1984-2016
32 Years of Development
Hotel and Resort Projects
CONTENTS
 Introduction
 Commercial Registrations
 Organization Chart
 Project Experience
 List of Hotel Operators
Introduction
Company Introduction
Dimensions Engineering Consultants(DEC) is one of the leading Architectural and Engineering Consultancy firm, established
by Arch. Hesham Abdelghane in 1984, in Dubai, United Arab Emirates. The company has witnessed substantial, sustained growth,
establishing offices in several countries across the world. Our operations have been spread over different Emirates: Dubai, Abu
Dhabi, Sharjah, Ras Al Khaimah, Fujairah and Ajman, and across other countries like Egypt, Bahrain, Qatar and Kingdom of Saudi
Arabia.
At Dimensions, we have successfully completed many prestigious projects in different categories, with a strong focus on
professionalism, employing the latest proven concepts and techniques.
We specialize in all kinds of architectural and engineering consultancy services, using international innovations in the related fields of
science, architecture, engineering and technology. Our strength lies in our ability to create feasible well-designed projects from our
clients’ visions, that become high quality design assets and help increase their return.
Dimensions Engineering Consultants over the years established itself in the Gulf region as one of the reputed Architectural
Consultancy firm as well as a leading firm in Interior Design. For more than two decades DEC has been providing quality, award
winning architectural and engineering solutions.
DEC’s Dubai Office is considered to be its main design and production office in UAE with a current staffing level of over 65
employees.DEC comprises a multidisciplinary team of highly qualified and experienced professionals including Engineers, Architects,
Economists, Town Planners and other experts.
Services Offered by Dimensions Engineering Consultants:
(DEC has in-house multi-disciplinary resources)
• Architecture
• Engineering Services
• Interior Design
• Landscape Architecture
• Master Planning and Urban Design
Page 1 of 2
• Project Management
• Structural Auditing and Review
• Value Engineering Studies and Analysis
• QS and Tender Services
• Construction Site Supervision
The above services apply to the following sectors:
• Urban Development
• Buildings
• Education
• Healthcare
• Government
• Tourism and Leisure
• Commercial & Retail
• Industrial
• Heritage and Authentic Design
DEC’s most precious asset is a highly qualified team specialized in the entire spectrum of projects. Extensive engineering expertise
and comprehensive in-house capabilities enable DEC to assume total responsibility for assignment of diverse nature, right from the
pre-feasibility stage through design, project management and monitoring of construction, leading to successful and on-time
completion.
Our strong affiliations, partners and joint ventures with overseas Architectural and Engineering companies enable us to continually
upgrade our technical levels to completely accomplish any competitive local or international job.
Page 2 of 2
Commercial Registrations
. .
~~Q 9J-(
~UBAI CHAMBER
License no. 126219 126219
Membership no. 27703
Registration no. 0
Trade Name DIMENSIONS ENGINEERING
CONSULTANTS
Legal Status Professional Company (Civil)
Activity Civil engineering services * Architectural and
engineering consultancies
Member Since 14/07/1993 14/07/1993
Date ofIssue 12/1112015 12/1112015
Expiry Date 09/0712016 09/07/2016
Remarks ol.b.:l.l1.oJ1
u9:l ~ ,J.p.c..j 9i ~ -?iJb ~ c'i.!L.lJ ibU!uU.J1 oi.cl J+W
Oil jiJl v.o ,~J.h:lLo.lt: I
0iIj.LJ1 ~g..o ~!t~j.J1 ~J.! o:ll=iul .::Ju4-! cb.D v.o r.WJ
http://www.dubaichamber.ae/verify
This certificate shall be invalid incase of any alteration
without chamber's authorization
For online verification of this Certificate, please visit our website
http://www.dubaichamber.ae/veri fy
<;.>-I:l ii-.c.L..i.Cl9 oJL-...;U iL-il;...t
Dubal Chamber of Commerce & Industry
P.O.Box 1457 - Dubal, UAE. I Tel (Within UAE) 800CHAMBER (8002426237) I Tel (Outside UAE) ( 971) 4 2280000 ui..JI..lil
Fax (+971) 4 2211646 ~191 customercare@dubaichamber.ae I www.dubaichamber.ae
•
Organization Chart
(Extended)
Dimensions Engineering Consultants
Organization Chart
Chairman
&
Principal Architect
General Manager Business Development
/ Vice Chairman
Construction Manager
Senior
Q. S
Junior
Q. S.
Head of Arch.
Department
Branch Managers
Area Managers
Head of Tender
Department
MEP Head of
Department
Head of Str.
Department
Draftsmen
Str. Jr. Design
Engr.
Str. Senior
Design Engr.
Draftsman
Electrical
Engineer
Mechanical
Engineer
Sr. Q.S
MEP Engineer/
Inspector
Site Civil Engr./
Inspector
R.E's Civil/
Arch
Site Arch Engr./
Inspector
Contract
Manager
C.F.O /
Vice Chairman
Finance, Admin &
Operation
Manager
HR Manager
Account
Manager
Technical Manager
P.R.O
HR Officer
Purchasing
Accounts
Admin Staff
Secretaries/
Documents
Controller
Store Keeper
Admin Staff
Drivers
Q.C & QA Department
Post Contract
Manager
Jr. Q.S
Technical
Secretary
Group
A
Group
C
Group
B
IT
Leed &
Sustainable Engr
Head of Project
Managers
Head of Design
Department
Architectural
& Urban
Interior
Designer
Landscape
Project
Manager
Librarian &
Secretary
Document
Contoroller
Document
Controller
Sr. Project
Manager
Senior
Architect
Architect
Draftsmen
Senior
Architect
Architect
Draftsmen
Senior
Architect
Architect
Draftsmen
Group Leader
Draftsmen
QS
Structural
MEP
Architects
Project Architects
Project Manager
Group Leader
Draftsmen
QS
Structural
MEP
Architects
Project Architects
Project Manager
Group Leader
Draftsmen
QS
Structural
MEP
Architects
Project Architects
Project Manager
Updated as of April 2015
Project Experience
108
II.	 Radisson Royal Twin Towers
Location:	 Dubai
Height:	 269m
No. of Floors:	 Hotel: 2B + G + M + 55
		 Mixed-Use: 1B + G + M + 50
Status:		 Completed
Completion Date: 2010
Type:		 Hotel + Mixed Use
Cost:		 AED 1.2 billion
Hotel Operator: JAL Hotels (previous)
		 Radisson Royal
From the outside the Radisson Royal Hotel has
a sleek, icy modern elegance. From the inside
classiceleganceandmoderndécorarereflected
in every room. This project is designed with
the cultural diversity and artistic sensibility
of its users in mind. Conceptual design in
cooperation with BRT Architekten.
	
	
Number	of	Hotel	Rooms:								375	Keys	
Number	of	Suites:																								96	Keys	
Number	of	Hotel	Apartment:	119	Apartments
Number	of	Offices:																				64	Offices	+	1	Bank
Sub-Consultants:	
-	ID	(M/s	Drawlink)	
-	MEP	(M/s	Crownhome)
109
110
111
112
A variety of choices
113
Outdoor lounge and pool
114
Fusion of styles and tastes
115
Business Center
Hilton Garden Inn
Location:	 Dubai - Al Mina
No. of Floors:	 2B + G + 4 + HC
Plot Size:	 2322.6 sq.m.
BUA:		 11,174 sq.m.
Status:		 Under Construction
Cost:		 AED 79 million
Hotel Operator: Hilton Garden Inn
This simple and elegant hotel is designed
for Al Wasl to be part of a chain that will
be operated by the Hilton Garden Inn. It is
designed to be part of an urban develepoment
scheme planned for the Al Mina area.
136
XIV.	 Hilton Garden Inn
Location:	 Dubai - Al Muraqabat
Height:	 35m
No. of Floors: 2B + G+ M + 7 + HC
Plot Size:	 1496.67 sq.m.
BUA:		 11,598.26 sq.m.
Status:		 Completed	
Cost:		 AED 83 million
Hotel Operator: Hilton Garden Inn
This elegant hotel is designed for Al Wasl to
be part of a chain that will be operated by
the Hilton Garden Inn. It is designed to be a
landmark hotel in the busy business district
of Al Muraqqabat.
	
	
List	of	Sub-Consultants:	
-	Accoustic	(M/s	Acoustic	Logic)	
-	ID	(M/s	Design	Young)	
-	Kitchen	(M/s	MCTS)	
-	Lighting	(M/s	Steffano	LLC)
Jebel Ali 4 Star Hotel Apartment
Location: Jebel Ali, Dubai, UAE
Number of Rooms: 150 Keys
Hotel Apartment: 112 Keys
Operator: not yet assigned
Project Status: Concept Design
DEC Scope of Work: Design & Supervision
The project is a 4 Stars Hotel & Hotel Apartments,
2 Basements + Ground Floors located in Jebel Ali
Industrial & Developed by Limitless. The project
includes parking, Entrances, restaurants, coffee shops,
retail, Health Club and Swimming Pools.
3 Star Hotel
Location : Jumeirah Village, Dubai
No. of Floors : 1B+G+3P+16 Floors
Plot Area : 17,195 sq. ft
Operator : Swiss Belhotel
Project Status : Concept Design Stage
Nos. of Rooms : 300 Keys
Nos. of Suites : 30 Keys
DEC Scope of Work: Design and Supervision
The project is a 3 Stars Hotel located in Jumeirah Village with a
configuration of 1 Basements + Ground + 3 Podium + 16 Floors
and includes parking at the basement and podium entrances,
restaurants, retail and 330 hotel rooms and suites
155
XV.	 HQ Tower
Location:	 Dubai
No. of Floors:	 B + G + 4P + 35
Plot Size:	 4,541 sq.m.
BUA:		 27,245 sq.m.
Status:		 Design
This hotel apartments tower is located at a
prime location, at a crossroads of major roads
at Jumairah Village Circle. Surrounded by open
roads on all sides, this gives maximum views to
all units, which inspired the elliptical form of
the tower to help facilitate the view.
XIV.	 The Cove Rotana
Location:	 Ras Al Khaimah, UAE
Size:		 400,000 sq.m.
Status:		 Completed
Completion Date: 2008
Estimated Cost: $200 million
Hotel Operator: Rotana
The Cove Rotana Resort, where the traditional charm
embraces the uniqueness of the Arabian culture,
locatedonanidyllicwaterinletontheRasAlKhaimah
beachfront overlooking the Arabian Gulf with 600 m
of pristine beach. With its uniquely traditional villas
spread across the mountains and into the water, the
design of this project on its own provides its visitors
with a sense of peace and tranquility. Designed in
cooperation with ElDahan and Farid Architects.
56
58
170
XXVIII.	 Radisson Blu Hotel & Resort
Location:	 Fujairah
Status:		 Completed
Completion Date: 2009
Estimated Cost: AED 60 million
Hotel Operator: JAL Hotels (previous)
		 Radisson Blu
The design of this five-star beach resort in Fujairah
is modern, colorful and relaxed.
172
173
174
XV.	 Iberotel Royal Miramar
Location:	 Fujairah, UAE
Size:		 17m height
Status:		 Completed
Completion Date: 2009
Estimated Cost: $100 million
Hotel Operator: Iberotel
The Iberotel Royal Miramar Fujairah Hotel is
located in Fujairah, UAE. Its delightful setting
in an area of unspoiled natural beauty makes it
an ideal destination for a relaxing holiday.
This luxurious 5-star hotel features Moroccan-
inspired architecture. The main building is
surrounded by clusters of rooms on three
floors. There are 313 tastefully-appointed
rooms, all of which offer a breathtaking sea
view amidst the rocky mountains.
Tastefully designed in a low-rise Arabian/
Moroccan style architecture, the interior
design keeps the Arabic feel by using authentic
materials. The hotel has wooden arabesque
mashrabiyas, marble domes and warm, deep
colours for the furniture along with Arabic
patterns. Designed in cooperation with
ElDahan and Farid Architects.
64
66
69
XVI .	The Gate
Location:	 Cairo, Egypt
Size:		 42m height
		 5B + G + M + 9 + Roof Gym
Built Up Area:	 Approx. 500,000 sq.m.
Status:		 Under Construction
This one of a kind multi-purpose project is
a benchmark for the real estate community
in the region. The Gate project consists of 8
buildings, 6 of which are residential, 1 hotel
apartment run by a world class hotel operator,
and 1 office building, sports and healthclub
and polyclinic. These buildings stand atop a
podium which contains a 50,000 sq.m. state
of the art foru storey mall, below which is a
5 story mix of underground traditional and
automated parking system housing up to 4000
cars. Connecting all components is a one-of a
kind “megatree” design covered in lush plants
and solar cells. This project is designed with the
latest technology in sustainability, architectural
details, engineering and electronics, becoming
the gate to a new era of design and technology
in Egypt.
Initial concept, sustainable and green building
design by Vincent Callebaut Architectures.
Architectural development, design and
engineering by Dimensions as lead consultant.
70
71
72
73
74
75
76
77
78
Double Tree by Hilton Hotel and Resort
Location:	 Al Ain al Sokhna, Egypt.
BUA:		 12,000 sq.m.
Status:		 Design Development
This project consists of the redesign and
upgrade of the constructed Orlando Hotel and
Resort to an international touristic destination
on the Red Sea, run by world famous Hilton.
The resort consists of 203 rooms and suites, all
overlooking a central pool and the Sea. Other
components include 3 lavish restaurants and a
retail & leisure area.
79
	 The Walk
Location:	 Cairo, Egypt
Size:		 7B + G + M + 9
Built Up Area:	 Approx. 150,000 sq.m.
Status:		 Design Development
This one of a kind multi-purpose project consists
of a retail and commercial zone, a residential
zone which contains luxury apartments and
furnished condos, an administrative zone which
houses 2 company headquarters, a hotel zone
comprising of one 5-star hotel, one 4-star hotel,
and one hotel apartment complex, a hospital,
and a massive underground parking structure
that can hold up to 4000 cars.
81
82
83
84
85
Hotel City
Location:	 Marsa Alam, Egypt
Site Area:	 500,000 sq.m.,
BUA:		 340,000 sq.m.
Status:		 Under Construction
Estimated Cost: $700 million.
This one-of-a-kind project concept is creating
a city of hundreds of small boutique hotels in
one destination. The project is divided into
different zones, where each zone is given a
different cultural and architectural theme. The
pilot project, currently under construction,
is a stand-alone 300 room hotel. The rest of
the project consists of 3000 rooms divided
amongst 300 boutique hotels, each of which
contains from 8 to 20 rooms. Spread across the
500 thousand square meters are more than 200
different commercial, service and retail outlets,
creating an open shopping resort in 7 different
themes: Arabian, Mexican, Asian, Anglo, Greek,
Mediterranean and Modern International. This
makes Hotel City a unique attraction amidst
all the Red Sea resorts, as well as a destination
and touristic hotspot for family vacations and
night life .
1- Entrance
2- Entrance Building AR01
- Under Development
3- Mosque
4- Arabian Court
5- Ateliers
6- Mexican Plaza
7 -Horse Stables
8 - Pools on mezz. level (between
parking level and plaza level)
9- Outdoor Shooting Range
& Horse Racing Loop
10- Central Plaza
11- Chinese Spa &
Wellness Centre
12- Piazza
13- Pool on Upper level
14 - Central Main Building
15- Main Building in
each Theme
16- Open Theatre
17- Maldives Bungalows
18- Pool
19- Steps to lower level
20 - Spanish Hotel Main Bldg
21- Business Centre
22- Recreation Centre
23- Diving Centre
24- Phase 1 Lakes
25- Beach
1
2
3
4
5
6
7
8
8
9
10
15
15
11
12
13
14
15
16
17
18
24
19
20
25
21
23
19
24
22
15
15
15
1. This is the project site, Hotel City.
2. Phase I of the project is currently
under construction.
3. This divides the remainder of the site
into 3 different zones.
4. Because of the size and width of
the rear zone ‘i’, it is subdivided into 4
interconnected zones.
i
ii
iii
5. Since this is the rear part of the site,
raise the 4 subdivided zones by 4 meters
to maximise view of the sea. This is used to
separate vehicular movement - at 0m level -
from pedestrian movement above.
6. Create a main view and movement axis
along the centre of the site to connect the
highway to the sea.
7. Create 3 nodes along the axis for ease
of pedestrian movement: the Hotel City
entrance (i), the main plaza that connects
the 4 subdivisions at 1 point (ii), and the
vertical transition point which moves
pedestrians from 4m to 0m level (iii).
8. Create smaller plazas that serve as
gathering spaces inside each of the 4
subdivisions, all connecting to the main
central plaza. All the projects zones are
given a different theme and character.
i ii iii
Hilton Awassa Resort
Location: Addis Ababa, Ethiopia
Number of Rooms: 151 Keys
Number of Suites: 18 Keys
Number of Villas: 6 Villas
Operator: Hilton Worldwide
Project Status: Schematic Design Stage
DEC Scope of Work: Architect and Lead Consultants
Sub-Consultants:
- MEP (M/s Seed Engineering)
- ID (M/s Les Harbotle)
- Structural (M/s Kenmos Engineering)
- Local Architect (M/s JDAW)
- Landscape (to be assigned
- Security (to be assigned)
Marriot Hotel
Location: Addis Ababa, Ethiopia
Number of Rooms: 174 Keys
Number of Suites: 24 Keys
Operator: Marriot International
Project Status: Concept Stage
Dec Stage of Work: Architect and Lead Consultant
Sub-Consultants:
- MEP (M/s Seed Engineering)
- ID (M/s Les Harbotle)
- Structural (M/s Kenmos Engineering)
- Local Architect (M/s JDAW)
- Landscape (to be assigned)
- Security (to be assigned)
Four Points by Sheraton
Location: Addis Ababa, Ethiopia
Nos. of Rooms : 378 Rooms
Nos. of Suites : 126 Keys
Operator: Sheraton
Project Status: Schematic Stage
DEC Scope of Work: Architect and Lead Consultant
List of Hotel Operators
Page 1 of 1
List of Hotel Operators Dimensions worked with are as follows:
1. Hilton Inn
2. Double Tree by Hilton
3. Marriot Hotel
4. Radisson Royal
5. Radisson Royal
6. Radisson
7. Iberotel
8. Cove Rotana
9. 4 Points by Sheraton
10. JAL Hotel
www.dimensions-ec.com

Hospitality Projects updated

  • 1.
    1984-2016 32 Years ofDevelopment Hotel and Resort Projects
  • 2.
    CONTENTS  Introduction  CommercialRegistrations  Organization Chart  Project Experience  List of Hotel Operators
  • 3.
  • 4.
    Company Introduction Dimensions EngineeringConsultants(DEC) is one of the leading Architectural and Engineering Consultancy firm, established by Arch. Hesham Abdelghane in 1984, in Dubai, United Arab Emirates. The company has witnessed substantial, sustained growth, establishing offices in several countries across the world. Our operations have been spread over different Emirates: Dubai, Abu Dhabi, Sharjah, Ras Al Khaimah, Fujairah and Ajman, and across other countries like Egypt, Bahrain, Qatar and Kingdom of Saudi Arabia. At Dimensions, we have successfully completed many prestigious projects in different categories, with a strong focus on professionalism, employing the latest proven concepts and techniques. We specialize in all kinds of architectural and engineering consultancy services, using international innovations in the related fields of science, architecture, engineering and technology. Our strength lies in our ability to create feasible well-designed projects from our clients’ visions, that become high quality design assets and help increase their return. Dimensions Engineering Consultants over the years established itself in the Gulf region as one of the reputed Architectural Consultancy firm as well as a leading firm in Interior Design. For more than two decades DEC has been providing quality, award winning architectural and engineering solutions. DEC’s Dubai Office is considered to be its main design and production office in UAE with a current staffing level of over 65 employees.DEC comprises a multidisciplinary team of highly qualified and experienced professionals including Engineers, Architects, Economists, Town Planners and other experts. Services Offered by Dimensions Engineering Consultants: (DEC has in-house multi-disciplinary resources) • Architecture • Engineering Services • Interior Design • Landscape Architecture • Master Planning and Urban Design Page 1 of 2
  • 5.
    • Project Management •Structural Auditing and Review • Value Engineering Studies and Analysis • QS and Tender Services • Construction Site Supervision The above services apply to the following sectors: • Urban Development • Buildings • Education • Healthcare • Government • Tourism and Leisure • Commercial & Retail • Industrial • Heritage and Authentic Design DEC’s most precious asset is a highly qualified team specialized in the entire spectrum of projects. Extensive engineering expertise and comprehensive in-house capabilities enable DEC to assume total responsibility for assignment of diverse nature, right from the pre-feasibility stage through design, project management and monitoring of construction, leading to successful and on-time completion. Our strong affiliations, partners and joint ventures with overseas Architectural and Engineering companies enable us to continually upgrade our technical levels to completely accomplish any competitive local or international job. Page 2 of 2
  • 6.
  • 9.
    . . ~~Q 9J-( ~UBAICHAMBER License no. 126219 126219 Membership no. 27703 Registration no. 0 Trade Name DIMENSIONS ENGINEERING CONSULTANTS Legal Status Professional Company (Civil) Activity Civil engineering services * Architectural and engineering consultancies Member Since 14/07/1993 14/07/1993 Date ofIssue 12/1112015 12/1112015 Expiry Date 09/0712016 09/07/2016 Remarks ol.b.:l.l1.oJ1 u9:l ~ ,J.p.c..j 9i ~ -?iJb ~ c'i.!L.lJ ibU!uU.J1 oi.cl J+W Oil jiJl v.o ,~J.h:lLo.lt: I 0iIj.LJ1 ~g..o ~!t~j.J1 ~J.! o:ll=iul .::Ju4-! cb.D v.o r.WJ http://www.dubaichamber.ae/verify This certificate shall be invalid incase of any alteration without chamber's authorization For online verification of this Certificate, please visit our website http://www.dubaichamber.ae/veri fy <;.>-I:l ii-.c.L..i.Cl9 oJL-...;U iL-il;...t Dubal Chamber of Commerce & Industry P.O.Box 1457 - Dubal, UAE. I Tel (Within UAE) 800CHAMBER (8002426237) I Tel (Outside UAE) ( 971) 4 2280000 ui..JI..lil Fax (+971) 4 2211646 ~191 customercare@dubaichamber.ae I www.dubaichamber.ae •
  • 10.
  • 11.
    (Extended) Dimensions Engineering Consultants OrganizationChart Chairman & Principal Architect General Manager Business Development / Vice Chairman Construction Manager Senior Q. S Junior Q. S. Head of Arch. Department Branch Managers Area Managers Head of Tender Department MEP Head of Department Head of Str. Department Draftsmen Str. Jr. Design Engr. Str. Senior Design Engr. Draftsman Electrical Engineer Mechanical Engineer Sr. Q.S MEP Engineer/ Inspector Site Civil Engr./ Inspector R.E's Civil/ Arch Site Arch Engr./ Inspector Contract Manager C.F.O / Vice Chairman Finance, Admin & Operation Manager HR Manager Account Manager Technical Manager P.R.O HR Officer Purchasing Accounts Admin Staff Secretaries/ Documents Controller Store Keeper Admin Staff Drivers Q.C & QA Department Post Contract Manager Jr. Q.S Technical Secretary Group A Group C Group B IT Leed & Sustainable Engr Head of Project Managers Head of Design Department Architectural & Urban Interior Designer Landscape Project Manager Librarian & Secretary Document Contoroller Document Controller Sr. Project Manager Senior Architect Architect Draftsmen Senior Architect Architect Draftsmen Senior Architect Architect Draftsmen Group Leader Draftsmen QS Structural MEP Architects Project Architects Project Manager Group Leader Draftsmen QS Structural MEP Architects Project Architects Project Manager Group Leader Draftsmen QS Structural MEP Architects Project Architects Project Manager Updated as of April 2015
  • 12.
  • 13.
    108 II. Radisson RoyalTwin Towers Location: Dubai Height: 269m No. of Floors: Hotel: 2B + G + M + 55 Mixed-Use: 1B + G + M + 50 Status: Completed Completion Date: 2010 Type: Hotel + Mixed Use Cost: AED 1.2 billion Hotel Operator: JAL Hotels (previous) Radisson Royal From the outside the Radisson Royal Hotel has a sleek, icy modern elegance. From the inside classiceleganceandmoderndécorarereflected in every room. This project is designed with the cultural diversity and artistic sensibility of its users in mind. Conceptual design in cooperation with BRT Architekten. Number of Hotel Rooms: 375 Keys Number of Suites: 96 Keys Number of Hotel Apartment: 119 Apartments Number of Offices: 64 Offices + 1 Bank Sub-Consultants: - ID (M/s Drawlink) - MEP (M/s Crownhome)
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
    Hilton Garden Inn Location: Dubai - Al Mina No. of Floors: 2B + G + 4 + HC Plot Size: 2322.6 sq.m. BUA: 11,174 sq.m. Status: Under Construction Cost: AED 79 million Hotel Operator: Hilton Garden Inn This simple and elegant hotel is designed for Al Wasl to be part of a chain that will be operated by the Hilton Garden Inn. It is designed to be part of an urban develepoment scheme planned for the Al Mina area.
  • 26.
    136 XIV. Hilton GardenInn Location: Dubai - Al Muraqabat Height: 35m No. of Floors: 2B + G+ M + 7 + HC Plot Size: 1496.67 sq.m. BUA: 11,598.26 sq.m. Status: Completed Cost: AED 83 million Hotel Operator: Hilton Garden Inn This elegant hotel is designed for Al Wasl to be part of a chain that will be operated by the Hilton Garden Inn. It is designed to be a landmark hotel in the busy business district of Al Muraqqabat. List of Sub-Consultants: - Accoustic (M/s Acoustic Logic) - ID (M/s Design Young) - Kitchen (M/s MCTS) - Lighting (M/s Steffano LLC)
  • 31.
    Jebel Ali 4Star Hotel Apartment Location: Jebel Ali, Dubai, UAE Number of Rooms: 150 Keys Hotel Apartment: 112 Keys Operator: not yet assigned Project Status: Concept Design DEC Scope of Work: Design & Supervision The project is a 4 Stars Hotel & Hotel Apartments, 2 Basements + Ground Floors located in Jebel Ali Industrial & Developed by Limitless. The project includes parking, Entrances, restaurants, coffee shops, retail, Health Club and Swimming Pools.
  • 32.
    3 Star Hotel Location: Jumeirah Village, Dubai No. of Floors : 1B+G+3P+16 Floors Plot Area : 17,195 sq. ft Operator : Swiss Belhotel Project Status : Concept Design Stage Nos. of Rooms : 300 Keys Nos. of Suites : 30 Keys DEC Scope of Work: Design and Supervision The project is a 3 Stars Hotel located in Jumeirah Village with a configuration of 1 Basements + Ground + 3 Podium + 16 Floors and includes parking at the basement and podium entrances, restaurants, retail and 330 hotel rooms and suites
  • 33.
    155 XV. HQ Tower Location: Dubai No. of Floors: B + G + 4P + 35 Plot Size: 4,541 sq.m. BUA: 27,245 sq.m. Status: Design This hotel apartments tower is located at a prime location, at a crossroads of major roads at Jumairah Village Circle. Surrounded by open roads on all sides, this gives maximum views to all units, which inspired the elliptical form of the tower to help facilitate the view.
  • 34.
    XIV. The CoveRotana Location: Ras Al Khaimah, UAE Size: 400,000 sq.m. Status: Completed Completion Date: 2008 Estimated Cost: $200 million Hotel Operator: Rotana The Cove Rotana Resort, where the traditional charm embraces the uniqueness of the Arabian culture, locatedonanidyllicwaterinletontheRasAlKhaimah beachfront overlooking the Arabian Gulf with 600 m of pristine beach. With its uniquely traditional villas spread across the mountains and into the water, the design of this project on its own provides its visitors with a sense of peace and tranquility. Designed in cooperation with ElDahan and Farid Architects.
  • 35.
  • 37.
  • 39.
    170 XXVIII. Radisson BluHotel & Resort Location: Fujairah Status: Completed Completion Date: 2009 Estimated Cost: AED 60 million Hotel Operator: JAL Hotels (previous) Radisson Blu The design of this five-star beach resort in Fujairah is modern, colorful and relaxed.
  • 40.
  • 41.
  • 42.
  • 43.
    XV. Iberotel RoyalMiramar Location: Fujairah, UAE Size: 17m height Status: Completed Completion Date: 2009 Estimated Cost: $100 million Hotel Operator: Iberotel The Iberotel Royal Miramar Fujairah Hotel is located in Fujairah, UAE. Its delightful setting in an area of unspoiled natural beauty makes it an ideal destination for a relaxing holiday. This luxurious 5-star hotel features Moroccan- inspired architecture. The main building is surrounded by clusters of rooms on three floors. There are 313 tastefully-appointed rooms, all of which offer a breathtaking sea view amidst the rocky mountains. Tastefully designed in a low-rise Arabian/ Moroccan style architecture, the interior design keeps the Arabic feel by using authentic materials. The hotel has wooden arabesque mashrabiyas, marble domes and warm, deep colours for the furniture along with Arabic patterns. Designed in cooperation with ElDahan and Farid Architects.
  • 46.
  • 48.
  • 50.
    69 XVI . The Gate Location: Cairo, Egypt Size: 42m height 5B + G + M + 9 + Roof Gym Built Up Area: Approx. 500,000 sq.m. Status: Under Construction This one of a kind multi-purpose project is a benchmark for the real estate community in the region. The Gate project consists of 8 buildings, 6 of which are residential, 1 hotel apartment run by a world class hotel operator, and 1 office building, sports and healthclub and polyclinic. These buildings stand atop a podium which contains a 50,000 sq.m. state of the art foru storey mall, below which is a 5 story mix of underground traditional and automated parking system housing up to 4000 cars. Connecting all components is a one-of a kind “megatree” design covered in lush plants and solar cells. This project is designed with the latest technology in sustainability, architectural details, engineering and electronics, becoming the gate to a new era of design and technology in Egypt. Initial concept, sustainable and green building design by Vincent Callebaut Architectures. Architectural development, design and engineering by Dimensions as lead consultant.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
    Double Tree byHilton Hotel and Resort Location: Al Ain al Sokhna, Egypt. BUA: 12,000 sq.m. Status: Design Development This project consists of the redesign and upgrade of the constructed Orlando Hotel and Resort to an international touristic destination on the Red Sea, run by world famous Hilton. The resort consists of 203 rooms and suites, all overlooking a central pool and the Sea. Other components include 3 lavish restaurants and a retail & leisure area.
  • 64.
    79 The Walk Location: Cairo, Egypt Size: 7B + G + M + 9 Built Up Area: Approx. 150,000 sq.m. Status: Design Development This one of a kind multi-purpose project consists of a retail and commercial zone, a residential zone which contains luxury apartments and furnished condos, an administrative zone which houses 2 company headquarters, a hotel zone comprising of one 5-star hotel, one 4-star hotel, and one hotel apartment complex, a hospital, and a massive underground parking structure that can hold up to 4000 cars.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
    Hotel City Location: MarsaAlam, Egypt Site Area: 500,000 sq.m., BUA: 340,000 sq.m. Status: Under Construction Estimated Cost: $700 million. This one-of-a-kind project concept is creating a city of hundreds of small boutique hotels in one destination. The project is divided into different zones, where each zone is given a different cultural and architectural theme. The pilot project, currently under construction, is a stand-alone 300 room hotel. The rest of the project consists of 3000 rooms divided amongst 300 boutique hotels, each of which contains from 8 to 20 rooms. Spread across the 500 thousand square meters are more than 200 different commercial, service and retail outlets, creating an open shopping resort in 7 different themes: Arabian, Mexican, Asian, Anglo, Greek, Mediterranean and Modern International. This makes Hotel City a unique attraction amidst all the Red Sea resorts, as well as a destination and touristic hotspot for family vacations and night life . 1- Entrance 2- Entrance Building AR01 - Under Development 3- Mosque 4- Arabian Court 5- Ateliers 6- Mexican Plaza 7 -Horse Stables 8 - Pools on mezz. level (between parking level and plaza level) 9- Outdoor Shooting Range & Horse Racing Loop 10- Central Plaza 11- Chinese Spa & Wellness Centre 12- Piazza 13- Pool on Upper level 14 - Central Main Building 15- Main Building in each Theme 16- Open Theatre 17- Maldives Bungalows 18- Pool 19- Steps to lower level 20 - Spanish Hotel Main Bldg 21- Business Centre 22- Recreation Centre 23- Diving Centre 24- Phase 1 Lakes 25- Beach
  • 72.
  • 74.
    1. This isthe project site, Hotel City. 2. Phase I of the project is currently under construction. 3. This divides the remainder of the site into 3 different zones. 4. Because of the size and width of the rear zone ‘i’, it is subdivided into 4 interconnected zones. i ii iii 5. Since this is the rear part of the site, raise the 4 subdivided zones by 4 meters to maximise view of the sea. This is used to separate vehicular movement - at 0m level - from pedestrian movement above. 6. Create a main view and movement axis along the centre of the site to connect the highway to the sea. 7. Create 3 nodes along the axis for ease of pedestrian movement: the Hotel City entrance (i), the main plaza that connects the 4 subdivisions at 1 point (ii), and the vertical transition point which moves pedestrians from 4m to 0m level (iii). 8. Create smaller plazas that serve as gathering spaces inside each of the 4 subdivisions, all connecting to the main central plaza. All the projects zones are given a different theme and character. i ii iii
  • 80.
    Hilton Awassa Resort Location:Addis Ababa, Ethiopia Number of Rooms: 151 Keys Number of Suites: 18 Keys Number of Villas: 6 Villas Operator: Hilton Worldwide Project Status: Schematic Design Stage DEC Scope of Work: Architect and Lead Consultants Sub-Consultants: - MEP (M/s Seed Engineering) - ID (M/s Les Harbotle) - Structural (M/s Kenmos Engineering) - Local Architect (M/s JDAW) - Landscape (to be assigned - Security (to be assigned)
  • 85.
    Marriot Hotel Location: AddisAbaba, Ethiopia Number of Rooms: 174 Keys Number of Suites: 24 Keys Operator: Marriot International Project Status: Concept Stage Dec Stage of Work: Architect and Lead Consultant Sub-Consultants: - MEP (M/s Seed Engineering) - ID (M/s Les Harbotle) - Structural (M/s Kenmos Engineering) - Local Architect (M/s JDAW) - Landscape (to be assigned) - Security (to be assigned)
  • 86.
    Four Points bySheraton Location: Addis Ababa, Ethiopia Nos. of Rooms : 378 Rooms Nos. of Suites : 126 Keys Operator: Sheraton Project Status: Schematic Stage DEC Scope of Work: Architect and Lead Consultant
  • 87.
    List of HotelOperators
  • 88.
    Page 1 of1 List of Hotel Operators Dimensions worked with are as follows: 1. Hilton Inn 2. Double Tree by Hilton 3. Marriot Hotel 4. Radisson Royal 5. Radisson Royal 6. Radisson 7. Iberotel 8. Cove Rotana 9. 4 Points by Sheraton 10. JAL Hotel
  • 89.