CURRICULUM VITAE
Name : Ibrahim Shukry El-Eter
Nationality : Jordanian
Marital Status : Married
Position : Senior Construction Engineer
Languages : English + Arabic
Address / Telephone : 00962-65935532 (Amman)
0096650-7835147 (Jeddah)
Key Qualifications : Construction supervision
Education : Degree : B.Sc. in Architecture
Date if Graduation : 1970
University : Fine Arts Collage (Architecture), Cairo -Egypt
Degree : Diploma in Housing Design & Policy
Date of Graduation : 1975
Institute : Bouwcentrum International Education,
Rotterdam - Holland.
Training Courses
• Project Management: (Computer Course), Amman
• Real Estate Appraising: United Nations, Amman 1974
• AUTOCAD: Release 2.2 (Computer Course), Amman .1991
• AUTOCAD: Release 10.0 (Computer Course), Amman .1991
• DOS Release (4): (Computer Course), Amman-1993
• Word Star 2000: (Computer Course), Amman-1993
• Windows 98, Excel 97 & Internet: (Computer Course), Amman-1999
.
• Safety Training :( Fall Protection/Scaffolding) by FLUOR-2007.
• Safety Training: (Crane & Rigging, Electrical safety, Scaffolding and
Fall Protection, PPE, Gas.
• Cutting and Wielding Safety) by FLUOR- 2007.
• Safety Training (30 Hours, Construction Safety) by FLUOR-2007.
• Certificate of Attendance: PMP – 2010.
• Basic Life Support-2009.
• Occupational Safety And Health Training Course in construction
safety and health (OSHA) -2010.
• World Class Maintenance Management -2012.
• Site Quality Manager Training: On line course with FLUOR-2013
• Construction Piping Inspection: On line course with FLUOR-2013
• Construction Building Inspection: On line course with FLUOR-2013
• Soil Inspection Training: On line course with FLUOR-2013
• Construction Control System: On line course with FLUOR-2013
Ibrahim El-Eter Page 1 of 8
• Construction Equipment Inspection: On line course with FLUOR-
2013
• Structural Steel Inspection: On line course with FLUOR-2013
• Construction Insulation Inspection: On line course with FLUOR-
2013
• Construction Receiving Inspection: On line course with FLUOR-
2013.
• SIX SIGMA-2015.
• QMS - ISO 9001:2015 Lead Implementer-2015.
• Certified Quality Consultant For QMS-ISO 9001:2016.
• Concrete Post Tensioning Design and installation-2015.
• PMO (Project Management Office) 2016.
Professional Memberships:
1-Association of Jordanian Engineers- –1971.
2- Saudi Society of Civil Engineers-2008.
3- Saudi Council of Engineers-2013.
4- Arab society of Engineers-2010.
Professional Experience:
Served for over 46 years as a Senior Architect on assigned projects for office
buildings, commercial buildings, hotels, military, educational, Banks Pre-engineered
buildings, health centers (hospitals , clinics & cyclotron) and residential projects.
Duties included design, detail, and co-ordinate and develop concepts for the various
projects,
Construction supervision and liaison with the Client and other Government authorities
to ensure compliance with the various requirements.
A. From 1/3/2003 to Present
Employer : Fluor Arabia
Position : Senior Construction Engineer
Job Nature : Project Management at job site.
Projects Cost : Many contracts.
Client : King Abed Al-Aziz University- Jeddah
Projects Area: Many Projects.
Contractors : Many Contractors.
Ibrahim El-Eter Page 2 of 8
Projects Description
The projects are educational buildings, class rooms, laboratories, computer labs, Dean
offices, clinic, security, chemical storages, hobbies, auditoriums, podium, Saudi Air
lines office, travel agency office for post office, stationary, offices , central kitchens,
restaurant, maize hall, parking areas, electrical room, mechanical rooms, sport
facilities, stadium, Bank ,multi story car parking , cyclotron , clean room, gas line and
gas station.
Responsibilities:
1- Follow the contractor’s “Time Schedule”, by sending letters to contractors for
behind activities.
2- Attending ,the meetings such as weekly contractors meetings, Fluor Arabia
meetings, KAAU meetings, satellite meetings, and TMM and safety meetings.
3- Follow up, material submittals, shop drawings submittals and mock up samples.
4- Follow up the DCR’s, DS and Submittals.
5- Sending letters to contractor.
6- Sending NCR to contractor.
7- Preparing snag list (PHO)
8- Routine inspection to the projects to check quality assurance, safety violations,
progress est.,
9- Supporting FLUOR safety engineer.
10- Revise the contractor monthly payments.
B. From 27/June/2000 to 21/October/2002
Employer : Saudi Projacs
Position : Deputy Project Manager
Job Nature : Project Management at job site
Project Cost : 664.760.000 SR
Client : Saudi Arabian National Guard (SANG)
Project Area : 165.000 M2
Number of Buildings : 450 Buildings
Name of Contractor : Saudi Oger.
Ibrahim El-Eter Page 3 of 8
Project Description
The project located beside Hofuf – Al- Ahsa in area size 1.5 x 2.0 KM consist of 450
Buildings such as Soldier & Officers, Dormitories, Mosques, Military Buildings,
Recreation Buildings Support Areas, Warehouses, Clinics, STP, WTP Training Yards,
Landscaping, Infrastructure etc… The building constructed from Pre-Cast elements
such as (Panels System & Steel Structure).
Responsibilities
• Follow up with and supervise all the Engineers to finalize the submittals such as
approval of Materials, Shop drawings, replying RFC’s, RFFA’s and RFI’s etc..
• Distributing assigning duties to Engineers.
• Attending and preparing the Minutes of Meetings such as Technical Meetings,
Progress Meetings, Safety Meetings, Satellite Meetings, SANG Site Visit
Meeting etc…
• Participating in the preparing of Monthly Progress Report and correspondence
with Contractor.
• Studying the technical issues, the proposed Sub-contractor approval etc…
C. From 25/05/1999 to 31/05/2000
Position : Owner representative
Job Nature : Project Management (Owner’s Representative)
Project Name : Raka Plaza at Tabouk, K.S.A.
Project Description
The project built up area is 11.000 square meters with a total construction cost of SR
25 millions. The reputable design is made by RBA and consists of 77 shops,
supermarket, kids corner, four restaurants, escalators, external finishing such as
escalators, elevators, cold cathode, fiber optic works, different types and sizes of
skylights bay windows, S. steel works, …etc.
Job Description:
• Study & review of all tender documents such as drawings, BOQ,
specifications etc.
• Monthly inspection of job site.
• Approval of shop drawings and materials.
• Checking and approving of contractors invoices.
• Coordination between different disciplines such as architectural, electrical,
mechanical and landscaping.
• Arrange weekly meeting with contractor.
D. From 1/07/1998 to 28/02/1999
Ibrahim El-Eter Page 4 of 8
Employer : Saudi Consolidated Engineering Co. (Khatib & Alami).
Project Name : Renovation of Riyadh InterContinental Hotel.
Project Cost : SR 22.1 Millions
Project Area : 16000 M2
Client : Ministry of Finance
Position : Resident Engineer
Job Description
• Study & review of all tender documents such as drawings, BOQ’s, special
specification, Inter-Continental Regulations and Mock-up rooms.
• Daily inspection of the job site.
• Approval of shop drawings and materials.
• Preparation of daily, weekly and monthly progress reports.
• Checking and approval of contractor’s invoices.
• Coordination between different disciplines such as furniture, electrical works,
mechanical works and skeleton.
• Arrange weekly progress meetings with Client, Consultant and contractors.
• Approval of Architectural and Furniture submittals.
E. From 1/10/1996 to 30/06/1998
Employer : Saudi Consolidated Engineering Co. (Khatib & Alami)
Project Name: Arab National Bank Building – Dammam
Project Value : SR 21 Millions
Project Area : 4578 M2
Client : Arab National Bank
Position : Resident Engineer
Project Description
The project is located at Dammam City and consists of 5 story building and basement.
Work included superstructure, structural glazing, marble works, space frame, security
systems, fire fighting system, gypsum works, …etc.
Job Description:
• Studying all tender documents such as drawings, BOQ’s, special specifications.
• Routine inspection to job site.
• Approval of civil and architectural materials.
• Preparing the monthly progress report and checking the monthly payment
certificate and submit the same to the Client’s representative.
• Coordination between different disciplines (Architectural, Structural, HVAC,
Electrical, Plumbing and Landscaping).
Ibrahim El-Eter Page 5 of 8
• Checking and approval of Architectural shop drawings.
• Arrange weekly meetings with Contractors’ staff at job site.
F. From 4/1994 to 9/1996
Employer : Al – Jabreen Contracting Est.
Project : New Dormitory in Dhahran Air Base (KAAB). KSA.
Project Cost : S.R. 21 Millions
Client : United States Military Training Mission – Riyadh
Project Area : 10500 M2
Position : Project Manager(superintendant).
Project Description
The project consists of 78 housing units, including all related facilities such as
landscaping, parking lots, kitchen and laundry.
Job Description
• Prepare the Architectural shop drawings.
• Prepare the special specifications for the project.
• Coordinate with different discipline such as Arch, Electrical, Mechanical, etc.
• Participate in progress meetings with Contracting Section at USMTM in
Riyadh and Dhahran.
• Preparation of pre-qualification documents.
• Inspection and quality control.
• Preparing sub-contractors agreements.
• Management of the project.
• Preparing safety manual.
G. From 7/1991 to 10/1993
Employer : Saad Construction Est., - Riyadh
Project : Administrative & Residential Military Camp, Sulayel
Project Cost : S.R. 185 Millions
Client : Ministry of Defense & Aviation (MODA).
Position : Project Design Engineer, Project Engineer.
Project Description
The project consisted of 52 reinforced concrete buildings including textured block,
pre-engineered steel structures, spaces frames, club, clinics, military buildings,
Ibrahim El-Eter Page 6 of 8
furniture, swimming pool, play grounds, landscaping, steel works, wooden works,
infra-structures, roads, pedestrian side walks, covered and open parking areas, G.R.C.
works, …etc.
Job Description
• Preparing submitting and following up shop drawings and material submittals.
• Preparing As-Built Drawings.
• Preparing mock up samples at site for approval.
• Routine inspection accompanied with consultant, owner’s representative and
senior Architect.
• Preparing and checking P.O’s, P.R’s and P.Q’s.
• Coordination with different disciplines.
H. From 3/1990 to 1/1991
Employer : Al-Radwan Holding Company, Jeddah
Position : Coordination & Drafting Office Manager
Assignment : 1. Dar Al-Huda Hotel in Makkah, consists of 13 stories, project cost
SR. 15 Millions (shop drawings).
2. Al Shadi Hotel in Makkah consists of 7 stories, Project cost is S.R. 7
Millions (shop drawings).
3. SASCO road side rest area (5 sites), project cost is SR 25 millions
(shop drawings).
I. From 1/1981 to 3/1990
Employer : Eng. Ibrahim El-Eter Office, Amman-Jordan
Duties : Design (Dwelling, housing schemes, warehouses factories,
Schools etc..), shop drawings, as built drawings, and supervision.
J. From 5/1978 to 12/1980
Employer : Arabian Engineer Company, Amman – Jordan
Duties : Senior Designer and Liaison Officer between joint-ventures, Arabian
Engineer Co., Schendler and Schendler (Swiss Consultant) and Swiss
Professor Alfred Ruth for Abu-Nosair Housing Scheme contains 6200
Units, two mosques, police station, hospital, maintenance center, five
Schools and Infrastructure plans.
K. From 5/1977 to 5/1978
Ibrahim El-Eter Page 7 of 8
Employer : Royal Scientific Society, Amman – Jordan
Duties : Member of special committee assigned for the preparation/updating of
Jordanian Standards with reference to the international codes such as
DIN, B.S. JS, TGL … etc.
L. From 1/1973 to 5/1977
Employer : Housing Corporation, Amman – Jordan
Duties : Worked as a Design Engineer for housing projects of low and middle-
income earners. Also, worked as a National Counter Part for UN
Experts in many housing schemes.
M. From 3/1971 to 12/1972
Employer : Ministry of Public Works, Amman – Jordan
Duties : As a Trainee Engineer in the Building section, Material Laboratory and
Q.S. Section.
Ibrahim El-Eter Page 8 of 8

السيرة الذاتية إبراهيم العتر

  • 1.
    CURRICULUM VITAE Name :Ibrahim Shukry El-Eter Nationality : Jordanian Marital Status : Married Position : Senior Construction Engineer Languages : English + Arabic Address / Telephone : 00962-65935532 (Amman) 0096650-7835147 (Jeddah) Key Qualifications : Construction supervision Education : Degree : B.Sc. in Architecture Date if Graduation : 1970 University : Fine Arts Collage (Architecture), Cairo -Egypt Degree : Diploma in Housing Design & Policy Date of Graduation : 1975 Institute : Bouwcentrum International Education, Rotterdam - Holland. Training Courses • Project Management: (Computer Course), Amman • Real Estate Appraising: United Nations, Amman 1974 • AUTOCAD: Release 2.2 (Computer Course), Amman .1991 • AUTOCAD: Release 10.0 (Computer Course), Amman .1991 • DOS Release (4): (Computer Course), Amman-1993 • Word Star 2000: (Computer Course), Amman-1993 • Windows 98, Excel 97 & Internet: (Computer Course), Amman-1999 . • Safety Training :( Fall Protection/Scaffolding) by FLUOR-2007. • Safety Training: (Crane & Rigging, Electrical safety, Scaffolding and Fall Protection, PPE, Gas. • Cutting and Wielding Safety) by FLUOR- 2007. • Safety Training (30 Hours, Construction Safety) by FLUOR-2007. • Certificate of Attendance: PMP – 2010. • Basic Life Support-2009. • Occupational Safety And Health Training Course in construction safety and health (OSHA) -2010. • World Class Maintenance Management -2012. • Site Quality Manager Training: On line course with FLUOR-2013 • Construction Piping Inspection: On line course with FLUOR-2013 • Construction Building Inspection: On line course with FLUOR-2013 • Soil Inspection Training: On line course with FLUOR-2013 • Construction Control System: On line course with FLUOR-2013 Ibrahim El-Eter Page 1 of 8
  • 2.
    • Construction EquipmentInspection: On line course with FLUOR- 2013 • Structural Steel Inspection: On line course with FLUOR-2013 • Construction Insulation Inspection: On line course with FLUOR- 2013 • Construction Receiving Inspection: On line course with FLUOR- 2013. • SIX SIGMA-2015. • QMS - ISO 9001:2015 Lead Implementer-2015. • Certified Quality Consultant For QMS-ISO 9001:2016. • Concrete Post Tensioning Design and installation-2015. • PMO (Project Management Office) 2016. Professional Memberships: 1-Association of Jordanian Engineers- –1971. 2- Saudi Society of Civil Engineers-2008. 3- Saudi Council of Engineers-2013. 4- Arab society of Engineers-2010. Professional Experience: Served for over 46 years as a Senior Architect on assigned projects for office buildings, commercial buildings, hotels, military, educational, Banks Pre-engineered buildings, health centers (hospitals , clinics & cyclotron) and residential projects. Duties included design, detail, and co-ordinate and develop concepts for the various projects, Construction supervision and liaison with the Client and other Government authorities to ensure compliance with the various requirements. A. From 1/3/2003 to Present Employer : Fluor Arabia Position : Senior Construction Engineer Job Nature : Project Management at job site. Projects Cost : Many contracts. Client : King Abed Al-Aziz University- Jeddah Projects Area: Many Projects. Contractors : Many Contractors. Ibrahim El-Eter Page 2 of 8
  • 3.
    Projects Description The projectsare educational buildings, class rooms, laboratories, computer labs, Dean offices, clinic, security, chemical storages, hobbies, auditoriums, podium, Saudi Air lines office, travel agency office for post office, stationary, offices , central kitchens, restaurant, maize hall, parking areas, electrical room, mechanical rooms, sport facilities, stadium, Bank ,multi story car parking , cyclotron , clean room, gas line and gas station. Responsibilities: 1- Follow the contractor’s “Time Schedule”, by sending letters to contractors for behind activities. 2- Attending ,the meetings such as weekly contractors meetings, Fluor Arabia meetings, KAAU meetings, satellite meetings, and TMM and safety meetings. 3- Follow up, material submittals, shop drawings submittals and mock up samples. 4- Follow up the DCR’s, DS and Submittals. 5- Sending letters to contractor. 6- Sending NCR to contractor. 7- Preparing snag list (PHO) 8- Routine inspection to the projects to check quality assurance, safety violations, progress est., 9- Supporting FLUOR safety engineer. 10- Revise the contractor monthly payments. B. From 27/June/2000 to 21/October/2002 Employer : Saudi Projacs Position : Deputy Project Manager Job Nature : Project Management at job site Project Cost : 664.760.000 SR Client : Saudi Arabian National Guard (SANG) Project Area : 165.000 M2 Number of Buildings : 450 Buildings Name of Contractor : Saudi Oger. Ibrahim El-Eter Page 3 of 8
  • 4.
    Project Description The projectlocated beside Hofuf – Al- Ahsa in area size 1.5 x 2.0 KM consist of 450 Buildings such as Soldier & Officers, Dormitories, Mosques, Military Buildings, Recreation Buildings Support Areas, Warehouses, Clinics, STP, WTP Training Yards, Landscaping, Infrastructure etc… The building constructed from Pre-Cast elements such as (Panels System & Steel Structure). Responsibilities • Follow up with and supervise all the Engineers to finalize the submittals such as approval of Materials, Shop drawings, replying RFC’s, RFFA’s and RFI’s etc.. • Distributing assigning duties to Engineers. • Attending and preparing the Minutes of Meetings such as Technical Meetings, Progress Meetings, Safety Meetings, Satellite Meetings, SANG Site Visit Meeting etc… • Participating in the preparing of Monthly Progress Report and correspondence with Contractor. • Studying the technical issues, the proposed Sub-contractor approval etc… C. From 25/05/1999 to 31/05/2000 Position : Owner representative Job Nature : Project Management (Owner’s Representative) Project Name : Raka Plaza at Tabouk, K.S.A. Project Description The project built up area is 11.000 square meters with a total construction cost of SR 25 millions. The reputable design is made by RBA and consists of 77 shops, supermarket, kids corner, four restaurants, escalators, external finishing such as escalators, elevators, cold cathode, fiber optic works, different types and sizes of skylights bay windows, S. steel works, …etc. Job Description: • Study & review of all tender documents such as drawings, BOQ, specifications etc. • Monthly inspection of job site. • Approval of shop drawings and materials. • Checking and approving of contractors invoices. • Coordination between different disciplines such as architectural, electrical, mechanical and landscaping. • Arrange weekly meeting with contractor. D. From 1/07/1998 to 28/02/1999 Ibrahim El-Eter Page 4 of 8
  • 5.
    Employer : SaudiConsolidated Engineering Co. (Khatib & Alami). Project Name : Renovation of Riyadh InterContinental Hotel. Project Cost : SR 22.1 Millions Project Area : 16000 M2 Client : Ministry of Finance Position : Resident Engineer Job Description • Study & review of all tender documents such as drawings, BOQ’s, special specification, Inter-Continental Regulations and Mock-up rooms. • Daily inspection of the job site. • Approval of shop drawings and materials. • Preparation of daily, weekly and monthly progress reports. • Checking and approval of contractor’s invoices. • Coordination between different disciplines such as furniture, electrical works, mechanical works and skeleton. • Arrange weekly progress meetings with Client, Consultant and contractors. • Approval of Architectural and Furniture submittals. E. From 1/10/1996 to 30/06/1998 Employer : Saudi Consolidated Engineering Co. (Khatib & Alami) Project Name: Arab National Bank Building – Dammam Project Value : SR 21 Millions Project Area : 4578 M2 Client : Arab National Bank Position : Resident Engineer Project Description The project is located at Dammam City and consists of 5 story building and basement. Work included superstructure, structural glazing, marble works, space frame, security systems, fire fighting system, gypsum works, …etc. Job Description: • Studying all tender documents such as drawings, BOQ’s, special specifications. • Routine inspection to job site. • Approval of civil and architectural materials. • Preparing the monthly progress report and checking the monthly payment certificate and submit the same to the Client’s representative. • Coordination between different disciplines (Architectural, Structural, HVAC, Electrical, Plumbing and Landscaping). Ibrahim El-Eter Page 5 of 8
  • 6.
    • Checking andapproval of Architectural shop drawings. • Arrange weekly meetings with Contractors’ staff at job site. F. From 4/1994 to 9/1996 Employer : Al – Jabreen Contracting Est. Project : New Dormitory in Dhahran Air Base (KAAB). KSA. Project Cost : S.R. 21 Millions Client : United States Military Training Mission – Riyadh Project Area : 10500 M2 Position : Project Manager(superintendant). Project Description The project consists of 78 housing units, including all related facilities such as landscaping, parking lots, kitchen and laundry. Job Description • Prepare the Architectural shop drawings. • Prepare the special specifications for the project. • Coordinate with different discipline such as Arch, Electrical, Mechanical, etc. • Participate in progress meetings with Contracting Section at USMTM in Riyadh and Dhahran. • Preparation of pre-qualification documents. • Inspection and quality control. • Preparing sub-contractors agreements. • Management of the project. • Preparing safety manual. G. From 7/1991 to 10/1993 Employer : Saad Construction Est., - Riyadh Project : Administrative & Residential Military Camp, Sulayel Project Cost : S.R. 185 Millions Client : Ministry of Defense & Aviation (MODA). Position : Project Design Engineer, Project Engineer. Project Description The project consisted of 52 reinforced concrete buildings including textured block, pre-engineered steel structures, spaces frames, club, clinics, military buildings, Ibrahim El-Eter Page 6 of 8
  • 7.
    furniture, swimming pool,play grounds, landscaping, steel works, wooden works, infra-structures, roads, pedestrian side walks, covered and open parking areas, G.R.C. works, …etc. Job Description • Preparing submitting and following up shop drawings and material submittals. • Preparing As-Built Drawings. • Preparing mock up samples at site for approval. • Routine inspection accompanied with consultant, owner’s representative and senior Architect. • Preparing and checking P.O’s, P.R’s and P.Q’s. • Coordination with different disciplines. H. From 3/1990 to 1/1991 Employer : Al-Radwan Holding Company, Jeddah Position : Coordination & Drafting Office Manager Assignment : 1. Dar Al-Huda Hotel in Makkah, consists of 13 stories, project cost SR. 15 Millions (shop drawings). 2. Al Shadi Hotel in Makkah consists of 7 stories, Project cost is S.R. 7 Millions (shop drawings). 3. SASCO road side rest area (5 sites), project cost is SR 25 millions (shop drawings). I. From 1/1981 to 3/1990 Employer : Eng. Ibrahim El-Eter Office, Amman-Jordan Duties : Design (Dwelling, housing schemes, warehouses factories, Schools etc..), shop drawings, as built drawings, and supervision. J. From 5/1978 to 12/1980 Employer : Arabian Engineer Company, Amman – Jordan Duties : Senior Designer and Liaison Officer between joint-ventures, Arabian Engineer Co., Schendler and Schendler (Swiss Consultant) and Swiss Professor Alfred Ruth for Abu-Nosair Housing Scheme contains 6200 Units, two mosques, police station, hospital, maintenance center, five Schools and Infrastructure plans. K. From 5/1977 to 5/1978 Ibrahim El-Eter Page 7 of 8
  • 8.
    Employer : RoyalScientific Society, Amman – Jordan Duties : Member of special committee assigned for the preparation/updating of Jordanian Standards with reference to the international codes such as DIN, B.S. JS, TGL … etc. L. From 1/1973 to 5/1977 Employer : Housing Corporation, Amman – Jordan Duties : Worked as a Design Engineer for housing projects of low and middle- income earners. Also, worked as a National Counter Part for UN Experts in many housing schemes. M. From 3/1971 to 12/1972 Employer : Ministry of Public Works, Amman – Jordan Duties : As a Trainee Engineer in the Building section, Material Laboratory and Q.S. Section. Ibrahim El-Eter Page 8 of 8