SHERIF ABDELMAGID
1290 Prestonwood Crest.
Mississauga – ON – L5V 2Z2                       sh_lotfy63@hotmail.com                                   Cell: 416-835-4573

                                              PROJECT MANAGER
                             Residential complexes / High rise buildings / Buildings ICI
Profile
•   Qualified Project manager with 8+ years of experience
•   Civil engineer with 14+ years of experience
•   Bachelor degree in Civil Engineering , PMP certified
•   Managed the construction of 54 storey high rise residential tower with complex structure comprise of steel structure skeleton ,
    post tension podium , precast façade with decorative GRC ornaments and luxury finishes apartments and high quality
    landscape around. The owner was able to sell all apartments long time before completion.
•   In-depth working experience with different types of contract forms
•   Experienced in Design management and the application of a wide range of professional skills to co-ordinate and optimize the
    design process, with the aim of ensuring that the delivery of the project as per the client and stakeholders expectations
•   Experience in conducting value engineering studies and cost control
•   Sound exposure to various building engineering disciplines and ability to carry the necessary coordination works
•   Advanced computer skills in using Primavera, MS Project, AutoCAD ,Windows, MS Words, MS Excel, MS PowerPoint
•   Leadership , Problem solving , Team player , self motivated and Good communication skills
•   Fluent in English and Arabic.

Work Experience
Senior Project manager                                                                                    2002- 2010
Architectural & Engineering Consultant (Artec) - Dubai U.A.E
Artec is a full service consulting firm in Dubai , Bulgaria , Algeria and Bahrain providing urban planning , Architectural , Civil
engineering and construction supervision services , as well as related surveying and consultation .Website http://artecint.com
Here below some of the important projects / achievements:
• Dubai Lagoon (Dubai U.A.E)                                                           Still under construction
    o Roles and responsibilities: leading the team to manage and control project activities, Review and evaluate contractor’s
         claims and submittals of shop drawings /technical method statements and material submittals , chair the regular progress
         meeting , evaluate the contractor’s performance with respect to the contract and manage all client’s relation issues.
    o The project: Residential Community designed around a large man-made lagoon and a rich landscaped core. The complex is
         designed in a contemporary architectural style. Comprise of 38 buildings in different heights (6 to 8 floors) and 2 levels
         basements
    o Prospective Cost of 544 million US dollars
•   Expo Complex (Constantine - Algeria)                                             Design completed 2009
    o Roles and responsibilities: Managed the design stage from initiation and collecting client’s requirements and make the
       necessary coordination between all disciplines till obtaining the building permit from all relevant authorities
    o The project: Commercial and Residential Complex that consists of three phases with total built up area 285,000 m². The
       project included: Expo center, Hotel, office building, shopping center and 6 residential buildings
    o Prospective Cost of 148 million US dollars
•   Marina Crown (Dubai U.A.E)                                                       Completed 2007
    o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
       plans
    o The project: Residential Tower comprise of (2 basement +M+ 50 floors) this high rise building has a steel structure,
       precast façade and luxury finishes
    o Final cost 54.3 million US dollars

Resident Engineer                                                                                         1998- 2002
Arenco Architectural & Engineering Consultant (Arenco) - Dubai U.A.E
Founded in 1971Arenco is international consultancy firm having head office in Dubai and Branches in London and Huston
Providing full design and supervision services for many of prestigious projects. Website http://www.arencoar.com
Here below some of the important projects / achievements:



Sherif Abdelmagid                                  sh_lotfy63@hotmail.com                                          Page 1 of 3
•   Internet City (Dubai U.A.E)                                                              Completed 2002
    o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
        plans. Coordinate with IT consultant , infrastructure designer and the Master Developer
    o The project: group of 5 Office Buildings (Basement + Ground +5) including large landscaping and retail area
    o Cost of 28.6 million US dollars
•   Emirates Airlines Staff Accommodation (Dubai U.A.E)                        Completed 2001
    o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
       plans
    o The project: Four Buildings (Basement + Ground +3) containing 980 units.
    o Cost of 27.5 million US dollars
•   84 Villas Complex (Dubai U.A.E)                                                   Completed 1999
    o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line
        plans
    o The project : Group of 84 commercial villas (G+1)
    o Cost of 12.5 million US dollars

Resident Engineer                                                                                          1995- 1998
Architectural & Engineering Consultant (Artec) - Dubai U.A.E
Here below some of the important projects / achievements:
• Al Manarah Tower (Sharjah U.A.E)                                                       Completed 1998
    o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and
        ensure that work execution as per the intended design.
    o The project : Residential tower (2 Basement +G+M+22)
    o Cost of 10.5 million US dollars
•   Al Abbar Villas Complex (Dubai U.A.E)                                       Completed 1997
    o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and
        ensure that work execution as per the intended design
    o The project : group of 12 commercial villas (G+1)
    o Cost of 12.5 million US dollars
•   Sarah Shopping Center and Offices (Sharjah U.A.E)                                    Completed 1996
    o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and
        ensure that work execution as per the intended design
    o The project: shopping mall that has a basement car park (B+ G + M + 9 Floors) 4 levels shopping mall and 7 levels offices
        10 million US dollars

Building Inspector                                                                                         1991- 1995
Dubai Municipality - Dubai U.A.E
    Working as Building Inspector in the Building control department – Dubai Municipality –
    Visiting the sites under construction and make sure that works in progress is according to the building permit obtained and
    with respect to the common practice, DM safety manual and specifications.
    During such I was obliged to report violation to the above if any and also make technical evaluation / reports in case of
    disputes between Owners / Consultants / Contractors.

Site Engineer                                                                                              1988- 1990
Atlas General Contracting – Cairo - Egypt
Working as Site Engineer in the following project :
• Badr City (Cairo - Egypt)                                                         Completed 1990
  o Roles and responsibilities: Site Engineer (contractor) Executing the work contracted and ensuring its adherence to
       regulations, contract drawings and specifications, conducting the progress & technical meetings , carrying all
       correspondences with all engaged parties
  o The project : Fifteen residential buildings (G +5 Floors)
  o Construction finished in 1990

Site Engineer                                                                                              1987- 1988
Cairo waste water consortium – Cairo - Egypt


Sherif Abdelmagid                                  sh_lotfy63@hotmail.com                                           Page 2 of 3
Working as Site Engineer in the following project :
• Cairo Waste Water Tunnel Network (Cairo - Egypt)                           Completed 1988
   o Roles and responsibilities: Site Engineer (contractor) Executing the work contracted and ensuring its adherence to
       regulations, contract drawings & specifications
   o The project : 20 meter underground, 5 km long tunnels. Including grouting around the tunnel and brick cladding inside
       the tunnel

EDUCATION AND TRAINING COURSE

•   B. Sc. Civil Engineering (Ain Shams University –Cairo – Egypt -1987)
•   Completed Course in M.S project May 1996
•   Completed Course in Primavera project planning October 2003
•   Completed PMP Exam preparation course May 2008
•   PMP Certified- December 2009

References shall be given upon request




Sherif Abdelmagid                                sh_lotfy63@hotmail.com                                    Page 3 of 3

Resume.Sherif

  • 1.
    SHERIF ABDELMAGID 1290 PrestonwoodCrest. Mississauga – ON – L5V 2Z2 sh_lotfy63@hotmail.com Cell: 416-835-4573 PROJECT MANAGER Residential complexes / High rise buildings / Buildings ICI Profile • Qualified Project manager with 8+ years of experience • Civil engineer with 14+ years of experience • Bachelor degree in Civil Engineering , PMP certified • Managed the construction of 54 storey high rise residential tower with complex structure comprise of steel structure skeleton , post tension podium , precast façade with decorative GRC ornaments and luxury finishes apartments and high quality landscape around. The owner was able to sell all apartments long time before completion. • In-depth working experience with different types of contract forms • Experienced in Design management and the application of a wide range of professional skills to co-ordinate and optimize the design process, with the aim of ensuring that the delivery of the project as per the client and stakeholders expectations • Experience in conducting value engineering studies and cost control • Sound exposure to various building engineering disciplines and ability to carry the necessary coordination works • Advanced computer skills in using Primavera, MS Project, AutoCAD ,Windows, MS Words, MS Excel, MS PowerPoint • Leadership , Problem solving , Team player , self motivated and Good communication skills • Fluent in English and Arabic. Work Experience Senior Project manager 2002- 2010 Architectural & Engineering Consultant (Artec) - Dubai U.A.E Artec is a full service consulting firm in Dubai , Bulgaria , Algeria and Bahrain providing urban planning , Architectural , Civil engineering and construction supervision services , as well as related surveying and consultation .Website http://artecint.com Here below some of the important projects / achievements: • Dubai Lagoon (Dubai U.A.E) Still under construction o Roles and responsibilities: leading the team to manage and control project activities, Review and evaluate contractor’s claims and submittals of shop drawings /technical method statements and material submittals , chair the regular progress meeting , evaluate the contractor’s performance with respect to the contract and manage all client’s relation issues. o The project: Residential Community designed around a large man-made lagoon and a rich landscaped core. The complex is designed in a contemporary architectural style. Comprise of 38 buildings in different heights (6 to 8 floors) and 2 levels basements o Prospective Cost of 544 million US dollars • Expo Complex (Constantine - Algeria) Design completed 2009 o Roles and responsibilities: Managed the design stage from initiation and collecting client’s requirements and make the necessary coordination between all disciplines till obtaining the building permit from all relevant authorities o The project: Commercial and Residential Complex that consists of three phases with total built up area 285,000 m². The project included: Expo center, Hotel, office building, shopping center and 6 residential buildings o Prospective Cost of 148 million US dollars • Marina Crown (Dubai U.A.E) Completed 2007 o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line plans o The project: Residential Tower comprise of (2 basement +M+ 50 floors) this high rise building has a steel structure, precast façade and luxury finishes o Final cost 54.3 million US dollars Resident Engineer 1998- 2002 Arenco Architectural & Engineering Consultant (Arenco) - Dubai U.A.E Founded in 1971Arenco is international consultancy firm having head office in Dubai and Branches in London and Huston Providing full design and supervision services for many of prestigious projects. Website http://www.arencoar.com Here below some of the important projects / achievements: Sherif Abdelmagid sh_lotfy63@hotmail.com Page 1 of 3
  • 2.
    • Internet City (Dubai U.A.E) Completed 2002 o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line plans. Coordinate with IT consultant , infrastructure designer and the Master Developer o The project: group of 5 Office Buildings (Basement + Ground +5) including large landscaping and retail area o Cost of 28.6 million US dollars • Emirates Airlines Staff Accommodation (Dubai U.A.E) Completed 2001 o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line plans o The project: Four Buildings (Basement + Ground +3) containing 980 units. o Cost of 27.5 million US dollars • 84 Villas Complex (Dubai U.A.E) Completed 1999 o Roles and responsibilities: mange and executes the scope of works contracted, monitor & control the project base line plans o The project : Group of 84 commercial villas (G+1) o Cost of 12.5 million US dollars Resident Engineer 1995- 1998 Architectural & Engineering Consultant (Artec) - Dubai U.A.E Here below some of the important projects / achievements: • Al Manarah Tower (Sharjah U.A.E) Completed 1998 o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and ensure that work execution as per the intended design. o The project : Residential tower (2 Basement +G+M+22) o Cost of 10.5 million US dollars • Al Abbar Villas Complex (Dubai U.A.E) Completed 1997 o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and ensure that work execution as per the intended design o The project : group of 12 commercial villas (G+1) o Cost of 12.5 million US dollars • Sarah Shopping Center and Offices (Sharjah U.A.E) Completed 1996 o Roles and responsibilities: representing the consultant design team and provide technical back up to the contractor and ensure that work execution as per the intended design o The project: shopping mall that has a basement car park (B+ G + M + 9 Floors) 4 levels shopping mall and 7 levels offices 10 million US dollars Building Inspector 1991- 1995 Dubai Municipality - Dubai U.A.E Working as Building Inspector in the Building control department – Dubai Municipality – Visiting the sites under construction and make sure that works in progress is according to the building permit obtained and with respect to the common practice, DM safety manual and specifications. During such I was obliged to report violation to the above if any and also make technical evaluation / reports in case of disputes between Owners / Consultants / Contractors. Site Engineer 1988- 1990 Atlas General Contracting – Cairo - Egypt Working as Site Engineer in the following project : • Badr City (Cairo - Egypt) Completed 1990 o Roles and responsibilities: Site Engineer (contractor) Executing the work contracted and ensuring its adherence to regulations, contract drawings and specifications, conducting the progress & technical meetings , carrying all correspondences with all engaged parties o The project : Fifteen residential buildings (G +5 Floors) o Construction finished in 1990 Site Engineer 1987- 1988 Cairo waste water consortium – Cairo - Egypt Sherif Abdelmagid sh_lotfy63@hotmail.com Page 2 of 3
  • 3.
    Working as SiteEngineer in the following project : • Cairo Waste Water Tunnel Network (Cairo - Egypt) Completed 1988 o Roles and responsibilities: Site Engineer (contractor) Executing the work contracted and ensuring its adherence to regulations, contract drawings & specifications o The project : 20 meter underground, 5 km long tunnels. Including grouting around the tunnel and brick cladding inside the tunnel EDUCATION AND TRAINING COURSE • B. Sc. Civil Engineering (Ain Shams University –Cairo – Egypt -1987) • Completed Course in M.S project May 1996 • Completed Course in Primavera project planning October 2003 • Completed PMP Exam preparation course May 2008 • PMP Certified- December 2009 References shall be given upon request Sherif Abdelmagid sh_lotfy63@hotmail.com Page 3 of 3