CURRICULUM VITAE
MOHAMED GALAL MOHAMED
Civil Engineer
ObjectiveObjective
Looking forward to take an active part in civil & structural engineering field,
where I can develop my knowledge and my experience.
Personal informationPersonal information
Name : Mohamed Galal Mohamed
Date Of Birth : 27th
September 1982
Gender : Male
Marital Status : Married
Nationality : Egyptian
Military Status : Exempted
Address : 15 Ben Al Qayeem-Al Hilal-
Doha
Phone : Mob: +9/74 - 66581623
E-mail : memo_gello2000@yahoo.com
Education and qualificationsEducation and qualifications
Graduation:
B.SC IN CIVIL AND STRUCTURAL ENGINEERING (May 2007)
Alexandria University
Faculty of Engineering
Civil and structural department
Project details:
Project Name: Surveying and Topography.
Grade: Very Good
Current jobCurrent job
From Jan 2015 till this date:
Job title:
Construction Manager.
Company:
RAMCO ENG. COMPANY W.L.L.
Job details: responsible for
• Review construction documents including plans and specifications received from the
field to assure accordance with Q.C.S. Wall Systems requirements
• Handle technical inquiries and questions received via letter, facsimile, email,
telephone from architects, engineers, consultants, clients, etc.
• In some instances become the point person for communication with staff and others
-develop, maintain and enhance consultant’s relationships and communication in a
cooperative and professional manner with all levels of sub-contractors and customers.
• Develop a professional and personal skill set that will impact business strategy and
growth.
• Assist with testing, procurement of materials approvals, research, development of
new systems/products, etc.
• Develop details via AutoCAD to meet company and customer needs
• Participate on committees as assigned, able to work in teams and have excellent
communication skills
• Maintain library on competitor literature
• Maintain database for consultants field complaints
• Document, review, negotiate and resolve field complaints to a fair resolution in a
timely manner
• Process warranties and applicator agreements
• Communicate sub-contractors to provide information on project specifications and
clients representative initiatives, giving honest and timely feedback.
• Assist in the development of Technical communications to consultant’s base through
understanding of project specifications and needs.
Work experiencesWork experiences
0
20
40
60
80
100
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
East
West
North
From Feb 2015 until Now:
Job title:
Construction Manager.
Company:
RAMCO ENG. W.L.L.
Job details:
• Overseeing the running of the several activities.
• Communicating with a range of people including the client, consultant,
subcontractors, suppliers, the public and the workforce.
• Planning a head to prevent problems on site before they occurs.
• Managing destructive and non-destructive tests and reports of concrete elements.
• Liaising with other construction professionals.
• Responsible for project progress.
• Developing the programme of work and strategy.
• Schedule the project in logical steps and budget time required to meet deadlines.
• Determine labor requirements and dispatch workers to construction sites.
• Inspect and review project to report compliance with building and safety codes and
other regulations.
• Interpret and explain plans and contract terms to administrative staff, workers and
clients representing the owner or developer.
• Obtain all necessary permits and licenses.
• Direct and supervise workers.
• Study job specifications to determine appropriate construction methods.
• Select, contract and oversee workers who complete specific pieces of the project.
• Requisition supplies and materials to complete construction projects.
• Prepare and submit budget estimates and progress and cost tracking reports.
• Develop and implement quality control programs.
• Take action to deal with the results of delays, bad weather or emergencies at
construction site.
• Confer with supervisory personnel, owners, contractors and design professionals to
discuss and resolve matters such as work procedures, complaints, and construction
problems.
• Plan, organize and direct activities concerned with the construction and maintenance
of structures, facilities and systems.
• Investigate damage, accidents or delays at construction sites, to ensure that proper
procedures are being carried out.
Projects:
 ACES HEAD QUARTERS LABORATORY BUILDING + ACCOMMODATION +
WORKSHOP @ INDUSTRIAL AREA
Cost: 21,970,000 Q.R (SIX MILLIONS FOUR HUNDED THOUSANDS QATARIAN
RIYAL)
From July 2012 until Dec 2014:
Job title:
Project Manager.
Company:
RAMCO ENG. W.L.L.
Job details:
• Reviewing documents, contracts and agreements.
• Reviewing and comparison between tender and construction drawings.
• Quantities surveying.
• Managing destructive and non-destructive tests and reports of concrete elements.
• Responsible for monthly evaluations.
• Responsible for project progress.
• Shop Drawings.
Projects:
 Proposed (G+1) Villa, Out Majles and Out Kitchen @ Khartiyat (Maryem M. A.
AL Humaidi)
Cost: 6,400,000 Q.R (SIX MILLIONS FOUR HUNDED THOUSANDS QATARIAN
RIYAL)
From Jan 2012 until April 2013:
Job title:
Project Manager.
Company:
RAMCO ENG. W.L.L.
Job details:
• Reviewing documents, contracts and agreements.
• Reviewing and comparison between tender and construction drawings.
• Quantities surveying.
• Managing destructive and non-destructive tests and reports of concrete elements.
• Responsible for monthly evaluations.
• Responsible for project progress.
• Shop Drawings.
Projects:
 Proposed (G+M+1) Shops @ Khartiyat (Abdullah Ben Ali Ben Nasser Al Attiya)
From Aug 2011 until June 2012:
Job title:
Project Manager.
Company:
RAMCO ENG. W.L.L.
Job details:
• Reviewing documents, contracts and agreements.
• Reviewing and comparison between tender and construction drawings.
• Quantities surveying.
• Managing destructive and non-destructive tests and reports of concrete elements.
• Responsible for monthly evaluations.
• Responsible for project progress.
• Shop Drawings.
Projects:
 Proposed (G+2) Residential Flats @ Khartiyat (Gabor Ben Ali Ben Nasser Al
Attiya)
From July 2010 until Oct 2011:
Job title:
Project Manager.
Company:
RAMCO ENG. W.L.L.
Job details:
• Reviewing documents, contracts and agreements.
• Reviewing and comparison between tender and construction drawings.
• Quantities surveying.
• Managing destructive and non-destructive tests and reports of concrete elements.
• Responsible for monthly evaluations.
• Responsible for project progress.
• Shop Drawings.
• Material submittals.
Projects:
 Proposed (G+2) (Showroom + 2 Residential Floors) @ Khartiyat (Heirs Ali Ben
Nasser Al Attiya)
From January 2010 to July 2010
Job title:
Technical Office Engineer
Company:
RAMCO ENG. W.L.L.
Projects:
Proposed Labors Accommodation (G+2), Mosque, Guard Room and Playground @ Wakra
(Ashghal)
Cost: 17,000,000 Q.R (SEVENTEEN MILLIONS QATARIAN RIYALS)
Duration:
6 months
Job details:
• Reviewing documents, contracts and agreements.
• Reviewing and comparison between tender and construction drawings.
• Quantities surveying.
• Managing destructive and non-destructive tests and reports of concrete elements.
• Submitting architectural and structural materials.
• Updating and reviewing for time schedule.
• Q.c. tests and inspections
• Shop Drawings.
From December 2008 to December 2009
Job title:
Site Engineer
Company:
RAMCO ENG. W.L.L.
Projects:
Additional Four Floors + Construction (G+3) Car Parking @ Al Saad
Cost: 38,000,000 Q.R (THIRTY EIGHT MILLIONS QATARIAN RIYALS)
Duration:
1 year
Job details:
 Soil and foundations works.
 Concrete form works.
 R.C skeletons works.
 Finishing and tile woks.
 Pipelines and sanitary works.
 Supervising for water proofing works.
 Landscape woks.
 Revision of design and specifications.
 Checking for building materials.
 Checking for setting out.
 Preparing of statements for the contractors.
 Responsible for prepared of monthly progress reports for managers.
 Responsible for construction equipments and rate of work.
 Responsible for safety procedures for staff and workers.
From November 2007 to November 2008:
Job title:
Site Engineer
Company:
RAMCO ENG. W.L.L.
Projects:
- 4 Villas (G+2) @ Douhail (Sheika Aisha Bent Abd Al Rahman Al Thani) (Q.I.B.)
Duration:
1 year
Job details:
 Structural and works.
 Finishing works.
 Inspection of building materials.
 Review of drawings and quantities.
 Review all statements.
 Landscape works.
TrainingTraining
Job title:
Site Engineer (under training)
Company:
TALAAT MOUSTAFA GROUP.
Projects:
San Stefano hotel project (san Stefano-Alexandria)
Duration:
3 months
Job details:
Training
LanguagesLanguages
 Arabic Mother tongue.
 English Excellent (reading ,writing and conversation)
 French Fair
Computer skillsComputer skills
 AutoCAD
 Primavera (updating and reviewing)
 Microsoft office (word - excel – power point)
 Windows (98,2000,XP)
 Internet for search & research
 Total station
 Ebanet
 Surfer
 Stability of slopes
Extra informationExtra information
 Fast learning.
 Hard work.
 Leadership.
 Good related with team work.
Extra Activities Works DetailsExtra Activities Works Details
• Post tension slabs.
• Tendering projects.
• Block works
• Plaster works
• Cladding works (stone, Aluminum, Marble, ceramics, etc…
• Floor finishing (screed, ceramics. Porcelain, marble, terrazzo, granite,
etc…
• Walls finishing (painting, wall papers, etc…
• Asphalt works
• Landscape works (Interlock, kerbstone, stamped concrete, etc…
• Waterproofing works (bathrooms , Roof , tanks )
• External drainage clay pipes.
Thank you for your time
 Primavera (updating and reviewing)
 Microsoft office (word - excel – power point)
 Windows (98,2000,XP)
 Internet for search & research
 Total station
 Ebanet
 Surfer
 Stability of slopes
Extra informationExtra information
 Fast learning.
 Hard work.
 Leadership.
 Good related with team work.
Extra Activities Works DetailsExtra Activities Works Details
• Post tension slabs.
• Tendering projects.
• Block works
• Plaster works
• Cladding works (stone, Aluminum, Marble, ceramics, etc…
• Floor finishing (screed, ceramics. Porcelain, marble, terrazzo, granite,
etc…
• Walls finishing (painting, wall papers, etc…
• Asphalt works
• Landscape works (Interlock, kerbstone, stamped concrete, etc…
• Waterproofing works (bathrooms , Roof , tanks )
• External drainage clay pipes.
Thank you for your time

my cv 2

  • 1.
    CURRICULUM VITAE MOHAMED GALALMOHAMED Civil Engineer ObjectiveObjective Looking forward to take an active part in civil & structural engineering field, where I can develop my knowledge and my experience. Personal informationPersonal information Name : Mohamed Galal Mohamed Date Of Birth : 27th September 1982 Gender : Male Marital Status : Married Nationality : Egyptian Military Status : Exempted Address : 15 Ben Al Qayeem-Al Hilal- Doha Phone : Mob: +9/74 - 66581623 E-mail : memo_gello2000@yahoo.com Education and qualificationsEducation and qualifications Graduation: B.SC IN CIVIL AND STRUCTURAL ENGINEERING (May 2007) Alexandria University Faculty of Engineering Civil and structural department Project details: Project Name: Surveying and Topography. Grade: Very Good
  • 2.
    Current jobCurrent job FromJan 2015 till this date: Job title: Construction Manager. Company: RAMCO ENG. COMPANY W.L.L. Job details: responsible for • Review construction documents including plans and specifications received from the field to assure accordance with Q.C.S. Wall Systems requirements • Handle technical inquiries and questions received via letter, facsimile, email, telephone from architects, engineers, consultants, clients, etc. • In some instances become the point person for communication with staff and others -develop, maintain and enhance consultant’s relationships and communication in a cooperative and professional manner with all levels of sub-contractors and customers. • Develop a professional and personal skill set that will impact business strategy and growth. • Assist with testing, procurement of materials approvals, research, development of new systems/products, etc. • Develop details via AutoCAD to meet company and customer needs • Participate on committees as assigned, able to work in teams and have excellent communication skills • Maintain library on competitor literature • Maintain database for consultants field complaints • Document, review, negotiate and resolve field complaints to a fair resolution in a timely manner • Process warranties and applicator agreements • Communicate sub-contractors to provide information on project specifications and clients representative initiatives, giving honest and timely feedback. • Assist in the development of Technical communications to consultant’s base through understanding of project specifications and needs.
  • 3.
    Work experiencesWork experiences 0 20 40 60 80 100 1stQtr 2nd Qtr 3rd Qtr 4th Qtr East West North From Feb 2015 until Now: Job title: Construction Manager. Company: RAMCO ENG. W.L.L. Job details: • Overseeing the running of the several activities. • Communicating with a range of people including the client, consultant, subcontractors, suppliers, the public and the workforce. • Planning a head to prevent problems on site before they occurs. • Managing destructive and non-destructive tests and reports of concrete elements. • Liaising with other construction professionals. • Responsible for project progress. • Developing the programme of work and strategy. • Schedule the project in logical steps and budget time required to meet deadlines. • Determine labor requirements and dispatch workers to construction sites. • Inspect and review project to report compliance with building and safety codes and other regulations. • Interpret and explain plans and contract terms to administrative staff, workers and clients representing the owner or developer. • Obtain all necessary permits and licenses. • Direct and supervise workers. • Study job specifications to determine appropriate construction methods. • Select, contract and oversee workers who complete specific pieces of the project. • Requisition supplies and materials to complete construction projects. • Prepare and submit budget estimates and progress and cost tracking reports. • Develop and implement quality control programs. • Take action to deal with the results of delays, bad weather or emergencies at construction site. • Confer with supervisory personnel, owners, contractors and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
  • 4.
    • Plan, organizeand direct activities concerned with the construction and maintenance of structures, facilities and systems. • Investigate damage, accidents or delays at construction sites, to ensure that proper procedures are being carried out. Projects:  ACES HEAD QUARTERS LABORATORY BUILDING + ACCOMMODATION + WORKSHOP @ INDUSTRIAL AREA Cost: 21,970,000 Q.R (SIX MILLIONS FOUR HUNDED THOUSANDS QATARIAN RIYAL) From July 2012 until Dec 2014: Job title: Project Manager. Company: RAMCO ENG. W.L.L. Job details: • Reviewing documents, contracts and agreements. • Reviewing and comparison between tender and construction drawings. • Quantities surveying. • Managing destructive and non-destructive tests and reports of concrete elements. • Responsible for monthly evaluations. • Responsible for project progress. • Shop Drawings. Projects:  Proposed (G+1) Villa, Out Majles and Out Kitchen @ Khartiyat (Maryem M. A. AL Humaidi) Cost: 6,400,000 Q.R (SIX MILLIONS FOUR HUNDED THOUSANDS QATARIAN RIYAL) From Jan 2012 until April 2013: Job title: Project Manager. Company: RAMCO ENG. W.L.L.
  • 5.
    Job details: • Reviewingdocuments, contracts and agreements. • Reviewing and comparison between tender and construction drawings. • Quantities surveying. • Managing destructive and non-destructive tests and reports of concrete elements. • Responsible for monthly evaluations. • Responsible for project progress. • Shop Drawings. Projects:  Proposed (G+M+1) Shops @ Khartiyat (Abdullah Ben Ali Ben Nasser Al Attiya) From Aug 2011 until June 2012: Job title: Project Manager. Company: RAMCO ENG. W.L.L. Job details: • Reviewing documents, contracts and agreements. • Reviewing and comparison between tender and construction drawings. • Quantities surveying. • Managing destructive and non-destructive tests and reports of concrete elements. • Responsible for monthly evaluations. • Responsible for project progress. • Shop Drawings. Projects:  Proposed (G+2) Residential Flats @ Khartiyat (Gabor Ben Ali Ben Nasser Al Attiya) From July 2010 until Oct 2011: Job title: Project Manager. Company: RAMCO ENG. W.L.L.
  • 6.
    Job details: • Reviewingdocuments, contracts and agreements. • Reviewing and comparison between tender and construction drawings. • Quantities surveying. • Managing destructive and non-destructive tests and reports of concrete elements. • Responsible for monthly evaluations. • Responsible for project progress. • Shop Drawings. • Material submittals. Projects:  Proposed (G+2) (Showroom + 2 Residential Floors) @ Khartiyat (Heirs Ali Ben Nasser Al Attiya) From January 2010 to July 2010 Job title: Technical Office Engineer Company: RAMCO ENG. W.L.L. Projects: Proposed Labors Accommodation (G+2), Mosque, Guard Room and Playground @ Wakra (Ashghal) Cost: 17,000,000 Q.R (SEVENTEEN MILLIONS QATARIAN RIYALS) Duration: 6 months Job details: • Reviewing documents, contracts and agreements. • Reviewing and comparison between tender and construction drawings. • Quantities surveying. • Managing destructive and non-destructive tests and reports of concrete elements. • Submitting architectural and structural materials. • Updating and reviewing for time schedule. • Q.c. tests and inspections • Shop Drawings. From December 2008 to December 2009 Job title:
  • 7.
    Site Engineer Company: RAMCO ENG.W.L.L. Projects: Additional Four Floors + Construction (G+3) Car Parking @ Al Saad Cost: 38,000,000 Q.R (THIRTY EIGHT MILLIONS QATARIAN RIYALS) Duration: 1 year Job details:  Soil and foundations works.  Concrete form works.  R.C skeletons works.  Finishing and tile woks.  Pipelines and sanitary works.  Supervising for water proofing works.  Landscape woks.  Revision of design and specifications.  Checking for building materials.  Checking for setting out.  Preparing of statements for the contractors.  Responsible for prepared of monthly progress reports for managers.  Responsible for construction equipments and rate of work.  Responsible for safety procedures for staff and workers. From November 2007 to November 2008: Job title: Site Engineer Company: RAMCO ENG. W.L.L. Projects: - 4 Villas (G+2) @ Douhail (Sheika Aisha Bent Abd Al Rahman Al Thani) (Q.I.B.) Duration:
  • 8.
    1 year Job details: Structural and works.  Finishing works.  Inspection of building materials.  Review of drawings and quantities.  Review all statements.  Landscape works. TrainingTraining Job title: Site Engineer (under training) Company: TALAAT MOUSTAFA GROUP. Projects: San Stefano hotel project (san Stefano-Alexandria) Duration: 3 months Job details: Training LanguagesLanguages  Arabic Mother tongue.  English Excellent (reading ,writing and conversation)  French Fair Computer skillsComputer skills  AutoCAD
  • 9.
     Primavera (updatingand reviewing)  Microsoft office (word - excel – power point)  Windows (98,2000,XP)  Internet for search & research  Total station  Ebanet  Surfer  Stability of slopes Extra informationExtra information  Fast learning.  Hard work.  Leadership.  Good related with team work. Extra Activities Works DetailsExtra Activities Works Details • Post tension slabs. • Tendering projects. • Block works • Plaster works • Cladding works (stone, Aluminum, Marble, ceramics, etc… • Floor finishing (screed, ceramics. Porcelain, marble, terrazzo, granite, etc… • Walls finishing (painting, wall papers, etc… • Asphalt works • Landscape works (Interlock, kerbstone, stamped concrete, etc… • Waterproofing works (bathrooms , Roof , tanks ) • External drainage clay pipes. Thank you for your time
  • 10.
     Primavera (updatingand reviewing)  Microsoft office (word - excel – power point)  Windows (98,2000,XP)  Internet for search & research  Total station  Ebanet  Surfer  Stability of slopes Extra informationExtra information  Fast learning.  Hard work.  Leadership.  Good related with team work. Extra Activities Works DetailsExtra Activities Works Details • Post tension slabs. • Tendering projects. • Block works • Plaster works • Cladding works (stone, Aluminum, Marble, ceramics, etc… • Floor finishing (screed, ceramics. Porcelain, marble, terrazzo, granite, etc… • Walls finishing (painting, wall papers, etc… • Asphalt works • Landscape works (Interlock, kerbstone, stamped concrete, etc… • Waterproofing works (bathrooms , Roof , tanks ) • External drainage clay pipes. Thank you for your time