responsible for the preparation of the original buildings functional requirements (design briefs) , procurement and management of the Building Design Consultant up to issuance of IFT deliverables by the Building Design Consultant.  Leading and chairing the Stakeholder consultations associated with the delivery of Buildings functional requirements. List of stakeholders included MWANI / the Port Authority, Ministry of Interior, General Authority of Customs, AWQAF, HASSAD, MAWASHI, Civil Aviation, Coast Guard, Internal Security Forces, QCDD and the Ministry of Environment.  Assist the Engineering Design Consultant in the preparation of the Building Design Consultant’s prequalification documents and evaluation.  Assist in the preparation of the different tender strategies for the procurement of the “Building Design Consultant” presented to the NPP committees, tender documents, tender issue and evaluation up to award of contract.  Management of the Engineering Design Consultant and the Building Design Consultant throughout all design stages and stakeholder coordination to ensure all requirements have been implemented up to issuance of technical tender documentation.  Management of the Engineering Design Consultant responsible for the design of the infrastructure package from detailed design until issue of tender documents.  Preparation of constructability review reports: Heading a team of 40 engineers
  • 4. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 4 of 8 from different disciplines.  Preparation of Tender documents for the “Buildings and Infrastructure construction packages”, tender, evaluation up to award of contracts.  Manage the “Engineering Design Consultant” in the preparation of the Design & Build Concept design deliverables for the visitors centre.  Preparation of the Visitors Centre tender documents.  Chair and Minute progress, technical, design and stakeholder meetings.  Review schedule and design deliverables to monitor progress.  Preparation of weekly and monthly reports.  Assist in the development of a master time schedule for project delivery.  Work closely with the Employer’s Representative to ensure instructions and decisions are fully implemented.  Working closely with the Client Project Team to ensure client directions, budget and program are fully implemented.  Reporting to the client, Technical, Steering and Tender Committees. August 2007- October 2008 Company: Aecom Middle East Project: Barwa Al Khor Development- Al Khor, Qatar Position: Assistant Project Manager Client: Barwa Barwa Al Khor Development with a budget of around QR 35 billion is a mixed use megaproject spanning 550 hectares and will accommodate 105,000 people. The development includes over 7.5 million square meters of residential, commercial and retail, a hotel, golf course, schools, nurseries, Mosques, public beach and plazas. Duties and responsibilities:  Direct follow up with the MMUP for Master Plan coordination meetings and approval.  Direct follow up with Statutory Authorities.  End user coordination and meetings.  Day to day coordination with the Abu Dhabi office preparing the Master plan. March 2005- July 2007 Al Waab City Development, Qatar Aecom Middle East Position: Assistant Project Manager Client: Nasser Bin Khaled The Al Waab city with a budget of around QAR 7.0 Billion will accommodate 8000 people in over 2000 homes, ranging from luxurious villas to contemporary apartments. The development includes over 100,000 square meters of retail space and 200,000 square meters of office accommodation - all spread over 1.25million square meters and supported by considered infrastructure and 10,700 off-road parking spaces. At the heart of the project, lies the multi-facility 50,000 m2 urban plaza of Barahat Al Waab. I was assigned as Assistant Project Manager for the whole project with main focus on the Design phase of a 3 stories combined retail / office multiple showrooms development (total 50,000 m2.) with a budget of QR 250 million. Duties and Responsibilities:
  • 5. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 5 of 8  Site offices: Design, construction, site supervision and fit out with testing, commissioning and handover.  Direct follow up with local governmental agencies to obtain land transfers, land deeds, master plan approval and building permits for the whole of Al Waab City development.  Day to day managing of the building design consultant on behalf of the Client/developer. Direct report to internal Al Waab City Project Director and Client representatives.  Liaison with Client/Developer, design consultants (architects, engineers, and interior designers) and end users (automobile dealership and high-end fashion retail).  Performance management of design consultant to ensure contractual obligations, schedules and costs are maintained.  Provide ongoing project status/progress reporting updates with all parties throughout design and construction phases.  Ensuring that all senior management is kept abreast of the project through the appropriate reporting structures.  Responsible for preparation of all internal and external project correspondence (letters, weekly reports, minute of meeting, presentations, etc.). Dec 2002- Feb 2005 Multiple projects, Qatar Aecom Middle East Position: Senior Architect Client: Government of Qatar- National Council for Culture, Arts and Heritage / NCCAH Senior Architect on various new projects undertaken on behalf of the National Council for Culture, Arts and Heritage, with an emphasis on museums. Duties and Responsibilities:  Review the design at various stages of the design process.  Monitor progress.  Participate in coordination and progress meetings with Building Engineering Department / Government agencies, QP, Turner International, local and international consultants and specialist sub consultants.  Site inspection visits and snag list for the NCCAH offices, National Theatre, Fahd Bin Ali Fort and Museum Store.  Ensure projects goals were being achieved on time.  Involved in the preparation of architectural briefs for various landmark and development projects.  Preparation of Consultants scope of work, review of consultant’s proposals. The projects included:  The Museum of Islamic Art: I.M.PEI and Jean Michel Wilmotte for the interior design.  Qatar National Library: Arata Isozaki  Qatar National Museum: Jean Nouvel and CEG.  Photography Museum: Santiago Calatrava  Traditional Clothes Museum:  The Museum Store at Wajbah: CEG.  NCCAH Headquarters: renovation / CICO.  Qatar National Theater: renovation / CICO.
  • 6. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 6 of 8  Fahd Bin Ali Fort at Souk Wakef: renovation.  The Weapons Museum. November 2000- October 2002 Company: ZAK International- Beirut, Lebanon Project: Mouawad Village – Broummana, Lebanon. Position: Assistant General Manager. Mouawad Village Broummana is a mixed use village with a hotel, apartments, Spa, restaurants, shopping area, theater, ballrooms, etc. The scope included the execution of all internal finishes. Duties and Responsibilities:  Managing a team of architects and engineers in the factory, office and site for the execution of all internal finishes and wooden furniture for the following areas within the mixed use hotel/ village: SPA, Ball room, French Restaurant, Cigar Bar, Lobby Bar, Business Centre, Administration, Nursery and Hotel Lobby, Hotel Baths and Corridors.  Finishes included very intricate marble flooring and designs, each floor with different designs, color and material- Intricate Ceiling Gypsum works, intricate paint works and gold leaf applications, installation of old antique marble and wooden fire places from China, custom made carpet installation, floor and wall marble tiling for all bathrooms and all wooden works.  Follow up on design reviews.  Preparation and review of shop drawings submittals.  Generating cutting lists for marble and their corresponding bill of quantities.  Procurement of all material.  Site/ office/ factory coordination.  Office and client coordination including meetings, correspondences, progress reports, etc…  General site supervision.  Testing and commissioning.  Handover. January 1998 – Oct 2000 Company: Al Attar Trading & Contracting- Beirut, Lebanon Project: Various tenders for Lebanon and Syria Position: Operations Manager. Assisted in the preparation of multi million dollars tenders in various Engineering fields for Syria and Lebanon for the following products:  Chemical products for the oil, mining, and glass industries  Heavy machinery equipment: trucks, tractors, bulldozers  Cranes and lift machines  Electrical wooden poles  Water and Waste water treatment plants  Electrical equipment: meters, cables Duties and Responsibilities:  Review tender documents and product specifications  Search for and contact international companies through their local embassies or related commercial sections.  Review company profiles.  Obtain letters of interest.
  • 7. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 7 of 8  Assist in submittals of the tender documents. September 1996 - December 1997 Company: ALUMCO- Beirut, Lebanon Project: New ESCWA Headquarters: Beirut- Lebanon Position: Project Manager Alumco was awarded the contract related to the execution of the external envelope of the new ESCWA headquarters in Beirut. An innovative unitized curtain wall system comprising of a combination of glass, aluminum and granite used for the first time in Lebanon and executed according to very strict International laws and under the supervision of Technal France, Fairhurst International, Bureau Veritas, and with the collaboration of internationally reputable companies such as Zamil Glass Industries, Marmo Décor for the granite, Balexco Bahrain for the aluminum profiles extrusion, Rhone Poullenc and Dow Corning for the gaskets and silicone, etc Duties and Responsibilities:  Coordination with the client Solidere, the main contractor A.C.C, Fairhurst International the project management company, the consultants Pierre and Rafik El Khoury and all trades involved.  Follow up on shop drawings submittals and presentation.  Generating cutting lists and their corresponding bill of quantities.  Procurement of material: glass, granite, aluminum, sealants, gaskets, rock wool, screws, bolts, etc.  Follow up on material delivery, quantity, quality, color, and defects for all preceding items.  Site / workshop / office coordination. General site supervision.  Testing and commissioning.  Handing over of the project. December 1993 – January 1996 Company - DIYAR Consultants- Lebanon / Saudi Arabia Project: multiple projects Position: Project Manager Duties and Responsibilities:  Responsible for the design, design review and assessment design development, preparation and checking of working drawings, coordination with all disciplines in addition to the preparation of permit drawings for a variety of commercial, residential and religious buildings in the Lebanon and Saudi Arabia.  Preparation of various bids and pre-qualification files that were presented to the C.D.R (Council of Development and Reconstruction) and Solidère.  All design co-ordination between the main office in Saudi Arabia and the company offices in Lebanon for all the previous projects.  The design, design review, design development and permit drawings for a number of newly built and restored residential buildings in the Beirut Central District (BCD) through the Solidère. December 1990- November 1993 Company: Al Attar Trading & Contracting, Beirut Lebanon Project: multiple projects Position –Free Lance Architect / Project Manager
  • 8. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 8 of 8 Projects Undertaken: March 1993 – July 1993 Project: Al-Attar Travel and Tourism- Beirut, Lebanon  Interior design and shop drawings  Execution  Supervision with direct hire  Handover March 1992 - Sept. 1993 Project: Residential and Office buildings- Mazraa / Kraytem - Beirut, Lebanon  Design review  Execution  Site supervision  Subcontracting  Management Feb. 1991 – Feb. 1992 Project: Residential building - Tallet El-Khayyat- Beirut, Lebanon  Prepared design and working drawings for fit out of building.  Requested and reviewed offers from suppliers and contractors for fit out of the building. Dec. 1990- Feb. 1991 Project: Soft Landscape for a Palace & Residential buildings- Beirut, Lebanon  Design  Execution.  Site supervision  Handover. October 1989 - August 1990 Company: Sabah Abi Hanna & Salem Al Marzouk- Kuwait Position: Architect  Prepared preliminary conceptual drawings for a competition entry for the Headquarters Office building of the “Petrochemical Industrial Company” (P.I.C.) in Kuwait, then the final design drawings after the project has been approved.  Participated in competition of the redesign of an existing park “Al Shaab Park” which involved the addition of new facilities such as a shopping mall, a sports center, a covered stadium, a day care centre and a library.  Work also included the preparation of design and working drawings for the renovation of all “National bank of Kuwait” branches and for the “Third Floor redesign” of the Amir’s residence, The BAYAN PALACE. This project also involved the selection of furniture, fabric, and material. Nov 1987-Dec 1988 Company: Simone Kosremelli- Beirut Lebanon Position: Architect  Worked on several projects preparing conceptual and detail drawings and
  • 9. AHMAD. F. AL ATTAR, PROJECT MANAGER Mobile: +974 5524 9331 E-Mail: ahmad.alattar61@gmail.com Page 9 of 8 architectural designs.  The projects varied in nature, and size ranging from small residences to large palaces for Saudi Arabia.  The projects included a design competition for Al-Ain University and the palace of the Crown Prince in the United Arab Emirates. Nov 1986- July 1987 Company: German Institute for Oriental Studies- Beirut, Lebanon Position: Architect  Prepared design and working drawings for a library and office extension to the German Institute for Oriental Studies, which is a Lebanese house dating back to the 1860’s.  Supervised construction and completed project with direct hire and sub- contracted forces.  Landscape design and execution.  Testing and commissioning.  Handover.